Tuesday, January 07, 2025, 17:06, Dave Neilson, , LP-FEBIAD, , , 44692-4, 42972-10, In progress, FEBIAD development
|
Tuesday, January 07, 2025, 16:00 - Target assembly installed in test stand. electrical connections assessed:
Prior to installation: oven and cathode isolated from heatshield. no shorts
After installation: Oven and Cathode 35kΩ from HVC.
Tuesday, January 07, 2025, 16:05 - pumping down to rough vacuum
Tuesday, January 07, 2025, 16:45 TP1B on. TP1A on. Pumping down
Prior to proceeding, ensure that ALL water cooling is turned on, as it was all drained and empty for the past 2 weeks.
Tuesday, January 07, 2025, 17:10 Beam line TP1 and TP2 on.
Wednesday, January 08, 2025, 09:01 chamber pressure at 1.0E-6 T, beamline pressure at 3.7E-7 T
Wednesday, January 08, 2025, 10:32 - water cooling all on. no effect on vacuum pressure.
Wednesday, January 08, 2025, 10:33 - Increased argon pressure in the gas line has no effect on vacuum pressure. it is registered on the pressure gauge at feedthrough.-
- However, roughing pump doesn't seem to be venting the argon gas line. I disconnected the copper line to the venting valve to confirm pump activity. - no activity detectable.
- removed pump from assembly. switching on by itself shows no evidence of pump functionality. When on, pump is heating to very hot temperatures. I've emailed Edi at vacuum group to investigate further.
Wednesday, January 08, 2025, 15:02 - Vacuum group says that the pump is dead. We can replace it if we'd like, but i've created a temporary solution by connecting the argon venting valve to the backing pumps. For the sake of being careful (although this may be overly cautious), we must avoid opening this venting valve without first isolating the connection from the turbo pumps via closing TSG:PV1
Wednesday, January 08, 2025, 15:04 ramping up COIL to ensure conditioning against outgassing later. vacuum appears to be stabilizing below 2e-6 T
Wednesday, January 08, 2025, 16:32 vacuum recovered, beginning to heat at 1A/30s up to 580A/230A TGHT/TBHT
Wednesday, January 08, 2025, 22:32 with COIL on, the vacuum pressure increased to ~2.2E-6 T before beginning to recover, leaving on to encourage vacuum recovery.
Thursday, January 09, 2025, 08:27 Vacuum at 1.0E-6 T. COIL off.
Thursday, January 09, 2025, 10:15 Argon gas line at 0.5 bar.a
Thursday, January 09, 2025, 10:56 increasing BIAS/EE/EZL to 30/1.5/13 kV
Thursday, January 09, 2025, 11:19 turning on optics elements. TMS:Q2 is timed out and possibly unalive. - must be investigated
Thursday, January 09, 2025, 12:38 HV at 30kV. monitoring for spark activity
Thursday, January 09, 2025, 12:53 over 15 minutes, there was just one possible spark. I see also that TPS:Q2 (quadrupole prior to FC0) seems to be half-down. i can't seem to get it to stop timing out and recharge. must investigate further
after investigating further and attempting to reset/reconfigure. I tried power cycling the canbus controller as well. In the end, controls group determined that this controller needed to be replaced.
Thursday, January 09, 2025, 14:34 all optics set. setting COIL CATHODE to 40A 120V. CATHODE is leaking 0 current. (0.000 mA readback).
Thursday, January 09, 2025, 14:37 reading 2.91e-8A at FC0 . found Argon peak at 40 exactly. MB1 current 96.4561 A
Thursday, January 09, 2025, 14:42 using COIL CATHODE scan program to optimize. (data file measure_id=9106) A local maximum was identified at 140V with 40A coil current. However, a short seems to show up when the cathode voltage reaches ~130V. it lets through only ~10mA at 130 and then will release up to at least 100mA at 140V.
As time passes, the sustained voltage drops over time, given a current limit of 100mA. it dropped to ~50V. On subsequent increases of the power supply, current begins leaking through at ~65V.
Given this, I will continue (while monitoring the cathode power supply) with a cathode coil of 50V 90A.
Thursday, January 09, 2025, 15:28 FC0 = 2.21 e-8 A. FC6 at 3.21e-10A RPM taken for all 4.
Thursday, January 09, 2025, 16:04 mass scan complete - 2025_01_09-16_01 FEBIAD no retainer 1.txt CATHODE voltage was stable at 50V throughout.
Thursday, January 09, 2025, 16:07 decreasing BIAS/EE/EZL to 0, 0, 0
Friday, January 10, 2025, 09:09 ramping BIAS/EE/EZL to 30/1.5/13 kV
Friday, January 10, 2025, 11:51 Increasing COIL and CATHODE to 90A and 50V (was able to ramp cathode up to 100V before seeing current loss)
Friday, January 10, 2025, 11:53 FC0 = 1.7e-8 A. FC6 = 4.9e-10 A wire scans taken.
Friday, January 10, 2025, 12:00 Beginning mass scan with COIL CATHODE at 90A 50V - 2025_01_10-12_28 FEBIAD no retainer 2.txt
Friday, January 10, 2025, 12:28 decreasing BIAS/EE/EZL to 0, 0, 0
Friday, January 10, 2025, 13:15 gas inflow OFF (at rough vacuum pressure). Ramping up again BIAS/EE/EZL to 30/1.5/13 kV
Friday, January 10, 2025, 14:27 FC0 = 1.22e-8A. FC6 = 2.93e-12A (at 40) . mass scan taken = 2025_01_10-14_18 FEBIAD no retainer 3 argon off.txt wire scans taken.
Friday, January 10, 2025, 14:28 TGHT TBHT cooling to 0A 0A at 1A/30s
Monday, January 13, 2025, 11:00 testing cathode isolation on cold target by ramping up cathode voltage until breakdown. At 120V, CATHODE current is 2.4mA. (125V, 8.5mA), at 130V, current limiting and dropping voltage.
Monday, January 13, 2025, 11:10 power supplies off. Winding down turbo pumps for chamber evac
Monday, January 13, 2025, 13:07 venting
|
Friday, December 20, 2024, 09:37, Dave Neilson, , , , , , , , Winter holiday shutdown
|
Friday, December 20, 2024, 09:37 turned off all 4 turbopumps. winding down prior to evacuating.
Friday, December 20, 2024, 11:43 Purged and closed all water cooling lines.
Friday, December 20, 2024, 15:54 removed target and installed Uline.
roughing down test stand
Friday, December 20, 2024, 16:17 valves closed and roughing pump off.
Friday, December 20, 2024, 16:17 shut down test stand computer for holiday break |
Tuesday, December 17, 2024, 16:09, Dave Neilson, , , , , , , Done, Anode,TGHT, TBHT power supply investigation. Resolved
|
Note, ground and HVC (high voltage common) are used interchangeably here.
Monday, December 16, 2024, in the previous test, elog 1038, it was found that the cathode was unable to hold any voltage and was shorted to HVC. The cathode was shorted directly to ground, with the cathode supply current limiting upon being powered, unable to reach even 1V.
After testing, the ANODE power supply stopped functioning and was unable to provide and voltage or current.
When the target was removed, it was found that the TBHT terminal was just ~100Ω from HVC. When I shorted the TGHT to TBHT terminal, as they are when the target is installed, the resistance from TBHT to HVC dropped to just 1Ω. Prior to the anode power supply stopping, it was found that when it was powered on with no target present, it was able to hold voltage, but still drew significant current: up to 400mA when provided less that 20V. This should be completely open, losing no current at all.
Keiko and the controls team have been looped in to address the issue with the ANODE power supply as it may be a controls issue. They believe there are a few possibilities for its error that must be investigated prior to deferring to the power supplies group. This will continue to be investigated
********** UPDATE: ISSUE RESOLVED ********* There is simply a physically triggered interlock that requires the faraday cage door to be closed to operate the ANODE power supply
When investigating the resistive short from the TBHT, I first noted the resistances between each of the channels: TGHT(-) to TGHT(+) 30↨Ω; TBHT(-) to TBHT(+) 20Ω; TBHT(-) to TGHT(-) 100Ω; TBHT(+) to TGHT(+) 140Ω. I also reconfirmed and noted relevant connections at the feedthroughs: There are NO visible shorts to HVC from the TGHT or TBHT feedthroughs. From TGHT(-), there is one 50kΩ resistor with varistor, between TGHT(-) and TGHT(+) there is a100Ω with varistor. I then removed the back of the faraday cage to investigate possible paths to ground from the TGHT and/or TBHT. This showed that TGHT- was grounded through a varistor (checked, functioning correctly, OL at low voltage), TGHT- to + has varistor||100Ω, TBHT- to + has varistor||100Ω, and TBHT- to TGHT- has varistor||100Ω. These fit in accordance with the observed resistances between the terminals.
I also disconnected the ANODE power supply from its output wire to further investigate without possible issues from the power supply. At this point, (after I had remade the varistor connections) I began to observe that the TGHT and TBHT terminals were all detached from ground by 50kΩ (expected amount, given that there is a 100k||100k resistor from TBHT- feedthrough to ground). When I reattached the anode power supply, that value dropped to 35kΩ, I assume due to internal resistance of the power supply. I placed everything back in position and (repeatedly) ensured that the 35kΩ separation persisted. It seems that this shorting issue has resolved itself. It may be that the was an accidental connection made from an unshielded wire inside the faraday cage.
|
Tuesday, December 17, 2024, 09:46, Dave Neilson, , , , , , 45235-26, In progress, SIS P2N source cup testing
|
Monday, December 16, 2024, 3:34 Target loaded in test stand. Confirmed correct connection to mass marker power supply through multipin. Bottom left pin (5 PS - ) connected to grounded side of the filament, top right pin (2, PS +) connected to top end of filament.
Tuesday, December 17, 2024, 09:30 Turbo pumps on
Tuesday, December 17, 2024, 16:21 water cooling on. No effect on vacuum. Vacuum stable at 1.18e-6T
Tuesday, December 17, 2024, 16:41 ramping TGHT TBHT at 1A/30s
Wednesday, December 18, 2024, 10:00 slowly increasing BIAS/EE/EZL to 30/2.5/13 kV
Wednesday, December 18, 2024, 11:40 BIAS EE EZL at 30 2.5 13 kV. 1 spark at 28kV, and there was a downward spike in the TGHT current when bias was at 28.5 kV
Wednesday, December 18, 2024, 11:41 FC0 reading 1.6E-10 A. quite low for total beam, but this is likely due to this target being hot so many times.
Wednesday, December 18, 2024, 11:51 wire scans taken (RPM0)
Wednesday, December 18, 2024, 11:54 FC) extracted for mass scan - mass scan beginning now . Background record appears to be functioning well, although it is high. comparatively to old tests. It could be that those old tests were recording irregularly low background, given the temporary solution that was implemented.
Wednesday, December 18, 2024, 12:13 it seems that a spark took down many optics elements. Going to allow conditioning at 30kV for a while before restarting . - optics elements down due to pressure sensor TMS:IG6 timing out. Vacuum group notified. Will likely bypass the interlock temporarily if it cannot be fixed fast. This should get a more permanent solution as it has failed a number of times before.
Wednesday, December 18, 2024, 13:06 sparks are occurring on average approximately once every 10 minutes. they don't seem to be tripping of any supplies or optics (after IG6). but this spark frequency is significantly higher than observed on other targets lately.
Wednesday, December 18, 2024, 13:24 restarting Mass scan with IG6 interlock forced by. scan name - 2024-12-18_13-47 SISP2N mmOFF.txt
Wednesday, December 18, 2024, 13:51 put FC0 back in, preparing to heat up mass marker. will plan to ramp to 3A to match previous MM tests. also, no sparks in the past 40 minutes, it appears they have subsided. additionally, IG6 has been fixed by vacuum group
Wednesday, December 18, 2024, 14:15 mass marker power supply is not connecting. When attempting to write to its IP address it times out. Had to drop the HV in order to investigate. Have enlisted controls group to aid as it appears to be connected and should be functional.
Wednesday, December 18, 2024, 14:30 had to reset the computer connection to the network 192.168.5. by unplugging and plugging in the usb ethernet connection at computer. situation resolved.
Wednesday, December 18, 2024, 14:40 HV back up and now increasing the mass marker current from 0A to 3A, at 0A, FC0 current is 1.4e-10, very close to previously recorded FC0 mm0A value.
Wednesday, December 18, 2024, 14:56 with mm current at 3.0A, requiring 6V, FC0 current is 2.1e-10 A.
Wednesday, December 18, 2024, 14:58 withdrawing FC0 to take mass scan
Wednesday, December 18, 2024, 15:25 mass scan complete: filename 2024-12-18 15-23 SISP2N mmON.txt
Wednesday, December 18, 2024, 15:27 further increasing mm current to 4.0A. FC0 current increasing noticeably. waiting for plateau. FC0 at 6.6e-10A. wire scans taken
Wednesday, December 18, 2024, 15:39 new mass scan: 2024-12-18 15-53 SISP2N mmON 4A.txt
Wednesday, December 18, 2024, 15:52 mm power supply turned off. 0A.
Wednesday, December 18, 2024, 15:53 rescan of high mass region. still a residual indium mass peak present. will scan again after cooling more.
Wednesday, December 18, 2024, 16:10 mass scan captured that shows the indium peak almost masked in background
Given that the indium peak for 3A was significantly lower than with a regular SIS source cup, i recommend that this target is heated up with the regular source cup again to compare.
Wednesday, December 18, 2024, 16:11 dropping HV EE EZL to 0V
Wednesday, December 18, 2024, 16:13 cooling target to 0/0A at 1A/30s
|
Tuesday, December 10, 2024, 14:38, Isaiah Rabuka, , , , , , , ,
|
Tuesday, December 10, 2024, 14:38 Depressurized ATTS using argon, switched out samples, and repressurized ATTS. Heated new sample to 1000 degrees Celsius.
|
Friday, December 06, 2024, 16:03, Isaiah Rabuka, , , , , , , ,
|
Friday, December 06, 2024, 16:03 Heated and cooled a sample in the ATTS 3x |
Thursday, December 05, 2024, 15:38, Dave Neilson, , LP-FEBIAD, , , 44692-4, 42972-10, , FEBIAD development
|
Tuesday, December 02, 2024, 15:35 - Target loaded into the test stand
Thursday, December 03, 2024, 14:33 - as per elog entry 1033, test stand has been changed to CATHODE mode, and wiring within the Faraday cage has been altered appropriately. Additionally, a GeMov resistor has been added to potentially reduce the sparking problems that have previously tripped the TGHT power supply
Thursday, December 04, 2024, 10:00 - Roughing pump having trouble reaching suitable vacuum - possible replacement required.
Thursday, December 05, 2024, 13:37 - Turbo pumps on
Monday, December 09, 2024, 09:51 Vacuum at 3e-7 T
Monday, December 09, 2024, 12:10 Water cooling switched on, monitored vacuum. No change to vacuum.
Monday, December 09, 2024, 16:58: TGHT / TBHT ramping to 580A/230A at 1A/30.
Tuesday, December 10, 2024, 11:14 increasing COIL current 10A at a time, monitoring vacuum pressure
Tuesday, December 10, 2024, 18:42 COIL at 100A after allowing pressure to fall to reasonable levels throughout the day. allowing to stabilize for a few hours.
Tuesday, December 10, 2024, 19:00 vacuum plateauing now, awaiting decrease to 1/3 of peak before reducing COIL to zero
Tuesday, December 10, 2024, 19:37 - vacuum at 9.9e-7T. dropping COIL to 0A
Wednesday, December 11, 2024, 10:27 increasing BIAS/EE/EZL to 30/1.5/13 kV
Wednesday, December 11, 2024, 11:30 TGHT TBHT adjusted to 490/290A
Wednesday, December 11, 2024, 13:47 degaussing script not currently available. For now. will examine beam extracted at CAT=120V COIL=40A
Wednesday, December 11, 2024, 14:27 The CATHODE is completely shorted. cannot hold even 1 volt and is currently limited immediately upon switching on cathode bias power supply.
Wednesday, December 11, 2024, 15:02 dropped bias/ee/ezl to 0
Wednesday, December 11, 2024, 15:02 Must cool target to investigate Cathode short. Prior to installation, target isolation was confirmed. If the cathode dropped to contact the copper plate shielding the coil, this would be evidence to support keeping the retainer.
Thursday, December 12, 2024, 09:24 after cooling, cathode power supply was checked to see if shorted and it is indeed still shorted out.
Thursday, December 12, 2024, 09:25 turning off turbo pumps to spin down
Thursday, December 12, 2024, 11:30: venting chamber
Friday December 13: after venting the chamber and removing the target. The target appears to be unshorted and intact. However, upon inspection of the test stand, there appears to be a ~100Ω load between the cathode and ground. This load is able to sustain voltage from the cathode power supply, but draws a significant amount of current. It is too much for operation, and might be further aggravated by the presence of the target. Further, when the TGHT and TBHT terminals are shorted together, the resistance from cathode to ground drops to ~1Ω. Perhaps this could be associated with the installation of the TGHT power supply, as FEBIAD has not been run on this machine since it was installed. Wiring at the feedthroughs as been quadruple checked, I don't believe that the problem lies there.
With no target in place, the cathode was able to hold a voltage, despite drawing 100+mA current. However, I was unable to repeat further tests, as the power supply stopped responding. Despite ramping up to ~10V in epics, the readback is 0V/0A, unlike before.
|
Thursday, December 05, 2024, 14:06, Isaiah Rabuka, , , , , , , ,
|
Thursday, December 05, 2024, 14:05 Pressurized ATTS with argon, swapped out samples, and repressurized and heated chamber. |
Thursday, December 05, 2024, 11:08, Aaron Schmidt, , , , , , , Problems/Solutions, Swap RP1 & Inspection (ITS Pumps)
|
Thursday, December 05, 2024, 11:04: RP1 was struggling to pump down. RP SN: MY20055A02 removed. Tip seal replacement likely req'd.
Swapped with a new roughing pump SN: MY2340SA06 (Voltage set to 115V. Shipping locks loosened prior to install)
Ballast filter installed.
Thursday, December 05, 2024, 11:05: Roughing.
Thursday, December 05, 2024, 11:10: Vacuum pressure dropping optimally. Down below 1T already
Thursday, December 05, 2024, 11:47: TP & other RP ok. Note TP1A is getting louder on startup. Will likely need a change out in Q1 - 2025.
Additional source tray inspection:
Monday, December 16, 2024, 15:30: OK
Images attached. |
Wednesday, December 04, 2024, 15:43, Isaiah Rabuka, , , , , , , ,
|
Wednesday, December 04, 2024, 15:42 Depressurized the ATTS |
Tuesday, December 03, 2024, 15:49, Isaiah Rabuka, , , , , , , ,
|
Tuesday, December 03, 2024, 15:48
Switched out pellets in ATTS, brought pressures down to ~10 uTorr, heated and cooled sample. |
Tuesday, December 03, 2024, 14:55, Dave Neilson, , , , , , , Done, Power supply changed to CATHODE mode (-)
|
Tuesday, December 03, 2024, 14:55 ANODE/CATHODE power supply switched to cathode mode, NEGATIVE |
Thursday, November 28, 2024, 13:47, Isaiah Rabuka, , , , , , , ,
|
November 28, 2024 1:46PM
Checked in on sample in ATTS. |
Thursday, November 28, 2024, 11:47, Isaiah Rabuka, , , , , , , In progress, Heating Stage Pellet Testing and Development
|
Opened the ATTS, placed what I will call “Cast Alumina Sample #1” into the ATTS and activated the roughing then turbo pumps. Currently sample is in slow heating progress to 1000 degrees Celsius, process is expected to take some time, so I'll revisit after lunch.
|
Tuesday, November 19, 2024, 14:25, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Tuesday, November 19, 2024, 14:25: Roughing |
Wednesday, November 13, 2024, 14:36, Aaron Schmidt, UC#(47) - Not included, LP-SIS, ITE, TM3, 44691-8, 45235-24, In progress, Conditioning UC#47 (Assembly only)
|
Gas line is attached.
Wednesday, November 13, 2024, 14:18: Roughing.
Wednesday, November 13, 2024, 18:20: Closed backing valves. Vacuum @ 2.140 T?
Thursday, November 14, 2024, 06:23: Venting manually.
Thursday, November 14, 2024, 06:50: Left line slightly un-seated. Swapped out waterline gaskets. Close. Roughing.
Thursday, November 14, 2024, 07:22: TP1B on.
Thursday, November 14, 2024, 07:33: Backing pressure below 0.100T. TP1A on.
Thursday, November 14, 2024, 07:43: TP1A Tripped. Backing pressure @ 0.067T.
Thursday, November 14, 2024, 07:47: TP1B off to bring backing pressure below 0.050T.
Thursday, November 14, 2024, 07:56: Re-opened & Restarted TP1B
Thursday, November 14, 2024, 08:38: Re-closed. Will have to allow TP to spin down before opening the vent valve to give the interlock a reset. (We should remove that or have a bypass in the future)
Thursday, November 14, 2024, 08:46: Coordinated opening BV1A & BV1B simultaneously from 2 computers to bypass the interlock. Success. TP1B. On & green. TP1A started.
Thursday, November 14, 2024, 08:52: TP1A at speed (Green) Teamwork makes the dream work!!! IG1 on.
Thursday, November 14, 2024, 13:41: Vacuum @ 1.10e-06T. Waterline FS#5 open. Vacuum ok.
Thursday, November 14, 2024, 13:43: Power / Sources on.
Thursday, November 14, 2024, 13:46: Checks. TGHT / TBHT to 5/5A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. OK. Tap back down. Allow vacuum to drop further. Ready for operation.
Thursday, November 14, 2024, 13:48: Open IV4. Timed out. Tighten sensor. Reset. Open IV4.
Friday, November 15, 2024, 05:25: Vacuum @ 4.23e-07T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Friday, November 15, 2024, 09:01: Vacuum @ 6.01e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Friday, November 15, 2024, 11:46: Optics on.
Friday, November 15, 2024, 11:54: TGHT tripped completely off & was unable to restart while turning up the HV. Was at 580 A. BIAS / EE / EZL was tapped up to near 27.5 / -1.5 / 13 kV.
Friday, November 15, 2024, 12:05: Verified nothing appears to have burnt up or similar. Unable to begin auto-cooling on TBHT as it requires both heater PS to operate. Will tap down TBHT manually. TGHT is set @ 0A.
Friday, November 15, 2024, 12:11: TBHT tapped down to 0A.
Friday, November 15, 2024, 12:14: Once at 0 A, the TGHT PS status turned from red to black??? Was able to reset & turn it back on. Brought it up to 5 A. That's different.
Friday, November 15, 2024, 12:23: Sources PS off. Will re-ramp on Monday.
Monday, November 18, 2024, 07:24: Vacuum @ 2.43e-07T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.
Monday, November 18, 2024, 09:17: Vacuum @ 2.69e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, November 18, 2024, 13:02: Sources / Optics On.
Monday, November 18, 2024, 13:08: BIAS / EE / EZL to 20 / -1.5 / 13 kV.
Monday, November 18, 2024, 13:10: BIAS / EE / EZL to 27 / -1.5 / 13 kV.
Monday, November 18, 2024, 13:20: TGHT Shut off again during a mass scan!
Monday, November 18, 2024, 13:22: Restarted TGHT. This is problematic. TGHT @ 580A.
Monday, November 18, 2024, 13:25: Redo mass scan.
Monday, November 18, 2024, 13:59: Mass / wire scans complete. HV to 0 kV.
Monday, November 18, 2024, 14:00: Auto-cooling @ 2 A per min.
Tuesday, November 19, 2024, 10:04: IV4 closed
Tuesday, November 19, 2024, 10:06: Sources off.
Tuesday, November 19, 2024, 10:07: IG1 & TP off.
Tuesday, November 19, 2024, 11:16: Power off / lockout. FS#5 purged. Venting. |
Tuesday, November 05, 2024, 16:40, Brady Borrmann, UC #24D (Assembly only), LP-IG-LIS, , , , 44972-5 / 42972-9, In progress, Conditioning UC#24D Assembly
|
42972-5 Base / 42972-9 Lid
Tuesday, November 05, 2024, 16:30: Roughing.
Tuesday, November 05, 2024, 17:04: TP1B on.
Tuesday, November 05, 2024, 17:13: TP1A on.
Tuesday, November 05, 2024, 17:21: IG1 on @ 2.41e-05T
Wednesday, November 06, 2024, 10:35: Vacuum @ 5.75e-07T. Waterline FS#5 open.
Wednesday, November 06, 2024, 16:24: TGHT/TBHT ramping to 580/230A at 2A/min
Thursday, November 07, 2024, 09:16: Increasing BIAS/EE/EZL to 30/2.5/13 kV slowly
Thursday, November 07, 2024, 11:26: as expected, no beam out to FC0. slowly increasing to bias to 45kV alongside ezl to 28kV
Thursday, November 07, 2024, 11:27: TGHT dropped out for 1s. Did not register a trip or anything. simply jumped down to 0A and immediately recovered.
Thursday, November 07, 2024, 14:40: At 45kV, there were no sparks noticed. The target assembly was brought down to 0V and ramped down to 0A/0A at -2A/min
Wednesday, November 13, 2024, 09:15: PS Off. TP off - AS.
Wednesday, November 13, 2024, 11:26: VV1 opened - BB. |
Thursday, October 31, 2024, 13:53, Aaron Schmidt, , , , , , , In progress, Chamber empty & Fix IG6
|
Thursday, October 31, 2024, 13:53: Roughing down empty chamber. U-Line installed.
Monday, November 04, 2024, 11:40: Vent beamline.
Monday, November 04, 2024, 13:40: 1/2 operating filament spare provided & installed. Roughing beamline section.
Monday, November 04, 2024, 13:51: TMS:TP2 on.
Monday, November 04, 2024, 13:57: TMS:TP6 on. TMS:IG6 on.
Tuesday, November 05, 2024, 15:00: Venting Chamber
Tuesday, November 05, 2024, 15:19: IG6 still displaying issues. Contacted Edi,
Tuesday, November 05, 2024, 15:35: Controller replaced. Switch to Filament 2. IG6 on. Reading 3.73e-07T.
Wednesday, November 13, 2024, 09:16: IG6 is tripped again.
Wednesday, November 13, 2024, 09:17: Reset & switched back to Filament 2. There is no filament 1. Reading 3.91e-07T. |
Tuesday, October 29, 2024, 18:25, Aaron Schmidt, UC#46 (assembly only), LP-IG-LIS, ITW, TM4, , 42972-6 / 39956-1, In progress, Conditioning UC#46 Assembly
|
42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20: Roughing.
Tuesday, October 29, 2024, 18:52: TP1B on.
Tuesday, October 29, 2024, 18:58: TP1A on.
Tuesday, October 29, 2024, 19:06: IG1 on.
Wednesday, October 30, 2024, 07:23: Vacuum @ 8.25e-07T. Waterline FS#5 open.
Wednesday, October 30, 2024, 07:25: Power on.
Wednesday, October 30, 2024, 07:32: PS for TGHT keeps timing out? Goes red. Won't start.
Tapped up TBHT to 10 A. TGHT?
Wednesday, October 30, 2024, 08:20: Manually cycled the PS. No longer trips.
Tapped up TGHT to 5 A. OK
Wednesday, October 30, 2024, 08:26: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Wednesday, October 30, 2024, 14:32: Auto-cooling @ 2 A per min.
Thursday, October 31, 2024, 08:30: TP/ IG1 off.
Thursday, October 31, 2024, 12:52: Venting. |
Wednesday, October 09, 2024, 13:29, Dave Neilson, , , , , 44691-8 , 45235-26 , , Retainer tests - with mass marker target
|
Wednesday, October 09, 2024, 11:28 Target loaded, remote power supply added for mass marker, negative channel on pin 5, positive channel on pin 7.
Wednesday, October 09, 2024, 11:50 roughing
Wednesday, October 09, 2024, 12:51 Turbo pumps TP1A TP1B on
Thursday, October 10, 2024, 09:27: Water cooling turned on. no effect on vacuum (2.6e-6T)
Thursday, October 10, 2024, 09:45: Increasing TGHT TBHT to 150/150A at 1A/30s
Thursday, October 10, 2024, 11:07 TGHT TBHT at 120/120A . increasing TGHT TBHT to 580/230 at 1A/10s
Thursday, October 10, 2024, 12:29 during the current increase, when TBHT was at 230 and TGHT reached ~460, the TBHT current began decreasing. Upon inspection, the TBHT voltage is higher than normal and hitting its limit. It may be that there is another current path. that is, it may be shorted.
as TGHT increases, TBHT voltage continues to increase. TGHT voltage is similarly higher than usual, at 6V to deliver 500A.
on another note, the vacuum value has been increasing slowly throughout heating, possibly due to the presence of indium within the mass marker reservoir, or simply because this target has not been hot for some time. Leaving TGHT at 502A for the time being.
Thursday, October 10, 2024, 13:34 Increasing BIAS/EE/EZL to 30/2.5/13 kV.
Thursday, October 10, 2024, 14:27 beginning mass scan - reservoir at 0 A. (reservoir contains solid Indium) - mass scan res In 0A
Thursday, October 10, 2024, 15:19 increased current through reservoir with magnet sitting at mass 115 - noticeable increase in Indium presence in beam beginning at ~2.5A. Brought res current to 3.0A, waited for FC6 current to plateau.- at 5e-10A
Thursday, October 10, 2024, 15:27 mass scan run again
Thursday, October 10, 2024, 15:57 res current decreased to 0A
Thursday, October 10, 2024, 15:57 dropping voltages to 0V
Thursday, October 10, 2024, 16:12 voltages at 0, decreasing TGHT TBHT at 1A/30s |
Monday, October 07, 2024, 09:54, Aaron Schmidt, , , , , , , , Pump down empty chamber / IG6 fix
|
Monday, October 07, 2024, 09:54: Roughing. U-Line installed on HS waterline.
Monday, October 07, 2024, 10:34: Vent Chamber. TP6 & TP2 off. |
Thursday, October 03, 2024, 16:26, Aaron Schmidt, Ta#68, HP-SIS, ITE, TM2, 45447-26, 45235-16 *, , Conditioning Ta#68
|
HS note:
Base# 45235-16
Lid# 39956-8
Thursday, October 03, 2024, 16:04: Roughing. IG6? Error?
Thursday, October 03, 2024, 16:24: BV1A open.
Thursday, October 03, 2024, 16:32: TP1B on
Thursday, October 03, 2024, 16:43: TP1A on.
Thursday, October 03, 2024, 16:51: IG1 on.
Thursday, October 03, 2024, 20:01: Water cooling on. No effect to vacuum. TGHT TBHT ramping at 1A/30s to 580A/230A
Friday, October 04, 2024, 09:13 : Slowly increasing BIAS/EE/EZL to 30/2.5/13 kV.
Friday, October 04, 2024, 09:30: problem with TMSIG6 (low pressure sensor in beam line). Forced on for interlocks temporarily.
Friday, October 04, 2024, 11:14 mass scanned - FC6 background working. filename = 2024-10-04--11-11 HP-Ta-24D - scan 3.txt
Friday, October 04, 2024, 11:14 repeating mass scan. filename = 2024-10-04--11-40 HP-Ta-24D - scan 4.txt
Friday, October 04, 2024, 11:53 increasing to bias 50kV / ezl 33kV.
Friday, October 04, 2024, 12:34: BIAS/EZL at 50/33 kV. Leaving for HV conditioning.
Friday, October 04, 2024, 12:43 one spark from HV BIAS to ground caused TGHT to trip. Current was restored within 10s.
Friday, October 04, 2024, 15:31: decreasing BIAS/EZL to 30/13kV. Throughout time at high voltage, there were 3 sparks. Two were within 5 minutes of each other, and the last 2 hours proceeded without incident (no sparks)
Friday, October 04, 2024, 15:47 BIAS EZL at 30/13 kV. running final mass scan. background FC6 appears not to be working again. but then restored. scan file name = 2024-10-04--16-30 HP-Ta-24D - scan 5.txt
Friday, October 04, 2024, 16:22 decreasing biases to 0V
Friday, October 04, 2024, 16:23 ramping TGHT TBHT to 0/0A at -1A/30s
Monday, October 07, 2024, 07:58: IV4 closed. IG1 off. TP off.
Monday, October 07, 2024, 08:43: PS off. Waterlines purged. Venting.
|
Friday, September 20, 2024, 14:22, Aaron Schmidt, Ta#, LP-SIS, ITE, TM2, 45447-18, 45235-13, , Conditioning Ta#
|
https://elog.triumf.ca/TIS/Target+Production/146
Has not run through EVAP2.
Friday, September 20, 2024, 14:04: Roughing.
Friday, September 20, 2024, 14:39: TP1B on
Friday, September 20, 2024, 14:45: TP1A on.
Friday, September 20, 2024, 14:54: TP1A at speed. IG1 on.
Monday, September 23, 2024, 16:38 Water cooling on. no effect on vacuum pressure. Pressure at 6.0e-7T
Monday, September 23, 2024, 17:00 Ramping TGHT and TBHT to 580/230A at 1A/30s
Tuesday, September 24, 2024, 08:58 TGHT at 502A. Ramping program preventing further ramp up do to 'good vacuum' restriction at 1e-6T as outgassing is pushing up the chamber pressure. Increased good vacuum parameter to 5e-6T, resuming ramp up to 580A at 1A/30s.
Tuesday, September 24, 2024, 11:12: TGHT TBHT at 580/230A. Increasing BIAS/EZL/EE to 30/13/2.5 kV slowly.
Tuesday, September 24, 2024, 14:16: mass scan at high voltage completed - 2024-09-24--14-11 LP-Ta-24C - scan 1
Tuesday, September 24, 2024, 14:17 background signal recording problem persists, despite channel change conducted with controls team and Keiko - will continue to investigate switching to current integrators
Tuesday, September 24, 2024, 14:17 ramping up HV BIAS to 50kV for conditioning, alongside increased EZL voltage
Tuesday, September 24, 2024, 17:00 BIAS was stable at 50kV for 30min. no noticeable sparking.
also noted that the mass scan data was saved incorrectly. however, there are multiple screen captures of the mass scan which clearly detail which peaks are present.
HV elements decreased to zero and target was left hot overnight for outgassing and so beam content can be re-evaluated
Wednesday, September 25, 2024, 10:24 increasing BIAS/EZL/EE to 30/13/2.5 kV slowly.
Wednesday, September 25, 2024, 13:25 two mass scans conducted: 2024-09-25--12-39 LP-Ta-24C - scan 2, 2024-09-25--13-22 LP-Ta-24C - scan 3
Wednesday, September 25, 2024, 13:26 ramping down high voltages. |
Tuesday, September 10, 2024, 16:24, Dave Neilson, TiC #24D, HP-SIS, ITW, TM3, 45447-27, 45235-25, , Back up target testing and conditioning
|
Tuesday, September 10, 2024, 16:21: Target installed in test stand by Brady
Tuesday, September 10, 2024, 16:21: roughed down and turbo pumps now on.
Tuesday, September 10, 2024, 20:27 Pressure at 4.9e-6, increasing TGHT TBHT to 580A/230A at 1A/30s
Wednesday, September 11, 2024, 10:00 The TGHT TBHT parameters were mistakenly reversed during heating. TBHT was dropped to 230A and TGHT increased to 580A at 1A/30s.
Wednesday, September 11, 2024, 13:50 TGHT TBHT at 580 230. Increasing BIAS/EE/EZL to 30/2.5/13 kV.
Wednesday, September 11, 2024, 14:36 At high voltage, on FC0 there is an output beam current of 1.85e-7 A.
Wednesday, September 11, 2024, 14:49 Mass scan recorded. 2024-09-11 HPTiC-24D - scan 1.txt ... FC6 problem with recording background level data persists
Wednesday, September 11, 2024, 15:53 increasing BIAS and EZL to condition high voltage
Wednesday, September 11, 2024, 16:32 at 37kV (EZL 22kV), TGHT timed out and cut the current to the target. I elected to leave it cold rather than suddenly reheating it, and am cooling down TBHT at -1A/30s, while continuing to increase BIAS for conditioning.
there have been no sparks at all and I'm unsure of what precipitated this event. None of the 'trip indicators' on the TGHT panel lit up during this event. I will bring this up with Keiko/Roberto tomorrow Sept 12.
Wednesday, September 11, 2024, 17:06 one spark occurred at 49kV
Wednesday, September 11, 2024, 17:15 now at 50kV, EZL at 33kV. Over 30 minutes there was just one spark at the HV bias.
Wednesday, September 11, 2024, 17:50 decreasing high voltage elements to 0 0 0. |
Friday, September 06, 2024, 12:08, Dave Neilson, , , , , , , Done, Test Stand repair/update
|
Friday, September 06, 2024: New TSH:TGHT power supply has been installed and is now functional. Magna-Power TSD-900/208. The TSH:TBHT power supply has also been cleaned, and the COIL power supply replaced with a duplicate that should function identically.
|
Tuesday, August 13, 2024, 09:31, Dave Neilson, , , , , , , Problems/Solutions, Troubleshooting HV sparks and FC0 signal
|
Monday, August 12, 2024, 17:00 EOD. target installed, roughed, turbos on. No effect on vacuum from turning on water cooling lines. TGHT TBHT slowly brought to 230A/230A overnight.
Tuesday, August 13, 2024, 09:28. Vacuum at 9.9e-7T. TGHT TBHT at 210/210. accelerating heating to 230/230. bringing up HV EZL EE to 30 / 2.5 / 13 kV
Tuesday, August 13, 2024, 09:51. with EZL 13kV, EE 2.5kV. When increasing BIAS from 17.0 to 17.5kV. Signal becomes detectable on FC0, at 7.75e-10A
Tuesday, August 13, 2024, 10:13 at BIAS 30kV. FC0 and wire scanners appear to be working correctly. FC0 reading 2.66e-8A
Tuesday, August 13, 2024, 10:13 turning on all beam optics for FC6 mass scan.
Tuesday, August 13, 2024, 10:31 mass scan procedure is doing a very poor job of recording the background noise. filename 2024-08-13_10-44 Ksalt mm 230-230
Tuesday, August 13, 2024, 10:46 increasing tght to 330
Tuesday, August 13, 2024, 10:59 FC0 at 2.1e-8A
Tuesday, August 13, 2024, 11:12 running mass scan at TGHT TBHT = 330/230 A. filename 2024-08-13_11-21 Ksalt mm 330-230
Tuesday, August 13, 2024, 11:23 increasing TGHT to 430
Tuesday, August 13, 2024, 11:29 three sparks within 2 min at TGHT 378A. (no sparks at all previous to this). TGHT ramp aborted.
Tuesday, August 13, 2024, 11:36 resuming TGHT increase after 6 minutes of no sparks.
Tuesday, August 13, 2024, 11:51 FC0 reading 1.6e-8. FC0 signal fluctuating throughout test. rises during ramp and drops during static TGHT TBHT level.
Tuesday, August 13, 2024, 11:53 running mass scan at TGHT TBHT 430/230 A . filename 2024-08-13_12-16 Ksalt mm 430-230
Tuesday, August 13, 2024, 12:17 increasing TGHT to 530A.
Tuesday, August 13, 2024, 12:31 FC0 at 3.03e-8 A
Tuesday, August 13, 2024, 12:31 beginning mass scan - filename 2024-08-13_13-02 Ksalt mm 530-230
Tuesday, August 13, 2024, 13:02 increasing TGHT to 580A
Tuesday, August 13, 2024, 13:13 FC0 at 3.58e-8A. beginning mass scan - filename 2024-08-13_13-35 Ksalt mm 580-230
Tuesday, August 13, 2024, 13:37 increasing bias to test sparking
Tuesday, August 13, 2024, 13:58 at 37kV, a number of optics elements prior to FC0 went down. no voltage or current spikes
Tuesday, August 13, 2024, 13:59 at 42.4kV, a couple sparks, seem to involve TGHT and BIAS. these dropped a few optics elements. when I brought them back up, they went down again, at a time with no voltage or current spikes.
Tuesday, August 13, 2024, 14:30 at 43.6kV, the sparking frequency became regular, with HV bias sparks occurring approximately every 5 minutes
Tuesday, August 13, 2024, 17:00 considerable time was spent until end of day manipulating the bias and the TGHT current level in an effort to discover the location of the regular sparking
increases in HV were found to increase the frequency of sparking, and eventually the HV increase was found to hit a threshold where the current would increase noticeably, with a stable voltage. this was accompanied by a buzzing coming from the feedthroughs on top of the cage. seemed to be coming from the TGHT(+) feedthrough. At no time did there appear to be sparking within the chamber of the test stand. In one instance, with HV just below the threshold of buzzing, increasing TGHT seemed to induce the buzzing state.
Wednesday, August 14, 2024, 11:16 ramping up bias to HV. intending to push HV today to find the source of these sparks and buzzing. initially, will be observing this with TGHT TBHT at 180/180 A
Wednesday, August 14, 2024, 11:47 at BIAS = 32.6kV (with EE 2.5 kV and EZL 13 kV), HV appears to be stable. Yesterday, we observed a fluctuating BIAS current which seemed to culminate in regular sparking activity (although this was at voltages of >40kV)
Wednesday, August 14, 2024, 12:26 at bias = 38.8kV, there was a significant accompanying increase in BIAS current, but no evidence of sparking or buzzing
Wednesday, August 14, 2024, 12:46 at BIAS = 49.2kV, the buzzing begins. On the strip tool this is also seen as a large jump in current, with stable voltage
Wednesday, August 14, 2024, 12:49 dropping the bias by ~1kV stopped the buzzing. ramping up quickly again caused a spark and more buzzing. increasing the voltage to attempt to locate the source.
Wednesday, August 14, 2024, 13:18 at bias of 49.2kV, buzzing began. dropping the bias stopped it. to attempt to locate the source, we increased the bias significantly. At 53kV, the bias power supply began to current limit. when this was increased, a spark caused the putty connection at the test stand to disconnect and two turbo pumps to trip off. once restored, another increase of the bias eventually caused a large spark when trying to locate the buzzing sound. Again, it seems to be at the feedthroughs of TGHT TBHT. My guess is TGHT+, but there is nothing visual to confirm it is coming from there. This buzzing state is also accompanied by a drop in EZL current to 0 and a large increase in EZL voltage readback.
Wednesday, August 14, 2024, 15:05 dropped the HV and removed the cage to investigate any issues. we propose that this likely involves jumping to the einzel lens and are curious if raising the EZL voltage significantly would prevent this state from recurring. cage back on, raising HV
Resuming testing after TGHT TBHT power supply updates:
Friday, September 06, 2024, 12:09: Ramped up TGHT and TBHT to ~170A at 1A/30s. Increasing ramp rate to 1.7A/10s up to 580A/230A
Friday, September 06, 2024, 14:11 slowly increasing BIAS, EE and EZL to 30kV, 2.5kV, 13kV
Friday, September 06, 2024, 15:53 appears that FC0 and wire scanners are working normally. However, there is a threshold reading problem with FC6. seems that a negative readout is present on FC6 if there is no substantial signal, and then nothing is recorded to the mass scans.
Friday, September 06, 2024, 15:54 increasing voltage to test high voltage sparking (BIAS AND EZL)
Friday, September 06, 2024, 16:23 after resetting the FC6 polarity and the FC6 bias, the background signal began showing up.
Tuesday, September 10, 2024, 12:19 Test stand vented, target removed. |
Friday, August 09, 2024, 21:08, Ferran Boix Pamies, Ta#67 Thin foils , LP-SIS, ITE, TM4, 45447-14 , 45235-10, In progress, Ta#67 thin foil retesting
|
Friday, August 09, 2024, 21:07 Insulators, retainer and Re foil have been replaced, source cup machined so the ion source does not short against it. Venting TS now.
Friday, August 09, 2024, 22:17 Roughing.
Friday, August 09, 2024, 22:35: TP1B on. - AS
Friday, August 09, 2024, 22:42: TP1A on. - AS.
Friday, August 09, 2024, 22:50: Both TP at speed. 2.65e-05T Vacuum. FS#5 open.
Friday, August 09, 2024, 22:52: PS on. - AS.
AS:
Saturday, August 10, 2024, 07:02: TGHT / TBHT @ 26 / 5 A. BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TGHT tapped back down to 5 A.
Saturday, August 10, 2024, 07:05: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Saturday, August 10, 2024, 07:27: Halt ramping @ 45 / 45 A. Set auto-ramping TGHT / TBHT to 500 / 230 @ 2 A per min. Optics are set.
Saturday, August 10, 2024, 09:59: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. TGHT / TBHT @ 321 / 230 & still ramping. One spark on tap up.
Saturday, August 10, 2024, 10:02: Small peaks on RPM0A & RPM0B. No signal on FC0. One spark*.
Saturday, August 10, 2024, 10:07: Spark*
Saturday, August 10, 2024, 10:11: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TGHT / TBHT @ 344 / 230 & still ramping.
Saturday, August 10, 2024, 11:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV
Saturday, August 10, 2024, 11:38: 1 spark*
Saturday, August 10, 2024, 11:40: TGHT / TBHT @ 500 / 230 A. FC0 & wire scans produced signals / peaks.
Saturday, August 10, 2024, 11:45: Starting mass scan.
Saturday, August 10, 2024, 12:17: Mass scan taken. Wire scans on Mass 27 taken. Signals noted on mass 40 & 138 approx. Also of note. One large spark. Steerers reset. Signal on TGHT current.
https://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2024_07_26_Ta_67_thinfoil_1st_massscan.txt
Saturday, August 10, 2024, 12:21: Begin HV Check.
Saturday, August 10, 2024, 12:24: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Saturday, August 10, 2024, 12:28: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Saturday, August 10, 2024, 12:44: Began sparking after 40. Brought back down
Saturday, August 10, 2024, 12:56: HV @ 0 kV.
Saturday, August 10, 2024, 13:05: BIAS / EE / EZL @ 30 / -1.5 / 13 kV
Saturday, August 10, 2024, 13:07: BIAS / EE / EZL @ 35 / -1.8 / 15 kV
Saturday, August 10, 2024, 13:10: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Saturday, August 10, 2024, 13:24: Spark* reset optics.
Saturday, August 10, 2024, 13:44: BIAS / EE / EZL @ 30 / -1.5 / 13 kV
Saturday, August 10, 2024, 14:03: HV to 0 kV.
Saturday, August 10, 2024, 14:12: Begin Auto-cooling @ 2 A per min.
Monday, August 12, 2024, 05:43: Sources Off. IV4 Closed.
Monday, August 12, 2024, 05:45: IG1 & Chamber TP off.
Monday, August 12, 2024, 07:46: TS Computer rebooted. IV4 reset. PS off. Venting. |
Tuesday, August 06, 2024, 15:50, Aaron Schmidt, , , , , , , Problems/Solutions, TS Troubleshooting - Leak/HV spark issues
|
Due to HV sparking & possible water leaks on the previous TiC & Ta targets, checks are to be performed.
Chamber is empty. U-Line installed. All waterlines purged. FS#2, 3, 4, & 5 are closed.
Vacuum Group LD #2 - Connected to TP1B backing line
Tuesday, August 06, 2024, 15:50: Vacuum @ 3.38e-06T.
Tuesday, August 06, 2024, 15:52: No He connected. 7.0 E-09 atm-cc. LD TP pressure 1.0e-03T.
Tuesday, August 06, 2024, 16:20: No He connected. 1.1 E-08 atm-cc. LD TP pressure 1.0e-03T.
Tuesday, August 06, 2024, 16:23: Open to chamber. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.97e-06T.
Tuesday, August 06, 2024, 16:26: 20 PSI. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.97e-06T.
Tuesday, August 06, 2024, 16:32: FS#5 Charged with 20 PSI He. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.75e-06T.
Tuesday, August 06, 2024, 16:34: Close FS#5
Tuesday, August 06, 2024, 16:35: FS#4 Charged with 20 PSI He. Increase to 2.5 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.75e-06T.
Tuesday, August 06, 2024, 16:42: While purging FS#4 with HPA, an increase of 8.3 E-08 atm-cc was observed. Vacuum @ 2.75e-06T.
Tuesday, August 06, 2024, 16:50: Re-connected He. FS#3 Charged with 20 PSI He. Increase to from 3.6 to 9.0 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.59e-06T.
Tuesday, August 06, 2024, 16:52: 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.57e-06T. Line still @ 20 PSI.
Tuesday, August 06, 2024, 16:53: Release pressure on FS#3. 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.57e-06T. Line still @ 20 PSI.
Tuesday, August 06, 2024, 16:55: FS#2 Charged with 20 PSI He. Steady @ 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.59e-06T.
Observed increases on FS#3 & FS4.
Tuesday, August 06, 2024, 17:02: All lines purged with HPA. Allow vacuum to continue down.
Tuesday, August 06, 2024, 17:03: Close off LD to TP1B valve. Dropped to 1.7 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.48e-06T. Safe to vent LD.
Tuesday, August 06, 2024, 17:06: LD vented & disconnected.
Wednesday, August 07, 2024, 09:15: Vacuum @ 6.43e-07T. Gradually refill the waterlines.
Wednesday, August 07, 2024, 09:20: FS#5 open. Vacuum remains steady.
Wednesday, August 07, 2024, 09:28: FS#2 open. Vacuum @ 6.38e-07T.
Wednesday, August 07, 2024, 09:30: FS#4 open. Vacuum @ 6.38e-07T. Wait 5 min.
Wednesday, August 07, 2024, 09:35: Vacuum steady @ 6.36e-07T. Occasional dip to 6.27e-07T.
Wednesday, August 07, 2024, 09:36: FS#3 open. Vacuum steady. Wait 5 min.
Wednesday, August 07, 2024, 09:41: No change to vacuum.
While the helium did get through on yesterdays tests as a minor molecular leak, the water does not appear to have an affect. Moving to an empty HV test.
Wednesday, August 07, 2024, 09:53: Vacuum 6.20e-07T.
Wednesday, August 07, 2024, 10:43: Vacuum 6.20e-07T. IG1 & TP off. - venting test stand for target installation
Wednesday, August 07, 2024, end of day. mass marker target installed in test stand with side foil removed so the target is visible through the view port. vacuum roughed, then turbo pumps turned on at end of day for overnight pumping
Thursday, August 08, 2024, 09:19 - vacuum at 6.27e-7T. water cooling was switched on. no effect on vacuum. TGHT and TBHT began ramping at 1A/30s. will test high voltage at low heat and at high heat.
Thursday, August 08, 2024, 10:04 HV at 35kV. No sparks. TGHT TBHT at <80A throughout HV ramp and plateau
Thursday, August 08, 2024, 10:14 BIAS down. TGHT TBHT at 100A. increasing ramp rate to 1.7A/10s. heating up to 480/230
Thursday, August 08, 2024, 13:59 BIAS has slowly been brought to 28kV . no sparks at all, despite being over 24kV for ~50min.
Thursday, August 08, 2024, 14:00 increasing TGHT to 580A to attempt to induce sparks.
Thursday, August 08, 2024, 14:42 at TGHT TBHT 580 230, HV bias at 28kV (with EZL and EE at 0 and 0), no sparks at all over the ramp and over 10 minutes at this condition.
Thursday, August 08, 2024, 14:43 ramping HV to 30kV
Thursday, August 08, 2024, 15:01 - - no sparks at 30kV. bringing up EZL to 13kV (EE=0)
Thursday, August 08, 2024, 15:11 - no sparks with EZL at 13kV. bringing up EE to -2500V
Thursday, August 08, 2024, 15:13 - no sparks with EE at -2500kV
Thursday, August 08, 2024, 15:22 turned on beam optics to observe beam out, but no beam currently detected on FC0, nor on the wire scanners, nor on FC6. This target commonly has a normal beam output of primarily Na and K
Thursday, August 08, 2024, 15:50 have not been able to deduce reason for lack of beam. increasing BIAS to 50kV.
Thursday, August 08, 2024, 15:51 during ramp up, at 38kV, many optics elements tripped and switched off. however, no spark was registered at the strip tool. not sure of the cause for this.
Thursday, August 08, 2024, 15:54 at 38.8kV, a small spark, only registered on BIAS:RDCUR (no voltage drop), tripped off beam elements prior to FC0 again.
Thursday, August 08, 2024, 16:00 BIAS at 40kV. no sparks apart from those mentioned immediately above. still have not registered any beam on FC0.
Thursday, August 08, 2024, 16:02 Vacuum pressure has raised from 6.5e-7 to 1.3e-6 T.
Thursday, August 08, 2024, 16:03 just now, there was a spike drop in pressure and optics elements have shut down again. nothing registered on BIAS, EZL, or EE.
Thursday, August 08, 2024, 16:11 a spark occurred at 43.3 kV
Thursday, August 08, 2024, 16:23 this spark was audible at the test stand --- ie, not inside
Thursday, August 08, 2024, 16:51 Saw no indication overall of the same HV sparking issues that we saw with the previous two targets. However, we were unable to generate beam register any beam output on FC0, FC6, or wire scanners. And we don't mean 'low signal'. Actually nothing at all.
Thursday, August 08, 2024, 16:54 Ramping down TGHT TBHT now
Friday, August 09, 2024, 08:05 turbo pumps off and spinning down in preparation to vent. will remove the inner foil from the target to observe if a change in shine from the target induces sparking as before.
Friday, August 09, 2024, 08:58 turbo pumps no longer spinning. venting now.
Friday, August 09, 2024, 10:26 foil stripped off the target. there was a hole in the source for gas (febiad/mass marker). This hole is now plugged. reinstalled, roughing.
Friday, August 09, 2024, 11:59 vacuum at 1.2e-5T. turning on water cooling lines. no effect on vacuum.
Friday, August 09, 2024, 12:50 heating TGHT TBHT at 1A/30s
Friday, August 09, 2024, 13:47 increasing heating rate to 1.7A/10s, up to 580/230A
Friday, August 09, 2024, 14:42 TGHT TBHT at 550 230, increasing BIAS to 30kV
Friday, August 09, 2024, 15:03 BIAS at 30kV. no sparks other than a single small one at 25kV. No beam detected at FC0, FC6, or wire scanners.
Friday, August 09, 2024, 15:18 increased BIAS again. there was one spark at 35kV, then it was stable for 8 minutes with no sparks. still no signal on FC0. This lack of signal is highly irregular, and should not be the case despite being an empty target. Will have to compare to the next target in the test stand. To attempt to correct, we have:
- manually adjusted gain
- reset bias
- flipped polarity back and forth
- confirmed FC in position
- confirmed no flagged power supply issue
- confirmed clear beam line to FC0
- confirmed upsteam optics are tuned appropriately
Friday, August 09, 2024, 15:23 cooling target and ramping down HV
Friday, August 09, 2024, 16:06 TGHT TBHT at 0. turbo pumps off and spinning down.
|
Wednesday, July 31, 2024, 18:50, Aaron Schmidt, TiC Spare, HP-FEBIAD, ITW, TM4, 45447-2, 42752-7, In progress, Conditioning Spare for TiC#7
|
Wednesday, July 31, 2024, 18:47: Roughing.
Wednesday, July 31, 2024, 19:24: TP1B on.
Wednesday, July 31, 2024, 19:30: TP1B at speed. Backing pressure CG1A @ 0.212T.
Wednesday, July 31, 2024, 19:33: TP1A Started. CG1A @ 0.164T.
Wednesday, July 31, 2024, 19:41: TP1A at speed. Whining a bit, but it's alive.
Wednesday, July 31, 2024, 19:42: IG1 on.
Thursday, August 01, 2024, 08:00: Vacuum @ 3.14e-0T. Waterline FS#5 open. Vacuum ok. CG1A @ 0.028T.
Thursday, August 01, 2024, 08:04: IV4 open.
Thursday, August 01, 2024, 08:09: Cage closed up. PS / Sources on. Note* TGHT/TBHT breakers were on. Anode was off. All "On" now.
Thursday, August 01, 2024, 08:13: Manual tap up checks. TGHT / TBHT @ 5 / 5 A. Anode @ 100 V / 15.873 mA. Coil PS acting up. Set to 7 A, displays 9.87A & fluctuates.
Thursday, August 01, 2024, 08:19: Anode to 0 V. Coil reduced to 0 A, however still reads back 4.15 A on epics. PS @ 0A.
Thursday, August 01, 2024, 08:24: Cage open. HV sources off. Coil back to 7A. Epics shows 9.82-10.11A (Blue). Fluctuates, PS direct reading @ 7A - Steady.
Thursday, August 01, 2024, 08:39: Cage closed up. HV sources back on.
Thursday, August 01, 2024, 08:40: BIAS / EE / EZL set to 1 / -0.5 / 1 kV. Anode to 100 V / 15.873 mA. Coil remains @ 7A. Epics 10.35A (Blue) Fluctuates still. PS direct reading @ 7A.
Thursday, August 01, 2024, 08:49: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, August 01, 2024, 08:54: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Thursday, August 01, 2024, 08:56: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Thursday, August 01, 2024, 08:57: 1 Spark. External - Audible.
Thursday, August 01, 2024, 09:01: Anode @ 200 V / 17.094 mA. Vacuum @ 2.75e-06T.
Thursday, August 01, 2024, 09:04: Anode @ 300 V / 18.315 mA.
Thursday, August 01, 2024, 09:05: Anode @ 400 V / 19.536 mA.
Thursday, August 01, 2024, 09:05: Anode @ 500 V / 20.757 mA. Interesting, the coil epics read back (Blue) moved to 6.98 (7) A.The coil read back stability appears to have occurred in conjunction with the 8:57am spark*.
Thursday, August 01, 2024, 09:17: 20 min stable. Can assume the spark was the coil instability discharging. Coil remain stable reading @ 7A. BIAS / EE / EZL @ 40 / -2.0 / 17 kV (20 min). Anode @ 500 V / 19.536 mA. (10 min+).
Thursday, August 01, 2024, 09:29: BIAS / EE / EZL to 0 kV. Anode to 0.
Thursday, August 01, 2024, 09:36: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 @ per min.
Thursday, August 01, 2024, 09:37: Tap up coil to 10 A. Stable. Read back on all ends match up.
Thursday, August 01, 2024, 09:39: Coil @ 20 A. Stable. Hold. Vacuum @ 2.66e-06T.
Thursday, August 01, 2024, 10:05: Coil @ 30 A. Vacuum @ 2.66e-06T.
Thursday, August 01, 2024, 10:13: Coil @ 40 A. Vacuum @ 2.68e-06T.
Thursday, August 01, 2024, 10:18: Coil @ 50 A. Vacuum @ 2.66e-06T.
Thursday, August 01, 2024, 10:24: Coil @ 60 A. Vacuum @ 2.66e-06T.
Thursday, August 01, 2024, 10:27: Coil @ 70 A. Vacuum @ 2.77e-06T.
Thursday, August 01, 2024, 10:32: Coil @ 80 A. Vacuum @ 3.03e-06T. Note* Coil was cleaned prior to installation & acrylic within dissolved. Successful run on coil.
Thursday, August 01, 2024, 10:43: Coil to 0 A. However in the last 20 A, the read back & epics did not match again. Slowly discharging on epics, although the PS read back was accurate.
Thursday, August 01, 2024, 13:29 FBP: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min . IG1:3.56e-6.
Thursday, August 01, 2024, 16:00: AS - Aborted target ramping. TGHT / TBHT @ 448 / 248 A. Vacuum limited at 5.0e-06T. Allow to out gas. Continue tomorrow am.
Friday, August 02, 2024, 06:01: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. Vacuum: 1.60e-06T.
Friday, August 02, 2024, 08:28 turning on HV
Friday, August 02, 2024, 08:35 BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No issues.
Friday, August 02, 2024, 08:40 Same kind of sparks as the previous thin foil Ta observed
Friday, August 02, 2024, 08:49 Bias lowered to 20kV
Friday, August 02, 2024, 10:39 HV issues could not be identified, we recorded some sparks from within the target near the multipin and TBHT. Outgassing coil and running mass scan. Source tray to be thoroughly checked after retrieving the target.
Friday, August 02, 2024, 15:04 gradually increased COIL current to 100A over time while monitoring vacuum to ensure no heater trips. Vacuum now at 2.4e-6 T
Friday, August 02, 2024, 15:05 increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV
Friday, August 02, 2024, 15:26 now at BIAS / EE / EZL to 30 / -1.5 / 13 kV --- first spark at 30kV.
Friday, August 02, 2024, 15:37 sparking occurring at 4-5min intervals. set anode to 120V, coil to 40A. finding Ar peak via scan. Argon operated at 0.5 bar.
Friday, August 02, 2024, 15:57 Ar peak located at 95.5332A. on magnet. tested gas on / off to confirm - current at FC6 = 1.37 nA
Friday, August 02, 2024, 16:02 ran febiad coil/anode scan.
Friday, August 02, 2024, 16:33 data at test number = 7462 can be further visualized using the shared jupyter notebook code. data taken at anode voltage 260V was disrupted due to a spark derailing a number of optics elements in the beamline. they were soon corrected, but this data was missed.
Friday, August 02, 2024, 16:34 - mass scan with 180V 70A (Argon ON) ---- doesn't seem to be recording background noise well. ie the common background recording artifact is present. records constant numbers instead of numbers in range (1e-13,5e-12). often appears in mass scan image at slants
Friday, August 02, 2024, 17:07 - mass scan rerun after switching off argon and pumping down the lines. however, only run from mass 49 down, as the signal above was completely blank
Friday, August 02, 2024, 17:25 ramping down bias ee and ezl
Friday, August 02, 2024, 17:45 decreasing TGHT and TBHT to 0a at 1A/30s
|
Monday, July 29, 2024, 23:02, Aurelia Laxdal, Ta#67 Thin foils, LP-SIS, ITE, TM3, 45447-14, 45235-10, , Cooldown for removing the V wires
|
22:55 Cooldown completed to remove the voltage wires from inside the vacuum box. |
Thursday, July 25, 2024, 14:26, Dave Neilson, Ta#67 Thin foil , LP-SIS, ITE, TM3, 45447-14, 45235-10, , Conditioning Ta#67 Thin foil
|
Thursday, July 25, 2024, 14:25 - competing electrical checks prior to test stand installation
Thursday, July 25, 2024, 17:07 - after target installation test stand roughed down, turbo pumps then turned on. vacuuming overnight
Friday, July 26, 2024, 09:01 - water cooling turned on, while monitoring vacuum level (~1.5e-6T). No affect on vacuum.
Friday, July 26, 2024, 09:32 - began increasing TGHT TBHT. increased to 230A/230A at 1A/30s
Friday, July 26, 2024, 10:22 - closed cage and increased BIAS to 30kV to ensure a lack of sparks - additional risk of sparking due to the multipin wires connected to TGHT and TBHT at the target terminals.
Friday, July 26, 2024, 11:04 - decreased BIAS to 0V. Then opening cage to allow access to reading voltage across TG and TB at target
Friday, July 26, 2024, 11:29 - reached 230/230 A. TG TB measurements taken at this point.
Friday, July 26, 2024, 12:05 - increasing TGHT at 1A/30s to 250A
Friday, July 26, 2024, 12:13 - TGHT at 250A for measurement
Friday, July 26, 2024, 12:29 - increasing TGHT to 300A at 1A/30s
Friday, July 26, 2024, 12:55 - TGHT at 300A for measurement
Friday, July 26, 2024, 13:08 - TGHT increasing at 1A/30s to 350A
Friday, July 26, 2024, 13:36 TGHT at 350 A for measurement
Friday, July 26, 2024, 13:43 TGHT increasing at 1A/30s to 400A
Friday, July 26, 2024, 14:10 TGHT at 400A for measurement
Friday, July 26, 2024, 14:17 TGHT increasing at 1A/30s
Friday, July 26, 2024, 14:43 TGHT at 450A for measurement
Friday, July 26, 2024, 14:53 TGHT increasing at 1A/30s
Friday, July 26, 2024, 15:20 TGHT at 500A for measurement
Friday, July 26, 2024, 15:28 TGHT increasing at 1A/30s
Friday, July 26, 2024, 19:14 FBP: we couldn't get a great mass scan with the provided tune from Dave, we might be doing something wrong. Mass scan saved and plotted here.
Friday, July 26, 2024, 19:16 FBP: Target will be cooled down today before the weekend.
Monday, July 29, 2024, 09:50 TGHT/TBHT ramping up to 580/230 A 1A/30s
Monday, July 29, 2024, 15:30: ramping up, relatively frequent sparking beginning at 24kV. Ramped down. (also noticed that internal test wires were shaking due to high voltage bias)
Monday, July 29, 2024, 15:49 HV at 20kV waiting for stabilization
Monday, July 29, 2024, 15:58 after a five minute period of stability, beginning to increase bias in 100V increments.
Monday, July 29, 2024, 17:35 sparking is too frequent (decided at 24kV) to warrant attempting to condition HV up to 30kV. must determine the cause of this sparking. thus cooling target overnight. will remove internal wires and reheat.
Tuesday, July 30, 2024, 08:32 after cooling, test stand was vented, wires removed, and subsequently pumped down.
now beginning TGHT TBHT ramp to 580 230 at 1A/30s
Tuesday, July 30, 2024, 10:02 during TGHT TBHT ramp, HV was slowly increased to 35kV to assess high voltage stability. Throughout, and at 35kV, there were no sparks seen at all.
Tuesday, July 30, 2024, 13:50 target at 580 230. increasing bias.
Tuesday, July 30, 2024, 14:45 at ~24kV, the bias is sparking approximately every 4 minutes.
Tuesday, July 30, 2024, 17:28 When sparks slowed, bias was increased, but ultimately the sparking behaviour persisted. The bias was then dropped down to 0 and TGHT TBHT cooled at -1A/30s to 0A for target removal tomorrow.
|
Wednesday, July 24, 2024, 14:08, Dave Neilson, , , , , , , , Beam line window change - DUV installation
|
Wednesday, July 24, 2024, 14:07 Changed beamline window to DUV window (window at magnet for target source viewing) |
Tuesday, July 23, 2024, 09:43, Dave Neilson, , LP-SIS, , , 44691-8, 45235-26, Done, mass marker - reservoir testing
|
Wednesday, July 22, 2024, 11:41 - target installed
Wednesday, July 22, 2024, 13:31 - pumping down
Wednesday, July 22, 2024, 14:21 - turbo pumps on
Wednesday, July 22, 2024, 16:35 - water cooling on - no pressure increase
Tuesday, July 23, 2024, 09:42 - TGHT/TBHT ramping up to 580/230A at 1A/15s.
Tuesday, July 23, 2024, 09:55 increasing ramp rate to 1.4A/10s
Tuesday, July 23, 2024, 11:17 increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV.
Tuesday, July 23, 2024, 11:44 sparks more frequent than expected. FC0 current at 1.17e-8A
Tuesday, July 23, 2024, 11:48 decreasing bias to 29.5k until spark frequency reduces
Tuesday, July 23, 2024, 13:23 once back up to 30kV, mass scan was run
Tuesday, July 23, 2024, 13:23 bias ee ezl were dropped to zero. reservoir heater was switched to 5A. the vacuum jumped up and shut down TGHT TBHT. heater turned off. TGHT TBHT restarted and reheated.
Tuesday, July 23, 2024, 13:24 reservoir heater turned to 2A while monitoring the vacuum. then to 3A as it appeared to be stable. at 4A the vacuum began slowly increasing.
Tuesday, July 23, 2024, 13:30 4A vacuum plateaus and recovering
Tuesday, July 23, 2024, 14:30 once reservoir heater is at 5A with a stable vacuum, increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV
Tuesday, July 23, 2024, 14:50 running mass scan
Tuesday, July 23, 2024, 15:20 dropping BIAS / EE / EZL to zero
Tuesday, July 23, 2024, 15:40 turning off reservoir heater
Tuesday, July 23, 2024, 15:51 increasing BIAS EE EZL to 30 -1.5 13 kV.
Tuesday, July 23, 2024, 16:05 running mass scan
Tuesday, July 23, 2024, 17:00 cooling target. TGHT TBHT to 0 at -1A/30s
Wednesday, July 24, 2024, 09:24 purged water lines and turned off TP1A and TP1B, TP6 and TP2 --- waiting for TP to slow down. (will be venting beam line to change window)
|
Wednesday, June 19, 2024, 15:50, Brady Borrmann, TiC#9, HP-SIS, , , 45447-29, 45235-19, In progress, Conditioning TiC#9
|
Wednesday, June19, 2024, Spare TiC HP-SIS target installed. TiC#24C
Wednesday, June19, 2024, 15:00: Roughing
Wednesday, June19, 2024, 17:25: TP1B started.
Wednesday, June 19, 2024, 15:30: TP1B Green. OK.
Wednesday, June 19, 2024, 15:30 : TP1A on.
Wednesday, June 19, 2024, 15:40: Time out on TP1A
Wednesday, June 19, 2024, 15:43: Turn on BV1A & TP1A
Wednesday, June 19, 2024, 15:43 : TP1A Green. OK.
Wednesday, June 19, 2024, 15:44: IG1 turned on @ 3.92e-05 T
_________ dave neilson
Thursday, June 20, 2024, 10:23: Water cooling valves opened. no effect on vacuum.
Thursday, June 20, 2024, 11:19: Power on. Increasing TGHT TBHT to 440A 290A at 1A/30s
Thursday, June 20, 2024, 15:59 increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV.
Thursday, June 20, 2024, 16:21 slowly increasing BIAS to test for high voltage sparking --- sparked at 33.6kV, sparked at 34kV. 34.6kV, 37.8kV sparking infrequent (period >5min)
Thursday, June 20, 2024, 17:18 decreasing high voltages to 0
Thursday, June 20, 2024, 17:36 decreased TGHT to 300A overnight.
Friday, June 21, 2024, 09:16 Increasing TGHT to 580A (1A/30s) for testing
Friday, June 21, 2024, 12:28 increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV.
Friday, June 21, 2024, 16:31 decreasing BIAS / EE / EZL to 0
Tuesday, June 25, 2024, 10:05 : TP1A TP1B off. preparing to vent chamber for target replacement.
Wednesday, July 10, 2024, 12:22: Venting - AS
Wednesday, July 10, 2024, 14:57: Roughing.
|
Thursday, May 30, 2024, 16:00, Aaron Schmidt, , LP-FEBIAD, , , 44692-4, 45235-18, In progress, Conditioning spare FEBIAD
|
Anode short repaired (Should be :) )
Thursday, May 30, 2024, 15:56: Roughing.
Thursday, May 30, 2024, 16:10: Waterline FS#5 open. Vacuum ok & roughing down.
Bypassed IG1. TGHT / TBHT @ 5 A. Ok.
Anode to 100 V. Ok.
Thursday, May 30, 2024, 16:12: TGHT / TBHT / Anode to 0. Bypass removed.
Thursday, May 30, 2024, 16:26: TP1B on.
Thursday, May 30, 2024, 16:33: TP1A on.
Thursday, May 30, 2024, 16:41: IG1 on.
Friday, May 31, 2024, 08:50: Anode to 400 V. OK. Tapped back down. Vacuum @ 5.07e-07T
Friday, May 31, 2024, 09:12 increasing TGHT TBHT to 440 230A at 1A/30s- dn
Friday, May 31, 2024, 10:20 at ~130A, increased heating rate to 1.4A/10s - dn
Friday, May 31, 2024, 11:22 anode increased to 200V, TGHT TBHT at 440 230A. increasing TBHT to 290A
Friday, May 31, 2024, 11:38 ANODE shorted to hvc at TBHT=286A
Friday, May 31, 2024, 11:39 decreased TBHT to 285A. waiting to reestablish ANODE voltage.
Friday, May 31, 2024, 11:48 decreased TBHT to 280A, waiting to reestablish ANODE voltage.
Friday, May 31, 2024, 12:59 decreased TBHT to 275A, waiting to reestablish ANODE voltage.
Friday, May 31, 2024, 12:09 decreased TBHT to 270A, waiting to reestablish ANODE voltage. ---> recovered after 2 min at 270
Friday, May 31, 2024, 14:09 decreased TGHT TBHT to 0 for target removal monday.
Monday, June 03, 2024, 09:04 TP1A TP1B off. Waiting 30min for turbo pumps to slow, prior to venting to atmosphere.
Monday, June 03, 2024, 10:07 venting. VV1 open. - target subsequently removed for testing possible shorting fix
Friday, June 14, 2024, 16:37: Ceramic spacer placed between the anode and plasma electrode.
Target returned to test stand. Rough vacuum on.
Monday, June 17, 2024, 09:34: TP1A on, TP1B on.
Monday, June 17, 2024, 16:54 increasing tght tbht to 440 230 A at 1A/30s
Tuesday, June 18, 2024, 14:14 Increasing ANODE to 100V . Voltage holding. Increasing TBHT to 290A, watching anode voltage for possible temperature induced short.
Tuesday, June 18, 2024, 14:54 ANODE shorted at TBHT = 290A. cooling TBHT to reestablish ANODE OL.
Tuesday, June 18, 2024, 15:04 ANODE OL reestablished at TBHT = 283A
Tuesday, June 18, 2024, 15:05 Increasing TBHT again. 1A/2min
Tuesday, June 18, 2024, 15:32 ANODE shorted again when TBHT reached 290A
Tuesday, June 18, 2024, 15:32 cooling tght tbht. ANODE OL reestablished at TBHT 275A
Tuesday, June 18, 2024, 15:42 reheating to 440A 290A with ANODE at zero, to see if there is a difference compared to heating with ANODE ON/OFF
Tuesday, June 18, 2024, 15:55 confirmed shorted when hot. cooling to zero. 1A/30s
|
Friday, May 17, 2024, 17:24, Brady Borrmann, UC#, LP-FEBIAD, ITE, , 44692-4, 45235-18, In progress, Conditioning Spare Development Target
|
Friday, May 17, 2024, Spare FEBIAD Development target installed
Friday, May 17, 2024, 17:00: Roughing
Friday, May 17, 2024, 17:38: TP1B started.
Friday, May 17, 2024, 17:43 TP1B Green. OK.
Friday, May 17, 2024, 17:46 : TP1A on.
Friday, May 17, 2024, 17:54 : TP1A Green. OK.
Tuesday, May 21, 2024, 09:47 : TP1A and TP1B switched off. Source tray calibrated leak to be removed.
Tuesday, May 21, 2024, 10:13 : VV1 open for venting to atmospheric pressure.
Tuesday, May 21, 2024, 11:26 : Source tray calibrated leak removed, target calibrated leak connected to gas line. Chamber closed, roughing valves open. Roughing down.
Tuesday, May 21, 2024, 12:02 TP1B on
Tuesday, May 21, 2024, 12:04: TP1A on.
Tuesday, May 21, 2024, 15:12 gradually raising BIAS/EL/EE voltages to 50kV/25kV/2kV.
Tuesday, May 21, 2024, 15:58 increasing BIAS to 50+kV, watching for sparks.
Tuesday, May 21, 2024, 16:38: voltage stable at 55kV. after 10 minutes, of high voltage with no sparks, dropping the voltages to 0V.
Wednesday, May 22, 2024, 11:36: increasing voltage BIAS/EL/EE to 30kV/15kV/1.5kV.
Wednesday, May 22, 2024, 11:56 gradually increasing COIL to 80A, letting vacuum recover as necessary.
Wednesday, May 22, 2024, 13:31: COIL to 90A, recovering vacuum.
Wednesday, May 22, 2024, 16:58 increasing TGHT TBHT to 440A/290A at 1A/30s. reducing COIL to 0A and voltages to 0V overnight
Thursday, May 23, 2024, 11:14 : increasing voltage BIAS/EL/EE to 30kV/13kV/1.5kV.
Thursday, May 23, 2024, 11:33: Sensor on beam line vacuum TMSIG6 not working. reports bad vacuum, despite both TMSTP6 TMSTP2 running at full speed. Likely that vacuum is at appropriate level.
Thursday, May 23, 2024, 11:35: turning on optics and confirming correct tune. --- cannot do this due to interlock on TP6. investigating problem. -- switched to filament 2 on control panel
Thursday, May 23, 2024, 13:14: after setting magnet to argon-40, running degaussing script for coil / anode optimization - measure_id= 6220. heat map at bottom. . optimal point at 120V 40A (local maximum)
Thursday, May 23, 2024, 13:45: allowing vacuum to recover after scan. vacuum during scan was approximately 4e-6 T
Thursday, May 23, 2024, 13:57 running mass scan with gas on - 2024-05-23-14-25 LP FEBIAD backup leak 1.txt
Thursday, May 23, 2024, 14:29 mass scan gas off (purged) - 2024-05-23-15-03 LP FEBIAD backup leak 2.txt
Thursday, May 23, 2024, 15:04 increasing tght tbht to 490A 320A
Thursday, May 23, 2024, 15:26: when at TGHT TBHT = 461A/313A, the anode power supply began current limiting (shorted to hvc)
Thursday, May 23, 2024, 15:28 cooling to 460A/310A
Thursday, May 23, 2024, 15:35 cooling to 450A/300A
Thursday, May 23, 2024, 15:44 stopped cooling at 455A/305A as the anode became UNshorted.
Thursday, May 23, 2024, 16:19 mass scan with gas off - 2024-05-23-16-18 LP FEBIAD backup leak 3.txt
Thursday, May 23, 2024, 16:21 gas on - mass scan - 2024-05-23-16-51 LP FEBIAD backup leak 4.txt
Thursday, May 23, 2024, 16:52 : increasing TGHT TBHT again to test anode shorting threshold: - shorted at: 458A/308A. then decreased to 450A/300A, did not UNshort until after a few minutes at that current. shorted when increased to 456/306
Thursday, May 23, 2024, 17:22 decreasing voltages to 0V
Thursday, May 23, 2024, 11:14 : increasing voltage BIAS/EL/EE to 30kV/13kV/1.5kV.
Tuesday, May 28, 2024, 12:59 cooling target to 0A. will remove target to attempt fix on anode short.
Tuesday, May 28, 2024, 17:17 TGHT TBHT at 0A. TP1A and TP1B off.
|
Thursday, May 02, 2024, 13:45, Dave Neilson, -, LP-SIS, , , 44691-8, 45235-26, In progress, Mass marker testing
|
Wednesday, May 01, 2024, 12:44: pumped down to rough vacuum, TP1B now on.
Wednesday, May 01, 2024, 12:49: TP1A on.
Thursday, May 02, 2024, 9:10: water cooling on. no effect on vacuum
Thursday, May 02, 2024, 10:02: TGHT and TBHT heating to 100A/100A at 1A/30s
Thursday, May 02, 2024, 11:02: TGHT and TBHT heating to 230A/230A at 1.4A/10s
Thursday, May 02, 2024, 13:53: increasing BIAS to 30kV, EE to 2500V, EZL to 13kV
Thursday, May 02, 2024, 14:11: increasing TGHT to 280A.
Thursday, May 02, 2024, 14:18 seeing a few sparks decreasing BIAS temporarily
Thursday, May 02, 2024, 14:25 sparks continued. decreased TGHT to 260A and saw them subside. increasing bias again.
Thursday, May 02, 2024, 14:42 conducting mass scan - 2024-05-02-15-05 mm LPSIS a.txt
Thursday, May 02, 2024, 15:09 increased COIL to 20A. mass scan repeated. 2024-05-02-15-37 mm LPSIS b.txt
Thursday, May 02, 2024, 15:38 decreasing TGHT to 230A, COIL at 0A
Thursday, May 02, 2024, 15:43: repeating mass scan. 2024-05-02-16-09 mm LPSIS c.txt * no signal. very unexpected.
Thursday, May 02, 2024, 16:10: increased COIL to 20A, repeating mass scan. 2024-05-02-16-35 mm LPSIS d.txt
Thursday, May 02, 2024, 16:35 decreasing BIAS, EE, EZL to 0V
Thursday, May 02, 2024, 16:50 increasing TGHT to 290A at 1A/30s, to be left hot overnight.
Friday, May 03, 2024, 10:26 increasing BIAS to 30kV, EE to 2500V, EZL to 13kV
Friday, May 03, 2024, 10:50 conducting mass scan, COIL at 0A - 2024-05-03-11-19 mm LPSIS e.txt
Friday, May 03, 2024, 11:19 increasing COIL to 20A. repeating mass scan - 2024-05-03-11-47 mm LPSIS f.txt
Friday, May 03, 2024, 11:47 increasing COIL to 40A. repeating mass scan - 2024-05-03-12-21 mm LPSIS g.txt
Friday, May 03, 2024, 12:22 decreasing TGHT to 260A.
Friday, May 03, 2024, 12:32 mass scan: - 2024-05-03-12-59 mm LPSIS g.txt <- accidentally labeled g. cannot change
Friday, May 03, 2024, 13:01 decreased COIL to 20A. mass scan: 2024-05-03-13-30 mm LPSIS i.txt
Friday, May 03, 2024, 13:31 decreased COIL to 0A. mass scan: 2024-05-03-13-59 mm LPSIS j.txt
Friday, May 03, 2024, 14:01 reducing TGHT to 230A. mass scan: 2024-05-03-14-37 mm LPSIS k.txt
Friday, May 03, 2024, 14:38 increasing coil to 20A. mass scan: 2024-05-03-15-14 mm LPSIS l.txt
Friday, May 03, 2024, 15:15 increasing coil to 40A. mass scan: 2024-05-03-15-42 mm LPSIS m.txt
Friday, May 03, 2024, 15:43 COIL -> 0A. decreasing EE EZL BIAS to 0V.
Friday, May 03, 2024, 15:59 decreasing TGHT and TBHT to 0A at 1A/30s
|
Friday, April 26, 2024, 13:49, Aaron Schmidt, TiC#7, HP-FEBIAD, ITW, TM4, 45447-5, 45235-15, In progress, Conditioning TiC#7
|
FM-SW calibrated leak installed.
Friday, April 26, 2024, 13:48: Roughing.
Friday, April 26, 2024, 14:20: TP1B started.
Friday, April 26, 2024, 14:26: TP1B Green. OK.
Friday, April 26, 2024, 14:30: TP1A on.
Monday, April 29, 2024, 08:44: Vacuum @ 4.58e-07T. Waterline FS#5 open. Vacuum ok.
Monday, April 29, 2024, 08:50: Power / sources on. Tap up check. TGHT / TBHT to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 100 V. Coil to 4 A. Ok. Tap back down.
Monday, April 29, 2024, 10:44: IV4 open.
-BB:
Monday, April 29, 2024, 11:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, April 29, 2024, 11:12: BIAS / EE / EZL @ 40 / -1.8 -2.0 / 17 kV.
Monday, April 29, 2024, 11:19: BIAS / EE / EZL @ 43 / -2.0 / 19 kV.
Monday, April 29, 2024, 11:23: BIAS / EE / EZL @ 45 / -2.0 / 19 kV.
Monday, April 29, 2024, 11:27: BIAS / EE / EZL @ 47.5 / -2.2 / 22 kV.
Monday, April 29, 2024, 11:33: BIAS / EE / EZL @ 50 / -2.5 / 25 kV.
Monday, April 29, 2024, 12:05: 30 minutes @ 50 kV. 3 sparks at the very end. 2 inside and 1 outside.
Monday, April 29, 2024, 12:09: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 4.67e-07T. Start tapping up coil.
Monday, April 29, 2024, 12:32: Coil @ 80 A. Tapped up manually at 4 A per min approx. Vacuum @ 5.2e-07T
Monday, April 29, 2024, 14:00: Vacuum @ 7.20e-07T (30-60 min depending on whether the out gassing levels or begins to decrease)
Monday, April 29, 2024, 14:02: Coil @ 0 A.
Monday, April 29, 2024, 14:05: Anode @ 100 V.
Monday, April 29, 2024, 14:07: Anode @ 200 V.
Monday, April 29, 2024, 14:09: Anode @ 500 V.
Monday, April 29, 2024, 14:11: Anode @ 0 V.
Monday, April 29, 2024, 14:33: HV @ 0 V.
Monday, April 29, 2024, 14:34: Auto-ramping TGHT / TBHT to 350 / 150 @ 2A per minute.
Tuesday, April 30, 2024, 07:18: Auto-ramping TGHT / TBHT to 580 / 290 @ 2A per minute.
Tuesday, April 30, 2024, 13:44: Gas lines purged & refilled with Ar.
Tuesday, April 30, 2024, 13:48: optics set.
Tuesday, April 30, 2024, 13:51: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, April 30, 2024, 13:56: Anode @ 100 V. Coil @ 20 A
Tuesday, April 30, 2024, 13:59: Reset / Cfg MB1
Tuesday, April 30, 2024, 14:40: Initial mass & wire scans complete.
Tuesday, April 30, 2024, 15:07: Argon gas lines purged.
Tuesday, April 30, 2024, 15:07: Mass scan repeated.
Tuesday, April 30, 2024, 15:42: Gas on. Magnet set to 40.1 mass/charge. Anode & coil vs fc6 output optimization scan started. 0-90A coil and 0-400V anode.
Tuesday, April 30, 2024, 15:55: Vacuum is noticeably rising. If it reaches 5e-6T, will terminate the scan.
Tuesday, April 30, 2024, 15:59: rate of increase appears to be slowing and reaching a plateau.
Tuesday, April 30, 2024, 16:01: optimization data at measure_id=6058. image at bottom.
Tuesday, April 30, 2024, 16:03: COIL and anode set to 0. decreasing BIAS/EZL/EE to 0V
Tuesday, April 30, 2024, 16:12: decreasing TGHT TBHT at 1A/30s to 0
Wednesday, May 01, 2024, 09:38: TP1B and TP1A turned off, winding down
Wednesday, May 01, 2024, 10:1: VV1 open, venting. Water cooling off. purged lines
|
Wednesday, April 24, 2024, 16:21, Dave Neilson, , LP-SIS, , , 44691-8, 45235-26, ,
|
Wednesday, April 24, 2024, 16:20: Target assembly installed.
Wednesday, April 24, 2024, 16:20: VV1 closed. Pumping down to rough vacuum
Wednesday, April 24, 2024, 16:21: Water cooling on. Seal on lines confirmed.
Thursday, April 25, 2024, 09:14 TP1A and TP1B on
Thursday, April 25, 2024, 15:45: Vacuum seems to be stalled at 1e-5 T. Resetting turbo pumps has no noticeable effect. TP1B is emitting a soft high pitched tone / ringing. Now venting chamber to reset target assembly and water cooling seals.
|
Friday, April 19, 2024, 11:33, Dave Neilson, -, LP-FEBIAD, , , 44692-4, 42972-10, In progress, Development target test - Calibrated leak - Anode mode
|
Friday, April 19, 2024, 11:32: assembly installed in test stand. VV1 closed, pumping down
Friday, April 19, 2024, 11:56: TP1A and TP1B on.
Friday, April 19, 2024, 12:34: water cooling on. no effect on vacuum.
Friday, April 19, 2024, 12:34: Argon gas set to 0.5 bar. No effect on vacuum.
Monday, April 22, 2024, 09:24 beginning TGHT TBHT ramp to 440A/290A at 1A/30s. COIL increased to 80A for conditioning. vacuum monitored.
Monday, April 22, 2024, 09:47: vacuum peaks at ~8e-7 T.
Monday, April 22, 2024, 10:49 vacuum recovered and stable at 4.2e-7 T.
Monday, April 22, 2024, 10:49 TGHT TBHT ramp rate toward 440/290 increased to 1.4A/10s. COIL increased to 90A for conditioning. vacuum continues to be closely monitored.
Monday, April 22, 2024, 11:39 TGHT TBHT have reached 440/290. Waiting for vacuum to drop to stable value. Currently at 1.12e-6 T.
Monday, April 22, 2024, 13:10: vacuum stable at 9.9e-7 T
Monday, April 22, 2024, 13:11 increasing bias to 30kV
Monday, April 22, 2024, 14:30 Unintentionally, TBHT had been increased to 230 instead of 290. Increasing to 290.
Monday, April 22, 2024, 14:40. BIAS sparking. Decreasing bias and increasing COIL back to 90A to condition. (spark frequency approximately 1/min)
Monday, April 22, 2024, 15:12 increasing TGHT TBHT to 490/320 for conditioning - monitoring vacuum and bias closely
Monday, April 22, 2024, 15:23 prior to vacuum recovering, bias sparked again. decreasing to 25kV while vacuum recovers.
Monday, April 22, 2024, 15:37 vacuum plateaued at 2.5e-6T
Monday, April 22, 2024, 16:50 Vacuum significantly decreased to ~1.5e-6. increased bias to 30kV to observe argon beam activity. looks normal. data to be collected tomorrow after vacuum down further. Sparks were still observed at 30kV although significantly less frequently. (1/5min)
Monday, April 22, 2024, 16:52 decreasing bias to 0 V
Tuesday, April 23, 2024, 09:24 Vacuum at 9.6e7 T. decreasing COIL to 0, increasing bias to 30 kV
Tuesday, April 23, 2024, 09:51 BIAS at 30kV, no sparks seen.
Tuesday, April 23, 2024, 09:58. Argon gas on. COIL at 40A, ANODE at 200V. Using short mass scan to find Ar-40 peak.
Tuesday, April 23, 2024, 10:33: ran degaussing script in anode mode - measure_id=6018
Tuesday, April 23, 2024, 10:36 COIL set to 80A, ANODE at 340V, BIAS at 29 660 V.
Tuesday, April 23, 2024, 10:37 mass scan
Tuesday, April 23, 2024, 10:57 closed sv4, open sv1. to pump down argon gas lines. then closed sv5 and sv1.
Tuesday, April 23, 2024, 10:57 mass scan
Tuesday, April 23, 2024, 11:19 TGHT TBHT decreased to 440 290
Tuesday, April 23, 2024, 11:35 mass scan
Tuesday, April 23, 2024, 11:49 turned argon gas back on
Tuesday, April 23, 2024, 11:50 mass scan
Tuesday, April 23, 2024, 12:13 decreasing bias to 0 V
Tuesday, April 23, 2024, 12:33 decreasing TGHT TBHT to 100A at 1.4A/10s
Tuesday, April 23, 2024, 13:29 decreasing TGHT TBHT to 0A at 1A/30s
Tuesday, April 23, 2024, 14:13 increasing bias to test HV
Tuesday, April 23, 2024, 15:00 when bias was at ~50kV, epics shut down at the test stand computer. Internet disconnected. there were two sparks over ~10min at 50kV, but there was no spark at the same time as the epics shut down
Tuesday, April 23, 2024, 15:05 It appears that this also actuated BV1B and BV6, then turning off TP1B and TP6 turbo pumps.
Tuesday, April 23, 2024, 15:16: continuing to increase HV remotely, while monitoring closely for any sparks. the HV appears to be stable.
Tuesday, April 23, 2024, 15:20 at 54.6 kV, the bias current rapidly increased from 0.02mA to 0.135mA. There was no decrease in voltage and no accompanying spark. HV was decreased until current dropped, before increasing HV again.
Tuesday, April 23, 2024, 16:01 decreased bias to 0V.
Tuesday, April 23, 2024, 16:01 Turbo pumps restarted.
Wednesday, April 24, 2024, 09:25 TP1B and TP1A off. winding down to begin venting
Wednesday, April 24, 2024, 10:47 VV1 open. venting. |
Wednesday, April 17, 2024, 14:16, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use - Run 2
|
https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08: IV4 opened. Vacuum @ 5.26e-07T.
Wednesday, April 17, 2024, 14:12: TGHT / TBHT manually tapped up to 5 / 5 A.
Wednesday, April 17, 2024, 14:13: BIAS / EE / EZL @ 2.5 / -1.0 / 1.0 kV. Ok.
Wednesday, April 17, 2024, 14:15: Anode to 100 V. Ok. Coil PS is still.
Wednesday, April 17, 2024, 14:19: Rear cage reopened. Coil PS on. Coil @ 5 A. Ok. Gas on in the morning.
Wednesday, April 17, 2024, 14:21: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min. Coil back to 0 A.
Thursday, April 18, 2024, 05:57: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Thursday, April 18, 2024, 08:26: Gas lines purged & reopened full of Ar.
Thursday, April 18, 2024, 08:39: Optics set with common tune.
Thursday, April 18, 2024, 08:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, April 18, 2024, 08:50: Begin mass & wire scans w/o Anode & Coil
Thursday, April 18, 2024, 08:55: MB1 appears to be tripped & out of sync.
Thursday, April 18, 2024, 08:57: Switched MB1 PS off, controller off. Restart them. PS on, then controller. Reset on epics & Can Diagnostics TMS:HallMB1 (cfg)
Thursday, April 18, 2024, 08:59: MB1 ready. Continue testing / mass scan.
Thursday, April 18, 2024, 09:37: Anode to 100 V. Coil to 20 A.
Thursday, April 18, 2024, 10:15: Set optics to Dave's previous tune.
Thursday, April 18, 2024, 10:49: Primary mass & wire scans set complete.
Thursday, April 18, 2024, 11:01: Anode & Coil to 0. Scanning w/ Dave's previous tune.
Thursday, April 18, 2024, 11:52: BIAS / EE / EZL to 0 kV. Gas lines closed. IV4 closed.
Thursday, April 18, 2024, 11:53: Begin auto-cooling @ 2 A per min.
Friday, April 19, 2024, 06:56: Power off. IG1 off. TP1B & TP1A off.
Friday, April 19, 2024, 09:03: VV1 open - venting |
Monday, April 15, 2024, 14:35, Aaron Schmidt, , , , , , , Problems/Solutions, TSH:EE Issues
|
Monday, April 15, 2024, 14:33: On Friday it was noted that the EE was being troublesome. If we put -500 V on the EE the PS would deliver -1000 V. However it would slowly trickle downward. elog:1002.
Tom H. had a look at it this afternoon & determined the PS is operating, however the signal going to it is peculiar. Controls group as been notified as well. Awaiting further response.
Tuesday, April 16, 2024, 16:09: Full epics & PLC restart needed. All TP & RP shut down.
Tuesday, April 16, 2024, 17:45: Restart RP. TP1B on. TP6 & TP2 on.
Tuesday, April 16, 2024, 17:49: TP1A on.
Tuesday, April 16, 2024, 17:55: Restarted TP6.
Tuesday, April 16, 2024, 18:05: Long sigh* TP6 was in soft start mode. Controller put back to regular start. TP6 started.
Tuesday, April 16, 2024, 18:08: IG1 & IG6 on.
Wednesday, April 17, 2024, 10:25: IG, TP, & RP, off.
Wednesday, April 17, 2024, 13:03: RP on.
Wednesday, April 17, 2024, 13:14: TP1A on.
Wednesday, April 17, 2024, 13:07: TP6, TP2, & TP1B on.
Wednesday, April 17, 2024, 13:23: IG6 & IG1 on.
Wednesday, April 17, 2024, 13:25: EE to -500V. Read back on Epics -500V. PS direct @ -500V
Wednesday, April 17, 2024, 13:26: EE to -1500V. Read back on Epics -1500V. PS direct @ -1500V
Wednesday, April 17, 2024, 14:07: EE was brought back to 0V. ISAC TS closed up & ready for operation.
|
Tuesday, April 09, 2024, 16:01, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use
|
Tuesday, April 09, 2024, 15:25: Roughing.
Wednesday, April 10, 2024, 05:41: TP1B on.
Wednesday, April 10, 2024, 05:47: TP1A on.
Wednesday, April 10, 2024, 06:01: IG1 on.
Wednesday, April 10, 2024, 12:21: Waterline FS#5 open. Vacuum stable @ 1.23e-06T.
Wednesday, April 10, 2024, 12:25: Power / sources on.
Wednesday, April 10, 2024, 12:32: TGHT / TBHT @ 5/5A tapped up & back down manually. Ok.
Wednesday, April 10, 2024, 12:33: Anode @ 25 V, Coil @ 10 A. Tapped up & down manually. Ok.
Wednesday, April 10, 2024, 12:35: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Tapped up & down manually. Ok.
Wednesday, April 10, 2024, 12:37: Vacuum @ 1.19e-06T. Ok, but will allow to drop further.
Thursday, April 11, 2024, 10:21: Gas lines open.
Thursday, April 11, 2024, 10:34: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, April 11, 2024, 10:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Thursday, April 11, 2024, 10:41: Significant sparking for about 5 seconds. BIAS / EE / EZL @ 43 / -2.0 / 19 kV.
Thursday, April 11, 2024, 10:42: BIAS / EE / EZL @ 45 / -2.0 / 19 kV.
Thursday, April 11, 2024, 10:46: BIAS / EE / EZL @ 47.5 / -2.2 / 22 kV. Sparking again. On the spark gap.
Thursday, April 11, 2024, 10:56: BIAS / EE / EZL @ 50 / -2.5 / 25 kV.
Thursday, April 11, 2024, 11:26: 30 minutes @ 50 kV. 2 sparks in that time. The second spark tripped the optics & IG6. They were reset.
Thursday, April 11, 2024, 11:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, April 11, 2024, 11:38: HV tapped to 0 kV.
Thursday, April 11, 2024, 11:39: Vacuum @ 8.27e-07T.
Thursday, April 11, 2024, 13:03: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 8.16e-07T.
Thursday, April 11, 2024, 13:26: Coil @ 80 A. Tapped up manually at 4 A per min approx.
Thursday, April 11, 2024, 13:28: Vacuum @ 1.01e-06T
Thursday, April 11, 2024, 13:57: Vacuum @ 2.96e-06T
Thursday, April 11, 2024, 14:19: Coil @ 0 A.
Thursday, April 11, 2024, 14:21: Anode @ 100 V.
Thursday, April 11, 2024, 14:22: Anode @ 200 V.
Thursday, April 11, 2024, 14:24: Anode @ 500 V.
Thursday, April 11, 2024, 14:28: Anode @ 0 V.
Thursday, April 11, 2024, 14:32: HV to 0 kV.
Friday, April 12, 2024, 06:30: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Friday, April 12, 2024, 13:23: Auto-ramping aborted. TGHT @ 556 A, Vacuum @ 4.94e-06T. Allow 20 min for stabilization.
Friday, April 12, 2024, 13:44: Auto-ramping TGHT to 580 A @ 2 A per min. Vacuum @ 4.57e-06T.
Friday, April 12, 2024, 14:15: Aborted auto-ramp. Vacuum @ 5.20e-06T. Will manually tap up.
Friday, April 12, 2024, 14:32: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 5.31e-06T. The extraction electrode is acting up. Doubling the voltage on what is input. Add 50 V on the slider, 100 V will go to the readback.
Friday, April 12, 2024, 14:49: HV back to 0 kV.
Friday, April 12, 2024, 15:12: EE Troubleshooting. Cage open & multiple tests to adjust the voltage.
Friday, April 12, 2024, 15:19: Auto-cooling @ -2 A per min
|
Tuesday, April 09, 2024, 15:28, Aaron Schmidt, , , , , , , , Set to Anode BIAS Mode & Old gas leak installed.
|
Switched to Anode mode on March 28 including polarity. The old calibrated leak was also re-installed. |
Thursday, April 04, 2024, 10:38, Dave Neilson, , LP-SIS, , , 44691-8, 45235-26, Done, Mass marker testing
|
Thursday, April 04, 2024, 09:49: Target inserted yesterday, April 3. mass marker tube connections carefully confirmed. Vacuum roughed, turbo pumps switched on at end of day. Water cooling turned on this morning.
Thursday, April 04, 2024, 09:52 : Vacuum at 6.4e-6. Not low enough to bypass lockout for TGHT TBHT ramp.
Thursday, April 04, 2024, 11:31 increasing the coil current to 30A, causing the vacuum to increase, waiting for vacuum to recover.
Thursday, April 04, 2024, 12:41 vacuum recovered but is at 6e-6 Torr. Changed Good Vacuum parameter in the target heater autoramp to 6.5e-6 and am increasing TGHT TBHT to 100A 100A at 1A/30s. Bad vacuum parameter left set at 7e-6 T
Thursday, April 04, 2024, 12:51 Vacuum continuing to drop. 5.7e-6T
Thursday, April 04, 2024, 14:26 ramping TGHT TBHT to 230A/230A at 1.4A/10s. vacuum stable at 5.6e-6T
Thursday, April 04, 2024, 14:48 increasing bias to 30kV
Thursday, April 04, 2024, 15:00 performing mass scan, range up to ~150. Coil at 0A. TGHT TBHT at 230/230 -- 2024-04-04-15-30 mm LPSIS 1.txt
Thursday, April 04, 2024, 15:31 increasing COIL current to 20A. repeating mass scan. 2024-04-04-15-56 mm LPSIS 2.txt
Thursday, April 04, 2024, 15:57 vacuum has increased over the course of the mass scan to 7e-6T. decreasing coil to 0A, and decreasing TGHT to 180A at 1.4A/10s
Thursday, April 04, 2024, 16:11 performing mass scan. coil at 0A, TGHT TBHT at 180/230 -- 2024-04-04-16-38 mm LPSIS 3.txt
Thursday, April 04, 2024, 16:39 increasing coil to 20A. repeating mass scan. -- 2024-04-04-17-05 mm LPSIS 4.txt
Thursday, April 04, 2024, 17:07 increasing TGHT to 230A at 1.4A/10s - - waiting for vacuum to settle and will compare results to salt output tomorrow
Thursday, April 04, 2024, 17:51 decreasing bias to 0
Friday, April 05, 2024, 09:27 increasing bias to 30kV -- epics crashed
Friday, April 05, 2024, 10:44 epics back, resuming bias increase to 30kV
Friday, April 05, 2024, 10:59 running mass scan for 'after overnight hot' data point ---2024-04-05-11-26 mm LPSIS 5.txt
Friday, April 05, 2024, 11:26 increased coil current to 20A, conducting mass scan. --- 2024-04-05-11-56 mm LPSIS 6.txt
Friday, April 05, 2024, 11:57 decreased coil current to 10A, conducting mass scan ---- 2024-04-05-12-25 mm LPSIS 7.txt
Friday, April 05, 2024, 12:26 increasing TGHT to 260A
Friday, April 05, 2024, 12:36 conducting mass scan with coil current at 0A ---- 2024-04-05-13-02 mm LPSIS 8.txt
Friday, April 05, 2024, 13:03 conducting mass scan with coil current at 20A ---- 2024-04-05-13-31 mm LPSIS 9.txt
Friday, April 05, 2024, 13:31 conducting mass scan with coil current at 10A ---- 2024-04-05-13-59 mm LPSIS 10.txt
Friday, April 05, 2024, 14:00 ramping TGHT to 290A
Friday, April 05, 2024, 14:06 conducting mass scan with coil current at 0A ---- 2024-04-05-14-32 mm LPSIS 11.txt
Friday, April 05, 2024, 14:33 conducting mass scan with coil current at 10A ---- 2024-04-05-15-00 mm LPSIS 12.txt
Friday, April 05, 2024, 15:01 conducting mass scan with coil current at 20A --- 2024-04-05-15-27 mm LPSIS 13.txt
Friday, April 05, 2024, 15:33 conducting mass scan with coil current at 30A --- 2024-04-05-16-01 mm LPSIS 14.txt
Friday, April 05, 2024, 16:02 conducting mass scan with coil current at 40A ---- 2024-04-05-16-31 mm LPSIS 15.txt
Friday, April 05, 2024, 16:32 conducting mass scan with coil current at 50A --- 2024-04-05-17-00 mm LPSIS 16.txt
Friday, April 05, 2024, 17:01 coil reduced to 0A. decreasing TGHT TBHT to 0 0 at 1A/30s, decreasing bias to 0
|
Thursday, March 14, 2024, 17:43, Dave Neilson, , LP-FEBIAD, , , 44692-4 , 42972, , Calibrated Leak Development
|
Thursday, March 14, 2024, 15:39: Roughing
Thursday, March 14, 2024, 16:20:TP1B on
Thursday, March 14, 2024, 16:40: TP1A on
Thursday, March 14, 2024, 16:51: IG1 on
Thursday, March 14, 2024, 17:28: Waterline FS#5 open
Friday, March 15, 2024, 13:19: Gradually increased BIAS to 25kV, then up to 50kV more slowly. Accompanied by increase in EZL voltage.
Friday, March 15, 2024, 13:50: Periodically increased BIAS voltage in 100V increments watching for sparks. Decrease BIAS whenever sparks. settled at 51.5 kV (cannot increase further without sparking), left at high voltage.
Friday, March 15, 2024, 15:48: Decreasing BIAS to 10kV
Friday, March 15, 2024, 16:28: ran coil at 80A until vacuum recovered.
Friday, March 15, 2024, 19:29: decrease coil to 0A, decrease BIAS to 0V
Monday, March 18, 2024, 10:08 increasing TGHT/TBHT to 440A/290A at 1A/30s
Monday, March 18, 2024, 16:00 increasing COIL to 40A, waiting for vacuum to return to normal
Monday, March 18, 2024, 21:05: decreasing COIL to 0A
Tuesday, March 19, 2024, 09:35: increased COIL to 40A.
Tuesday, March 19, 2024, 10:17: increased TDH:ANODE (cathode mode) to (-)200V
Tuesday, March 19, 2024, 10:20: increasing BIAS to 30kV
Tuesday, March 19, 2024, 13:12: turned on gas. vacuum jumped up and tripped everything off. gas was immediately turned back off. TGHT and TBHT were off for approximately 1 minute before being turned back on.
Tuesday, March 19, 2024, 13:46: cooling. need to investigate possible leaks.
Tuesday, March 19, 2024, 15:58: TGHT and TBHT at 0A. Turbo pumps turned off. waiting to slow before venting.
Tuesday, March 19, 2024, 16:20 venting
Wednesday, March 20, 2024, 14:47: Target assembly was removed today and the tube from the inlet to the calibrated leak was replaced. Now reinstalled, roughing. Gas was turned on at ~0.2 bar during roughing. No effect on vacuum.
water cooling also turned on.
Wednesday, March 20, 2024, 14:53 Turbo pumps turned on.
Wednesday, March 20, 2024, 20:24: begin ramping TGHT TBHT to 440/290A at 1A/30s
Thursday, March 21, 2024, 09:54: Target heated, vacuum good. Tested gas to ensure there is no noticeable effect on vacuum. Lines subsequently vented through the line roughing pump.
Thursday, March 21, 2024, 09:55 Optics switched on. increasing cathode to 200V and coil to 40A. Watching vacuum, checking beam tune
Thursday, March 21, 2024, 10:20 ramping BIAS to 30kV
Thursday, March 21, 2024, 11:14 : scanned, data recorded
Thursday, March 21, 2024, 11:14 cathode reduced to 100V. scanned
Thursday, March 21, 2024, 11:32: coil reduced to 20A. scanned.
Thursday, March 21, 2024, 11:50 cathode increased to 200V. scanned
Thursday, March 21, 2024, 12:07 coil increased to 40A. Argon gas on (-0.8bar at regulator). scanned
Thursday, March 21, 2024, 12:31 reducing bias to 0kV
Thursday, March 21, 2024, 13:02 argon regulator pressure increased to -.64bar
Thursday, March 21, 2024, 13:05 increasing bias to 30kV
Thursday, March 21, 2024, 13:15: vented lines, scanning
Thursday, March 21, 2024, 13:35 gas on. scanning
Thursday, March 21, 2024, 15:05 cathode at 100V, scanning
Thursday, March 21, 2024, 15:20 coil at 20A, scanning
Thursday, March 21, 2024, 15:55 coil off. scanning
Thursday, March 21, 2024, 16:10 cathode off, scanning
Thursday, March 21, 2024, 17:23 - bias down. changing gas pressure
Friday, March 22, 2024, 09:08 increasing bias, checking tune, increasing cathode to 200V, coil to 40A, EZL to 13kV
Friday, March 22, 2024, 09:48 gas vented, scanned, gas on, scanned.
Friday, March 22, 2024, 09:48 decreasing bias to 0V, changing gas pressure.
Friday, March 22, 2024, 10:12 pressure at 1bar.abs. increased bias to 30kV, checked beam tune, cathode to 200V, coil to 40A, EZL to 13kV
Friday, March 22, 2024, 10:13 gas on. scanning
Friday, March 22, 2024, 10:33 decrease bias, changing pressure.
Friday, March 22, 2024, 10:57 gas line pressure at 1.5bar.a. increasing bias to 30kV, checking beam tune, cathode to 200V, coil to 40A, EZL to 13kV
Friday, March 22, 2024, 11:42 decreased bias, changing pressure.
Friday, March 22, 2024, 11:52 gas line pressure at ~2bar.a increasing bias to 30kV, checking beam tune, cathode to 200V, coil to 40A, EZL to 13kV
Friday, March 22, 2024, 15:40 bias down to 0V. reducing TGHT TBHT to 0/0
Monday, March 25, 2024, 09:30 Turbo pumps turned off
Monday, March 25, 2024, 10:00 venting chamber, purged water lines.
Monday, March 25, 2024,11:00 removed target assembly
Monday, March 25, 2024,13:00 replaced target assembly, began roughing
Monday, March 25, 2024,13:50: turned on water cooling. Vacuum stable. Turned on turbo pumps.
Monday, March 25, 2024, 15:16 turned on optics elements, cathode to 200V, coil to 80A, EZL to 13kV. monitoring vacuum. Gas leak test shows no effect on vacuum (5e-6T).
Monday, March 25, 2024, 15:22: Ramping TGHT TBHT to 440/290A at 1A/30s
Tuesday, March 26, 2024, 10:32 Ran mass scans with gas off and on.
Tuesday, March 26, 2024, 10:32 scanning parameter space for optimal beam output - cathode voltage and coil current.
Tuesday, March 26, 2024, 15:29 ramping TBHT to 300A, scanning
Tuesday, March 26, 2024, 16:10 ramping TBHT to 310A, scanning
Tuesday, March 26, 2024, 16:40 ramping TBHT to 320A, scanning
Wednesday, March 27, 2024, 09:25 - ramping bias to 30kV
Wednesday, March 27, 2024, 09:40 scanning cathode / coil parameter space to optimize output --- highest output at 200V 60A - 200V 62A - magnet drifted and is not right at Ar peak. corrected. scan repeated
Wednesday, March 27, 2024, 10:31 scanning cathode / coil parameter space to optimize output
Wednesday, March 27, 2024, 11:02 mass scan with 200V 62A cathode coil.
Wednesday, March 27, 2024, 11:17 - lines evacuated. mass scan.
Wednesday, March 27, 2024, 11:40 bias to 0V. change gas pressure
Wednesday, March 27, 2024, 11:50 bias to 30kV. mass scan
Wednesday, March 27, 2024, 12:10 bias to 0V. change gas pressure
Wednesday, March 27, 2024, 12:21 bias to 30kV. mass scan
Wednesday, March 27, 2024, 12:31 bias to 0V. change gas pressure
Wednesday, March 27, 2024, 12:43 Ramping bias to 30kV.
Wednesday, March 27, 2024, 15:00 bias to 0V. changing pressure to .5 bar.
Wednesday, March 27, 2024, 15:13 bias at 30kV.
Wednesday, March 27, 2024, 15:13 increasing TGHT to 468A (~2250W) - mass scan - monitoring vacuum. stable at 6e-7T
Wednesday, March 27, 2024, 15:39 increasing TGHT to 490A (~2500W) - mass scan - monitoring vacuum. stable at 6e-7T
Wednesday, March 27, 2024, 16:23 reduced cathode voltage to 50V to record the electron current (17.09mA). mass scan taken with coil at 35A
Wednesday, March 27, 2024, 16:35 ramping down BIAS to 0V.
Wednesday, March 27, 2024, 16:38 decreasing TGHT TBHT to 0A 0A at 1A/30s in preparation to switch to anode mode in the morning.
Thursday, March 28, 2024, 13:59 - Switched to anode mode
Thursday, March 28, 2024, 13:59 - ramping TGHT and TBHT to 100A at 1A/30s
Thursday, March 28, 2024, 14:37 increasing BIAS to 30kV
Thursday, March 28, 2024, 14:47 - ramping TGHT/TBHT to 440A/290A at 1A/7s
Thursday, March 28, 2024, 15:56 mass scan with 200V 62A cathode coil. gas on at 0.5 bar. (bias at 29.8kV)
Thursday, March 28, 2024, 15:56 mass scan with 200V 62A cathode coil. gas vented. (bias at 29.8kV)
Thursday, March 28, 2024, 16:29 ramping TGHT/TBHT to 490A/320A at 1.4A/10s
Thursday, March 28, 2024, 16:36 mass scan with 200V 62A cathode coil. gas on at 0.5 bar. (bias at 29.8kV)
Thursday, March 28, 2024, 16:56 mass scan with 200V 62A cathode coil. gas vented. (bias at 29.8kV)
Thursday, March 28, 2024, 17:13 dropping bias to 0
Thursday, March 28, 2024, 17:14 cooling tght and tbht at 1A/30s |
Monday, February 26, 2024, 10:24, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:RP2 purge. TS exhaust clearing. + TMS:TP6
|
Monday, February 26, 2024, 10:12:
While attempting to cycle FC0, noticed that the turbo pumps TMS:TP6 & TMS:TP2 were off, with TP2 being tripped off. The vacuum on TMS:CG2A sat around 0.825T although RP2 was running. The ballast plug has since been removed to allow for a 2 hour purge of the roughing pump.
Thursday, February 29, 2024, 13:10: Backing pressure still had not stabilized. RP2 removed & taken to Vacuum Group.
Wednesday, March 06, 2024, 10:28:
Tip seals were replaced by Vacuum Group. Roughing.
Wednesday, March 06, 2024, 10:31: TMS:TP6 & TMS:TP2 on.
Wednesday, March 06, 2024, 10:49: TP6 has tripped twice. TP2 ok.
Wednesday, March 06, 2024, 12:25: Venting. TP6 is not operating above 3 krpm.
Vacuum Group acquired TP6. It was nearly seized.
Wednesday, March 06, 2024, 14:57: Varian 551 pump installed from the furnace behind the TS. Roughing.
Friday, March 08, 2024, 06:58: Soft start initiated.
Friday, March 08, 2024, 08:47: TP6 at speed. |
Tuesday, February 20, 2024, 14:22, Aaron Schmidt, , , , , , , , Set to Cathode BIAS Mode
|
Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D.
Monday, March 11, 2024, 13:59: Power supply polarity switched to negative. |
Friday, February 16, 2024, 10:30, Aaron Schmidt, SiC# (Stock), HP-FEBIAD, , , 45447-4, 45235-21, In progress, Conditioning stock SiC HP FEBIAD
|
Friday, February 16, 2024, 10:30: Roughing
Friday, February 16, 2024, 17:38: TP1B on.
Friday, February 16, 2024, 17:47: TP1A on.
Friday, February 16, 2024, 17:55: IG1 on. New Coil PS was installed.
Tuesday, February 20, 2024, 07:51: Waterline FS#5 open.
Tuesday, February 20, 2024, 07:58: Cage closed. PS on.
Tuesday, February 20, 2024, 08:01: Check. TGHT / TBHT manually to 5 / 5 A. Coil & Anode not responding.
Tuesday, February 20, 2024, 09:40: Pressure gauge reconnected within cage. Gas lines purged, refilled with argon. SV5 closed.
Tuesday, February 20, 2024, 09:48: System check 2: TGHT / TBHT manually to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 50 V.
Coil set to 15 A, did not adjust.
Tuesday, February 20, 2024, 12:04: Coil PS SW1-7 switch in was in an "Off" position & wouldn't allow the voltage signal through to the PS. Switched to "on". Coil tapped to 7 A manually & back to 0 A ok.
Tuesday, February 20, 2024, 12:24: SV4 open. SV5 is closed. Cage is closed.
Tuesday, February 20, 2024, 12:26: All power & sources on.
Tuesday, February 20, 2024, 12:29: Optics on & set w/ updated tune.
Tuesday, February 20, 2024, 12:56: PS off to switch to Cathode BIAS mode.
Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D. Cage closed up. PS on.
Tuesday, February 20, 2024, 14:52: Anode/Cathode short. PS off & remove the cage again.
Tuesday, February 20, 2024, 15:20: IG1 off. Chamber TP off.
Wednesday, February 21, 2024, 07:30: Venting.
Wednesday, February 21, 2024, 08:32: Short found on waterlines (E) to (D)
Wednesday, February 21, 2024, 08:34: IG1 Bypass in effect.
Wednesday, February 21, 2024, 08:37: BIAS / EE / EZL to 1 / -0.5 / 0.5 kV. Note* If voltage is put on the EE before the BIAS, a small amount of voltage also goes to the BIAS. To keep an eye on. Back to 0 V.
Wednesday, February 21, 2024, 08:40: Coil to 5 A, Anode to 50 V. OK. Back to 0 A / V
Wednesday, February 21, 2024, 08:41: TGHT / TBHT both to 5 / 5 A ok. Back to 0 A. All checks ok.
Wednesday, February 21, 2024, 08:42: IG1 Bypass removed.
Wednesday, February 21, 2024, 09:14: TP1B on.
Wednesday, February 21, 2024, 09:22: TP1A on.
Wednesday, February 21, 2024, 09:31: IG1 on.
Wednesday, February 21, 2024, 14:00: HV & Coil checks. OK. IV4 open.
Thursday, February 22, 2024, 08:17: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, February 22, 2024, 08:23: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Thursday, February 22, 2024, 08:26: BIAS / EE / EZL @ 45 / -2.0 / 19 kV. 2 large sparks on the tap up.
Thursday, February 22, 2024, 08:42: BIAS / EE / EZL @ 47.5 / -2.0 / 22 kV. Small sparks on the tap up
Thursday, February 22, 2024, 09:00: BIAS / EE / EZL @ 50 / -2.0 / 25 kV. Sparks on the tap up.
Thursday, February 22, 2024, 09:10: One spark. Reset steering & optics.
Thursday, February 22, 2024, 09:17: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, February 22, 2024, 09:39: Coil @ 80 A. Tapped up manually at 4 A per min approx. Vacuum @ 5.13e-07.
Thursday, February 22, 2024, 12:06: Coil @ 0 A
Thursday, February 22, 2024, 12:10: Anode @ 100 V.
Thursday, February 22, 2024, 12:12: Anode @ 200 V.
Thursday, February 22, 2024, 12:16: Anode @ 500 V.
Thursday, February 22, 2024, 12:26: Anode @ 0 V.
Thursday, February 22, 2024, 12:38: BIAS / EE / EL @ 0 kV.
Thursday, February 22, 2024, 12:58: Auto-ramping TGHT / TBHT to 350 / 200 A @ 2 A per min.
Thursday, February 22, 2024, 16:25: Vacuum @ 1.16e-06T. Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Thursday, February 22, 2024, 18:35: TGHT / TBHT @ 580 / 290 A.
Thursday, February 22, 2024, 18:45: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. FC0 @ 100nA = 7.71e-09
Thursday, February 22, 2024, 18:48: Anode @ 100 V. Coil to 10 A. FC0 @ 100nA = 6.82e-09
Thursday, February 22, 2024, 19:00: FC0 is stuck!!!. However it is not releasing HPA? Confirmed by the MCR over MS teams video chat. IV4 Closed. (Angry tech noises)
Thursday, February 22, 2024, 19:02: BIAS/ EE / EZL @ 0 KV. Anode & Coil to 0.
Thursday, February 22, 2024, 19:07: Auto-cooling @ 2 A per minute.
Thursday, February 22, 2024, 19:08: Closed SV4 & SV5.
Friday, March 08, 2024, 06:59: Issues with FC0 & RP2 resolved. Soft start on TP6 initiated.
Friday, March 08, 2024, 07:06: Gas lines filled with Argon.
Friday, March 08, 2024, 07:08: Auto-ramping TGHT / TBHT @ 2 A per min to 350 / 200 A
Friday, March 08, 2024, 07:32: TBHT @ 41 A. TGHT @ 0 A?
Friday, March 08, 2024, 07:35: TGHT PS was physically off (Why???). Turned on. Manually tapped up to 25 A. Ok. Auto-ramping TGHT / TBHT @ 2 A per min to 350 / 200 A.
Friday, March 08, 2024, 08:05: TP6 tripped. Half way spun up. Soft start restarted.
Friday, March 08, 2024, 08:47: TP6 at speed. TP2 on.
Friday, March 08, 2024, 08:52: IG6 on.
Friday, March 08, 2024, 09:05: Optics on. Quick checks on BIAS / EE / EZL, Cathode (Anode), & Coil OK.
Friday, March 08, 2024, 09:33: IV4 open.
Friday, March 08, 2024, 10:18: Vacuum @ 2.43e-07T. Halted auto-ramping. Increase. Auto-ramping TGHT / TBHT @ 2 A per min to 580 / 290 A.
Friday, March 08, 2024, 13:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Friday, March 08, 2024, 15:59: Mass & wire scans complete. Appear the anode PS is likely positive. Auto-cooling @ 2 A per min.
Friday, March 08, 2024, 16:04: HV off. Gases closed.
Monday, March 11, 2024, 23:09: Auto-ramping TGHT / TBHT to 580 / 290 A @ 1 A per min.
Tuesday, March 12, 2024, 09:45: Gas on.
Tuesday, March 12, 2024, 09:51: BIAS / EE / EZL @ 30 / -1.5 / 13
Tuesday, March 12, 2024, 10:36: Anode @ 100 V. Coil @ 20 A.
Tuesday, March 12, 2024, 11:19: Mass & Wire scans complete.
Tuesday, March 12, 2024, 13:51: EE at -2.5. mass scan
Tuesday, March 12, 2024, 13:55: EE at -1.5. Coil at 0A. mass scan
Tuesday, March 12, 2024, 14:11: Coil at 20A, TSH:ANODE at 0V. mass scan
Tuesday, March 12, 2024, 14:30: coil and anode on. gas turned off.
Tuesday, March 12, 2024, 16:59: decreasing bias
Tuesday, March 12, 2024, 17:07 decreasing TBHT TGHT to 0, 1A/s |
Friday, February 16, 2024, 05:03, Aaron Schmidt, , , , , , , Problems/Solutions, Coil PS issue
|
15-02-2024
The coil PS control card is fried. Roughly since the beginning of December. The PS was removed.
See attached image.
New PS was installed on Friday.
Tuesday, February 20, 2024, 08:01: Check Coil not responding.
Tuesday, February 20, 2024, 09:48: System check 2: TGHT / TBHT manually to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 50 V.
Coil set to 15 A, did not adjust.
Tuesday, February 20, 2024, 12:04: Coil PS SW1-7 switch in was in an "Off" position & wouldn't allow the voltage signal through to the PS. Switched to "on". Coil tapped to 7 A manually & back to 0 A ok.
Fixed*
|
Tuesday, February 06, 2024, 14:09, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid issue
|
Tuesday, February 06, 2024, 14:06: Attempted to 'Close' FC0. While it succeeded in moving into position, HPA rushed out of the exhaust. This solenoid was replaced recently on January 18th. Requires replacement. (ordered)
Reference: https://elog.triumf.ca/TIS/Test-Stand/990
Stores PN: 01-7/01026
Valve, Solenoid, 24 Volt 5 Port |
Tuesday, February 06, 2024, 11:48, Aaron Schmidt, SiC# (Stock), HP-SIS, , , 41369-2, 45235-14, In progress, Conditioning (Stock SiC-24C) SiC HP-SIS
|
Tuesday, February 06, 2024, 11:45: Roughing.
Tuesday, February 06, 2024, 13:27: TP1B on.
Tuesday, February 06, 2024, 13:33: TP1A on.
Tuesday, February 06, 2024, 13:47: IG1 on.
Wednesday, February 07, 2024, 06:54: Vacuum @ 7.55e-07T.
Wednesday, February 07, 2024, 06:56: PS on. FS#5 open. Vacuum stable.
Wednesday, February 07, 2024, 06:58: Coil jumped from 0A with the breaker off to 200 A w/ 4.2 V.
Wednesday, February 07, 2024, 06:59: Coil PS switched on. Increase coil current to 75 A & back down again. No change. Will need to trouble shoot this once this target is complete.
Wednesday, February 07, 2024, 07:04: Auto-ramping TGHT / TBHT to 350 / 200 A @ 2 A per min. Good vac / bad vac settings set back to 5.00e-06T / 7.00e-06T. Note: The TS will trip at 1.00e-05T.
Wednesday, February 07, 2024, 07:09: FC0 still acting up. Optics on.
Wednesday, February 07, 2024, 10:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Wednesday, February 07, 2024, 12:10: IV4 open.
Wednesday, February 07, 2024, 12:14: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, February 07, 2024, 12:15 : Opening & Closing FC0 for a measurment does not interfere with IV4.
Wednesday, February 07, 2024, 12:42: One audible spark. Knocked out TMS : Q2/Q5. Reset.
Wednesday, February 07, 2024, 13:34: Mass & Wire scans complete with 2 tunes. Ok.
Thursday, February 08, 2024, 09:02: Auto-cooling @ 2A per min.
Coil PS removed. (See elog 995)
Friday, February 16, 2024, 04:57: IV4 closed
Friday, February 16, 2024, 04:58: IG1 & TP off. |
Monday, January 22, 2024, 13:55, Aaron Schmidt, , LP-SIS, , , 45447-19, 45235-22, In progress, Conditioning UCx HS - 2
|
Conditioning HS for UCx. LP-SIS oven / end caps installed
Monday, January 22, 2024, 13:53: Roughing.
Monday, January 22, 2024, 14:21: TP1B On.
Monday, January 22, 2024, 14:34: TP1A on.
Monday, January 22, 2024, 14:41: IG1 on. Vacuum @ 3.95e-05T & dropping.
Monday, January 22, 2024, 14:46: FS#5 open. Vacuum stable. 2.41e-05T & dropping. Power on.
Tuesday, January 23, 2024, 07:40: IV4 open.
Tuesday, January 23, 2024, 07:42: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute.
Tuesday, January 23, 2024, 13:43 increasing BIAS to 30kV - dn
Tuesday, January 23, 2024, 14:03 BIAS at 30kV
Tuesday, January 23, 2024, 14:06 beginning mass scan
Tuesday, January 23, 2024, 16:06: Data exported and saved
Tuesday, January 23, 2024, 16:15: Decreasing BIAS to 0V
Tuesday, January 23, 2024, 16:27: BIAS at 0V
Tuesday, January 23, 2024, 16:41: Vacuum in main chamber consistently at ~1.4e-6 T throughout.
Wednesday, January 24, 2024, 07:39: Auto-cooling @ 2 A per min.
Wednesday, January 24, 2024, 08:59: Auto-cooling Halted. Auto-ramp back up to 580 / 230 A @ 2 A per min.
Wednesday, January 24, 2024, 15:30: Target already hot - TBHT 230A, TGHT 580A
Wednesday, January 24, 2024, 15:31: increasing BIAS to 30kV
Wednesday, January 24, 2024, 15:41: beginning mass scan - Completed and repeated for confirmation
Wednesday, January 24, 2024, 16:55: decreasing BIAS to 0kV
Wednesday, January 24, 2024, 17:10: BIAS at 0kV
Thursday, January 25, 2024, 10:13: increasing bias to 30kV
Thursday, January 25, 2024, 10:30: BIAS at 30kV
Thursday, January 25, 2024, 10:40 : beginning mass scan
Thursday, January 25, 2024, 13:41 Tuned various parameters, multiple mass scans
Thursday, January 25, 2024, 16:19: decreasing BIAS to 0V
Thursday, January 25, 2024, 16:42 BIAS at 0V
Thursday, January 25, 2024, 16:42 Target cooling.
Monday, January 29, 2024, 08:55: Closed IV4, switched off turbo pumps, and opened VV1 to vent test stand and bring to atmospheric pressure. In preparation to remove target and add high mass salt.
Monday, January 29, 2024, 09:04: Does not appear to be venting. investigating. appears that the valve did not actuate on first instruction. Worked on repeated attempt.
Monday, January 29, 2024, 11:43 : at 700+ T, opening for target assembly removal.
Monday, January 29, 2024, 12:37 10µL Rb salt added to target. Assembly placed back into test stand. Pumping down.
Tuesday, January 30, 2024, 09:25: Vacuum stable. 8e-7 T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute.
Tuesday, January 30, 2024, 15:13: increasing BIAS to 30kV
Tuesday, January 30, 2024, 15:39 bias at 30kV, beginning mass scan
Tuesday, January 30, 2024, 16:48 Scans complete, lowering bias.
Wednesday, January 31, 2024, 16:02 increasing bias to 30kV
Wednesday, January 31, 2024, 16:40 scanned
Wednesday, January 31, 2024, 16:40 decreasing bias
Wednesday, January 31, 2024, 16:48 bias at 0V. cooling target
Thursday, February 01, 2024, 09:21: venting
Thursday, February 01, 2024, 11:14 : removed target assembly. added 5 salts: Na, Li,K,Rb,Cs. Placed target assembly back in test stand. pumping down.
Thursday, February 01, 2024, 16:51 Vacuum at 2e-6
Thursday, February 01, 2024, 16:52 heating target. TGHT and TBHT to 580 230 A overnight. .6A / min and .2A / min
Friday, February 02, 2024, 10:17 Target hot. Vacuum stable at 1e-6. increasing bias to 30kV
Friday, February 02, 2024, 10:42 scanning
Friday, February 02, 2024, 16:06 reducing bias
Friday, February 02, 2024, 16:18 bias at 0V. cooling target to 0 A at 2A per minute
PS & breaker off earlier via DN.
Monday, February 05, 2024, 13:58: TS was vented. HS removed - AS. |
Thursday, January 18, 2024, 10:49, Aaron Schmidt, , LP-SIS, , , 44139-2, 45235-22, In progress, Conditioning UCx HS
|
Straight/closed TGHT tube oven installed. SIS Assembly.
Thursday, January 18, 2024, 10:32: Roughing.
Thursday, January 18, 2024, 10:57: TP1B on.
Thursday, January 18, 2024, 11:08: TP1A on.
Thursday, January 18, 2024, 11:17: IG1 on.
Thursday, January 18, 2024, 11:27: IV4 cycled ok.
Thursday, January 18, 2024, 12:07: IV4 open. PS / Sources on. Waterlines already open.
Thursday, January 18, 2024, 14:57: TPS:Q1 un-plugged, cycled, & reset. OK. Optics set to previous tune.
Friday, January 19, 2024, 06:45: TGHT on. Auto-ramping TGHT to 580 A @ 2 A per min.
Friday, January 19, 2024, 13:30: BIAS on at 30kV , preparing for mass scan - dn
Friday, January 19, 2024, 13:45: noting that mass scan 'field' parameter is not displayed in scanner. nor does the hall probe seem to be registering any changes on the magnet -dn
Friday, January 19, 2024, 15:00: after troubleshooting for quite a while, we fixed the problem by resetting/reconfiguring the canbus controllers. IOC reset did not help the problem and nor did power cycling the box 2A-5, which is believed to be routed to the hall probe.
noted that resetting the IOC did trip the BIAS and drop it to 0V.
Friday, January 19, 2024, 15:15: BIAS back to 30kV, resume mass scan.
Friday, January 19, 2024, 16:00, mass scan completed, data extracted.
Friday, January 19, 2024, 16:36: BIAS brought down to 0V over 15 min. auto cooling initiated at -1A / 30s
Monday, January 22, 2024, 10:36: EZL / EE to 0 V. Sources off.
Monday, January 22, 2024, 10:39: IV4 & FC0 closed.
Monday, January 22, 2024, 10:41: Power off. IV4 reset.
Monday, January 22, 2024, 10:42: IG1 off. Turbo pumps off.
Monday, January 22, 2024, 12:29: Venting via the turbo pumps. |
Thursday, January 18, 2024, 10:47, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid Replaced.
|
Issues with valve operations due to a leak in the solenoid valve above FC0. The HPA leak did not allow for sufficient pressure to remain in the lines to operate. The solenoid as changed this morning.
Thursday, January 18, 2024, 10:32: Roughing. Valves can be cycled. FC0 cycled. OK.
Thursday, January 18, 2024, 10:40: TMS TP6 & TMS:TP2 on.
Thursday, January 18, 2024, 10:45: IG6 on.
|
Thursday, January 18, 2024, 10:44, Aaron Schmidt, , , , , , , Done, Thermal tests 2
|
December 18 - January 15. Were not logged. Placed holder. Aurelia's tests. Included thermocouples in the oven & ionizer. |
Tuesday, December 12, 2023, 16:11, Dave Neilson, Shunt #0, , , , -, -, , P2N Thermal Test
|
Tuesday, December 12, 2023, 16:07 - Pumping down test stand overnight for testing tomorrow. vacuum good, turbos starting now. Four thermocouples attached inside. tc1: high on (+) TGHT leg, pins 1+2. tc2: at target terminal (+), pins 4+5. tc3: at target terminal (-), pins 6+7. tc4: low on (+) TGHT leg, pins 8+9.
Wednesday, December 13, 2023, 09:32 : Vacuum at 8.2e-7 T. Electrical team is finishing connecting the cables. Claim it will be complete at 11am.
Wednesday, December 13, 2023, 11:41Started both tc loggers at 11:40 - important for offset time. Beginning ramp as well on ATTS TGHT. set vacuum values high at 1e3 1e4 to bypass ATTS interlock, which does not apply here. ramping to 600A with step increment 10A and wait interval 10s.
ATTS TGHT claims ramping in progress, but increased voltage is reported only on the autoramp window, which reports increasing the target amperage by 10A each 10s. However, no increased voltage reading is reported there, nor is there any increased current. ATTS:TGHT:RDCUR and ATTS:TGHT:RDVOL are ~0 as well. No increased temperature on any of 6 tc channels.
Wednesday, December 13, 2023, 11:57 ATTS TGHT power supplies appear to be under local control. It also appears (low current right now) that the value reported in EPICS is 1/3 of the value reported on the master power supply. It may be that the epics value is per output of the individual 3 supplies, while the total output is reported on the PS display. Planning to now increase to 300A and reach steady state.
Wednesday, December 13, 2023, 12:13 : 1/3 ratio idea confirmed at 33A EPICS reading / 100A master reading and again at 100A EPICS reading / 300A master reading. 300A now reached. Waiting for 20min. Temps inside ~ 21°C. Temps on feed through terminals ~22°C
Wednesday, December 13, 2023, 12:26: 200epics 600A master. tc out: 23.0, 22.6. tc in: 21.4 21.7 22.0 20.8. waiting
Wednesday, December 13, 2023, 12:36 No temp change over 10 min. increasing to 900A
Wednesday, December 13, 2023, 12:47: 900A. outside tc 24.5 23.7°C. inside tc 21.7 23 23.6 21.0 °C.
Wednesday, December 13, 2023, 13:04: increasing to 1200A
Wednesday, December 13, 2023, 13:11 1200A. outside tc 27.1 25.4. inside tc 22.6 24.8 25.9 21.7 °C. Will wait to observe stability
Wednesday, December 13, 2023, 13:20 after ~10min. outsideTC: 27.6 25.9. insideTC: 22.5 25.2 26.1 21.8 °C. Temperatures appear stable. increasing to 1300A
Wednesday, December 13, 2023, 13:25 at 1300A. outsideTC: 28.3 26.5, insideTC: 22.8 25.7 26.8 21.8. waiting for stability
Wednesday, December 13, 2023, 13:38 after ~10min, outsideTC 29.1 27.1, insideTC 23.2, 26.2, 27.4, 21.9. stable. Increasing to 1400A
Wednesday, December 13, 2023, 13:41: 1400A. outsideTC 29.8, 27.6. insideTC 23.4 26.7 28.2 21.4
Wednesday, December 13, 2023, 13:50 temps look stable 30.1 27.9, 23.3 27.7 28.4 21.4 . going to increase to 1500A ---- turning off turbo pumps in case of failure at high current
Wednesday, December 13, 2023, 13:57 at 1500A. temps: 30.9 28.3. 23.6 27.2 28.9 21.8 .
Wednesday, December 13, 2023, 14:07 temps look stable: 31.5 28.8... 23.6 28.0 29.4 22.0 going to increase to 1600A
Wednesday, December 13, 2023, 14:10 at 1600A temps: 32.0 29.1..... 23.8 28.2 30.0 22.2
Wednesday, December 13, 2023, 14:20 temps stable: 32.8 29.7, 23.9 28.9 30.6 22.2,. increasing to 1700A
Wednesday, December 13, 2023, 14:24 at 1700A temps: 33.5 30.2 24.3 29.3 31.5 22.4
Wednesday, December 13, 2023, 14:35 temps stable : 34.2 31.0 24.3 30.0 32.0 22.6 increasing to 1800A
Wednesday, December 13, 2023, 14:38 at 1800A. temps: 35.0 31.3 24.6 30.3 32.7 22.8
Wednesday, December 13, 2023, 14:47 temps: 35.8 32.0 24.7 31.2 33.3 22.8
Wednesday, December 13, 2023, 14:58 temps stable. 36.0 32.2 24.7 31.2 33.3 23.1 turning down power supply
Wednesday, December 13, 2023, 15:23 power supply off. strip tool data dumped to test1.txt --- copy this elsewhere. TCs left to continue monitoring for any additional cooldown.
Wednesday, December 13, 2023, 16:13 tc recording stopped.
repeat test
Thursday, December 14, 2023, 15:18 tcs start time
Thursday, December 14, 2023, 15:20 increasing TGHT from ATTS directly to 1500A and waiting for steady state temperature. Aiming for similar ramp rate to previous ~1A/s, 60A/min. tcs at cold read 21.9 21.9... 21.1 20.9 20.9 20.7
Thursday, December 14, 2023, 15:39 at 1500A
Thursday, December 14, 2023, 15:50 after~10min, temps at 31.3 28.4... 23.6 27.6 29.1 22.3
Thursday, December 14, 2023, 15:59 after ~20min, temps at 31.5 28.6.... 23.5 27.5 28.8 22.5. stable. increasing to 1800A
Thursday, December 14, 2023, 16:03 at 1800A
Thursday, December 14, 2023, 16:14 after 10min - 35.8 31.8 24.7 30.8 32.6 23.1
Thursday, December 14, 2023, 16:25 after 20min - 36.3 32.2 24.7 30.9 32.6 23.4 stable. decreasing current.
Thursday, December 14, 2023, 16:42 0A... cooling for a while
Thursday, December 14, 2023, 16:56 22.8 22.8 21.1 21.0 21.2 20.8 |
Tuesday, December 12, 2023, 12:41, Aaron Schmidt, , , , , , , Done, Source Tray / TS inspection
|
Tuesday, December 12, 2023, 12:39: Visual inspection.
Source tray: OK. Minor cracks on insulator near the coil conductor. Small chip in the upper TBHT insulator as well.
Water blocks: No leaks.
Pumping: TMS:RP2 recently purged. Otherwise all TP & RP OK.
Door seals: OK. |
Monday, November 27, 2023, 16:09, Ferran Boix Pamies, , LP-SIS, , , 45220-2, 45235-13, In progress, HV power surge test plus mass scans
|
Monday, November 27, 2023, 16:09 Roughing
Monday, November 27, 2023, 17:22 Both turbos are on, leaving vacuum over night.
Tuesday, November 28, 2023, 09:28 after pumping over night IG1 is at .15e-6 T. Water cooling on.
Tuesday, November 28, 2023, 14:34 HV test started. Sparks on the TC seen at BIAS/EE/EZL 31/-1.8/15kV. TC values recovered after sparks, TP6 tripped during sparks as well. Venting chamber to reposition TC.
Tuesday, November 28, 2023, 17:37 I couldn't manage to close properly the side door of the chamber... waiting for help tomorrow.
Wednesday, November 29, 2023, 10:51 Roughing started earlier in the morning. IG1 at 1e-5 T. Ramping up bias.
Wednesday, November 29, 2023, 11:41 HV tests lead to 45kV sparks on the TC. Nothing seen on the RPi.
Wednesday, November 29, 2023, 13:22 The ballast of TMSRP2 was opened to attempt to improve the roughing in the beam line section. Things appear to be somehow better now, TMSTP6 and TMSTP2 are on now.
Wednesday, November 29, 2023, 16:00 IG1 is at 3.58e-6. HV tests starting again.
Wednesday, November 29, 2023, 23:36 HV tests ended earlier in the afternoon. No spark up to 55kV when gauge in the HV cage started sparking as usual.
Wednesday, November 29, 2023, 23:38 TGHT and TBHT ramp up in preparation of mass scans in the morning. 1A/30s up to TGHT:400A, TBHT:160A
Thursday, November 30, 2023, 09:05 TGHT and TBHT ramp up in preparation of mass scans in the morning. 1A/30s up to TGHT:580A, TBHT:230A
Thursday, November 30, 2023, 12:12 Mass scans started earlier in the morning. 1st scan completed at 0.1A/s, repeating it again now with 0.05A/s.
Thursday, November 30, 2023, 15:04 HV tests again up to 55kV. 2 sparks inside the vacuum, to be checked if they affected TC measurement with the pi. Gauge still sparks in the upper HV cage.
Friday, December 01, 2023, 12:05. Error saving mass scan data Thursday. Repeating mass scans at 0.02,0.01,0.005 scan speeds. note* must delete old data prior to saving. -> save procedure: Delete Old Data, Right click plot, save as plot.txt, click Clean, Show/Save Data, enter file name and save. Filenames: 2023-12-01-*
Friday, December 01, 2023, 15:22. Spent some time selectively tuning various elements of the beam. Report in local folder, file "2023-12-01 beam tuning".
Friday, December 01, 2023, 15:23. Recording mass scan with inactive quadrupole elements. File name 2023-12-01_Q-off.txt
Sunday, December 03, 2023, 22:02 : Vacuum looks good. 4e-7 T. Heating up target for Monday morning. 1A/30s up to TGHT:580A, TBHT:230A
Monday, December 04, 2023, 12:21: This morning, increased BIAS to 30kV. Ran mass scan with adjusted beam tune up to FC0. This mass scan was repeated with inactive quadrupole elements up to FC0 to compare with Friday. 2023-12-02_RBsalt_SIS_test1.txt and 2023-12-02_RBsalt_SIS_test2.txt
Tuesday, December 05, 2023, 14:12 HV tests restarted, TC wire brought closer to the ground wall. IG1 at 2.3e-6 T. Ramping up HV.
Wednesday, December 06, 2023, 13:48 Both yesterday and today the TC wire was not close enough to spark even at 60kV. Venting the chamber one more time to bring the TC closer.
Thursday, December 07, 2023, 10:18 Vacuum at 5e-7T we see sparks at about 47kV. Lost control of epics during sparks, PS shut off manually. Everything recovered after.
Thursday, December 07, 2023, 13:32 After spark tests at ~55kV, Pi seems not to be affected by the sparks. Tests without the power surge components yielded similar results. We discovered that the sparks on the TC are partially diverted by spark gaps and probably other elements in the top HV cage.
Monday, December 11, 2023, 10:35 Turbopumps winding down. |
Thursday, November 16, 2023, 09:43, Aaron Schmidt, , LP-SIS, , , , , In progress, Thermal tests
|
Aurelia has been testing on the ISAC TS since last week. Thermocouples are installed in the end cap, left side & the ionizer.
No elog was initiated, but much has happened.
Site wide power outage on Friday/Saturday caused problems. The TS was running at that time & was also affected. Reboots occurred on the weekend & testing resumed. IG6 was reset yesterday.
Thursday, November 16, 2023, 09:30: IV4 closed. TP6, TP2, TP1B, TP1A off. IG6 & IG1 off. PS off.
Thursday, November 16, 2023, 13:11: TP6 & TP2 restarted.
Monday, November 20, 2023, 12:06: IV4 closed. IG6 off. TP6 & TP2 off.
Monday, November 20, 2023, 12:42: Venting beamline side. |
Monday, October 30, 2023, 16:01, Aaron Schmidt, , LP-SIS, , , 45220-2, 45235-13, In progress, HV power surge test plus mass scans
|
Monday, October 30, 2023, 16:00 Roughing
Tuesday, October 31, 2023, 08:58 Turbos on the afternoon before, TP1A timed out which delayed for another 30min turning on both TP. Now 3e-6 Torr in IG1. - FBP
Tuesday, October 31, 2023, 09:38: FS#5 open. Vacuum Stable @ 2.96e-06T
Tuesday, October 31, 2023, 09:40: PS / sources on.
Tuesday, October 31, 2023, 10:32 Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, October 31, 2023, 12:07 HV cage closed. TSG:BIAS and TSH:EE PS are on. Waiting for TGHT ramp up to finish.
Tuesday, October 31, 2023, 14:21: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, October 31, 2023, 14:39 IG1 5e-6Torr , TGHT ramp up on hold.
Tuesday, October 31, 2023, 14:40 Starting HV tests.
Tuesday, October 31, 2023, 15:10 HV tests went up to 53kV until gauge on Faraday cage started sparking. TP6 seems to have tripped after a few sparks from that gauge. The TC wire seems to be placed to conservatively.
Wednesday, November 01, 2023, 08:06: TP6 Was tripped. IV4 closed. TP6 Restarted. - AS
Wednesday, November 01, 2023, 08:10: Tp6 on. IV4 open.
Wednesday, November 01, 2023, 09:32: HV to 0 kV.
Wednesday, November 01, 2023, 09:33: Auto-cooling @ 2 A per min.
Monday, November 06, 2023, 09:07: IV4 closed. PS off. IG1 & turbos off. |
Wednesday, October 18, 2023, 15:43, Aaron Schmidt, , LP-SIS, , , 45447-12, 45235-17, In progress, Conditioning UC#43 (empty) w/ gas line
|
Thermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line on center block. Empty oven.
Wednesday, October 18, 2023, 15:13: Roughing
Wednesday, October 18, 2023, 15:35: Waterline FS#5 on.
Wednesday, October 18, 2023, 15:42: TP1B on.
Wednesday, October 18, 2023, 15:52: TP1A on.
Wednesday, October 18, 2023, 16:00: IG1 on.
Thursday, October 19, 2023, 07:34: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, October 19, 2023, 09:15: IV4 opened.
Thursday, October 19, 2023, 09:42: HV sources on.
Thursday, October 19, 2023, 09:43: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.
Thursday, October 19, 2023, 09:45: Optics are set. Standard tune.
Thursday, October 19, 2023, 10:40: HV to 0 kV. Cage open.
Thursday, October 19, 2023, 12:16: Cage closed. HV sources on. Optics set.
Thursday, October 19, 2023, 13:41: 1st set of mass scans complete. Optics set to 'Fernando's Tune',
Friday, October 20, 2023, 06:29: Mass & wire scans continue.
Friday, October 20, 2023, 10:33: BIAS / EE / EZL @ 43 / -2.2 / 18.5 kV.
Friday, October 20, 2023, 11:00: Spark* Optics needed full reset.
Friday, October 20, 2023, 12:48: HV to 0 kV. HV test done
Tuesday, October 24, 2023, 09:39: PS / sources off. IV4 closed - Tripped - Reset.
Tuesday, October 24, 2023, 09:41: IG1 off. TP off. |
Tuesday, October 10, 2023, 15:46, Aaron Schmidt, Ta#68 (Spare), LP-SIS, , , 45220-3, 45235-11, In progress, Conditioning Ta#68 (Spare)
|
Tuesday, October 10, 2023, 15:18: Roughing.
Tuesday, October 10, 2023, 15:46: TP1B on.
Tuesday, October 10, 2023, 15:52: TP1B at speed. CG1A @ 0.113T & dropping.
Tuesday, October 10, 2023, 15:53: TP1A on.
Tuesday, October 10, 2023, 16:01: TP1A tripped. Reset.
Tuesday, October 10, 2023, 16:03: TP1A on. IG1 on.
Wednesday, October 11, 2023, 09:14: FS#5 open. Vacuum @ 5.19e-07T.
Wednesday, October 11, 2023, 09:20: PS / Sources on.
Wednesday, October 11, 2023, 09:22: Auto-ramping TGHT / TBHT to 230 / 230 A @ 2 A per min.
Wednesday, October 11, 2023, 14:10: HV off.
Wednesday, October 11, 2023, 14:26: Grounded HV rack. HV on.
Wednesday, October 11, 2023, 14:27: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.
Wednesday, October 11, 2023, 22:59: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, October 11, 2023, 23:24: 1st round of mass & wire scans complete.
Thursday, October 12, 2023, 09:37: HV off.
Wednesday, October 18, 2023, 08:12: IV4 closed. Sources off.
Wednesday, October 18, 2023, 08:14 : Power off. IG1 off. TP off.
Thursday, August 15, 2024, 08:15: Formerly Ta#67 until the thin foil target, - AS |
Thursday, September 28, 2023, 13:42, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Thursday, September 28, 2023, 13:40: Roughing - BB.
Tuesday, October 10, 2023, 14:08: Venting. |
Monday, September 25, 2023, 16:31, Aaron Schmidt, Ta#66, LP-SIS, ITW, TM2, 45220-5, 45235-9, Done, Conditioning Ta#66 & HV Tests.
|
Thermocouples installed on the left end plate x 2.
Monday, September 25, 2023, 16:23: Roughing.
Monday, September 25, 2023, 16:51: TP1B on.
Monday, September 25, 2023, 16:56: Waterline FS#5 open. Vacuum ok.
Monday, September 25, 2023, 16:58: Power on. TP1A on.
Tuesday, September 26, 2023, 09:44: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per minute.
Tuesday, September 26, 2023, 16:11: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute.
Tuesday, September 26, 2023, 16:12: IV4 opened.
Tuesday, September 26, 2023, 16:45: Optics on/set. BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TC @ 47 / 51 C
Tuesday, September 26, 2023, 21:00: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Spark @ 28 kV.
Tuesday, September 26, 2023, 21:41: Mass & wire scans taken. Masses from 110 to 160? Curious.
Wednesday, September 27, 2023, 08:24: TC @ 71 / 79 C.
Wednesday, September 27, 2023, 11:57: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Wednesday, September 27, 2023, 12:06: BIAS / EE / EZL @ 40 / -2.0 / 17 kV. Spark right after.
Wednesday, September 27, 2023, 12:23: Recovered computer & epics controls from previous spark.
Wednesday, September 27, 2023, 12:36: BIAS / EE / EZL @ 45 / -2.3 / 19 kV. Spark @ 44.5 kV.
Wednesday, September 27, 2023, 13:17: Large spark *
Wednesday, September 27, 2023, 13:21: Closed IV4. Reset TSG:TP1B. TMS:TP6 Spinning up? Did not reset right away. Reset optics. Epics & Firefox on the TS computer are down.
Wednesday, September 27, 2023, 13:26: BIAS / EE / EZL @ 40 / -2.0 / 17 kV. Plus 1 spark while tapping the HV down. TMS:TP6 has recovered.
Wednesday, September 27, 2023, 14:01: HV to 0 kV. TS computer is disconnected from the network but epics is still running.
Wednesday, September 27, 2023, 14:05: TC @ 69.8 / 81 C
Thursday, September 28, 2023, 09:23: TS computer is running again. Continue HV tests.
Thursday, September 28, 2023, 09:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, September 28, 2023, 09:47: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Thursday, September 28, 2023, 10:43: No sparks thus far.
Thursday, September 28, 2023, 10:46: BIAS / EE / EZL @ 45 / -2.3 / 19 kV.
Thursday, September 28, 2023, 10:50: Gauge for FEBIAD gases is "buzzing".
Thursday, September 28, 2023, 10:52: BIAS / EE / EZL @ 47.5 / -2.5 / 20 kV.
Thursday, September 28, 2023, 11:35: No sparks occurred. BIAS / EE / EZL @ 0 kV.
Thursday, September 28, 2023, 11:41: PS off. IV4 closed.
Thursday, September 28, 2023, 11:42: IG1 off. Turbo pumps off.
Thursday, September 28, 2023, 12:35: Venting.
|
Tuesday, August 29, 2023, 12:14, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Tuesday, August 29, 2023, 12:14: Roughing.
Tuesday, August 29, 2023, 13:17: TP1B started.
Tuesday, August 29, 2023, 13:21: TP1B on.
Tuesday, August 29, 2023, 13:46: TP1A started.
Tuesday, August 29, 2023, 14:00: TP1A Tripped.
Tuesday, August 29, 2023, 14:20: TP1B off. |
Friday, August 25, 2023, 17:21, Aaron Schmidt, Nb#11, LP-IG-LIS, ITW, TM2, 45447-9, 42132-4, In progress, Conditioning Nb#11
|
Replacement for Nb#10
Friday, August 25, 2023, 17:15: Roughing.
Friday, August 25, 2023, 17:57: Vacuum taking a while to rough down. Vacuum @ 1.034T. Opened FS#5.
Friday, August 25, 2023, 17:59: Water leak noted. Venting.
Friday, August 25, 2023, 18:27: The left HS waterline was not tight. Chamber is cleaned out & wiped down.
Friday, August 25, 2023, 18:28: Roughing. Purge on RP1
Friday, August 25, 2023, 19:00: Open closed ballast repeatedly on RP1 to purge excess moisture.
Friday, August 25, 2023, 19:05: FS#5 open. No effect on vacuum. Vacuum @ 2.228T & dropping. Power / sources on.
Friday, August 25, 2023, 19:18: Quick bypass check with "IG1 on". Tapped up TGHT / TBHT to 5 A each, & down again. 500 V on & off the BIAS. ok. Bypass removed. Vacuum @ 1.222T. Will remote start TP later. Allow vacuum to stabilize. Otherwise ready for remote operation.
Friday, August 25, 2023, 23:14: Vacuum @ 0.135T. TP1B on.
Friday, August 25, 2023, 23:20: TP1B at speed. CG1 @ 0.165 T - Allow to stabilize.
Friday, August 25, 2023, 23:26: CG1 @ 0.091 T. TP1A on.
Friday, August 25, 2023, 23:36: TP1A Tripped. Reset & restart. TP1B off.
Saturday, August 26, 2023, 00:02: The TSG:CG1A limit to open needs to be increased from 0.050T to 0.100T. Currently at 0.070T. Unable to restart the TP until it's below the limit. Will wait till morning... Later in the morning.
Saturday, August 26, 2023, 09:19: TP1B switched on.
Saturday, August 26, 2023, 10:08: TP1A switched on.
Saturday, August 26, 2023, 10:16: TP1 A tripped. Reset right away - CG1A @ 0.048T.
Saturday, August 26, 2023, 10:17: IG1 on.
Saturday, August 26, 2023, 16:40: IV4 open.
Saturday, August 26, 2023, 16:41: Optics set. Vacuum @ 5.63e-06T
Saturday, August 26, 2023, 23:43: Vacuum @ 4.46e-06T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per minute. Expecting outgassing however.
Sunday, August 27, 2023, 09:11: Vacuum @ 5.10e-06T. TGHT / TBHT @ 350 / 150 A. Auto-ramping TGHT to 400 A.
Sunday, August 27, 2023, 10:44: Abort TGHT @ 383 A. Auto-ramping TGHT / TBHT to 500 / 200 A.
Sunday, August 27, 2023, 19:13: Vacuum @ 5.08e-06T. TGHT / TBHT @ 422 / 189 A. Auto cool TGHT / TBHT to 250 / 100 A @ 4 A per minute.
Sunday, August 27, 2023, 20:06: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Sunday, August 27, 2023, 22:43: Halt auto-ramp @ 490 / 230 A.
Sunday, August 27, 2023, 22:50: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Sunday, August 27, 2023, 22:52: Begin mass & wire scans. Manually tap up TGHT to 500 A. Vacuum @ 5.36e-06T
Sunday, August 27, 2023, 23:04: Manually tap up TGHT to 505 A
Sunday, August 27, 2023, 23:09: Manually tapped up TGHT to 520 A.
Sunday, August 27, 2023, 23:11: Increase TSH auto-ramp vacuum limit from 5.00e-06T to 6.00e-06T. Auto-ramping TGHT to 580 A @ 3A per min.
Sunday, August 27, 2023, 23:25: TGHT up to 554 A . Vacuum limit reached. Take mass & wire scans.
Sunday, August 27, 2023, 23:59: Peak on Mass 40. Otherwise mostly back round.
Monday, August 28, 2023, 00:02: Reset TSH auto-ramp vacuum limit to 5.0e-06T. Auto-cooling @ 2A per minute.\
Monday, August 28, 2023, 00:09: HV tapped down to 0 V.
Monday, August 28, 2023, 06:08: IV4 closed. Sources off.
Monday, August 28, 2023, 06:09: IG1 & turbo pumps off.
Monday, August 28, 2023, 07:30: Power off. Venting. Purge FS#5. |
Wednesday, August 16, 2023, 11:32, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Wednesday, August 16, 2023, 11:32: Roughing.
Thursday, August 17, 2023, 11:01: Venting. |
Monday, August 14, 2023, 12:11, Aaron Schmidt, , LP-SIS, , , 45220-11, 45235-3, , Graphite target test 2 (C2023B)
|
Graphite experiment insert 1: ID GR-230515, WO#45220-11. https://elog.triumf.ca/TIS/Evaporator_2/622
New disc form. End caps expanded, no Re foil installed. 4 heat shields wrapped around the oven.
Monday, August 14, 2023, 12:04: Roughing.
Monday, August 14, 2023, 13:09: TP1B on.
Monday, August 14, 2023, 13:16: TP1A on.
Monday, August 14, 2023, 13:24: IG1 on.
Monday, August 14, 2023, 13:31: Power / Sources on.
Monday, August 14, 2023, 13:33: Waterline FS#5 open. Vacuum @ 2.03e-05T & dropping. OK.
Monday, August 14, 2023, 14:58: IV4 open.
Monday, August 14, 2023, 14:59: Optics set.
Monday, August 14, 2023, 15:00: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. ok
TGHT / TBHT tapped up to 5 / 5 A. ok . Vacuum @ 4.53e-06T.
Tuesday, August 15, 2023, 05:29: Auto-ramping TGHT / TBHT to 150 / 150 A @ 1 / 2 A per min. Vacuum @ 7.33e-07T
Tuesday, August 15, 2023, 05:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, August 15, 2023, 05:39: FC0 out. Magnet set to@ -2465 to -2467 G. Mass "22.225 - 22.235".
Tuesday, August 15, 2023, 07:29: Slope set to 1.00 on the pyrometer. Sighted on end cap. No temperature noted as yet. Signal of 3.21e-09 A on FC6. TGHT / TBHT @ 114.0 / 151.1 A.
Tuesday, August 15, 2023, 07:46: Mass scan on masses range 30 - 17 to find optimal peak.
Tuesday, August 15, 2023, 07:53: Mass 35.2 @ 1.05e-08 A on FC6
Tuesday, August 15, 2023, 07:59: Magnet set to -2406.9 to -2409.1 G. Mass "21.194 - 21.224". FC6 @ 7.36e-09.
Tuesday, August 15, 2023, 08:23: TGHT / TBHT @ 150 / 150 A
Tuesday, August 15, 2023, 08:21: Magnet set to -2419.77 to -2420.64. Mass "21.411 - 21.4396". FC6 @ 3.56e-09 A.
Tuesday, August 15, 2023, 08:24: Auto-ramping TGHT / TBHT to 200 / 200 A @ 1 / 2 A per min. Vacuum @ 7.24e-07T.
Tuesday, August 15, 2023, 09:35: Auto-ramping TGHT / TBHT to 230 / 230 A @ 1 / 2 A per min.
Tuesday, August 15, 2023, 10:16: TGHT / TBHT @ 230 / 230 A. Take a full range mass scan. Mass 5 - 150.
Tuesday, August 15, 2023, 10:32: http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-15-10-30%20Graphite%2045220-11%20at%20230%20A
Tuesday, August 15, 2023, 10:35: Magnet set to -2406.64 to -2409.1. Mass "21.187 - 21.219". FC6 @ 6.79e-11 A.
Tuesday, August 15, 2023, 10:39: Auto-ramping TGHT to 237 A @ 1 A per min. (monitor throughout)
Tuesday, August 15, 2023, 10:53: Auto-ramping TGHT to 250 A @ 1 A per min.
Tuesday, August 15, 2023, 11:14: Auto-ramping TGHT to 300 A @ 1 A per min.
Tuesday, August 15, 2023, 12:11: Auto-ramping TGHT to 350 A @ 1 A per min. Check FC0 periodically.
Tuesday, August 15, 2023, 13:13: Slope set to 0.93. Auto-ramping TGHT to 397 A @ 1 A per min.
Tuesday, August 15, 2023, 14:09: Auto-ramping TGHT to 400 A @ 1 A per min.
Tuesday, August 15, 2023, 14:18: Auto-ramping TGHT to 450 A @ 1 A per min.
Tuesday, August 15, 2023, 15:32: http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-15-15-31%20Graphite%2045220-11%20at%20450%20A
Tuesday, August 15, 2023, 16:21: http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-15-16-19%20Graphite%2045220-11%20at%20450%20A
|
Wednesday, August 09, 2023, 14:29, Aaron Schmidt, , LP-SIS, , , 45220-6, 45235-3, In progress, Graphite target test 1 (C2023A)
|
Graphite experiment 2: ID Gr-230601, WO#45220-6 ( https://elog.triumf.ca/TIS/Evaporator_2/598 )
Original disc form. End caps expanded, no Re foil installed. 4 heat shields wrapped around the oven.
Wednesday, August 09, 2023, 14:00: Roughing.
Wednesday, August 09, 2023, 14:10: TP6 & TP2 beamline side. On.
Wednesday, August 09, 2023, 14:15: IG6 on.
Wednesday, August 09, 2023, 14:29: TP1B on.
Wednesday, August 09, 2023, 14:38: TP1A on.
Wednesday, August 09, 2023, 14:46: No trips. IG1 on. Vacuum @ 6.08e-05T & dropping.
Wednesday, August 09, 2023, 14:48: Waterline FS#5 open. Vacuum @ 4.45e-05T & dropping.
Wednesday, August 09, 2023, 16:10: HV rack grounded.
Wednesday, August 09, 2023, 16:16: BIAS / EE / EZL @ 1 / -0.5 / 0.5 kV. ok
TGHT / TBHT tapped up to 5 / 5 A. ok
Wednesday, August 09, 2023, 16:17: TGHT / TBHT Tapped back to 0 A. IV4 open. Vacuum @ 7.03e-06T.
Thursday, August 10, 2023, 05:16: Auto-ramping TGHT / TBHT to 150 / 150 A @ 1 A per minute.
Thursday, August 10, 2023, 05:24: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, August 10, 2023, 05:26: FC0 out. MB1 set to -2508 to -2510 G. FC6 Auto range & Log10 green.
Thursday, August 10, 2023, 09:08: Pyrometer set on end cap. Slope set to 1.000. Temperature not yet displayed.
Thursday, August 10, 2023, 09:13: Auto-ramping TGHT / TBHT to 200 / 200 A @ 1 / 2 A per minute. (TBHT rate change confirmed)
Thursday, August 10, 2023, 10:17: Auto-ramping TGHT / TBHT to 230 / 230 A @ 1 / 2 A per minute.
Thursday, August 10, 2023, 10:48: Slope set to 0.99. Temperature @ 1109.8C. TGHT / TBHT @ 230 / 230 A.
Thursday, August 10, 2023, 10:58: Auto-ramping TGHT to 250 @ 1 A per minute.
Thursday, August 10, 2023, 11:20: TGHT @ 250 A. Mass scan taken to check for Na. Swept masses 30-19. Peak on 20-22. Magnet set to peak @ -2465 to -2467 G. Mass "22.225"
Thursday, August 10, 2023, 11:25: Auto-ramping TGHT to 250 @ 1 A per minute. Slope set to 0.98. Temperature @ 1215.5C.
Thursday, August 10, 2023, 12:00: Slope set to 0.97. Temperature @ 1339.7C.
Thursday, August 10, 2023, 12:12: Slope set to 1.00. Temperature @ 1340.1C.
Thursday, August 10, 2023, 12:15: Swept masses 30-19. Peak on 20-22. Magnet set to peak @ -2465 to -2467 G. Mass "22.225 - 22.235" again.
Thursday, August 10, 2023, 12:24: Auto-ramping TGHT to 350 @ 1 A per minute.
Thursday, August 10, 2023, 13:50: Slope set to 0.93 from 1. Temperature @ 1576.0 C. (Note: Was at 1466 C while at 1)
Thursday, August 10, 2023, 13:52: Auto-ramping TGHT to 400 @ 1 A per minute.
Thursday, August 10, 2023, 14:23: Steerers TSG:CBC dropped to 0V. Reset to 500 V.
Thursday, August 10, 2023, 14:52: Masscorr - Link to all:
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/
Link to this test:
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-10-14-51%20Graphite%2045220-6
Thursday, August 10, 2023, 14:57: Auto-ramping TGHT to 450 A @ 1 A per min.
Thursday, August 10, 2023, 16:12: TGHT @ 450A. Mass scan taken. Swept mass 45 to 4.
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-10-16-21%20Graphite%2045220-6 - dn
Thursday, August 10, 2023, 16:43: graphitetesting.stp data dump to http://isacwserv.triumf.ca/onlylocal/isactdata/isactdata/2023-08-10-16-38-Graphite-25220-6 -dn
Mass scan taken. swept mass from 150 to 4. http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-10-16-45%20Graphite%2045220-6 -dn
Thursday, August 10, 2023, 16:58: moved magnet back to Na at -2441.4G. - dn
Thursday, August 10, 2023, 17:08: ramping TBHT and TGHT down at 1A/min
Monday, August 14, 2023, 08:15: HV off.
Monday, August 14, 2023, 08:46: Power / Sources off.
Monday, August 14, 2023, 08:47: IG1 & turbo pumps off.
Monday, August 14, 2023, 10:12: Venting. |
Thursday, July 13, 2023, 18:29, Aurelia Laxdal, , LP-SIS, , , , , In progress, Spectrometer tests
|
Pumping down: TS loaded with a LP-SIS container for spectrometer test.
Started heating up the target container: up to 300A.
Last week: the LP container was heated up to TGHT 580A and TBHT 230A, and cooled down before the weekend.
Pumping again (LP container in) for one more check. Last check was completed on July 26: up to 400A.
Vented the chamber today (July 27).
Did another test over the weekend. Currently the PSs are off and the chamber under vacuum. |
Thursday, July 13, 2023, 07:37, Aaron Schmidt, , , , , , , , Tests - Aurelia L
|
Thursday, July 13, 2023, 07:37: Chamber is vented. Beamline is vented. Interlock bypassed on TPS:IV4 - AS |
Monday, July 10, 2023, 15:01, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Monday, July 10, 2023, 15:01: Roughing.
Wednesday, July 12, 2023, 09:38: Venting both chambers. |
Thursday, July 06, 2023, 16:55, Aaron Schmidt, Nb#10, LP-IG-LIS, ITW, TM2, 45447-7, 42132-2, In progress, Conditioning Nb#10
|
Thursday, July 06, 2023, 16:13: Roughing.
Thursday, July 06, 2023, 16:41: TP1B on.
Thursday, July 06, 2023, 16:47: TP1A on.
Thursday, July 06, 2023, 16:55: TP1A Trip, reset.
Thursday, July 06, 2023, 16:56: IG1 on.
Thursday, July 06, 2023, 16:58: Vacuum @ 1.32e-05T. Waterline FS#5 open.
Thursday, July 06, 2023, 17:02: Power's on. HV Rack is open.
Friday, July 07, 2023, 06:52: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per minute. Vacuum at 5.02e-07T
Attempted to open IV4, however it timed out.
Friday, July 07, 2023, 08:25: IV4 reset & opened.
Friday, July 07, 2023, 09:02: HV on.
Friday, July 07, 2023, 09:40: BIAS / EE / BIAS @ 30 / -1.5 / 13 kV.
Friday, July 07, 2023, 10:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per minute. Vacuum at 6.34e-07T
Friday, July 07, 2023, 10:28: Optics set. FC0 @ 3.36e-11, set from 1uA to 100 nA.
Friday, July 07, 2023, 10:59: Reduce BIAS to 20 kV due to sparking.
Friday, July 07, 2023, 12:24: BIAS back to 30 kV. TGHT / TBHT @ 580 / 230 A. FC0 @ 2.52e-09. Vacuum @ 1.32e-06T. Beginning mass & wire scans.
Friday, July 07, 2023, 16:57: BIAS / EE / BIAS @ 0 kV.
Friday, July 07, 2023, 16:59: Vacuum @1.14e-06T. Auto-cooling @ 2 A per min. |
Thursday, June 08, 2023, 14:22, Aaron Schmidt, , , , , , , , Rough down empty chamber
|
Thursday, June 08, 2023, 14:22: Roughing. |
Wednesday, May 31, 2023, 15:19, Aaron Schmidt, SiC#46, HP-SIS, , , 44692-2, 45235-6, In progress, Conditioning SiC#2023A (Spare, renamed SiC-23B) - No salts
|
(Spare HP-SIS SiC SiC-23B)
Wednesday, May 31, 2023, 15:18: Roughing.
Thursday, June 01, 2023, 07:30: TP1B on.
Thursday, June 01, 2023, 07:31: TMS:TP6 & TMS:TP2 on.
Thursday, June 01, 2023, 07:38: IG6 on. TSG:TP1A on.
Thursday, June 01, 2023, 07:48: IG1 on.
Thursday, June 01, 2023, 08:26: Waterline FS#5 on. Vacuum @ 1.40e-06T. Power on.
Thursday, June 01, 2023, 08:28: Sources on. IV4 open.
Thursday, June 01, 2023, 08:31: Optics set.
Thursday, June 01, 2023, 08:33: Quick check: Manually tap up TGHT / TBHT to 5 / 5 A
BIAS / EE / EZL @ 1 / -0.5 / 1 kV.
Thursday, June 01, 2023, 08:51: Auto-ramping TGHT / TBHT to 100 / 50 A @ 2 A per min.
Thursday, June 01, 2023, 09:55: Auto-ramping TGHT / TBHT to 300 / 100 A @ 2 A per min.
Thursday, June 01, 2023, 11:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, June 01, 2023, 13:56: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, June 01, 2023, 14:20: Mass & wire scans.
Friday, June 02, 2023, 07:10: Mass & wires scans complete. Auto-cooling @ 2 A per min
Friday, June 02, 2023, 09:22: BIAS / EE / EZL @ 0 kV.
Thursday, June 08, 2023, 07:51: IV4 closed. Power / Sources off.
Thursday, June 08, 2023, 07:53: IG1 & Turbo pumps off.
Thursday, June 08, 2023, 10:32: Venting. |
Thursday, May 25, 2023, 13:47, Aaron Schmidt, , , , , , , , Rough down empty chamber
|
Thursday, May 25, 2023, 13:47: Roughing. |
Tuesday, May 16, 2023, 14:00, Aaron Schmidt, Ta#65, LP-SIS, ITE, TM4, 45220-7, 45235-2, In progress, Conditioning Ta#65
|
Calibrated window installed on the beam line.
Tuesday, May 16, 2023, 13:45: Roughing both the chamber & beam line.
Tuesday, May 16, 2023, 14:00: TMS:TP6 on.
Tuesday, May 16, 2023, 14:04: TMS:TP2 on.
Tuesday, May 16, 2023, 14:13: IG6 on.
Tuesday, May 16, 2023, 14:17: TSG:TP1B on.
Tuesday, May 16, 2023, 14:23: TSG:TP1A on.
Tuesday, May 16, 2023, 14:33: IG1 on.
Tuesday, May 23, 2023, 07:30: Waterline FS#5 open. Vacuum stable @ 2.78e-07T
Tuesday, May 23, 2023, 07:32: Power / Sources on.
Tuesday, May 23, 2023, 07:35: Auto-ramping TGHT / TBHT to 230 A / 230 A @ 2 A per min. IV4 open.
Tuesday, May 23, 2023, 07:38: Optics are set.
Tuesday, May 23, 2023, 11:38: Auto-ramping TGHT to 300 A @ 2 A per minute.
Tuesday, May 23, 2023, 12:32: Auto-ramping TGHT to 350 A @ 2 A per minute.
Tuesday, May 23, 2023, 13:13: Auto-ramping TGHT to 400 A @ 2 A per minute.
Tuesday, May 23, 2023, 14:00: Auto-ramping TGHT to 450 A @ 2 A per minute.
Tuesday, May 23, 2023, 14:50: Auto-ramping TGHT to 500 A @ 2 A per minute.
Tuesday, May 23, 2023, 16:07: Auto-ramping TGHT to 550 A @ 2 A per minute.
Tuesday, May 23, 2023, 16:51: Auto-ramping TGHT to 580 A @ 2 A per minute.
Tuesday, May 23, 2023, 17:35: TGHT at 580A with TBHT at 230A.
Tuesday, May 23, 2023, 21:37: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Begin wire & mass scans.
Tuesday, May 23, 2023, 22:03: Mass & wire scans complete.
Tuesday, May 23, 2023, 22:09: BIAS / EE / EZL @ 0 kV.
Wednesday, May 24, 2023, 13:48: Auto-ramping TGHT to 550 A and TBHT to 200A @ 2 A per minute.
Currently at TGHT to 500 A and TBHT to 150A. 15:44 pm
Wednesday, May 24, 2023, 15:44: Auto-ramping TGHT to 450 A and TBHT to 100A @ 2 A per minute.
Wednesday, May 24, 2023, 17:22: Auto-ramping TGHT to 400 A and TBHT to 50A @ 2 A per minute.
Thursday, May 25, 2023, 07:49: TGHT / TBHT @ 0A (Reached before midnight - But not logged). IV4 closed.
Thursday, May 25, 2023, 09:04: Power / Sources off.
Thursday, May 25, 2023, 09:06: IG1 off. TP1B & TP1A off.
|
Tuesday, May 09, 2023, 10:40, Aaron Schmidt, SiC#45, HP-SIS, ITE, TM4, 44692-3, 45235-8, In progress, Conditioning SiC#45
|
Tuesday, May 09, 2023, 10:28: Roughing.
Tuesday, May 09, 2023, 11:25: TP1B on.
Tuesday, May 09, 2023, 12:38: TP1A on.
Tuesday, May 09, 2023, 12:49: IG1 on.
Wednesday, May 10, 2023, 10:41: Waterline FS#5 opened. Vacuum @6.36e-07T
Wednesday, May 10, 2023, 10:56: IV4 open. Power / sources / optics on.
Wednesday, May 10, 2023, 10:59: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 / 1 A per minute.
Wednesday, May 10, 2023, 11:09: BIAS / EE / EZL @ 10 / -1.0 / 5 kV.
Wednesday, May 10, 2023, 11:54: Vacuum climbing quickly @ 4.10e-06T. Halt ramping to stabilize. TGHT / TBHT @ 100 / 50 A.
Wednesday, May 10, 2023, 11:59: Vacuum @ 7.69e-06T & still climbing.
Wednesday, May 10, 2023, 12:05: Levelled off @ 8.91e-06T.
Wednesday, May 10, 2023, 13:16: Vacuum @ 2.04e-06T. Auto-ramping TGHT / TBHT to 200 / 100 A @ 2 / 1 A per minute.
Wednesday, May 10, 2023, 13:34: Abort ramping.
Wednesday, May 10, 2023, 13:52: Vacuum @ 4.35e-06T. Restart auto-ramping TGHT / TBHT to 200 / 100 A @ 1 A per minute.
Wednesday, May 10, 2023, 15:43: Vacuum @ 1.05e-06T. Auto-ramping TGHT / TBHT to 300 / 150 A @ 1 A per minute.
Wednesday, May 10, 2023, 16:36: Vacuum @ 8.23e-07T. TGHT / TBHT @ 250 A / 150 A. Auto-ramping TGHT / TBHT to 450 / 250 A @ 2 / 1 A per minute.
Wednesday, May 10, 2023, 20:52: Vacuum @ 5.01e-06T. TGHT / TBHT Slowly ramping due to vacuum limit being reached.
Thursday, May 11, 2023, 05:42: TBHT reduced @ 230 A. Auto-ramping TGHT to 580 A @ 2 A per min
Thursday, May 11, 2023, 05:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, May 11, 2023, 09:30: Mass & wire scans complete.
Friday, May 12, 2023, 07:21: Auto-cooling @ 1 A per min.
Friday, May 12, 2023, 11:54: HV to 0 kV.
Tuesday, May 16, 2023, 11:03: IV4 closed. Power / Sources off. Locked out.
Tuesday, May 16, 2023, 11:04: IG1 & IG6 off. All turbo pumps off.
Tuesday, May 16, 2023, 12:19: Venting.
|
Friday, May 05, 2023, 06:49, Aaron Schmidt, TiC#6, HP-FEBIAD, ITW, TM2, 44692-10, 45235-12, In progress, Conditioning TiC#6
|
Ceramic elbow installed on the anode.
Friday, May 05, 2023, 06:47: Roughing.
Friday, May 05, 2023, 07:24: TP1B on.
Friday, May 05, 2023, 07:34: TP1A on.
Friday, May 05, 2023, 07:43: IG1 on.
Friday, May 05, 2023, 12:12: Vacuum @ 6.91e-06T. FS#5 opened. Vacuum stable.
Friday, May 05, 2023, 12:16: Power/sources on. Gases set
Friday, May 05, 2023, 12:19: Optics on / set.
Friday, May 05, 2023, 12:21: Quick System ready check - OK. Manually set.
TGHT / TBHT @ 5 / 5 A
BIAS / EE / EZL @ 1 / -0.5 / 1 kV
Anode @ 100 V - 7.326mA
Coil @ 10 A.
Friday, May 05, 2023, 12:23: Ready for operation. All sources back to 0 A / 0 V. Optics remain. Vacuum continues down @ 6.70e-06T.
Monday, May 08, 2023, 08:21: IV4 open.
Monday, May 08, 2023, 08:25: Tap up Anode in steps @ 20 v per 20 seconds.
Anode @ 100 V = 4.884 mA
Anode @ 200 V = 6.105 mA
Anode @ 300 V = 7.326 mA
Anode @ 400 V = 7.326 mA
Monday, May 08, 2023, 08:42: Anode tapped down to 20 V.
Monday, May 08, 2023, 08:52: Coil tapped up to 70 A @ 7 A per minute.
Monday, May 08, 2023, 09:12: Coil tapped back down to 0 A @ 7 A per minute.
Monday, May 08, 2023, 09:15: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 / 1 A per min.
Monday, May 08, 2023, 09:20: BIAS / EE / EZL set to 10 / -1.0 / 5 kV.
Monday, May 08, 2023, 14:37: TGHT / TBHT @ 580 / 290 A. BIAS / EE / EZL set to 30 / -1.5 / 13 kV.
Monday, May 08, 2023, 14:38: Anode tapped up to 100 V @ 20 V per 20 seconds. Begin mass & wire scans.
Monday, May 08, 2023, 15:01: Mass & wire scans complete.
Monday, May 08, 2023, 18:59: Tap up Anode in steps @ 20 v per 20 seconds from 100 V.
Anode @ 100 V = 9.768 mA
Anode @ 200 V = 12.210 mA
Anode @ 300 V = 14.652 mA
Monday, May 08, 2023, 19:05: Anode @ 400 V = 17.094 mA
Monday, May 08, 2023, 19:18: Anode tapped down to 20 V.
Monday, May 08, 2023, 19:24: BIAS / EE / EZL @ 1 / -0.5 / 1 kV
Monday, May 08, 2023, 19:35: Coil tapped up to 70 A @ 7 A per minute.
Monday, May 08, 2023, 19:49: Coil tapped back down to 0 A @ 7 A per minute. Vacuum rose to 6.20e-06T @ 70A. Stabilized back down around 2.24e-06T.
Monday, May 08, 2023, 19:53: Auto-cooling @ 1 A per minute.
Tuesday, May 09, 2023, 06:59: Anode, & HV sources to 0 V. IV4 closed.
Tuesday, May 09, 2023, 07:35: SV5 closed. Power / sources off.
Tuesday, May 09, 2023, 07:38: IG1 off. TP1B & TP1A off.
Tuesday, May 09, 2023, 08:49: Venting. |
Monday, May 01, 2023, 14:31, Aaron Schmidt, TiC#5, LP-FEBIAD, ITE, TM4, 44692-5, 45235-20, In progress, Conditioning TiC#5
|
New TiC LP-FEBIAD Target installed.
Monday, May 01, 2023, 14:23: Roughing.
Monday, May 01, 2023, 21:42: TP1B on
Monday, May 01, 2023, 21:49: TP1A on.
Monday, May 01, 2023, 21:57: IG1 on.
Tuesday, May 02, 2023, 08:39: Vacuum @ 1.16e-06T. Waterline FS#5 opened.
Tuesday, May 02, 2023, 08:48: Power / sources on. Source gas set. SV5 remains open.
Tuesday, May 02, 2023, 09:00: Optics set.
Tuesday, May 02, 2023, 09:13: System ready check - OK. Manually set.
TGHT / TBHT @ 5 / 5 A
BIAS / EE / EZL @ 1 / -0.5 / 1 kV
Anode @ 100 V - 10.989 mA
Coil @ 10 A.
Tuesday, May 02, 2023, 10:12: Coil @ 70 A. Tapped up manually @ 7 A per minute.
Tuesday, May 02, 2023, 12:20:
Tap up Anode in steps @ 20 v per 20 seconds.
Anode @ 100 V = 10.989 mA
Anode @ 200 V = 12.210 mA
Anode @ 300 V = 12.210 mA
Anode @ 400 V = 13.431 mA
Tuesday, May 02, 2023, 12:36: Anode @ 20 V.
Tuesday, May 02, 2023, 12:53: BIAS / EE / EZL @ 10 / -0.5 / 5 kV
Wednesday, May 03, 2023, 04:30: Auto-ramping TGHT / TBHT to 550 / 280 A @ 1 A per minute.
Wednesday, May 03, 2023, 10:42: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
TGHT / TBHT @ 360 / 280 A. Ramping ongoing.
Wednesday, May 03, 2023, 14:04: TGHT / TBHT @ 550 / 280 A
Wednesday, May 03, 2023, 14:10: Anode tapped up to 100 V @ 20 V per 20 seconds.
Wednesday, May 03, 2023, 14:25: Large spark*. Reset Optics.
Wednesday, May 03, 2023, 14:46: Mass & wire scans complete.
Wednesday, May 03, 2023, 17:05: Anode & coil checks complete. Auto-cooling of TGHT / TBHT @ 1 / 2 A per minute.
Wednesday, May 03, 2023, 22:51: IV4 closed.
Thursday, May 04, 2023, 07:35: SV5 closed. Sources / Power off.
Thursday, May 04, 2023, 07:37: IG1 off. TP off.
Thursday, May 04, 2023, 09:17: Venting. |
Wednesday, April 26, 2023, 08:46, Aaron Schmidt, TiC#5, LP-FEBIAD, ITE, TM4, 44692-6, 45235-20, , Testing TiC#5 assembly w/ an empty target
|
Anode remade with a ceramic "elbow-cube". Empty target oven in use for testing.
Wednesday, April 26, 2023, 08:44: BV1B open. Roughing.
Wednesday, April 26, 2023, 08:46: BV1A open
Wednesday, April 26, 2023, 09:15: TP1B on.
Wednesday, April 26, 2023, 09:21: TP1A on.
Wednesday, April 26, 2023, 09:31: IG1 on.
Wednesday, April 26, 2023, 10:43: Vacuum @ 2.33e-06T.
Wednesday, April 26, 2023, 10:51: Waterline FS#5 opened. Vacuum stable.
Wednesday, April 26, 2023, 11:00: Gases set. IV4 opened. (Timed out repeatedly. Reset w/ screwdriver)
Wednesday, April 26, 2023, 11:16: System ready check - OK. Manually set.
TGHT / TBHT @ 5 / 5 A
BIAS / EE / EZL @ 1 / -0.5 / 1 kV
Anode @ 100 V - 7.326mA
Coil @ 10 A.
Wednesday, April 26, 2023, 11:19: Optics set after reset.
Wednesday, April 26, 2023, 11:57: System tapped back down. Hold off for better vacuum. Vacuum @ 1.26e-06T.
Thursday, April 27, 2023, 07:21: Vacuum @ 3.57e-07T
Thursday, April 27, 2023, 07:32: Tapped up coil to 70 A @ 7 A per min. Hold. Vacuum @ 3.68e-07T.
Thursday, April 27, 2023, 07:42: Vacuum @ 4.96e-07T. Tap down coil @ 7 A per min.
Thursday, April 27, 2023, 07:55: Auto-ramp TGHT / TBHT to 200 / 150 A @ 2 A per min.
Thursday, April 27, 2023, 09:47: TGHT / TBHT @ 200 / 150 A.
Thursday, April 27, 2023, 10:00: Tap up Anode in steps @ 20 v per 20 seconds.
Anode @ 100 V = 4.884 mA
Anode @ 200 V = 7.326 mA
Anode @ 300 V = 10.989 mA
Anode @ 400 V = 13.431 mA
Thursday, April 27, 2023, 10:12: BIAS / EE / EZL @ 10 / -1.0 / 5 kV.
Thursday, April 27, 2023, 10:21: Auto-ramp TGHT / TBHT to 400 / 200 A @ 2 A per min.
Thursday, April 27, 2023, 11:43: Anode tapped down to 100 V - 8.547mA. Some instability noted.
Thursday, April 27, 2023, 12:17: Auto-ramp TGHT / TBHT to 580 / 290 A @ 2 A per min.
Thursday, April 27, 2023, 12:18: Anode to 20 V.
Thursday, April 27, 2023, 14:09: Tap up Anode in steps @ 20 v per 20 seconds.
Anode @ 100 V = 9.768
Anode @ 200 V = 13.431 mA
Anode @ 300 V = 15.873 mA
Anode @ 400 V = 18.315 mA
Thursday, April 27, 2023, 14:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, April 27, 2023, 14:50: Mass & wire scans complete.
Thursday, April 27, 2023, 21:52 : Anode sat at 400V for ~8hrs. One spark early on when HV sparked, otherwise stable drawing ~18mA. Ramped anode to zero and BIAS/EL down to 10/5 for the night (Carla).
Friday, April 28, 2023, 07:01: Auto-cooling TGHT / TBHT @ 2 A per minute.
Friday, April 28, 2023, 13:05: HV to 0. SV5 closed.
Monday, May 01, 2023, 07:34: Power / Sources off. IG1 off. TP1A & TP1B off. |
Monday, April 17, 2023, 14:08, Aaron Schmidt, TiC#6, HP-FEBIAD, ITW, TM2, 44692-10, 45235-12, In progress, Conditioning TiC#6
|
Monday, April 17, 2023, 14:03: Roughing.
Monday, April 17, 2023, 14:08: BV1A open.
Monday, April 17, 2023, 14:32: TP1B on.
Monday, April 17, 2023, 14:38: TP1A on.
Monday, April 17, 2023, 14:47: TP1A Timed out. Restarted it within 30 seconds & it's up to speed. IG1 on.
Tuesday, April 18, 2023, 11:49: Vacuum @ 3.68e-07T. Waterline FS#5 opened. Vacuum stable.
Tuesday, April 18, 2023, 11:52: Power / Sources on.
Tuesday, April 25, 2023, 12:20: Power / Sources off
Tuesday, April 25, 2023, 12:26: IG1 Off. TP1B & TP1A off. |
Thursday, April 13, 2023, 11:07, Aaron Schmidt, , , , , , , In progress, Installation of new IDP-15 TMS:TP2
|
IDP15 Scroll Pump, Std w/ inlet.
TMS:RP2
PN: X3815-64010
Serial: MY2301SA17
Thursday, April 13, 2023, 11:04: Roughing RP2
Thursday, April 13, 2023, 11:05: Open BV6 & BV2
Thursday, April 13, 2023, 11:15: TMS:TP2 & TMS:TP6 on.
Thursday, April 13, 2023, 11:19: IG6 on.
Thursday, April 13, 2023, 12:05: Vacuum @ 1.43e-05T. |
Wednesday, March 29, 2023, 12:22, Aaron Schmidt, TiC#5, LP-FEBIAD, ITE, TM4, 44692-7, 45235-20, Failed, Conditioning TiC#5
|
Wednesday, March 29, 2023, 09:15: Roughing.
Wednesday, March 29, 2023, 12:22: TP1B on.
Wednesday, March 29, 2023, 12:40: TP1A on.
Wednesday, March 29, 2023, 13:03: IG1 on.
Thursday, March 30, 2023, 08:23: Vacuum @ 3.42e-07T.
Thursday, March 30, 2023, 08:24: Waterline FS#5 open. Vacuum ok.
Thursday, March 30, 2023, 08:31: Manual Checks:
TGHT / TBHT @ 5 / 5 A ok
BIAS / EE / EZL @ 1 / 0.5 / 1 kV ok.
Thursday, March 30, 2023, 08:32: Anode @ 100 V ok. Coil @ 10 A ok.
Thursday, March 30, 2023, 08:56: Auto-ramping TGHT / TBHT to 350 / 100 A @ 2 A per minute.
Thursday, March 30, 2023, 11:45: Abort heating. TGHT / TBHT @ 233 / 100 A.
Thursday, March 30, 2023, 13:53: Auto-cooling @ 2 A per min
Thursday, April 13, 2023, 11:07: New TMS:RP2 roughing pump installed: Elog 961
Thursday, April 13, 2023, 12:06: Gas lines opened. Ar gas @ 50 kPa
Thursday, April 13, 2023, 13:34: IG1 @ 2.27e-07T / IG6 @ 6.46e-06T. Open IV4
Thursday, April 13, 2023, 13:35: IG1 @ 3.66e-07T / IG6 @ 6.31e-06T7.
Thursday, April 13, 2023, 13:39: IG1 @ 4.03e-07T / IG6 @ 6.24e-06T. Power / Sources on.
Thursday, April 13, 2023, 13:42: Optics still require vacuum below 5.01e-06T on IG6. Wait.
Friday, April 14, 2023, 06:30: Optics still not configuring on TMS:Q2,Q5 or TMS:CB1. Controls group notified.
Friday, April 14, 2023, 06:42: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per minute.
Friday, April 14, 2023, 11:26: Optics fixed / set. Continue ramping to 580 / 270 A @ 2A per minute.
Friday, April 14, 2023, 12:27: Halt & hold ramping. Vacuum @ 5.01e-06T.
Friday, April 14, 2023, 13:54: Ramping continued.
Friday, April 14, 2023, 14:57: Halt & hold ramping. Vacuum @ 5.01e-06T.
Friday, April 14, 2023, 15:38: Ramping continued.
Friday, April 14, 2023, 15:47: TGHT / TBHT @ 580 / 290 A.
BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 100 V. Coil @ 10 A
Friday, April 14, 2023, 15:51: Anode @ 400 V.
Friday, April 14, 2023, 15:52: Anode back to 300 V / 41 mA. . Limited around 350 V. Current limit 50 mA.
Friday, April 14, 2023, 15:55: Adjusted current limit. Anode @ 400 V / 72.039 mA.
Friday, April 14, 2023, 15:58: Adjust Anode current limit further. 300 mA.
Friday, April 14, 2023, 16:06: Anode stable. Reduced current limit to 150 mA. Anode @ 400 A / 91.575 mA
Friday, April 14, 2023, 16:35: Spark* during mass scan. Current limited on the Anode. Reset optics as well.
Friday, April 14, 2023, 16:41: Reduced Anode to 100 V / 30.525 mA. Current limit reduced to 100 mA.
Friday, April 14, 2023, 19:45: Auto-Cooling @ 2 A per min. HV, Coil, & Anode to 0.
Monday, April 17, 2023, 07:35: Coil manually tapped up to 80 A @ 8 A per min.
Monday, April 17, 2023, 08:39: IV4 closed.
Monday, April 17, 2023, 08:44: Power ? Sources off.
Monday, April 17, 2023, 08:45: IG1 off. Turbos pump TP1B & TP1A off.
Monday, April 17, 2023, 13:24: Venting.
Monday, April 17, 2023, 13:26: Odd, the venting is going very slowly. "Aiding" the venting process.
Target oven was inspected post TS. Risks of cracking due to crystallization. |
Thursday, February 02, 2023, 12:44, Aaron Schmidt, , LP-SIS, , , 44062-1-SK , 45235-1, In progress, Conditioning UC#x assembly
|
SK Series of LP-SIS targets are for conditioning only.
Thursday, February 02, 2023, 12:41: Roughing.
Thursday, February 02, 2023, 12:43: BV1A open.
Thursday, February 02, 2023, 13:30: TP1B on.
Thursday, February 02, 2023, 13:34: TP1B at speed. TP1A on.
Thursday, February 02, 2023, 13:43: TP1A at speed. IG1 on.
Thursday, February 02, 2023, 14:53: Waterlines opened. Vacuum Ok @ 5.38e-06T.
Thursday, February 02, 2023, 14:55: PS / Sources on. Manually tap up TGHT / TBHT to 5 A. OK.
Friday, February 03, 2023, 06:32: Vacuum @ 6.56e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, February 06, 2023, 07:39: Vacuum @ 8.36e-07T. Auto-cooling @ 2 A per min.
Tuesday, March 28, 2023, 13:45: Power / sources off.
Tuesday, March 28, 2023, 13:47: IG1 off. TP1A & TP1B off.
Wednesday, March 29, 2023, 07:53: Venting. |
Tuesday, January 31, 2023, 10:42, Aaron Schmidt, , LP-SIS, , , 44062-1-SK, 45235-7, In progress, Conditioning UC#x assembly
|
SK Series of LP-SIS targets are for conditioning only.
Tuesday, January 31, 2023, 10:39: Roughing. (Took quite a bit of effort to get the doors to shut. It's colder than usual in here. The seals were stiff)
Tuesday, January 31, 2023, 11:10: TP1B on.
Tuesday, January 31, 2023, 11:16: TP1B up to speed. TP1A on.
Tuesday, January 31, 2023, 11:24: TP1A timeout trip. Restarted @ 32 KRPM
Tuesday, January 31, 2023, 11:25: TP1A up to speed. IG1 n. Vacuum @ 1.51e-05T & dropping.
Tuesday, January 31, 2023, 13:34: Vacuum @ 2.08e-06T.
Tuesday, January 31, 2023, 13:36: FS#5 opened. PS on.
Tuesday, January 31, 2023, 13:46: Auto-ramping TGHT / TBHT to 10 A / 10 A @ 2 A per min.
Tuesday, January 31, 2023, 15:35: Auto-ramp TGHT / TBHT to 100 A / 50 A @ 2 A per min.
Tuesday, January 31, 2023, 19:02: Vacuum @ 7.92e-07T. Auto-ramping TGHT / TBHT to 350 A & 150 A @ 2 A per min.
Wednesday, February 01, 2023, 06:16: Vacuum @ 5.75e-07T. Auto-ramping TGHT / TBHT to 580 A & 230 A @ 2 A per min.
Wednesday, February 01, 2023, 19:44: Vacuum @ 1.08e-06T. Auto-cooling TGHT / TBHT @ 2 A per min.
Thursday, February 02, 2023, 07:34: Sources off. Turbo pumps off.
|
Tuesday, January 17, 2023, 09:48, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:RP2 Failure
|
Tuesday, January 17, 2023, 09:48: TMS:RP2 off. Audible failure was in progress. Also observable on the strip tool. Vacuum group contacted.
|
Monday, January 16, 2023, 16:02, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , In progress, HP-FEBIAD tests
|
Extra wraps of foil around the center block (6) + 3 full wraps around the shield.
Monday, January 16, 2023, 15:40: Roughing.
Monday, January 16, 2023, 16:10: TP1B on.
Monday, January 16, 2023, 16:17: TP1A on.
Monday, January 16, 2023, 16:32: Bypass on BV1A/BV1B used to undo TP1A trip. IG1 on & TP up to speed now.
Tuesday, January 17, 2023, 09:35: TMS:RP2 is failing. Beamline side roughing pump.
Tuesday, January 17, 2023, 09:35: Waterline FS#5 is open. Chamber side vacuum @ 1.14e-06T.
Tuesday, January 17, 2023, 09:46: TMS:TP6 & TMS TP2 off. PV2 shut. TMS RP2 off.
Tuesday, January 17, 2023, 12:46: Manually tapped up TGHT / TBHT to 10 A. 100 V on Anode. ok.
Tuesday, January 17, 2023, 12:47: Auto-ramping TGHT / TBHT to 25 / 25 A @ 2 A per min.
Tuesday, January 17, 2023, 13:00: Auto-ramping TGHT / TBHT to 100 / 100 A @ 2 A per min.
Tuesday, January 17, 2023, 13:47 : Ramping TGHT/TBHT to 0 / 0 A @ 4A per min as the datalogger is not showing up reading.
Tuesday, January 17, 2023, 14:24: Previous data logger was off. But could be turned back on. Dataloggers swapped just in case. Reading T2 @ 68.8 C. - AS
Tuesday, January 17, 2023, 15:49: Auto-ramping TGHT / TBHT to 100 / 100 A @ 2 A per min.
Tuesday, January 17, 2023, 17:10: Auto-ramping TGHT / TBHT to 200 / 200 A @ 2 A per min.
Tuesday, January 17, 2023, 19:56: Auto-ramping TGHT / TBHT to 250 / 250 A @ 2 A per min.
Tuesday, January 17, 2023, 20:28: Auto-ramping TGHT to 300 A @ 2 A per min.
Wednesday, January 18, 2023, 10:17: Auto-ramping TGHT to 400 A @ 2 A per min.
Wednesday, January 18, 2023, 11:35 : Auto-ramping TGHT to 500 A @ 2 A per min.
Wednesday, January 18, 2023, 13:51 :Auto-ramping TGHT / TBHT to 600 / 300 A @ 2 A per min.
Wednesday, January 18, 2023, 16:06 : Auto-ramping down TGHT / TBHT to 580 / 270 A @ 2 A per min to stay overnight.
Thursday, January 19, 2023, 10:49: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, January 19, 2023, 10:53: Anode @ 500 V.
Thursday, January 19, 2023, 10:54: Coil @ 50 A. Vacuum @ 1.36e-06T.
Thursday, January 19, 2023, 11:00: Auto-ramping TBHT to 290 A @ 2 A per minute.
Thursday, January 19, 2023, 11:14: Anode current @ 1.221 mA. Vacuum @ 1.52e-06T. TGHT / TBHT @ 580 / 290 A.
Thursday, January 19, 2023, 11:24: Auto-cooling @ 2 A per min.
Thursday, January 19, 2023, 17:04: Anode voltage ramped down to 0 V.
Thursday, January 19, 2023, 17:04: Auto ramping down TGHT/TBHT to 0/ 0 A @ 2A per min.
Monday, January 30, 2023, 08:49: IG1 off. Turbo pumps off. |
Thursday, January 12, 2023, 09:04, Aaron Schmidt, , LP-SIS, , , 44691-14, 44378-20, In progress,
|
Test for Aurelia L. Empty LP-SIS w/ end caps in. Right side expanded.
Thermocouples installed (R - L):
X & Y For the (V) checks.
Y - Y
X - O
X - R
L - R
L - O
Datalogger: R= T1 & L=T2
X = TGHT
Y = TBHT
O = Not in use.
Thursday, January 12, 2023, 09:06: Beamline side roughed down & TP on sometime last night. Vacuum @ 2.77e-06T.
Connect volt meters to 4,5 (TBHT) & 6,7 (TGHT)
Thursday, January 12, 2023, 09:43: IG1 Bypass made. TGHT / TBHT at 10 A. Volt meter check. Both display in negatives.
Thursday, January 12, 2023, 09:54: Swapped wires around for both TGHT / TBHT volt meters. OK. Breaker / PS off. Bypass removed.
Thursday, January 12, 2023, 10:14: Roughing.
Thursday, January 12, 2023, 10:16: BV1A open.
Monday, January 16, 2023, 10:25: Sources off. IV4 closed. Turbo pumps off. |
Tuesday, January 03, 2023, 10:03, Carla Babcock, , , , , , , , Recovery from power outage
|
Easy recovery after power outage, just had to power cycle the ground PLC IOC and the BiRa IOC.
Test stand vacuum currently pumping down again. Water and HV elements still off.
Tuesday, January 03, 2023, 11:13: Reset IG6 - Filament 2. Vacuum 7.22e-06T - AS
Tuesday, January 03, 2023, 14:00: Both Turbo pumps on.
Tuesday, January 03, 2023, 14:27: Vacuum @ 2.32e-06T
Tuesday, January 03, 2023, 14:28: FS#2 opened. Vacuum ok.
Tuesday, January 03, 2023, 14:29: FS#3 opened. Vacuum ok.
Tuesday, January 03, 2023, 14:30: FS#4 opened. Vacuum ok.
Tuesday, January 03, 2023, 14:31: FS#5 opened. Vacuum ok. Stable @ (2.24-2.32)e-06T. - AS |
Wednesday, December 21, 2022, 17:06, Carla Babcock, , , , , , , , Prep for power outage
|
Source and beamline power supplies turned off in EPICS
HV cage power off
Magnet ramped down and power supplies turned off manually (bira and tdk lambda)
VME crates and kepco turned off
Water lines closed
Will turn off pumps remotely later. Left PLC on |
Monday, December 19, 2022, 12:49, Carla Babcock, , HP-FEBIAD, , , , , , HP-FEBIAD tests
|
Monday, December 19, 2022, 12:06 : Tomislav changed the polarity of the anode power supply last week and everything has been closed up again. The anode wire was switched to feedthru J and the short there removed. Forgot to put the short on the tube before closing the top but it should be ok for these tests since it has the resistor still installed to keep it at some potential. Pumping out gas lines.
Monday, December 19, 2022, 12:46 : Anode voltage ramped to 500V no problems. BIAS\EE\EL at 30kV\-1kV\13kV. Starting heaters ramping to TGHT=600A TBHT=290A.
Tuesday, December 20, 2022, 08:23 : Cancelled heater ramp at 500A yesterday, resuming now.
Wednesday, December 21, 2022, 14:48 : Everything ramped down
Friday, January 06, 2023, 09:27: Turbo pumps off. - AS |
Friday, December 16, 2022, 10:32, Aaron Schmidt, , HP-FEBIAD-CTL, , , 43104-2, 45235-12, In progress, New anode routed FEBIAD Test - 3
|
Thermocouples installed (X):
O - O
O - Anode
O - X
O - X
O - O
Same set up as test 2 other than a proper gas line connection was made.
Friday, December 16, 2022, 10:29: Roughing.
Friday, December 16, 2022, 14:46: TP1B on.
Friday, December 16, 2022, 14:52: TP1A on.
Friday, December 16, 2022, 14:59: IG1 on. Vacuum @ 2.58e-05T & dropping.
|
Tuesday, December 13, 2022, 16:12, Aaron Schmidt, , HP-FEBIAD-CTL, , , 43104-2, 45235-12, In progress, New anode routed FEBIAD Test - 2
|
Thermocouples installed (X):
O - O
O - Anode
O - X
O - X
O - O
Megger check ok. Thermocouples checked with a heat gun ok.
Using CTL FEBIAD for thermocouple access. Gas line running into ion source. Anode is run under the coil w/ source cup modification. No welding. 1mm PE spacer installed. 3 layers of Ta foil added to the HP-FEBIAD-CTL on the center block. Edge fins exposed.
Tuesday, December 13, 2022, 16:10: Roughing.
Tuesday, December 13, 2022, 16:40: TP1 B on.
Tuesday, December 13, 2022, 16:49: TP1 A on.
Tuesday, December 13, 2022, 16:58: IG1 on Vacuum @ 7.00e-05T & dropping.
Wednesday, December 14, 2022, 06:49: Waterline FS#5 opened. Vacuum @ 2.42e-06T.
Wednesday, December 14, 2022, 06:53: Power / Sources / Optics on.
Wednesday, December 14, 2022, 06:54: BIAS / EE / EZL / Anode to 1 / 0.5 1 / 0.1 kV.
Wednesday, December 14, 2022, 06:59: TGHT / TBHT / Coil @ 10 A.
Wednesday, December 14, 2022, 07:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, December 14, 2022, 07:21: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Wednesday, December 14, 2022, 07:23: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Wednesday, December 14, 2022, 07:47: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No sparks.
Wednesday, December 14, 2022, 07:49: Auto-ramping TGHT / TBHT to 25 / 25 A @ 2 A per min
Wednesday, December 14, 2022, 07:52: IV4 open.
Wednesday, December 14, 2022, 08:01: Auto-ramping TGHT / TBHT to 50 / 50 A @ 2 A per min
Wednesday, December 14, 2022, 09:05: Auto-ramping TGHT / TBHT to 100 / 50 A @ 2 A per min
Wednesday, December 14, 2022, 09:49 : Auto-ramping TGHT & TBHT to 200 A & 100 A @ 2A er min
Wednesday, December 14, 2022, 10:49 :Auto-ramping TGHT & TBHT to 220 A & 120 A @ 2A er min
Wednesday, December 14, 2022, 11:05 :Auto-ramping TGHT & TBHT to 240 A & 140 A @ 2A er min
Wednesday, December 14, 2022, 11:19 :Auto-ramping TGHT & TBHT to 260 A & 160 A @ 2A er min
Wednesday, December 14, 2022, 11:33 :Auto-ramping TGHT & TBHT to 280 A & 180 A @ 2A er min
Wednesday, December 14, 2022, 11:48 :Auto-ramping TGHT & TBHT to 300 A & 200 A @ 2A er min
Wednesday, December 14, 2022, 12:05 :Auto-ramping TGHT & TBHT to 320 A & 220 A @ 2A er min
Wednesday, December 14, 2022, 12:29: Auto-ramping TGHT & TBHT to 340 A & 240 A @ 2A er min
Wednesday, December 14, 2022, 13:08 : Auto-ramping TGHT & TBHT to 360 A & 260 A @ 2A er min
Wednesday, December 14, 2022, 13:14 : Pyrometer reading shows up after adjustment in focussing
Wednesday, December 14, 2022, 13:22 : Auto-ramping TGHT & TBHT to 380 A & 270 A @ 2A er min
Wednesday, December 14, 2022, 13:35 : Auto-ramping TGHT to 400 A @ 2A per min
Wednesday, December 14, 2022, 13:49: Auto-ramping TGHT to 420 A @ 2 A per min.
Wednesday, December 14, 2022, 14:01: Auto-ramping TGHT to 440 A @ 2 A per min.
Wednesday, December 14, 2022, 14:16: Auto-ramping TGHT to 460 A @ 2 A per min.
Wednesday, December 14, 2022, 14:31: Auto-ramping TGHT to 480 A @ 2 A per min.
Wednesday, December 14, 2022, 14:44: Auto-ramping TGHT to 500 A @ 2 A per min.
Wednesday, December 14, 2022, 14:56: Auto-ramping TGHT to 520 A @ 2 A per min.
Wednesday, December 14, 2022, 15:08: Auto-ramping TGHT to 540 A @ 2 A per min.
Wednesday, December 14, 2022, 15:21: Auto-ramping TGHT to 560 A @ 2 A per min.
Wednesday, December 14, 2022, 15:35 : Auto-ramping TGHT & TBHT to 580 A & 290 A @ 2A er min
Wednesday, December 14, 2022, 16:08 : Auto-ramping TGHT to 600 A @ 2 A per min.
Thursday, December 15, 2022, 10:00 : Auto-ramping TBHT to 300 A @ 2 A per min.
Thursday, December 15, 2022, 13:19 : Auto-ramping TBHT to 330 A @ 2 A per min.
Thursday, December 15, 2022, 14:25 : Increased anode voltage to 400 V.
Thursday, December 15, 2022, 14:50: Reducing TGHT & TBHT to 0 A @ 2 A per min.
Thursday, December 15, 2022, 14:59 : Ramped down anode voltage to 0 V & coil current to 0 A.
Friday, December 16, 2022, 06:59: IV4 & power off.
Friday, December 16, 2022, 07:01: IG1 off. Turbo pumps off.
Friday, December 16, 2022, 08:15: Venting.
|
Tuesday, December 06, 2022, 11:20, Aaron Schmidt, , HP-FEBIAD-CTL, , , 43104-2, 45235-12, In progress, New anode routed FEBIAD Tests
|
Thermocouples installed:
O - O
O - Anode
O - X
X - X
X - O
Multi-pin left side w/ TGHT left end cap thermocouple. TS1 on datalogger
Multi-pin right side w Center Block thermocouple. TS2 on datalogger
Megger check ok. Thermocouples checked with a heat gun ok.
Using CTL FEBIAD for thermocouple access. Gas line running into ion source. Anode is run under the coil w/ source cup modification. No welding. 1mm PE spacer installed. 3 layers of Ta foil added to the HP-FEBIAD-CTL.
Tuesday, December 06, 2022, 11:13: Roughing.
Tuesday, December 06, 2022, 11:56: TP1B on.
Tuesday, December 06, 2022, 12:02: IG1 on. TP1A on.
Tuesday, December 06, 2022, 14:57: Vacuum @ 8.98e-06T.
Tuesday, December 06, 2022, 15:06: Waterline FS#5 open. 8.59e-06T
Tuesday, December 06, 2022, 15:09: Gas line pressurized with argon. SV5 opened.
Tuesday, December 06, 2022, 15:10: No change on vacuum pressure. SV5 closed.
Wednesday, December 07, 2022, 08:14: Power / Sources on.
Wednesday, December 07, 2022, 08:16: Vacuum @ 2.68e-06T Open SV5. Vacuum remains stable.
Wednesday, December 07, 2022, 08:21: Optics set - Timed out TMS:Q5 & TMS:Q3 re-configured - reset
Wednesday, December 07, 2022, 08:23: TGHT / TBHT / Coil manually set @ 10 / 10 / 5 A. Ok.
Wednesday, December 07, 2022, 08:25: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Anode to 100 V. Ok.
Wednesday, December 07, 2022, 08:37: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 1 spark between 27-28 kV while tapping up.
Wednesday, December 07, 2022, 10:28: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Wednesday, December 07, 2022, 10:35: BIAS / EE / EZL @ 40 / -2.0 / 17 kV. Two sparks occurred while taping up.
Wednesday, December 07, 2022, 10:59: HV reduced. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, December 07, 2022, 11:06: 27.0C - 66.0C Begin coil tap. Vacuum @ 2.59e-06T
Wednesday, December 07, 2022, 11:25: 27.8C - 67.8C. Coil to 80 A. Vacuum @ 2.96e-06T.
Wednesday, December 07, 2022, 11:38: 29.0C - 67.6C. Vacuum @ 3.23e-06T.
Wednesday, December 07, 2022, 11:41: Coil @ 0A.
Wednesday, December 07, 2022, 11:43: Anode @ 200V
Wednesday, December 07, 2022, 11:46: Anode @ 300V
Wednesday, December 07, 2022, 11:48: Anode - BIAS spark @ 364V while tapping up. Anode current jumped from 0 mA to 3.66mA
Wednesday, December 07, 2022, 11:49: Anode @ 400V. Anode Current @ 4.884 mA
Wednesday, December 07, 2022, 11:55: Anode @ 500V. Anode Current @ 6.105 mA
Wednesday, December 07, 2022, 13:05: Auto-ramping TGHT / TBHT to 25 / 25 A @ 2 A per min.
Wednesday, December 07, 2022, 13:08: IV4 Open.
Wednesday, December 07, 2022, 13:23: Auto-ramping TGHT / TBHT to 50 / 50 A @ 2 A per min.
Wednesday, December 07, 2022, 13:39: Auto-ramping TGHT / TBHT to 100 / 50 A @ 2 A per min.
Wednesday, December 07, 2022, 14:12: Auto-ramping TGHT / TBHT to 120 / 70 A @ 2 A per min.
Wednesday, December 07, 2022, 14:24: Auto-ramping TGHT / TBHT to 140 / 90 A @ 2 A per min.
Wednesday, December 07, 2022, 14:37: Auto-ramping TGHT / TBHT to 150 / 100 A @ 2 A per min.
Thursday, December 08, 2022, 08:06: Auto-ramping TGHT / TBHT to 170 / 120 A @ 2 A per min.
Thursday, December 08, 2022, 08:19: Auto-ramping TGHT / TBHT to 190 / 140 A @ 2 A per min.
Thursday, December 08, 2022, 08:36: Auto-ramping TGHT / TBHT to 210 / 160 A @ 2 A per min.
Thursday, December 08, 2022, 08:52: Auto-ramping TGHT / TBHT to 230 / 180 A @ 2 A per min.
Thursday, December 08, 2022, 09:09: Anode @ 100 V
Thursday, December 08, 2022, 09:11: Auto-ramping TGHT / TBHT to 250 / 200 A @ 2 A per min.
Thursday, December 08, 2022, 09:23: Auto-ramping TGHT / TBHT to 270 / 220 A @ 2 A per min.
Thursday, December 08, 2022, 09:38: Auto-ramping TGHT / TBHT to 290 / 230 A @ 2 A per min.
Thursday, December 08, 2022, 09:52: Auto-ramping TGHT / TBHT to 310 / 250 A @ 2 A per min.
Thursday, December 08, 2022, 10:05: Auto-ramping TGHT / TBHT to 330 / 270 A @ 2 A per min.
Thursday, December 08, 2022, 10:19: Auto-ramping TGHT 350 A @ 2 A per min.
Thursday, December 08, 2022, 10:43: Auto-ramping TGHT 370 A @ 2 A per min. Pyrometer is setup. Reading @ 1067.9C.
Thursday, December 08, 2022, 10:56: Auto-ramping TGHT 390 A @ 2 A per min.
Thursday, December 08, 2022, 11:09: Auto-ramping TGHT 400 A @ 2 A per min.
Thursday, December 08, 2022, 12:06: Auto-ramping TGHT 420 A @ 2 A per min.
Thursday, December 08, 2022, 12:19: Auto-ramping TGHT 440 A @ 2 A per min.
Thursday, December 08, 2022, 12:34: Auto-ramping TGHT 460 A @ 2 A per min.
Thursday, December 08, 2022, 12:46: Auto-ramping good vacuum limit reached. TGHT @ 453 A. Vacuum @ 5.12e-06T.
Thursday, December 08, 2022, 13:00: TGHT @ 460 A. Vacuum @ 4.95e-06T
Thursday, December 08, 2022, 13:15: Auto-ramping TGHT 470 A @ 2 A per min.
Friday, December 09, 2022, 06:54: Auto-ramping TGHT 490 A @ 2 A per min. Vacuum @ 2.33e-06T.
Friday, December 09, 2022, 07:08: Auto-ramping TGHT 510 A @ 2 A per min
Friday, December 09, 2022, 07:23: Auto-ramping TGHT 530 A @ 2 A per min
Friday, December 09, 2022, 07:36: Auto-ramping TGHT 550 A @ 2 A per min
Friday, December 09, 2022, 07:50: Auto-ramping TGHT 570 A @ 2 A per min
Friday, December 09, 2022, 08:07: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Friday, December 09, 2022, 08:50: Coil @ 10A - Anode @ 200 V
Friday, December 09, 2022, 10:14: Coil manually tapped up to 50 A
Friday, December 09, 2022, 10:20: Anode to 400 V.
Friday, December 09, 2022, 10:27: Vacuum @ 6.70e-06T
Friday, December 09, 2022, 12:51: Auto-cooling TGHT to 480 A @ 2 A per min
Friday, December 09, 2022, 13:59: Auto-cooling TBHT to 230 A @ 2 A per min
Friday, December 09, 2022, 14:26: Stopped TBHT auto-cooling at 255 A
Friday, December 09, 2022, 14:46 : Auto-ramping TBHT to 290 @ 2 A per min
Friday, December 09, 2022, 15:25 : Auto-ramping TGHT to 580 @ 5 A per min
Friday, December 09, 2022, 16:16 : Auto-cooling TGHT & TBHT to 0 @ 2 A per min
Friday, December 09, 2022, 16:38: Ramped down Anode Voltage to 94 V and coil current to 44.05 A
Monday, December 12, 2022, 08:11: Coil @ 0 A. HV @ 0 V.
Monday, December 12, 2022, 08:15: IV4 closed. SV5 closed. Sources off.
Monday, December 12, 2022, 10:09: IG1 off. TP off.
Monday, December 12, 2022, 11:17: Venting.
|
Monday, December 05, 2022, 15:41, Aaron Schmidt, , , , , , , , Source tray insulator replacement 7x
|
Monday, December 05, 2022, 15:38: Source Tray TGHT & TBHT insulators replaced.
Torqued @ 75 in-lbs. (Reference image attached)
|
Wednesday, November 23, 2022, 13:52, Aaron Schmidt, , , , , , 44378-14, In progress, FEBIAD Coil Tests
|
Sam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51 FS#5 on (HS bypassed with a water loop)
Wednesday, November 23, 2022, 13:55: TSG:IG1 Bypass on
Wednesday, November 23, 2022, 14:03: Signage up. Main breaker on.
Wednesday, November 23, 2022, 14:07: FS#5 off & purged. Not needed.
Wednesday, November 23, 2022, 15:01: measured magnetic field of coil at 8A
end test
Monday, November 28, 2022, 11:45: start test set up the hall probe with the jig to move it on the table and centered the hall probe in the magnet. signage up Main breaker on
Monday, November 28, 2022, 13:17: start collecting data at 8 amps
Monday, November 28, 2022, 16:11: end test
Tuesday, November 29, 2022, 10:50:Signage up Main Breaker on Testing started; with current of 8 amps
Taking measurements of temperature at 8A 9A and 10A
Tuesday, November 29, 2022, 15:25 : system locked out and took out magnet
end test
Wednesday, November 30, 2022, 12:40: Test started. Breaker on. signage up. put in low profile magnet with wire ties to keep coils together.
taking data with 8A of current
Wednesday, November 30, 2022, 16:25: end of test power supply off breaker off
|
Wednesday, November 16, 2022, 13:28, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1A Replaced
|
See elog 944
Wednesday, November 16, 2022, 13:23: TP1 A replaced
Wednesday, November 16, 2022, 13:25: Roughing.
Wednesday, November 16, 2022, 14:53: TP1B on
Wednesday, November 16, 2022, 14:56: TP1B at speed.
Wednesday, November 16, 2022, 14:58: TP1A on.
Wednesday, November 16, 2022, 15:07: TP1A at speed. IG1 on. Vacuum @ 3.32e-05T
|
Tuesday, November 15, 2022, 15:32, Sam Gupta, , , , , , , , ATTS tantalum Bracket Heating test
|
Heated up sample 01 for the second time and measured the temperature with increasing current. Used pyrometre to measure temperature and calibrated it with the emmissivity values from cassidy |
Tuesday, November 15, 2022, 11:24, Aaron Schmidt, UC#41 assembly, LP-SIS, ITE, TM4, 45220-8, 45235-4, In progress, Conditioning UC#41 assembly
|
LP-SIS 45220-8 is empty & for testing only.
Tuesday, November 15, 2022, 11:00: Roughing.
Tuesday, November 15, 2022, 11:21: BV1A open.
Tuesday, November 15, 2022, 12:40: TP1B on
Tuesday, November 15, 2022, 12:47: TP1A on
Tuesday, November 15, 2022, 12:49: T1A Currently spinning up. Distinct & loud hum noted. Contacting vacuum group.
Tuesday, November 15, 2022, 12:50: TP's off.
Tuesday, November 15, 2022, 12:55: TP1B restart. ok
Tuesday, November 15, 2022, 12:56: TP1A restart. Failed
Tuesday, November 15, 2022, 13:04: TP1A restart. Failed.
Tuesday, November 15, 2022, 13:05: Controller reset TP1A restarted. Failed. Visually confirmed that it has seized.
See elog# 946
Wednesday, November 16, 2022, 14:53: TP1B on
Wednesday, November 16, 2022, 14:56: TP1B at speed.
Wednesday, November 16, 2022, 14:58: TP1A on.
Wednesday, November 16, 2022, 15:07: TP1A at speed. IG1 on
Thursday, November 17, 2022, 07:14: Waterline FS#5 open. Vacuum stable @ 9.59e-07T
Thursday, November 17, 2022, 07:15: IV4 open.
Thursday, November 17, 2022, 07:18: PS & Sources on.
Thursday, November 17, 2022, 07:20: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Thursday, November 17, 2022, 07:23: Optics set
Thursday, November 17, 2022, 07:32: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, November 17, 2022, 07:35: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Thursday, November 17, 2022, 07:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Thursday, November 17, 2022, 07:40: BIAS / EE / EZL @ 45 / -2.3 / 20 kV
Thursday, November 17, 2022, 08:40: No sparks over 1 hr.
Thursday, November 17, 2022, 08:43: HV reduced. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, November 17, 2022, 10:06: Minor instability & sparks noted.
Thursday, November 17, 2022, 10:18: Consistent sparking. Visually confirmed on the TBHT insulator.
Thursday, November 17, 2022, 10:21: BIAS & EZL reduced to 20 / 10 kV.
Thursday, November 17, 2022, 10:51: HV stable for the last 15 minutes. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, November 17, 2022, 14:02: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Stable
Thursday, November 17, 2022, 14:25: Mass & wire scans complete Empty LP-SIS No salts added.
Masses showed around mass:
-130-140
-39-40
-23-28
Thursday, November 17, 2022, 14:27: Outgassing continues.
Friday, November 18, 2022, 07:39: Mass & wire scans continued.
Traces masses:
-39-40
-23
Friday, November 18, 2022, 07:48: Auto-cooling @ 2 A per min.
Friday, November 18, 2022, 08:01: HV off.
Monday, November 21, 2022, 06:44: Sources off & IV4 closed.
Monday, November 21, 2022, 06:45: IG1 off. Turbo pumps off. |
Wednesday, October 19, 2022, 12:16, Aaron Schmidt, , , , , , , , Test Stand controls changed
|
genepicsas.triumf.ca
x11 enabled.
Then use login credentials.
Wednesday, October 19, 2022, 12:10: Login. Success
Monday, November 07, 2022, 13:13 Use ATTS on putty page.
New ramping program:
Monday, November 07, 2022, 13:15: Auto-ramping TGHT / TBHT to 20 A @ 4A per minute. (Testing new auto-ramp)
Monday, November 07, 2022, 13:19: Ramping complete:
|
Tuesday, October 18, 2022, 13:25, Aaron Schmidt, C#5, LP-SIS, , , 45235-5, 44691-13, In progress, Conditioning C#5
|
Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28: BV1A open
Wednesday, October 19, 2022, 12:14: TP1B on.
Wednesday, October 19, 2022, 12:18: TP1A on.
Wednesday, October 19, 2022, 12:26: IG1 on.
Wednesday, October 19, 2022, 12:34: IV4 open & Closed. Vacuum @ 4.13e-06T.
Wednesday, October 19, 2022, 12:39: FS#5 Water line opened.
Wednesday, October 19, 2022, 12:40: PS on.
Wednesday, October 19, 2022, 12:43: Optics PS on. Unlocked.
Wednesday, October 19, 2022, 12:44: Sources on. Vacuum @ 3.21e-06T.
Wednesday, October 19, 2022, 12:46: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.
Wednesday, October 19, 2022, 12:47: TGHT / TBHT @ 10 / 10 A manually.
Wednesday, October 19, 2022, 12:48: IV4 Open.
Wednesday, October 19, 2022, 12:53: Optics set.
Controls updated
Monday, November 07, 2022, 12:40: Optics set
Monday, November 07, 2022, 13:00: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, November 07, 2022, 13:15: Auto-ramping TGHT / TBHT to 20 A @ 4A per minute. (Testing new auto-ramp)
Monday, November 07, 2022, 13:35: BIAS / EE / EZL @ 35 / -1.8 / 15 kV. Spark*
Monday, November 07, 2022, 13:37: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Monday, November 07, 2022, 13:41: BIAS / EE / EZL @ 45 / -2.3 / 20 kV with multiple sparks near the 44-45kV end of the tap up.
Monday, November 07, 2022, 14:09: Spark. Audible outside the cage, however vacuum was also affected.
Monday, November 07, 2022, 14:49: No further sparks. HV check ok.
Monday, November 07, 2022, 14:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. |
Thursday, September 29, 2022, 13:50, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber
|
Water loop installed.
Thursday, September 29, 2022, 13:50: Roughing
Tuesday, October 18, 2022, 11:17: Venting |
Tuesday, September 27, 2022, 07:55, Aaron Schmidt, C#4, LP-SIS, ITE, TM4, 44691-3, 44378-23, In progress, Conditioning C#4 w/ thermocouples
|
Thermocouples attached on 5 X 5 multi-pin:
O - O
O - X
O - X
X - X
X - X
Tuesday, September 27, 2022, 07:51: Roughing.
Tuesday, September 27, 2022, 08:25: TP1B on.
Tuesday, September 27, 2022, 08:45: TP1A on.
Tuesday, September 27, 2022, 11:02: Vacuum @ 8.31e-06T
Tuesday, September 27, 2022, 11:04: Waterline FS#5 opened. Vacuum @ 8.13e-06T. Power on
Data logger connected as per FBP
Tuesday, September 27, 2022, 12:18: Sources/PS on.
Tuesday, September 27, 2022, 12:21: TGHT / TBHT manually tapped up to 10A.
Tuesday, September 27, 2022, 12:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 27, 2022, 12:34: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Tuesday, September 27, 2022, 12:35: Sparks* @ 37 KV BIAS. Outside the cage. x 2
Tuesday, September 27, 2022, 12:37: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Tuesday, September 27, 2022, 12:47: BIAS / EE / EZL @ 45 / -2.3 / 19 kV with multiple sparks on the tap up.
Tuesday, September 27, 2022, 13:00: 2 more sparks. TSG:CBC down. (Red)
Tuesday, September 27, 2022, 13:08: BIAS / EE / EZL @ 47.2 / -2.4 / 20 kV. Significant spark outside the cage.
Tuesday, September 27, 2022, 13:10: BIAS / EE / EZL @ 50 / -2.5 / 20 kV. Spark outside the cage.
Tuesday, September 27, 2022, 13:12: Blue glow / crack flowing across the TBHT.
Tuesday, September 27, 2022, 13:15: The glow is flexing? Fading in & out.
Tuesday, September 27, 2022, 13:50: HV Tap down to 0 kV
Tuesday, September 27, 2022, 14:13: TSG:CBC controls card replaced. Operation returned.
Tuesday, September 27, 2022, 14:14: IV4 opened.
Tuesday, September 27, 2022, 14:17: Optics set.
Tuesday, September 27, 2022, 14:19: Auto-ramping TGHT / TBHT to 350 / 150 @ 2A per min.
Tuesday, September 27, 2022, 14:43: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Remote operation clear.
Tuesday, September 27, 2022, 18:20: TS tripped shortly after 3:35 PM
Tuesday, September 27, 2022, 18:30: Reset TS sources & optics
Tuesday, September 27, 2022, 18:49: Auto-ramping TGHT / TBHT to 300 / 150 @ 1A per min. Allow for a gradual out gassing.
Tuesday, September 27, 2022, 21:20: TGHT / TBHT @ 150A Vacuum @ 2.15e-06T. TGHT ramp ongoing @ 1 A per min.
Tuesday, September 27, 2022, 22:08: TGHT / TBHT @ 200 / 150 A. Vacuum @ 2.15e-06T. Stable. TGHT ramp ongoing @ 1 A per min.
Tuesday, September 27, 2022, 23:19: Auto-ramp halted. Sped up to 2 A per min. Vacuum @ 1.96e-06T. TGHT @ 270 A.
Tuesday, September 27, 2022, 23:41: TGHT / TBHT @ 300 / 150 A. Vacuum @ 1.97e-06T
Wednesday, September 28, 2022, 06:36: Auto-ramping TGHT to 350A @ 1A per min.
Wednesday, September 28, 2022, 08:14: Vacuum remained stable @ 1.49e-06T. Auto-ramping TGHT / TBHT to 400 / 200 A @ 2A per min.
Wednesday, September 28, 2022, 08:48: Increase in vacuum up to 2.50e-06T+ followed by a drop in TBHT voltage. TGHT / TBHT remain stable @ 400 / 200 A. Vacuum stabilizing @ 2.32e-06T. HV off.
Wednesday, September 28, 2022, 09:15: Data logger setup. Pins moved from 3 & 4 to 4 & 5. Temperature @ 50.6 C.
Wednesday, September 28, 2022, 09:20: HV sources & optics back on. Tap up.
Wednesday, September 28, 2022, 09:33: Auto-ramping TGHT to 450A @ 2 A per min. Some small sparks noted.
Wednesday, September 28, 2022, 09:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, September 28, 2022, 09:59: Auto-ramping TGHT to 500A @ 2 A per min. Some small sparks noted although less frequent.
Wednesday, September 28, 2022, 10:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Wednesday, September 28, 2022, 10:41: BIAS lowered to 25 kV.
Wednesday, September 28, 2022, 11:09: TGHT / TBHT @ 580 / 230 A. BIAS @ 30 kV. Unstable / sparking.Very active on FC0
Wednesday, September 28, 2022, 11:29: Mass & wire scans ongoing. Reset DAC PS.
Wednesday, September 28, 2022, 11:58: Mass, wire & emittance scans complete. FC0 in. Auto-cooling @ 2 A per min.
Wednesday, September 28, 2022, 13:16: Cooling aborted for measurement.
Wednesday, September 28, 2022, 13:21: Auto-cooling @ 2 A per min.
Thursday, September 29, 2022, 07:20: IV4 closed. Sources off. IG 1 & TP off. |
Tuesday, August 30, 2022, 13:58, Aaron Schmidt, , , , , 44062-7, 44378-25, In progress, Conditioning UC#40 assembly
|
Conditioning the UC#40 LP-SIS assembly & ISAC TS main vacuum chamber. Straight / round oven in use (TGHT only).
Tuesday, August 30, 2022, 13:55: BV1B open. Roughing.
Tuesday, August 30, 2022, 14:00: BV1A open.
Wednesday, August 31, 2022, 07:29: Vacuum @ 0.064T. TP1B on.
Wednesday, August 31, 2022, 07:35: TP1 A on.
Wednesday, August 31, 2022, 08:56: Vacuum @ 9.97e-06T. Waterline FS#5 opened.
Wednesday, August 31, 2022, 08:58: Vacuum @ 9.95e-06T. OK. Power on.
Thursday, September 01, 2022, 07:50: Vacuum @ 5.21e-06T.
Thursday, September 01, 2022, 07:54: Manually tapped up TGHT to 50 A.
Limit increased on TGHT parameter setup to 5.500e-06T.
Thursday, September 01, 2022, 07:57: Auto-ramping TGHT to 580 A @ 2 A per min.
Monday, September 12, 2022, 15:09: Vacuum @ 1.69e-06T. Auto-cooling @ 2A per min.
Monday, September 26, 2022, 10:52: Turbo pumps off.
Monday, September 26, 2022, 12:20: Venting. PS off & waterlines purged. |
Monday, July 11, 2022, 09:17, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber
|
Monday, July 11, 2022, 09:15: Roughing. |
Sunday, July 10, 2022, 22:19, Aaron Schmidt, , , , , , , Problems/Solutions, TP2 Trip / TMS:RP2 issue
|
Sunday, July 10, 2022, 22:19: A trip was noted on TP2. the backing pressure is quite high. Shutting off the turbo pumps for the beamline side.
Monday, July 11, 2022, 06:01: Venting.
Monday, July 11, 2022, 08:12: RP1 off.
Monday, July 11, 2022, 09:01: RP changed. SN#LPA49885
Monday, July 11, 2022, 09:02: Down to 0.032T Fast. TP2 & TP6 on.
Monday, July 11, 2022, 09:08: Pumps up to speed. IG6 on. |
Thursday, July 07, 2022, 16:52, Aaron Schmidt, , LP-IG-LIS, ITW, TM2, , 42132-3, In progress, Conditioning UC#39 assembly
|
No UCx target installed. Straight / blank oven in use for out gassing.
Thursday, July 07, 2022, 16:50: Roughing.
Thursday, July 07, 2022, 16:53: BV1A Open.
Thursday, July 07, 2022, 17:31: TP1B on.
Thursday, July 07, 2022, 17:36: TP1A on.
Thursday, July 07, 2022, 17:46: IG1 on. Vacuum @ 2.31e-05T
Thursday, July 07, 2022, 17:47: Waterline FS#5 Opened. Vacuum @ 2.05e-05T & continuing down.
Thursday, July 07, 2022, 18:00: Bypass on IG1. 10A TGHT Check. Ok. Back to 0A. Removed bypass. Ready for remote operation.
Friday, July 08, 2022, 10:44: Started autoramping TGHT 580A/TBHT 0A
Friday, July 08, 2022, 15:37: Autoramping complete
Saturday, July 09, 2022, 07:34 : ramp down started
Sunday, July 10, 2022, 22:14: IG1, TP1B & A off. TP6 has tripped. Sources off.
|
Thursday, June 30, 2022, 13:50, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Thursday, June 30, 2022, 13:46: Roughing.
Thursday, July 07, 2022, 15:00: Venting. |
Thursday, June 23, 2022, 11:00, Aaron Schmidt, SiC#44, HP-FEBIAD, ITE, TM4, 37978-1, 44378-24, In progress, Conditioning SiC#44
|
Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A open.
Thursday, June 23, 2022, 11:34: TP1B on
Thursday, June 23, 2022, 11:41: TP1A on.
Thursday, June 23, 2022, 11:49: IG1 on.
Thursday, June 23, 2022, 12:25: Gases on.
Thursday, June 23, 2022, 12:30: Power on. Cage locked up
Thursday, June 23, 2022, 14:14: Vacuum @ 3.23e-06T.
Thursday, June 23, 2022, 14:15: Waterlines opened. Vacuum stable.
Thursday, June 23, 2022, 14:16: IV4 opened.
Thursday, June 23, 2022, 14:17: Sources on.
Thursday, June 23, 2022, 14:18: Optics set. FM tune.
Thursday, June 23, 2022, 14:21: Electrical check OK. Will leave as is. Remote operation ready.
BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V.
TGHT / TBHT @ 5 A each. Coil @ 5 A.
Thursday, June 23, 2022, 14:22: Reset Kepco (E-rig) PS.
Friday, June 24, 2022, 09:07: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Friday, June 24, 2022, 09:17: BIAS / EE / EZL @ 20 / -1.5 / 10 kV.
Friday, June 24, 2022, 13:18: Ramping ongoing. TGHT / TBHT @ 510 / 290 A. Vacuum @ 3.65e-06T
Friday, June 24, 2022, 19:19: FM Tune on optics / Sources. Vacuum @ 1.60e-06T. BIAS / EE / EZL @ 30 / -1.5 / 15 kV.
Friday, June 24, 2022, 19:42: Coil to 15 A. Anode to 200 V.
Friday, June 24, 2022, 20:00: Mass scans complete.
Friday, June 24, 2022, 20:01: BIAS / EZL reduced to 20 / 10 kV.
Friday, June 24, 2022, 20:02: Anode @ 100 V.
Monday, June 27, 2022, 09:34: BIAS / EE / EZL @ 30 / -1.5 / 15 kV.
Monday, June 27, 2022, 09:36: Anode @ 200 V. Coil @ 40 A. Vacuum @ 9.99e-07T
Monday, June 27, 2022, 10:09: Last scans complete. Auto-cooling @ 2 A per min.
Monday, June 27, 2022, 10:19: Anode, coil, & HV to 0.
Monday, June 27, 2022, 10:20: IV4 & SV5 Closed.
Wednesday, June 29, 2022, 10:57: Sources & IG1 off. Turbo pumps off
Wednesday, June 29, 2022, 12:25: Venting. |
Monday, June 20, 2022, 11:49, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Monday, June 20, 2022, 11:49: Water line loop installed. Roughing.
Thursday, June 23, 2022, 09:25: Venting. |
Saturday, June 18, 2022, 10:04, Aaron Schmidt, SiC#43, HP-FEBIAD, ITW, TM2, 42464-1, 44378-16, In progress, Conditioning SiC#43
|
Note: SiC#42 replacement.
Saturday, June 18, 2022, 09:54: Roughing.
Saturday, June 18, 2022, 10:08: Data logger removed. Pins 4 & 5 grounded. Power on.
Saturday, June 18, 2022, 10:41: TP1B on.
Saturday, June 18, 2022, 10:48: TP1A on.
Saturday, June 18, 2022, 10:55: IG1 on.
Saturday, June 18, 2022, 11:13: Gases on. Cage closed up. SV5 remains on. SV4 (Argon tank) Closed.
Saturday, June 18, 2022, 11:14: Vacuum @ 2.49e-05T.
Saturday, June 18, 2022, 11:15: Waterline FS#5 opened.
Saturday, June 18, 2022, 11:22: Electrical check w/ IG1 bypass
BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V.
TGHT / TBHT @ 5 A each. Coil @ 5 A.
Saturday, June 18, 2022, 11:23: All checks clear. Bypass removed. Ready for remote operation. Vacuum @ 2.14e-05T
Saturday, June 18, 2022, 21:34: Sources on. Vacuum @ 3.38e-06T. IV4 open.
Saturday, June 18, 2022, 21:36: Optics on. Standard tune.
Saturday, June 18, 2022, 22:24: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min to out gas overnight.
Saturday, June 18, 2022, 22:55: BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V. Coil @ 10 A. Low settings left as a general electrical check to run as the target heats up.
Sunday, June 19, 2022, 16:37: Vacuum @ 1.60e-06T.
Sunday, June 19, 2022, 16:40: Open SV4 (Argon gas - W/ quick steps on procedure). Vacuum ok.
Sunday, June 19, 2022, 16:42: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Sunday, June 19, 2022, 19:48: BIAS / EE / EZL / Anode @ 0. Coil to 0.
Sunday, June 19, 2022, 19:59: Anode tapped up manually to 400 V @ approx 1 V per second.
Sunday, June 19, 2022, 20:14: Anode tapped up manually to 0 V @ approx 1 V per second.
Sunday, June 19, 2022, 20:14: Coil tapped up manually to 100 A @ approx 1 A per second.
Sunday, June 19, 2022, 20:15: Full Trip. Vacuum limit passed. TGHT / TBHT Went to 0 A
Sunday, June 19, 2022, 20:17: TGHT / TBHT @ 580 / 290 A.
Sunday, June 19, 2022, 20:31: Stable. Vacuum @ 4.21e-06T.
Sunday, June 19, 2022, 20:58: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 100 V.
Sunday, June 19, 2022, 21:00: Coil @ 10 A. Vacuum @ 3.49e-06T.
Sunday, June 19, 2022, 21:07: Begin mass & wire scans.
Sunday, June 19, 2022, 21:39: Scans complete.
Monday, June 20, 2022, 05:58: Further mass, wire, & emittance scans.
Monday, June 20, 2022, 06:29: Coil @ 40 A, Anode @ 300 V. Optics set to FM tune.
Monday, June 20, 2022, 06:59: Scans complete. Auto-cooling @ 3 A per min.
Monday, June 20, 2022, 07:03: Coil & Anode to 0 A / 0 V.
Monday, June 20, 2022, 07:07: BIAS / EE / EZL @ 0 kV.
Monday, June 20, 2022, 10:12: IV4 closed.
Monday, June 20, 2022, 10:13: Gases closed. IG1 off. Turbo pumps off.
Monday, June 20, 2022, 11:09: Venting. |
Wednesday, June 08, 2022, 10:01, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, 44378-13, In progress, Conditioning Ta#64 & HV Test. 7x
|
Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33: Roughing.
Wednesday, June 08, 2022, 10:07: TP1B on.
Wednesday, June 08, 2022, 10:13: TP1B up to speed. TP1A on.
Wednesday, June 08, 2022, 10:21: TP1A up to speed. IG1 on.
Wednesday, June 08, 2022, 13:06: Waterline FS#5 Open. Vacuum @ 3.32-e06T.
Wednesday, June 08, 2022, 13:22: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. OK.
Wednesday, June 08, 2022, 13:26: One spark*.
Wednesday, June 08, 2022, 13:32: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Wednesday, June 08, 2022, 13:33: Spark*
Wednesday, June 08, 2022, 13:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Wednesday, June 08, 2022, 13:42: Spark*. Outside the cage (EE) Feedthrough (K) Between a hex edge & one of the resistors on a plastic plate.
Wednesday, June 08, 2022, 13:50: BIAS / EE / EZL @ 45 / -2.3 / 19 kV
Wednesday, June 08, 2022, 14:18: We are back. Spark tripped the computer & shut it off while tapping up the HV. BIAS / EE / EZL @ 48.3 / 2.4 / 20 kV.
Wednesday, June 08, 2022, 14:22: BIAS / EE / EZL @ 50 / -2.5 / 20 kV.
Wednesday, June 08, 2022, 14:45: Spark* In the cage.
Wednesday, June 08, 2022, 14:57: Spark* In the cage.
Wednesday, June 08, 2022, 15:19: No sparks have occurred off the thermocouples. Begin tapping down the HV.
Wednesday, June 08, 2022, 15:29: HV off. TGHT / TBHT Check @ 5 / 5 A OK.
Wednesday, June 08, 2022, 15:31: IV4 open.
Thursday, June 09, 2022, 05:14: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Thursday, June 09, 2022, 08:21: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. OK.
Thursday, June 09, 2022, 08:22: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min
Thursday, June 09, 2022, 08:29: Optics set. Standard tune.
Thursday, June 09, 2022, 10:22: Beginning wire & mass scans.
Thursday, June 09, 2022, 10:30: Adjust TSG:CB1 (ok)
Thursday, June 09, 2022, 11:40: Mass & wire scans complete. Tune set to standard. HV tests begin. BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Thursday, June 09, 2022, 11:45: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Thursday, June 09, 2022, 13:01: BIAS / EE / EZL @ 45 / -2.3 / 19 kV
Thursday, June 09, 2022, 13:13: Small spark* Outside the chamber, but in the cage.
Thursday, June 09, 2022, 13:22: BIAS / EE / EZL @ 50 / -2.5 / 20 kV. (One spark during the tap up. In the cage)
Thursday, June 09, 2022, 14:03: Small spark, barely audible.
Thursday, June 09, 2022, 14:11: Large spark in the cage* Computer was shut off. Got it back around 14:16
Thursday, June 09, 2022, 14:20: Reset steering, optics, IG6.
Thursday, June 09, 2022, 14:28: Begin tapping down HV
Thursday, June 09, 2022, 14:34: HV to 0.
Thursday, June 09, 2022, 14:36: Closed IV4. (Reset w/ screwdriver)
Friday, June 10, 2022, 09:58: Auto-Cooling @ 2 A per min.
Monday, June 13, 2022, 10:16: IG1 off. Turbo pumps off. |
Tuesday, May 31, 2022, 13:35, Aaron Schmidt, UCx HS, , ITW, TM2, , 44378-19, In progress, Conditioning UC#38 assembly
|
Using a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B on.
Tuesday, May 31, 2022, 14:06: TP1A on.
Tuesday, May 31, 2022, 14:13: IG1 on.
Wednesday, June 01, 2022, 07:41: Vacuum @ 2.13e-06T. Waterline FS#5 open.
Wednesday, June 01, 2022, 07:43: Power/Sources on.
Wednesday, June 01, 2022, 07:51: Auto-ramping TGHT to 580A @ 2A per min.
Monday, June 06, 2022, 07:09: Auto-cooling @ 2A per min.
Wednesday, June 08, 2022, 07:07: Turbo pumps off.
Wednesday, June 08, 2022, 07:53: Venting. |
Friday, May 27, 2022, 07:19, Fernando Maldonado, , , , , , , Done, FEBIAD parameter scan web-app and brief description (with links)
|
A web-app for systematic FEBIAD parametrizations has been develop and now includes the ISAC Test Stand (ITS) :
https://beta.hla.triumf.ca/degaussing/FEBIAD-scan/
Upon landing in the web-app the ITS will be selected by default as well as the TMS:FC6:SCALECUR faraday cup, which corresponds the last cup of the ITS beamline.
To run a similar scan but on the total source current (FC0) the field has to change from TMS:FC6:SCALECUR to TMS:FC0:SCALECUR.
Each measurement will create a unique id (measurement_id), and the data can be retrieved from
https://beta.hla.triumf.ca/jaya/data/get/measure_id
Plot and analysis routines for the data generated by the FEBIAD-scan can be found in
https://jupyter.triumf.ca/hub/login
for which you need a TRCOMP account. The routines are located in the group folder
/group/ionsrc/fernando |
Wednesday, May 25, 2022, 15:48, Aaron Schmidt, SiC#42, HP-FEBIAD, ITW, TM2, 44692-9, 44378-5, In progress, Conditioning SiC#42
|
Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B on.
Wednesday, May 25, 2022, 16:38: TP1A on.
Wednesday, May 25, 2022, 16:46: IG1 on.
Thursday, May 26, 2022, 09:20: FS#5 Waterline opened. Vacuum ok @ 5.27e-06T.
HV preset: BIAS / EE / EZL @ 30 / -1.0 / 15 kV
Friday, May 27, 2022, 05:11: Coil to 40 A. Anode t0 300 V.
Friday, May 27, 2022, 05:16: TGHT on. Auto-ramping TGHT / TBHT to 580 / 290 @ 2 A per min.
Friday, May 27, 2022, 07:14: Optics set & IV4 opened. TGHT / TBHT @ 242 A (Ramping ongoing)
FM
Friday, May 27, 2022, 17:17 : IG1 @ 5.19e-6 T. TBHT @ 290 A. TGHT @ 540 A since 16:27.
Friday, May 27, 2022, 17:18: The assembly has been outgassing and the good vacuum limit was reached, preventing reaching the operational point.
Friday, May 27, 2022, 17:19: Auto-ramp up aborted. We'll heat up again Monday morning.
Friday, May 27, 2022, 17:20: Auto-cooling to 0 A @ 2A/min
Sunday, May 29, 2022, 21:35: Auto-ramping TGHT/ TBHT to 350 / 150 A @ 2 A per min - AS.
Sunday, May 29, 2022, 21:40: Vacuum @ 1.43e-06T.
Monday, May 30, 2022, 04:53: Vacuum @ 1.49e-06T. Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min - AS
Monday, May 30, 2022, 08:06: Initial wire & mass scans ok. Increase EE to -1.5 kV.
Monday, May 30, 2022, 08:30: EE back to -1.0 kV.
Monday, May 30, 2022, 10:31: BIAS / EE / EZL / Anode @ 0 kV. Lock over. Open back/top cage.
FM
Monday, May 30, 2022, 11:21: Mass set to 40Ar+. The gas on/off now shows an effect on the signal
Monday, May 30, 2022, 11:24: Running a small scan to test the web-app
Monday, May 30, 2022, 14:00: Spark towards TBHT, TPS:Q1 charged up.
Monday, May 30, 2022, 14:30: Spark to anode.
Monday, May 30, 2022, 16:16: Issue preventing FEBIAD-scan solve.
Monday, May 30, 2022, 16:16 : FEBIAD scan on 40Ar+.
Monday, May 30, 2022, 17:00: TMS :VCB1 died in the middle of the scan. Scan aborted save id 1085. Starting a new scan
Monday, May 30, 2022, 18:24: measured_id = 1086
Moving to H2O
Monday, May 30, 2022, 18:30: Scan started for H2O.
Monday, May 30, 2022, 19:53: Scan finished. measure_id = 1087
Monday, May 30, 2022, 19:58: Gas off. Scan for H2O ready to go.
Monday, May 30, 2022, 19:59: Scan started
Monday, May 30, 2022, 21:21: Scan finished. measured_id = 1089
Monday, May 30, 2022, 21:32: Auto-cooling to 0 A @ 2A/min
AS
Tuesday, May 31, 2022, 05:10: All HV & Sources off.
Tuesday, May 31, 2022, 05:11: IV4 closed. IG1 & turbo pumps off.
Tuesday, May 31, 2022, 07:02: IV4 reset. Venting.
Tuesday, May 31, 2022, 07:08: FS#5 purged. Power locked up. |
Thursday, May 12, 2022, 10:50, Aaron Schmidt, , P2N-SIS, ITE, TM4, 44812-2, 45240-1, In progress, P2N assembly conditioning - 4
|
PE shimmed & extended 1mm due to likely ion source contact.
Thursday, May 12, 2022, 10:41: Roughing.
Thursday, May 12, 2022, 11:26: TP1B on.
Thursday, May 12, 2022, 11:35: TP1A on.
Thursday, May 12, 2022, 11:43: IG1 on.
Thursday, May 12, 2022, 11:48: Vacuum @ 2.65e-05T. FS#5 Opened. No immediate spike.
Thursday, May 12, 2022, 11:50: Vacuum @ 2.47e-05T & dropping.
Friday, May 13, 2022, 07:32: TP/IG off.
Friday, May 13, 2022, 09:51: Venting. |
Wednesday, May 11, 2022, 10:05, Aaron Schmidt, , P2N-SIS, ITE, TM4, 44812-2, 45240-1, , P2N assembly conditioning - 3
|
Target oven #45241-1 swapped out. SS bolts were in use on the legs.
Molybdenum screws in the legs on oven #44812-2. No target to ion source cup interference. 3mm gap - OK.
TGHT - R: 1.215
TGHT - L: 1.206
TBHT - R: 2.014
TBHT - L: 2.013
Cathode cable detached from feed-through (B).
Wednesday, May 11, 2022, 10:04: Roughing.
Wednesday, May 11, 2022, 10:33: TP1B on.
Wednesday, May 11, 2022, 10:43: TP1A on.
Wednesday, May 11, 2022, 10:51: IG1 on.
Wednesday, May 11, 2022, 13:43: Vacuum @ 5.43e-06T. FS#5 Open.
Wednesday, May 11, 2022, 13:45: Vacuum @ 5.36e-06T. OK. |
Tuesday, May 10, 2022, 10:09, Aaron Schmidt, , P2N-SIS, ITE, TM4, 45241-1, 45240-1, In progress, P2N assembly conditioning - 2
|
Ref: https://elog.triumf.ca/TIS/Test-Stand/924. During testing, it was noted one leg was glowing vs the other. P2N assembly was removed & inspected. No contact or defects were found.
Tuesday, May 10, 2022, 10:05: Roughing.
Tuesday, May 10, 2022, 10:42: TP1 on.
Tuesday, May 10, 2022, 10:50: TP1A on.
Tuesday, May 10, 2022, 10:58: IG1 on. Vacuum @ 1.77e-05T & dropping.
Tuesday, May 10, 2022, 13:45: Vacuum @ 5.63e-06T. FS#5 Opened.
Tuesday, May 10, 2022, 13:58: Vacuum @ 5.27e-06T.
|
Monday, May 09, 2022, 10:08, Luca Egoriti, , P2N-SIS, ITE, TM4, , , In progress, P2N heating test
|
Beginning of May:
The cabling on the top of the test stand was changed to adapt for P2N testing. The TGHT and COIL PS were disconnected, and their DC cable terminals were connected instead to the TDK-LAMBDA P2Nheaters. The configuration on top of the ITS module is the following:
TBHT+ = A
TBHT- = B
MASTER+ = D
MASTER- = C
SLAVE+ = G/E
SLAVE- = F/H
Friday May 6th, afternoon
Once the pressure was almost stable in the low E-6 torr range, the first rampup was conducted up to ~600 A and the I,V parameters looked similar to previous P2N units. More tests to full current happening next week.
Monday, May 09, 2022, 09:29
P2N unit is being heated now, the automatic ramping utility is ramping the TDK-LAMBDAs while the TBHT is being increased manually.
Monday, May 09, 2022, 10:31
A voltage event happened, the TBHT voltage increased frmo 0.64 V to 0.73 V, while the P2Nheater dropped from 1.73 V to 1.56 V.
Monday, May 09, 2022, 12:19
At P2NHT=950A it was noticed that one leg of the P2N was glowing much more than the other, the ramping was first stopped and then ramped down.
Now the P2NHT=282A and TBHT=47A
Tuesday, May 10, 2022, 09:32
Test stand vented and target inspected, there is no obvious sign of damage or misconnection on the tantalum assembly. Some resistance measurements were taken across target elements and connections:
Screw on copper L to bottom flexy leg L = 117
Bottom flexy leg L to top flexy leg L = 24 / 0 (?)
top flexy leg L to bottom elephant leg L = 64
elephant L to elephant R = 360
top flexy leg R to bottom elephant leg R = 69
Bottom flexy leg R to top flexy leg R = 0 (?)
Screw on copper R to bottom flexy leg R = 125
Tuesday, May 10, 2022, 11:39
This morning, the target was inspected but nothing major was noticed, hence it was put back in the ITS for heating.
Tuesday, May 10, 2022, 17:40
Target being ramped: so far all good, total current in P2NHT=690A and TBHT=116A
A current measuring clamp was used to measure current in the 4/0 cables. The only bad thing is that the slave outputs half the current than the master, making the cables hotter (30deg vs 24deg).
Currents:
A-B ~116 A (TBHT)
C~468
E~124
G~102
Tuesday, May 10, 2022, 17:45
Event: reduction in P2NHT voltage and increase in TBHT voltage. After letting the PS ramp, it was noticed that the P2NHT voltage accelerated its increased, and the left leg started glowing like the previous time. The current was immediately ramped down, but still there was a voltage spike upwards in the P2NHT.
While the leg was glowing hot, the current between feedthroughs H (P2NHT-) and I (HV common) was 90A. Now that the "episode" is not there any more, the current is zero
Wednesday, May 11, 2022, 10:55
The previous P2N target had stainless steel screws at the bottom, where the copper L-shaped connector and the ta foil legs connect, which might have bene the cause of the gap opening and voltage increase. Now, the target manufactured for the previous beamtime is used, which does not have the cuts on the elephant ears but they are OK since don't interfere with the new IS cup design, and are ~3mm away from it.
Wednesday, May 11, 2022, 13:57
Start heating the new P2N assembly
Wednesday, May 11, 2022, 14:58
Stopped at
P2NHT= 501 A
TBHT= 95 A
All currents seem to be flowing in the right path, with no current in the jumper between H-I
Wednesday, May 11, 2022, 15:26
Voltage step in P2NHT and TBHT happened again. Current sum:
A = 125 A
B = 125 A
C= 470 A
D=474 A
E = 118 A
F= 85 A
G = 95 A
H = 132 A
Short G-E = 5 A
Short F-H = 3 A
Jumper H-I = 62 A
The most likely explanation of this jump is that the IS tip touches the plasma electrode as shown in the drawing below which would result in some current flowing through the jumper, more investigations are needed
Thursday, May 12, 2022, 08:19
Test stand opened, there is some sign of burn in the plasma electrode, but it's hard to say if it's because they were touching. Aaron added a tantalum 0.040" shim to the plasma electrode to distance it further from the target IS tube
Thursday, May 12, 2022, 13:20
ITS with P2N target installed and pumping down
Thursday, May 12, 2022, 15:50
P2NHT started ramping |
Thursday, May 05, 2022, 14:43, Aaron Schmidt, , P2N-SIS, , , 45241-1, 45240-1, In progress, P2N assembly conditioning.
|
Thursday, May 05, 2022, 14:43: Roughing. Open BV1B
Thursday, May 05, 2022, 14:46: Upper chamber cage closed. The rest remains open. Open BV1A.
Thursday, May 05, 2022, 15:20: TP1B up to speed.
Thursday, May 05, 2022, 15:25; TP1A on.
Thursday, May 05, 2022, 15:32: TP1A to speed. IG1 on.
Thursday, May 05, 2022, 15:33: Vacuum @ 4.72e-05T. FS#5 Open. No spike. ok.
Thursday, May 05, 2022, 15:34: Vacuum steady 4.09e-05T & dropping. |
Monday, May 02, 2022, 14:10, Aaron Schmidt, , P2N-SIS, , , , , , Empty Chamber PS test.
|
No P2N is loaded. Testing the power supplies.
Tuesday, May 03, 2022, 10:07
In the past few days, the ITS has been reconfigured for P2N operation:
- The two ATTS PS were moved to the ITS rack, one on top of the TGHT and the other instead of the COIL
- AC rewiring was necessary since the breakers were not connected to the wires. Marshall was on it and re-connected
- Ray has configured the ATTS PLC to be compatible with P2N operation in ITS
- The controls cables to the MASTER and SLAVE supplies have been configured: the cables come from the front of the PS rack, so we could close the back and top cage if we wanted. One control cable was connected to the relay to send the proper ENABLE signal only when the ITS vacuum and water flow are OK
- DC cables re-routed for P2N parallel operation:
MASTER+ = D
MASTER- = C
SLAVE+ = E,G
SLAVE- = F,H
TBHT+ = A
TBHT- = B
Wednesday, May 04, 2022, 07:54: PS main shutoff. IG1 & Turbo pumps off. |
Thursday, April 21, 2022, 13:38, Aaron Schmidt, , , , , , , Problems/Solutions, Leak checks
|
https://elog.triumf.ca/TIS/Test-Stand/919
Vacuum Group LD#1
(A) Top feed through fittings upgraded
Thursday, April 21, 2022, 13:11: Pumping directly on FS#4-Line A (TBHT). Leak rate @ 0.0E-07 atm-cc/sec.
Thursday, April 21, 2022, 13:13: Sprayed He on Block (A) & the TBHT solder joints. No signal change.
(B) Top feed through fittings upgraded.
Thursday, April 21, 2022, 13:39: Pumping directly on FS#4-Line B (TBHT). Leak rate @ 0.0E-07 atm-cc/sec.
Thursday, April 21, 2022, 13:42: Sprayed He on Block (A) & the TBHT solder joints. Dips up to a Leak rate @ 0.1E-07 atm-cc/sec & back to 0.0.
Disconnect LD. Will need to pressurize w/ He.
Thursday, April 21, 2022, 14:09: Pressurize FS#4-Line B (TBHT) to 50 PSI.
Thursday, April 21, 2022, 14:20: False positives. Saturated the area w/ He. LD off & lines depressurized.
Tuesday, April 26, 2022, 11:14: Leak rate @ 0.0E-07 atm-cc/sec. (No He)
Tuesday, April 26, 2022, 11:15: Pressurize FS#4-Line B (TBHT) to 120 PSI.
Tuesday, April 26, 2022, 11:20: Checked TBHT solder joints & water block (B). Leak rate @ 0.0E-07 atm-cc/sec. Disconnect, purge, & swap fittings to (A)
Tuesday, April 26, 2022, 11:31: Pressurize FS#4-Line A (TBHT) to 120 PSI. Leak rate @ 0.0E-07 atm-cc/sec
Tuesday, April 26, 2022, 11:38: Checked TBHT solder joints & water block (A). Leak rate @ 0.4E-07 atm-cc/sec on the water block. Disconnect, purge.
Wednesday, April 27, 2022, 10:38: Indium gasket installed on FS#4-Line A water block.
Wednesday, April 27, 2022, 10:43: Leak rate @ 0.0E-07 atm-cc/sec. (No He)
Wednesday, April 27, 2022, 10:44: Spiked as soon as He was applied.
Wednesday, April 27, 2022, 11:14: Line A removed.
Wednesday, April 27, 2022, 11:40: Line A reinstalled after inspection w/ new Indium gasket fitted. Gasket only. No C-Seal.
Wednesday, April 27, 2022, 11:44: Leak rate @ 0.0E-07 atm-cc/sec. (No He)
Wednesday, April 27, 2022, 11:46: Spiked as soon as He was applied.
Wednesday, April 27, 2022, 11:53: New Indium gasket fitted. Gasket only. No C-Seal.
Leak rate @ 0.0E-07 atm-cc/sec. (No He)
Wednesday, April 27, 2022, 11:54: Pressurize to 30 PSI. Leak rate @ 0.0E-07 atm-cc/sec
Wednesday, April 27, 2022, 11:57: Pressurize to 50 PSI. Leak rate gradually increased to the (X)E-05 atm-cc/sec range.
Multiple leak checks & gasket attempts Thursday.
Monday, May 02, 2022, 09:45: Indium gasket installed w/ 90-100 inch pounds of torque. Used a heat gun up to 90. Allowed to cool, then given one more tightening.
Monday, May 02, 2022, 09:57: Leak rate @ 0.0E-08 atm-cc/sec. (No He) using the sniffer.
Monday, May 02, 2022, 09:59: Initial leak rate @ 0.0E-08 atm-cc/sec. (w/ 120 PSI He)
Monday, May 02, 2022, 10:11: Leak rate @ 0.0E-08 atm-cc/sec. (w/ 120 PSI He).
Monday, May 02, 2022, 10:20: BV1B open. Rouging
Monday, May 02, 2022, 10:22: BV1A open.
Monday, May 02, 2022, 11:51: TP1B on.
Monday, May 02, 2022, 11:57: TP1A on.
Monday, May 02, 2022, 12:05: IG1 on.
Monday, May 02, 2022, 12:10: Vacuum @ 4.19e-05T & dropping.
Monday, May 02, 2022, 13:59: Vacuum @ 1.33e-05T
Monday, May 02, 2022, 14:04: FS#4 open. Vacuum @ 1.33e-05T. Stable. No immediate Spike.
Monday, May 02, 2022, 14:05: FS#2 open. Vacuum @ 1.33e-05T.
Monday, May 02, 2022, 14:06: FS#3 open. Vacuum @ 1.33e-05T.
Monday, May 02, 2022, 14:09: FS#5 open. Vacuum @ 1.33e-05T. Stable.
|
Wednesday, April 20, 2022, 13:42, Aaron Schmidt, , , , , , , , Vent Beamline half
|
Aurelia to do a visual test later.
Wednesday, April 20, 2022, 13:41: IG6 Off. TP6 & TP2 off.
Tests by AL were complete. Installed a fresh gasket on the rear window.
Thursday, April 21, 2022, 12:04: BV6 open. Roughing.
Thursday, April 21, 2022, 12:06: BV2 open.
Thursday, April 21, 2022, 12:11: TMS:TP6 on.
Thursday, April 21, 2022, 12:15: TMS:TP2 on.
Thursday, April 21, 2022, 12:16: TMS:TP6 Green.
Thursday, April 21, 2022, 12:20: TMS:TP2 Green. |
Wednesday, April 13, 2022, 07:46, Aaron Schmidt, , , , , , , Problems/Solutions, Water leak
|
Wednesday, April 13, 2022, 07:38: Appears to have a water leak. Vacuum @ 8.48e-06T. All power / sources shut off. (Had already tripped).
Wednesday, April 13, 2022, 07:44: All waterlines closed. Water leak confirmed. Vacuum dropped to 2.33e-06T.
Wednesday, April 13, 2022, 08:23: Vacuum @ 2.06e-06T.
Wednesday, April 13, 2022, 08:28: Open FS#2. Vacuum @ 2.06e-06T.
Wednesday, April 13, 2022, 08:34: Vacuum @ 2.06e-06T. Open FS#3. Vacuum @ 2.06e-06T.
Wednesday, April 13, 2022, 08:39:. Open FS#4. immediate spike to 2.57e-06T.
Wednesday, April 13, 2022, 08:44: All lines closed & purged.
Wednesday, April 13, 2022, 08:47: Opened FS#4 w/ added air pressure (40 PSI). Immediate spike noticed.
Wednesday, April 13, 2022, 08:50: FS#5 Pressurized. No change. Leak appears on FS#4.
Wednesday, April 13, 2022, 08:51: IG1 & Turbo pumps off.
|
Monday, April 11, 2022, 14:52, Aaron Schmidt, , , , , , , Problems/Solutions, TP6 controller
|
Monday, April 11, 2022, 13:58: Controller for TP6 is dead. Literally smokes if you try to use it.
Monday, April 11, 2022, 14:51: TP6 Controller is replaced. TP6 on. |
Thursday, April 07, 2022, 11:19, Aaron Schmidt, Test FEBIAD TM2-2022, , ITW, TM2, , 42752-5, , Test FEBAID & TS operation
|
Gas system switched on manually to use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25: Roughing.
Thursday, April 07, 2022, 11:17: TP1B on.
Thursday, April 07, 2022, 12:55: TP1A on.
Thursday, April 07, 2022, 14:42: SV5 on. Power / sources on.
Thursday, April 07, 2022, 14:44: IV4 open. Optics on. Vacuum @ 2.7e-06T.
Thursday, April 07, 2022, 14:47: System check:
TGHT / TBHT @ 10 A. Coil @ 10A.
BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Anode @ 50V
OK. Set.
Thursday, April 07, 2022, 14:49: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Thursday, April 07, 2022, 14:51: BIAS / EE / EZL @ 0 kV. Anode @ 0V
Friday, April 08, 2022, 05:44: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min.
Friday, April 08, 2022, 05:51: BIAS / EE / EZL @ 20 / -1.0 / 7.5 kV.
Coil @ 20 A, Anode @ 100 V.
Friday, April 08, 2022, 10:01: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.
BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Friday, April 08, 2022, 11:15: TBHT @ 290 A.
Friday, April 08, 2022, 12:09: Mass & wire scans complete. HV to 0kV. Anode to to V. Auto cooling @ 1 A per min. Coil @ 0 A.
Monday, April 11, 2022, 07:25: Auto-ramping TGHT /TBHT to 580 / 290 A @ 2 A per min.
Monday, April 11, 2022, 13:48: BIAS / EE / EZL 30 / -1.5 / 13 kV. Mass & wire scans started.
Wire scans good.
Monday, April 11, 2022, 13:58: Controller for TP6 is dead. Literally smokes if you try to use it.
Monday, April 11, 2022, 14:05: HV to 0 kV / Off. IV4 closed. Anode & Coil to 0.
Tuesday, April 12, 2022, 07:14: Vacuum instability noted. 2 spikes to 4.6e-06T. Back to 2.48e-06T. BIAS / EE / EZL 30 / -1.5 / 13 kV. IV4 opened. Coil to 10 A. Anode to 100 V Optics standard tune set.
Mass & wire scans started.
Tuesday, April 12, 2022, 08:16: FM tune used. Mass & wire scans ok. Minor vacuum instability continues. Begin auto-cooling @ 2 A per min.
Tuesday, April 12, 2022, 08:27: Coil, Anode off. HV off. Closed SV5. Closed IV4
|
Tuesday, April 05, 2022, 14:01, Aaron Schmidt, Test FEBIAD TM2-2022, LP-FEBIAD, ITW, TM2, , 42752-5, , Test FEBIAD & TS operation
|
Tuesday, April 05, 2022, 13:57: Roughing. BV1B.
Tuesday, April 05, 2022, 14:04: BV1A on.
Tuesday, April 05, 2022, 14:28: TP1B on.
Tuesday, April 05, 2022, 14:36: TP1A on.
Tuesday, April 05, 2022, 14:46: IG1 on.
Wednesday, April 06, 2022, 07:42: Vacuum @ 2.50e-06T.
Wednesday, April 06, 2022, 07:44: Waterlines opened. Vacuum Remains stable.
Wednesday, April 06, 2022, 07:59: Cage fully closed up. Power/sources on.
Wednesday, April 06, 2022, 08:00: COIL / TGHT / TBHT @ 10 A manually. Check - Ok.
Wednesday, April 06, 2022, 08:02: Anode @ 50V - Ok.
Wednesday, April 06, 2022, 08:04: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Check - Ok.
Wednesday, April 06, 2022, 08:10: BIAS / EE / EZL @ 10 / -1 / 10 kV.
Wednesday, April 06, 2022, 08:16: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Ok. Vacuum @ 2.39e-06T.
Wednesday, April 06, 2022, 08:46: 1/2 hour. Stable.
Wednesday, April 06, 2022, 08:50: All sources off. PS off. Open Cage.
Wednesday, April 06, 2022, 08:54: Begin cycling source gas control.
Wednesday, April 06, 2022, 08:57: SV5 open.
Wednesday, April 06, 2022, 08:58: SV3 & SV4 open. Vacuum stable @2.32e-06T.
Wednesday, April 06, 2022, 09:02: Cage closed. Sources / PS on. IV4 open.
Wednesday, April 06, 2022, 09:04: Auto-ramping TGHT / TBHT to 350 / 150 @ 2 A per min.
Wednesday, April 06, 2022, 09:05: Anode @ 50 V. Coil @ 10 A.
Wednesday, April 06, 2022, 09:10: Optics set.
Wednesday, April 06, 2022, 11:37: Gas lines closed. Abort ramping. TGHT / TBHT @ 306 / 150 A. HV lockout. Open cage.
***Gas bottles are not in the old configuration*** No gas.
Wednesday, April 06, 2022, 11:50: Begin Auto-cooling @ 2 A per min.
Thursday, April 07, 2022, 08:13: IG1 off. Turbo pumps off. Power off.
Thursday, April 07, 2022, 09:17: Venting.
|
Monday, April 04, 2022, 20:56, Carla Babcock, , , , , , , , wiring reverted for cathode-bias FEBIAD
|
Wiring which was changed to run the mass marker tests has been reverted:
- anode bias cable connected to "B"
- tube negative attached to HV common through "B" to "F" connection
Ready for cathode biased FEBIAD operation. |
Monday, April 04, 2022, 20:44, Carla Babcock, , , , , , , , Change from 9-pin connectors to 5-pin connectors
|
Swapped the old 9pin connectors out and replaced with 2 5-pin connectors, same as on the modules.
See attached for current pin out diagram. Many of the wires are too short to reach the bottom sockets, so wires 2, 8, 9 are not connected in the connector. 4 spots are empty on connector 2 (right). (6, 7) and (4, 5) are twisted pairs. Unused wires are tapped up out of the way, but we should improve this, the tape may come loose due to heat and then the wires could present an HV risk. (Update: added some wire to hold them in place. Slightly better...)
Need to either extend the wires, or put in new ones. All wires are grounded on the rack.
In addition, there are two screws in each connector which are floating right now. Need to make a connection for them but should be ok if we dont go to really high voltages. |
Monday, March 21, 2022, 13:59, Carla Babcock, , , , , , , , 3rd mass marker test
|
3rd version of the mass marker target has been installed. This one is further back on the heat shield, and has a longer ceramic piece attached. There are three thermocouples as follows:
Thermocouple |
Source tray pins |
Rack position |
Target location |
TC1
|
1,2 |
4,5 |
ceramic feeder tube |
TC2 |
4,5 |
1,2 |
Right side oven |
TC3 |
8,9 |
6,7 |
Left side oven |
Monday, March 21, 2022, 13:55 : Roughing down.
Monday, March 21, 2022, 16:45 : Turbos have been on for a few hours. Starting water.
Monday, March 21, 2022, 17:20 : Only TC1 has to be tested with heating and maybe swapped if it is the wrong way around. Otherwise ready to go.
Thursday, March 24, 2022, 10:51 : Ramping up heaters to test thermocouples.
AS:
Monday, April 04, 2022, 09:10: Power locked out. IG1 & Turbo pumps off. HV top cage removed. |
Monday, February 28, 2022, 08:08, Aaron Schmidt, , LP-SIS, , , , , , Mass marker / Coil-Tube target Test #2
|
Installed & roughing Friday.
Monday, February 28, 2022, 08:07: Turbopump TP1B on.
Monday, February 28, 2022, 09:21: TP1A on.
New thermocouple setup:
|
Rack position |
Multipin position |
Target position |
TC1 |
5,9
|
- |
- |
TC2 |
1,2 |
4,5 |
Right side of Ta oven |
TC3 |
6,7 |
8,9 |
Left side of Ta oven |
Monday, February 28, 2022, 18:57 : Data logging started. Forgot to set interval, not sure what it is at....
PLAN:
Ramp up coil to 50A, record temperatures
Ramp coil down then ramp target and tube to same values as before, record temperatures.
Ramp coil as before.
Tuesday, March 01, 2022, 14:52: Vacuum @ 1.60e-06T. Waterlines opened - AS
Tuesday, March 01, 2022, 14:54: Vacuum ok.
Turbos stopped Wednesday night. Ready to be uninstalled after venting and water purging. |
Wednesday, January 12, 2022, 16:12, Carla Babcock, , , , , , , , Ramp up of the mass marker target
|
Wednesday, January 12, 2022, 16:08 : HV ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A on TBHT. See MassMarkerTest#1 for ramp up values of the thermocouples.
Seeing some beam on FC0, changing magnet settings to Cs to check FC6 then will ramp up.
Thursday, January 13, 2022, 14:22 : 1.3e-10 approximately Cs on FC6. Optimal EE -2700V, slightly higher than standard on EZL.
Ramping down to Na on the magnet, found 5 pA:
Started a ramp up to nominal heater values (TGHT-500 A TBHT-230 A) but too much HV sparking so aborted at TGHT-299 A and TBHT-230 A. Ramped HV down to 16kV to get sparking to slow down.
Ramped quickly back up to 30kV to get FC readings but since there is so much sparking, we decided to ramp everything down and open the vacuum chamber.
PLAN:
1. ramp down heaters, vent vacuum, open chamber.
2. Try to tape the thermocouples up so that they are further from ground.
3. Try to crimp the bottom of the mass marker tubes, and bend them upwards so they aren't facing ground.
4. Add a dedicated ground to the COIL power supply.
From Fernando:
Monday, January 17, 2022, 09:52: IG1 on. Source PS off. HV Cage removed. - AS
Monday, January 17, 2022, 11:11: Cage on. TGHT/TBHT PS on. - AS
Monday, January 17, 2022, 11:23: PS/ Sources on. - AS
Monday, January 17, 2022, 14:00: HV ramped to 20kV, EZL 10kV, EE, -1500V. Ramping TGHT/TBHT to previous values of 250A/200A.
Monday, January 17, 2022, 16:51 : Back to previous heater values, didn't find any Cs on FC6 so went to Na. Tuned and found the tune the opposite of last time, all voltage wanted to go lower. Found 736pA, maybe better than last time because I tuned quite a bit.
Monday, January 17, 2022, 18:00: Ramping to TGHT 300A, TBHT 230A, where we had sparking problems last time.
Monday, January 17, 2022, 18:17 : So far no sparking issues so I will start to heat up the mass markers. One spark about 4 mins after ramping up, after that maybe 10 sparks/40mins or so. Too many....
Monday, January 17, 2022, 19:20 : Got to 20A on the mass markers, will ramp down now.
Friday, January 28, 2022, 18:49 : Yesterday opened the HV rack to re-start data logging on the thermocouples. This morning ramped everything up and started the heaters. Found the Na current around 250A on the target, but abandoned looking for it because the TGHT heating was causing lots of outgassing, which was causing bias sparks. In addition, there is a weird effect where the Na current spikes, then slowly decreases over the course of an hour or something, to values lower than before the heating. Could this be an indication of some thermal issues, like cold spots where things condense? Or something is drifting. The HV common point on the target is at the mass markers now instead of at the exit of the ion source, but I can't imagine you would see such a large difference. The thermocouples do not change in value during these long slow declines. In light of this, decided to just go up and see what the thermocouples read. Settings were close to what is shown above - bit lower on the HV but magnet the same.
Monday, January 31, 2022, 16:23: Power/sources off. Thermocouple reader off. HV rack open. -AS
Wednesday, February 02, 2022, 07:36: IG1 & Turbo pumps off. - AS |
Wednesday, January 05, 2022, 15:12, Carla Babcock, , , , , , , , Modifications to test stand for mass marker tests
|
Connection of TBHT negative to HV common removed (R4 in circuit diagram). Labelled and put in MRO bucket.
Anode connection moved to feedthrough J.
Rewired multipin patch panel. Left some grounded (HVC) wires hanging, should probably make this nice later. |
Tuesday, January 04, 2022, 13:00, Aaron Schmidt, , , , , , , , Post water leak
|
December 30th, 2021: Water poured down around Isac test stand and probes lab area in service annex extension. problem was traced to a Cracked HVAC coil on SA roof
Fault: 14601
https://web.accel.triumf.ca/ncr/dbfault.pl?faultno=14601&usertype=unknown&username=&faultgroup=CYCLOTRON&debug=0&btn_submit=Showfault
https://elog.triumf.ca/TIS/Test-Stand/908
Noted on arrival to startup the ISAC TS some cleaning of the area was required. Optics PS & all PS quickly checked. OK / Dry.
Use caution when HV is to be applied later. Expect conditioning / noise from the cage.
|
Tuesday, December 21, 2021, 13:34, Aaron Schmidt, , LP-SIS, , , 44691-8, 44378-6, In progress, Salts test HS & Holiday Shutdown
|
LP-SIS modified w/ 2 holes on the center block to accept a pair of Ta tubes that are run to the coil PS.
*Note modified HS plates at the ion source to accommodate the LP-SIS (Has a slightly bent ionizer tube from the drilling)
-Plan to shut down the ISAC TS on 12/23/2021 for the holidays.
Thermocouples are installed.
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
Twisted pairs |
TP1 |
TP1 |
- |
TP2 |
TP2 |
TP3 |
TP3 |
TP4 |
TP4 |
Tuesday, December 21, 2021, 13:55: Roughing.
Tuesday, December 21, 2021, 13:57: BV1A open.
Thursday, December 23, 2021, 07:42: TP2 & TP6 off.
Thursday, December 23, 2021, 09:00: PV1 & PV2 off. RP1 & RP2 off.
Clean up?? What happened here? (Water mess?)
Tuesday, January 04, 2022, 11:13: RP1 & RP2 on.
Tuesday, January 04, 2022, 11:14: Roughing.
Tuesday, January 04, 2022, 11:17: TP2 & TP6 on.
Tuesday, January 04, 2022, 11:21: IG6 on.
Tuesday, January 04, 2022, 13:00: TP1B on.
Carla:
Swapped top and bottom connector on target side multipin to match up with wires. Added kapton tape where things were touching. TC#3 (ROI) maybe won't work, was very twisted. Not sure if I got all the twists.
Data logger |
Location |
Source tray position |
HV rack position |
TC#1 |
MMO |
1 pos |
5 pos
|
|
|
6 neg |
9 neg |
TC#2 |
MMI |
4 pos |
2 pos |
|
|
5 neg |
1 neg |
TC#3 |
ROI |
8 pos |
7 pos |
|
|
9 neg |
6 neg |
Monday, January 10, 2022, 09:53: Roughing.
Monday, January 10, 2022, 15:55: TP1B on
Monday, January 10, 2022, 16:04: TP1A on.
Monday, January 10, 2022, 16:14: TP2 Tripped. Back on within 30 seconds.
Monday, January 10, 2022, 16:14: IG1 on.
Wednesday, January 12, 2022, 09:56 : Cage has been closed up and HS water lines are open. |
Tuesday, November 16, 2021, 13:45, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Tuesday, November 16, 2021, 13:44: Roughing. Water loop installed. Lock out tag removed. |
Friday, November 12, 2021, 13:01, Aaron Schmidt, Ta#63, LP-SIS, ITE, TM4, 44691-11, 44378-12, In progress, Conditioning Ta#63
|
Friday, November 12, 2021, 13:01: BV1B open. Roughing.
Friday, November 12, 2021, 13:05: BV1A open.
Friday, November 12, 2021, 13:34: TP1B on.
Friday, November 12, 2021, 13:42: TP1A on.
Friday, November 12, 2021, 13:50 : IG1 on. TMS:TP2 trip. Fast reset. OK. Vacuum @ 3.54e-05T. Waterline FS#5 open.
Friday, November 12, 2021, 13:53: Vacuum @ 2.12e-05T. Ok
Friday, November 12, 2021, 13:54: Power / sources on.
Monday, November 15, 2021, 09:00: Auto-ramping TGHT / TBHT to 350 / 150 @ 3 A per min. IV4 open. TMS:VCB1 not functioning. Controls group notified.
Monday, November 15, 2021, 09:40: Optics set minus TMS:VCB1
Monday, November 15, 2021, 11:16: Auto-ramping TGHT / TBHT to 580 / 230 @ 2 A per min.
Monday, November 15, 2021, 11:34: TMS:VCB1 fixed. Optics set ok.
Monday, November 15, 2021, 11:43: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, November 15, 2021, 15:44: Mass & wire scans complete. OK. HV to 0 kV. IV4 closed.
Tuesday, November 16, 2021, 06:16: Auto-cooling TGHT / TBHT @ 2A per min.
Tuesday, November 16, 2021, 11:13: Power / sources off.
Tuesday, November 16, 2021, 11:14: IG1. Turbo pumps off.
Tuesday, November 16, 2021, 12:12: Venting. |
Thursday, November 04, 2021, 11:55, Fernando Maldonado, , , , , , , Done, Opening vacuum chamber for thesis pictures :p
|
Thursday, November 04, 2021, 11:54: Venting
water loop removed
Thursday, November 04, 2021, 13:39: Roughing
|
Wednesday, October 20, 2021, 15:01, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Wednesday, October 20, 2021, 15:01: Roughing. |
Thursday, October 14, 2021, 10:13, Aaron Schmidt, , LP-SIS, ITW, TM2, , 44378-22, In progress, Conditioning UC#36 HS
|
Tube / TGHT only.
Thursday, October 14, 2021, 10:11: Roughing.
Thursday, October 14, 2021, 12:05: TP1B on.
Thursday, October 14, 2021, 12:10: TP1A on.
Thursday, October 14, 2021, 13:27: IG1 on.
Thursday, October 14, 2021, 16:08: Vacuum @ 3.73e-06T
Thursday, October 14, 2021, 16:10: FS#5 open. Vacuum Stable.
Thursday, October 14, 2021, 16:13: PS on. Sources on. TGHT manually tapped up to 10 A. OK. Allow vacuum to stabilize further.
Friday, October 15, 2021, 06:38: Auto-ramping TGHT to 580 A @ 2 A per min.
Friday, October 15, 2021, 21:32: Auto-Cooling @ 1 A per min.
Monday, October 18, 2021, 07:50: Sources, IG1, & turbo pumps off. |
Wednesday, October 06, 2021, 11:56, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Wednesday, October 06, 2021, 11:56: Roughing.
Thursday, October 14, 2021, 09:07: Venting. |
Monday, October 04, 2021, 15:38, Aaron Schmidt, , LP-IG-LIS, ITE, TM4, , 42132-7, In progress, Conditioning UC#35 IG-LIS HS
|
Monday, October 04, 2021, 15:38: Roughing.
Monday, October 04, 2021, 16:08: TP1B on.
Monday, October 04, 2021, 16:15: TP1 A on.
Monday, October 04, 2021, 16:41: IG1 on.
Tuesday, October 05, 2021, 06:47: Vacuum @ 4.09e-06T.
Tuesday, October 05, 2021, 06:49: Waterlines opened. Vacuum stable.
Tuesday, October 05, 2021, 06:50: Power / sources on.
Tuesday, October 05, 2021, 06:52: Auto-ramping TGHT to 580 A @ 2 A per min.
Wednesday, October 06, 2021, 05:44: Auto-cooling @ 3 A per min. Vacuum @ 2.37e-06T.\
Wednesday, October 06, 2021, 09:37: Power / sources off.
Wednesday, October 06, 2021, 09:38: IG1 off. TSG:TP1 A & B off.
Wednesday, October 06, 2021, 11:11: Venting. Waterlines off.
Edit* Switched from ITW to ITE. on station icon - AS.
|
Thursday, September 23, 2021, 07:16, Aaron Schmidt, , , , , , , , Pump down empty chamber & reboot
|
Thursday, September 23, 2021, 07:15: Roughing. Waterline loop installed.
Monday, September 27, 2021, 10:35: MB1 off. Turbo pumps, IG, RP, all off/closed. DI water closed/purged.
TS shutdown for planned power outage.
Friday, October 01, 2021, 06:03: Roughing pumps on.
Friday, October 01, 2021, 06:04: Roughing TS beam line side.
Friday, October 01, 2021, 06:52: TMS:TP6 & TMS:TP2 on. Venting Chamber side.
Friday, October 01, 2021, 06:57: IG6 on - Filament 2 manually set. Beam line side vacuum @ 1.5e-05T
Friday, October 01, 2021, 07:01: Vacuum @ 9.04e-06T & dropping steady (Beam line side) OK.
Friday, October 01, 2021, 07:05: Reboot ISAC TS PLC/IOC. Reset controls whiteout.
Friday, October 01, 2021, 07:10: MB1 restart ok. |
Tuesday, September 14, 2021, 17:12, Aaron Schmidt, C#3, LP-SIS, ITW, TM2, 44691-7, 44378-11, In progress, C#3 Conditioning 6x
|
Tuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37: TP1B on.
Tuesday, September 14, 2021, 17:47: TP1A on.
Tuesday, September 14, 2021, 17:55: IG1 on.
Wednesday, September 15, 2021, 06:51: Waterlines opened. Vacuum Stable @ 4.46e-06T.
Wednesday, September 15, 2021, 07:01: Power/sources/optics on - Set.
Wednesday, September 15, 2021, 07:02: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.8 |
3.99 |
TBHT |
24.6 |
3.23
|
COIL + EE |
23.6 |
5.02 |
TGHT |
23.8 |
5.66 |
Wednesday, September 15, 2021, 07:05: Quick system check. TGHT / TBHT @ 10 / 10 A. OK.
Wednesday, September 15, 2021, 07:06: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Not ok. BIAS short!!!* set to 1kV, zero read back. 0V & 0.230 mA.
Wednesday, September 15, 2021, 08:01: Hook was still in the cage. Removed*
Wednesday, September 15, 2021, 08:05: Quick system check. TGHT / TBHT @ 10 / 10 A. BIAS / EE / EZL @ 1 / -0.5 / 1 kV. All ok. Vacuum @ 4.02e-06T. Allow to stabilize.
Thursday, September 16, 2021, 04:38: Vacuum @ 2.13e-06T. Auto-ramping TGHT / TBHT to 350 A / 150 A @ 2 A per min.
Thursday, September 16, 2021, 04:44: BIAS / EE / EZL @ 20 / -1.0 / 10 kV.
Thursday, September 16, 2021, 08:58: Auto-ramping TGHT / TBHT to 580 A / 230 A @ 2 A per min.
Thursday, September 16, 2021, 13:20: Auto-ramp halted. Vacuum @ 3.12 e-06T. TGHT / TBHT @ 410 / 210. Adjusted good vacuum / increment limit t0 5.0e-06T & 7e-06T (Back off limit). Continue auto-ramping TGHT / TBHT to 580 A / 230 A @ 2 A per min.
Thursday, September 16, 2021, 16:30: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. TGHT / TBHT @ 543+/ 230 A. TGHT still ramping on vac limit. Good wire scans so far.
Thursday, September 16, 2021, 16:36: Mass & wires scans proceeding.
Thursday, September 16, 2021, 17:16: Scans ok. TGHT @ 550 A. Vacuum @ 5.12e-06T.
Friday, September 17, 2021, 10:41: Mass & wire scans ok. BIAS / EE / EZL to 0 kV.
Sunday, September 19, 2021, 20:33: Auto-cooling @ 1 A per min.
Monday, September 20, 2021, 06:10: Power/sources off. IV4 off. Lock-out.
Monday, September 20, 2021, 06:13: IG1 off. Turbo pumps off.
Thursday, September 23, 2021, 05:04: Venting. |
Tuesday, September 07, 2021, 16:04, Alexander Shkuratoff, , , , , , , Done, Replaced flange on F/T R with blank flange
|
Feedthrough R had a flange installed with a HV feedthrough on it for TM3 service tray prototype HV tests. It was replaced today with the original blank flange. |
Tuesday, August 31, 2021, 13:55, Aaron Schmidt, , , , , , , , Pump down chamber
|
Pump down chamber w/ empty HS |
Wednesday, August 25, 2021, 15:30, Ferran Boix Pamies, , , , , , , , Thermocouple high voltage test
|
Wednesday, August 25, 2021, 15:29: Roughing.
Thursday, August 26, 2021, 04:11: IG1 switched on. Vacuum @ 8.35e-06T - AS
Thursday, August 26, 2021, 14:04 Water on, no spike in vacuum. IG1:2.6e-6T
Thursday, August 26, 2021, 14:37 HV rack closed, BIAS EE and EZL power supplies on.
Thursday, August 26, 2021, 15:03 BIAS/EE/EZL 10000/-1000/9000
Thursday, August 26, 2021, 15:08 BIAS/EE/EZL 30000/-1500/13000 1 spark just when reached 30kV.
Thursday, August 26, 2021, 15:28 Series of sparks restarted the controling PC. Back in control BIAS/EE/EZL 48000/-2500/22000
Thursday, August 26, 2021, 15:34 BIAS/EE/EZL 50000/-2500/22000
Thursday, August 26, 2021, 15:48 BIAS/EE/EZL 55000/-2800/24000
Thursday, August 26, 2021, 15:53 Ramping down.
Monday, August 30, 2021, 10:25 turbos off.
|
Monday, August 23, 2021, 10:49, Aaron Schmidt - Fernando Maldonado, , , , , , , Problems/Solutions, RGA replaced with a blind flange
|
Monday, August 23, 2021, 10:49: Aaron removed the Extorr RGA and install a blind instead.
When the new RGA arrives it will be changed. |
Monday, August 23, 2021, 09:55, Fernando Maldonado, , , , , , , Problems/Solutions, RP1 changed back
|
Monday, August 23, 2021, 09:53: RP1 was swapped back to our original pump. (see e-log 889)
Derek informed that they test it overnight and performed well, and it's a bit slow but it goes down to 20 mT.
Current is at 36 mTorr and dropping. |
Saturday, August 07, 2021, 18:07, Fernando Maldonado, , , , , , , Problems/Solutions, FC0 lasrge oscillation and RMPs offset. Both started today. [Got solved by itself]
|
Saturday, August 07, 2021, 18:02: As mentions in previous entries, the FC0 current oscillates with no change on ion source parameters.
Hence, I came on-site to see if there was an issue with the hardware. Nothing obvious.
Last night there were some sparks that might have cause some issue.
RPMS are shifted toward negative current reading, similar to what we observed when testing TM4 sourcetray.
To rule out hardware issues I swapped the signals from FC0 to FC6 and visceversa.
When the output of FC0 goes to the FC6 controller the readout makes sense, and this behaves as expected with gas on/off.
When the output of FC6 goes to the FC0 controller there is no readout coming out. This suggest, at least to me, that some damage or error is happening on the DAQ side.
I will reboot the ioc expecting to see something.
Things sort kind of Ok but I don't trust it. FC0 reading makes a bit more sense. RPMS remains with an offset
Saturday, August 07, 2021, 20:31: The FC0 reading increase from 7.54e-11 A to 1.64e-8 A starting at 19:32. Also, the RPMS baseleves are not offset anymore, the -10 rd when using the 1 nA scale is back to 0 (normal) |
Thursday, August 05, 2021, 08:49, Fernando Maldonado, , , , , , , Problems/Solutions, CANBUS snooper set up to investigate random optics turnining off
|
Problem: Some devices turn off unexpectedly and sometimes without any obvious trigger. In the past, the only time this was an issue was during mass scans. Now with the automation of measurements, this is a major problem as it prevents longer parameter scans.
Thursday, August 05, 2021, 08:00: Kevin setup the CANBUS snooper by hooking it up on the magnet card loop port.
This device tracks the network so if any error happen it will be captured.
Thursday, August 05, 2021, 09:39: Test unsuccessful. No device turned off (I should be happy XD)
Thursday, August 05, 2021, 09:40: Will run the test another time
A PC was setup near the old magnet power supply (20210806_150334.jpg ). One of the software run smoothly but the other more useful one fails to connect to the usb adapter.
Friday, August 06, 2021, 14:52: Fixed issue with the usb adapter. With this, the CANBUS traffic can be store and inspected to catch any error on the communication (Annotation_2021-08-06_144737.png).
Friday, August 06, 2021, 14:53: Loggers are running.
Friday, August 13, 2021, 11:07: I forgot to input the feedback from Kevin:
"33 errors out of 10,300,00 transaction seems statistically insignificant to me. "
From the devices tripped,
"Most of the tripped supplies are located on the front side of the rack, the original test stand controllers"
So maybe the issues could be
"Compatibility issues with the old and new? The newer supplies are all daisy chained, should we upgrade these to the tap boards?
Should the old controllers (original test stand appear to be MK supplies) be upgraded (do we have enough)?" |
Tuesday, August 03, 2021, 11:55, Fernando Maldonado, , , , , , , Problems/Solutions, Swapped emmittance meter voltage cables.
|
After not being able to get beam through the emittance meter. I diagnosed that the plates was not biased (reason yet unknow).
I swapped the cables from the plates such that it looks like the picture below. With this, I was able to take an emittance scan with the previous parameters.
Varying the optics affect the shape and position of the emittance so I believe this is a real signal.
Keeping this configuration until I finish my measurement.
|
Friday, July 30, 2021, 16:28, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Done, FEBIAD parameter scan - efficiency measurements
|
Restarting everything after swapping RP1 (see elog 889).
Friday, July 30, 2021, 16:14: IG1 @ 7.02e-7 T.
Friday, July 30, 2021, 16:26: IV4 open. IG1 @ 6.3e-7 T.
Friday, July 30, 2021, 16:27: Auto-ramping TGHT/TBHT to 540/270 A @ 4A/min.
Friday, July 30, 2021, 16:32: Emittance meter power supply found at 500 V. Running a scan does not weep the voltage.
Cycling the PS and running a scan. Now the voltage is swept.
Friday, July 30, 2021, 17:43: TBHT reached set current. TGHT @ 304 A and ramping up. IG1 @ 6.36e-7 T. TIS glowing so I guess it didn't break from early trip.
Friday, July 30, 2021, 18:53: IG1 @ 7 e- 7 T.
Friday, July 30, 2021, 18:53 : Auto-ramping TGHT to 580A @ 4A/min.
Friday, July 30, 2021, 19:10. TGHT reached set current. IG1 @ 7.35e-7 T.
Friday, July 30, 2021, 19:22: BIAS/EZL/EE @ 30/13/1.5 kV.
Friday, July 30, 2021, 19:25: IG1 @ 7.55e-7 T.
Friday, July 30, 2021, 19:26 : Auto-ramping TBHT to 280A @ 4A/min.
Friday, July 30, 2021, 19:29: TBHT reaches set current. IG1 @ 7.72e-7 T.
Friday, July 30, 2021, 21:24: Mass scans with gas on/off shows clear only contribution from gas line.
Friday, July 30, 2021, 21:25: Anode=200C,Coil=30A. FC0=5.14e-9 A. FC6=9.35e-10 A for 40Ar+
Parameter scans performed on nominal heater current and also with heater at similar power to older measurements.
Leaving some devices that are typically at 0 V to something like 1 to 2 volts, to avoid the red 0 readback as a test.
Saturday, July 31, 2021, 08:13: System stable overnight. TMS:VCB5 was the only device found off.
Mass scans, anode-coil scans. gas line effects.
Sunday, August 01, 2021, 08:42: On-site: Grid is fine. Gas pressure stays at |200kPa| even after several line flushes. Continuing remotely.
Several parameter scans all at 280A. All of the look remarkably similar, so reproducibility over two day is possible. Mass scans at three different coil-anode combinations
Emittance scans still not possible @ 1.3e-9 A on FC6, when going to 290 A will try again.
Sunday, August 01, 2021, 22:52: IG1 @ 8.43e-7 T.
Sunday, August 01, 2021, 22:53: Auto-ramping TBHT to 290A @ 4A/min.
Monday, August 02, 2021, 01:00: IG1 @ 860e-7T. FC1=1.59e-8.
Monday, August 02, 2021, 08:59: IG1 @ 7.44e-7 T.
Mass scans performed. Emittance scans are still not possible with FC6=2.2e-9 A. Parameter scans
Monday, August 02, 2021, 09:02: Auto-ramping TBHT to 300 A @ 4A/min.
Emittance scans are still not possible with FC6=3.1e-9 A
Monday, August 02, 2021, 12:48: IG1 @ 7.6e-7 T.
Monday, August 02, 2021, 12:48: Auto-ramping TBHT to 305 A @ 2A/min.
Monday, August 02, 2021, 16:40: IG1@ 8.01 e-7 T.
Parameter scans. Mass scans performed. Emittance scans are still not possible with FC6=6.21e-9 A. I think there is something wrong with the parameters or with the hardware. To check with Carla on Tuesday.
Monday, August 02, 2021, 20:44: Ran some tests with the older tune as it provides a broader beam. With this the emittance meter is able to detect the beam center at 85 mm as is common with this tune. However, the beam is not scan in angle, that is the voltage is not swept. Not sure if this has to do with a stuck power supply, or if the voltages of the plate are not biased.
I will take one more measurement at higher current and go tomorrow to check the emittance scan status.
Monday, August 02, 2021, 20:46: Auto-ramping TBHT to 310 A @ 1A/min. IG1 @ 8.16e-7 T.
Parameter scans. Mass scans.
Monday, August 02, 2021, 23:47: IG1 @ 8.07e-7 T. FC0 = 3..8e-8 A.
Monday, August 02, 2021, 23:52: Done for the day.
Tuesday, August 03, 2021, 07:34: Things were stable overnight. IG1 @ 7.92e-7 T.
Parameter scans, and emittance meter troubleshooting.
Grid is fine.
Tuesday, August 03, 2021, 11:55: Emittance scans seem to work now( see e-log 891)
Tuesday, August 03, 2021, 12:08: Done on-site. Continuing remotely.
Emittance scan. Mass scans.
Tuesday, August 03, 2021, 20:21: Ramping TBHT to 315 A @ 1A/min. IG1 @ 8.2e-7 T.
Parameter scan. Mass scans. Emittances scans.
Tuesday, August 03, 2021, 22:55: IG1 @8.07e-6. Done for the day. Will continue tomorrow.
Wednesday, August 04, 2021: Parameter scan. Mass scans. Emittances scans.
Data analysis on files generated so far. Efficiency as a function of temperature-voltage look similar.
Given that previous cathode heating current did not have emittance, I will go down to measure efficiency.
Wednesday, August 04, 2021, 18:09: Cooling TBHT to 280 A @ -2A/min.
Thursday, August 05, 2021: Morning troubleshooting CANBUS signal with no luck (this is actually something good)
Mass scans. Parameter scans, and finally emittance scans at lower temperatures.
Thursday, August 05, 2021, 20:58: IG1 @ 7.35e-7 T.
Friday, August 06, 2021: CANBUS analyzer up-and-running.
Parameter scan. Mass scans. Emittances scans.
Saturday, August 07, 2021, 06:00: Found all my epics windows closed. Probably a network issue as I cannot connect from any of my pc's. Submitting a ticket.
Saturday, August 07, 2021, 08:43: Reply from Steve McDonald says there are general network issues and someone is goin on-site to investigate the "network switch stack in the ISAC2 second floor"
Saturday, August 07, 2021, 10:12 : Communications restore after fix.
Saturday, August 07, 2021, 15:06: FC0 reading oscillates a lot and sometimes drop to 0. Mass scan shows almost no peaks without gas. With gas, the FC0 behaves the sames even thought 40Ar+ signal is 1e-8A and responds to the gas open/close.
Moreover, the RPM0s have an offset current. RPM0A is not showing beam.
I will turn the HV off in case there is weird dark current going on.
Saturday, August 07, 2021, 17:29 : On-site
ISAC test stand PC lost connection to epics due to the same issue. Initiating striptools.
Nothing visible wrong on service cap nor around the ISAC test stand, however, FC0 still oscillates a lot.
I will change the signal cables to see if one controller can read from the other faraday cup.
Things look better now (see entry 893)
Finished mass scans
Sunday, August 08, 2021, 00:35: Ramping TBHT to 300 A @ 4 A/min. IG1 @ 6.71e-7 T.
Sunday, August 08, 2021: Parameter scans, mass scans, emittance scans performed.
Sunday, August 08, 2021, 23:55: Checking other species given that with TBHT=310 A I can see m=90, which I think it might be Ta++
Monday, August 09, 2021: TBHT increased to 315 A
Parameter scans, mass scans, and emittance scans performed.
Investigating the following species: O+, (H2O)+, Ar++, (N2)+/CO+, (O2)+,Ta++,(TaO)++ on masses 16,18,20,28,32,90,98, respectively.
Both the atomic, and molecular oxygen follow different tendencies wrt other species.
Tuesday, August 10, 2021, 09:57: TBHT @ 320 A. IG1 @ 6.53e-7T.
Tuesday, August 10, 2021, 10:01: Increasing anode limit current to 200mA. All previous tests had 150 mA and the maximum current recorded was ~110mA.
Tuesday, August 10, 2021, 11:42: Grid is fine (confirmed by Marla)
Tuesday, August 10, 2021: Mass 60 observed, it might be (SiO2)+ coming from the coil jacket. The parameter scan shows that the ion current is only dependent on voltage.
Wednesday, August 11, 2021. Mass scan, and parameter scan. For the first time I am measuring only FC0 with and without gas. I'm gonna investigate the higher peaks individually, likely they are H2O,O2,O,H2, and Ar
Thursday, August 12, 2021: All day measuring different ion currents with and without gas (H2,N,O,OH,H2O,N2/CO,O2).
Friday, August 13, 2021, 09:03: Currently measuring FCO with gas.
Friday, August 13, 2021, 10:42: On-site. Grid is fine
Friday, August 13, 2021, 19:50:Scans completed for different species, results seem consistent but required more in-depth. FC0 scans shows higher values towards high anode voltage and high coil current but not all species shows this behavior.
Friday, August 13, 2021, 19:51: Ramping tbht to 330 @ 1 A/min.
Friday, August 13, 2021, 20:29L IG1@8.25e-7T.
Saturday, August 14, 2021, 22:28: Parameter scans, mass scans. Some emittance scans unsuccessful.
Anode leakage current seems to creep a bit overnight. This could be an indication of a failure onset but I'll have to see. I won't increase the current remotely until being on-site
Sunday, August 15, 2021, 10:10: Anode leakage current has increased 10 mA overnight.
Sunday, August 15, 2021, 20:43: Emittance scans for multiple anode/coil combinations. Visually there are differences on the geometrical emittance, not so much on the 90% intensity emittance. Requires proper emittance analysis.
Monday, August 16, 2021, 18:58: Data analysis and short summary. Systematic emittance measurements.
Request to add more PVs to control emittance and mass scans from jupyter notebook
Tuesday, August 17, 2021, 10:22: On site. Grid is fine. Re-initianing epics as my pc reboot it.
Tuesday, August 17, 2021, 10:23: TBHT to 335A @ 1A/min. Anode leakage current =150 mA. IG1=6.51e-7T. Increase anode current limit to 250 mA.
Tuesday, August 17, 2021, 10:29: The grid is as bright as the cathode. This is the first time the grid shines this bright.
Tuesday, August 17, 2021, 10:53: The grid looks normal at anode=200V. By making an anode sweep I was able to observe that at around 300 V there is an onset on how bright the anode get. Passing this voltage the grid start to shine and gets a maximum brightness when reaching 500V.
This seems to suggest that the power deposited on the grid is enough to cause substantial heating if it makes it as bright as the cathode. The maximum power into the anode body (at this cathode heating current (335A)) is 500V* 200mA=100W (just like a lightbulb)
Tuesday, August 17, 2021, 12:03: Done on-site. Will continue remotely.
Tuesday, August 17, 2021, 20:19: Anode is drawing more current. During Ar+ scan, the maximum anode current registered was ~200 mA. Now is ~250 mA
Schottky plot shows a tiny upwards kick.
Tuesday, August 17, 2021, 22:16: Once again, at the end of the scan the current increased. This time to 320 mA
Tuesday, August 17, 2021, 22:18: I think the grid will melt tonight with anode/coil @ 200V/30A.
Wednesday, August 18, 2021: Well, well, well. Grid didn't melt but the anode leakage current has increased again. At some point the anode got current limited to 350 mA and from 490 V it drop to 470V.
Wednesday, August 18, 2021, 16:57: Increasing the anode limit current to 400 A.
Wednesday, August 18, 2021, 18:01: During the scan on FC0, the anode current went up to 400 mA so I increased to 500 mA, but I had to increase to 600 mA but it was still getting current limited. Scan aborted
Maybe now I am melting the grid
I will run an FC0 scan with gas on while I'll go on-site to check the grid and the "anomalous" ionization..
Running a mass scan while I go on-site. Anode=200. Coil=90 A.
Wednesday, August 18, 2021, 19:42: Grid is melted. From the look of it half of the visible part collapsed into a blob while the other is gone (allowing to see the far backside of the target oven.
With this knowledge I can proceed with more aggressive tests in order to test the limit if the "anomalous" regime.
Wednesday, August 18, 2021, 23:24: After a mass scan with 0 V to check surfaces ionizes species I noticed there is a signal on mass ~ 137.5 which I am not sure what it is.
It might be Ba or a molecule but is coming from the transfer line as sweeping the voltage between 0 and 2 V changes the response but above this the signal is gone and reappears with 80 V.
Thursday, August 19, 2021, 08:08: mass ~137.5 disappeared. If I increased the anode voltage to 400 V or so some appears but quickly drops.
Thursday, August 19, 2021, 11:35: Increased anode current limit to 800 mA.
Thursday, August 19, 2021, 14:08: Scan didn't cause an increased on leakage current. Maximum registered was around 200 mA. However, the contour plot looks different to the case when the grid was complete.
Thursday, August 19, 2021, 23:36: Finishing some scans at the current settings.
Thursday, August 19, 2021, 23:36: TBHT to 280A @ -1A/min. Tomorrow I will focused on temperature scans without caring much on emittance o mass composition.
Friday, August 20, 2021, 11:28: Scans done for,280,285. Currently running 290 A.
The coil current dependence qualitatively follows the one from ISOLDE, in which a series of minimum and maxima occur and also vary a bit with voltage.
Friday, August 20, 2021, 13:34: Accidentally set TBHT to 226 A directly from 295 A.
Friday, August 20, 2021, 13:36: Heating TBHT to 300 A @ 4A/min.
Friday, August 20, 2021, 14:13: TBHT is at 295 A to check things are still the same.
Friday, August 20, 2021, 23:46: TBHT @ 310 A.
Saturday, August 21, 2021, 06:20: Scan on-going for TBHT 315 A.
Saturday, August 21, 2021, 13:25: TBHT to 335 A.
Saturday, August 21, 2021, 15:02: TBHT to 340 A.
Saturday, August 21, 2021, 18:11: The voltage got current limited during the scan for 345 A. When setting the voltage to 0V, the anode seems to be shorted.
Saturday, August 21, 2021, 22:46: Ramping down TGHT/TBHT to 0 (@-1A/min) but the short is still present. Currently @ TGHT/TBHT 454/162 A.
Sunday, August 22, 2021, 13:29: This morning the heaters reach 0 A but the anode remain current limited. I will proceed to turn off the TS to check tomorrow morning the ion source.
Sunday, August 22, 2021, 13:31: IV4 closed.
Sunday, August 22, 2021, 13:36: Sources off.
Sunday, August 22, 2021, 13:38: IG1 off
Sunday, August 22, 2021, 13:38: Turbos off.
Monday, August 23, 2021, 07:19: Venting
Monday, August 23, 2021, 08:30: Confirmed a short between target/cathode to anode/heatshield
Monday, August 23, 2021, 11:29: Confirmed that the anode power supply still works :) |
Friday, July 30, 2021, 15:34, Carla Babcock, , , , , , , Failed, TSG:RP1 failure
|
TP1A tripped off on Fernando, seems the backing pressure got too high. Even with PV1 closed the RP1 pump could not get below 200mTorr. Derek from vacuum group came and had a look, and is swapping RP1 out for one of the vacuum group pumps, then will see if they can repair ours. |
Wednesday, July 28, 2021, 08:48, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD parameter scan - efficiency measurements
|
Modified spiral tube from VCR to counteract torque towards the HS. Now points towards TBHT.
Electric checks before closing shows no short between TIS and HS.
Wednesday, July 28, 2021, 08:48: Venting
Wednesday, July 28, 2021, 09:18 Turbos on.
Wednesday, July 28, 2021, 09:26: IG1 on. TP1 didn't timed out.
Wednesday, July 28, 2021, 10:24: IG1 @ 4.13e-6 T. All voltages can be set with no problem.
Wednesday, July 28, 2021, 11:48: IG1 @ 1.98e-6 T. Anode @ 10 V.
Wednesday, July 28, 2021, 11:49: Auto-ramping TGHT/TBHT to 560/280 A @ 4A/min.
Wednesday, July 28, 2021, 14:10: Heaters reached setpoints. No shorts!
Wednesday, July 28, 2021, 14:14: IG1 @ 1.71e-6 T.
Wednesday, July 28, 2021, 14:30: Spark when ramping voltage @ 20 kV.
Wednesday, July 28, 2021, 14:30: IV4 open.
Wednesday, July 28, 2021, 14:32: Bias/ EZL/EE @ 30/13/1.5 kV. Anode @ 0 V.
Wednesday, July 28, 2021, 14:33: FC0 = 1.09e-10 A
Wednesday, July 28, 2021, 14:34: IG1 @ 1.62e-6 T.
Wednesday, July 28, 2021, 14:35: Auto-ramping TGHT to 580 A @ 4A/min.
Wednesday, July 28, 2021, 14:48: IG1 @1 .60e-6 T
Wednesday, July 28, 2021, 14:48: FC0 = 2.35e-10
Ready to start systematic measurements.
Wednesday, July 28, 2021, 15:00: Mass scan with anode = 0 V started.
Couple more mass scans, and parameter scans with a python notebook.
Wednesday, July 28, 2021, 20:37: Auto-ramping TBHT to 285 A @ 2A/min.
Thursday, July 29, 2021, 11:46: Manually tapping to 279 A as this provides a similar power to an older measurement. Even though the anode-cathode gap distance might be different, this is a preliminary measurement to make sure things look relatively similar.
Thursday, July 29, 2021, 21:38: Most of the day I was running parameter scans with similar parameter to an older measurement.
For this I varied TBHT and TGHT and some look closer than other, which indicates how much the sources varies from each other.
I tried running an emittance measurement but it seems the voltage is not been swept. I need to check if the power supply is working.
Thursday, July 29, 2021, 21:38: TBHT to 270 A @ -2A/min. TGHT @ 580 A
Friday, July 30, 2021, 09:57: Things stay fine overnight and only TPS:CBC was found off . The plan for today is the following:
- Check grid integrity
- Flush and refill gas line
- Start systematic measurements at low temperature.
- Mass scan nominal values of coil and anode
- Anode-coil scans
- Mass scan interesting points
- Emittance scan interesting points
Friday, July 30, 2021, 11:43: Grid is fine. Voltages to 0 to open cage.
Friday, July 30, 2021, 11:44: Gas lines flushed and refilled with a pressure of |200| kPa. Similar to older measurements. It seems that yesterday measurements were with |240| kPa.
Friday, July 30, 2021, 11:51: Noticed that TP6 was red. Likely a consequence of a spark. Not sure since when. The vacuum seem ok before.
Friday, July 30, 2021, 11:55: TP1A interlock due to vacuum on CG1A. When opening it the system pressure peak and trip the heaters :/. Waiting for the backing lines to evacuate before heating again.
Friday, July 30, 2021, 14:39: TSG:CG1A&B are not coming down. Bypassing TSG:BV1A increase the pressure reading on IG1, indicating that the signal is real. The question is why there is such buildup in the backing lines.
Digging the archive this seems common but only after march 2021, the pressure does not decrease as good as before. This matches a big water leak. Maybe a new pump is needed as it was the case in August 2020.
Friday, July 30, 2021, 14:49: IG1 off. TP1B off.
Friday, July 30, 2021, 16:05: Backing lines @ 0.025 T. An order of magnitude decrease after swapping RP1 (see elog 889).
Turbos on, IG1 On. Things look to be ok again. TP1A epics readback is 9.92 A at all times but controller reads 6 A upon start (normal) and at full speed reads 0.7 A (normal). To check with control group.
Friday, July 30, 2021, 16:14: IG1 @ 7.02e-7 T. |
Tuesday, July 27, 2021, 12:57, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD parameter scan - efficiency measurements
|
Assembly has new gas tube to the target for better fit and clearance to the HS.
Electric checks before closing shows no short between TIS and HS.
Tuesday, July 27, 2021, 12:57: Venting
Tuesday, July 27, 2021, 13:28: Turbos on.
TP1A timed out again! Bypassing BV1A to open it, then reset TP1A and turn it on. Turbo show that is at speed right away.
Tuesday, July 27, 2021, 13:38: IG1 on
Tuesday, July 27, 2021, 15:24: IG1 @ 7.07e-6.
Tuesday, July 27, 2021, 15:28: Waterlines open. No vacuum response.
Tuesday, July 27, 2021, 15:33. IV4. Timed out a couple of times.
Tuesday, July 27, 2021, 15:37: Power/Sources on.
Tuesday, July 27, 2021, 17:57: IG1 @ 2.76e-6 T.
Tuesday, July 27, 2021, 18:04: Auto-ramping TGHT/TBHT to 560/280 A. @ 2A/min.
Wednesday, July 28, 2021, 00:46: Found out that anode got current limited around 9 pm. I wonder if the tube got moved again
Wednesday, July 28, 2021, 00:48: Auto-cooling to 0 A to investigate.
Wednesday, July 28, 2021, 06:44: IV4 closed
Wednesday, July 28, 2021, 06:44: IG1 off. Turbos off.
Wednesday, July 28, 2021, 08:01: Venting.
Once more, the tube was touching the heatshield in the same way as before.
- The cause is likely the spiral line coming from the VCR as in "rest" state in pointing towards the grip handles.
- I was trying to put an insulator piece and I noticed (and recall) how much force I had to put in order to accommodate the spiral line in order to align it with the target capillary.
- This lead me to think that when the targets gets hot and the capillary deforms, this will be pushed towards the HS.
- To fixed it, I modified the spiral to have less torque or at least make it push to the other side (touching the tbht is no problem).
Closing everything and pumping down. |
Monday, July 26, 2021, 17:35, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD efficiency measurements.
|
Monday, July 26, 2021, 17:23: Roughing
Monday, July 26, 2021, 17:55: Turbos on.
Monday, July 26, 2021, 18:03 : TP1A timed out ...again
Monday, July 26, 2021, 18:03: Bypassing BV1A. TP1A reset and on. turbos at speed.
Monday, July 26, 2021, 18:05: IG1 on.
Monday, July 26, 2021, 18:26: IG1 @ 1.97e-5 T.
Monday, July 26, 2021, 22:33: IG1 @ 2.41e-6 T
Monday, July 26, 2021, 22:33: IV4 open.
Monday, July 26, 2021, 22:55: BIAS/EZL/EE to 10/6/1 kV. No problem. All set to 0.000 kV again
Monday, July 26, 2021, 22:57: Coil to 10 A. Anode to 100 V.. No problem. All set to 0 again.
Monday, July 26, 2021, 22:59: Auto-ramping TGHT/TBHT to 580/280 A @ 2A/min.
Tuesday, July 27, 2021, 06:32: IG1 @ 1.52e-6 T.
At 01:30, approximately 10 minutes after TBHT heater reached the desired current, the anode went from 0 to 1.5 V.
Tried to put anode voltage to 100 V but it got current limited as of 2 V.
Given that before heating the anode voltage was fine, I think the gas tube move again and made contact with the heatshield.
I will need to open this again :(
Tuesday, July 27, 2021, 06:41: Auto-cooling TGHT/TBHT to 0 A @ -4A/min
Tuesday, July 27, 2021, 09:08: Heaters @ 0 A. Anode still gets current limited.
Tuesday, July 27, 2021, 09:09: IV4 close. Timed out.
Tuesday, July 27, 2021, 09:09: IG1 off.
Tuesday, July 27, 2021, 09:09: Turbos off.
Tuesday, July 27, 2021, 11:13: Venting.
Tuesday, July 27, 2021, 11:58: Gas tube move and end up touching the heatshield again. When try to adjust it to add an insulator as an spacer, the gas line de-coupled from the target.
removing the target for re-installation and clearance addition.
Replace Ta capillary going into the target with the one from previous febiad as it felt sturdy and had better shape for clearance with the HS.
|
Thursday, July 22, 2021, 17:43, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD efficiency measurements
|
Thursday, July 22, 2021, 17:43: Roughing
New argon gas bottle installed.
Thursday, July 22, 2021, 18:16: Turbos on.
Thursday, July 22, 2021, 18:25: TP1A timed out. TSG:CG1A is larger than TSG:CG1, that is the roughing lines are higher than the vacuum chamber.
Thursday, July 22, 2021, 18:27: Bypassing TSG:BV1 to open it.
Thursday, July 22, 2021, 18:28: Turbo at speed.
Thursday, July 22, 2021, 18:28: Bypass removed.
Thursday, July 22, 2021, 18:28: IG1 on.
Friday, July 23, 2021, 09:16: IG1 @ 1.69e-6 T.
Friday, July 23, 2021, 09:17: Waterlines open. No vacuum response
Friday, July 23, 2021, 10:09: While checking the gas connections I found out that inside the faraday cage there are a couple of connections missing:
Coil PS chasis ground disconnected
Resistor between A and C (tbht pos and tght neg) disconnected.
Friday, July 23, 2021, 15:29: Gas system taken out to properly install a new "tee" union.
Friday, July 23, 2021, 15:29: IG1 @ 1.34e-6 T.
Friday, July 23, 2021, 15:52: Power/ sources on.
Friday, July 23, 2021, 15:54: Auto-ramping TGHT/TBHT to 580 A/ 280 A @ 2A/min
Friday, July 23, 2021, 15:58: IV4 open.
Saturday, July 24, 2021, 13:07: IG1 @ 1.25 e-6 T.
Saturday, July 24, 2021, 18:34: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark when Bias reached 30 kV.
Saturday, July 24, 2021, 18:36: Two consecutive sparks. Lowering to bias 29.5 kV to let it conditioned there for at least 10 minutes.
Saturday, July 24, 2021, 18:46: Bias to 30 kV. No sparks.
Saturday, July 24, 2021, 18:59. No sparks. IG1 @ 1.16e-6
Saturday, July 24, 2021, 19:26: Anode gets current limited as of 2 V. Maybe there is a short somewhere else either inside the vacuum box, or on the service cap. Will check tomorrow
Saturday, July 24, 2021, 19:30: BIAS / EE / EZL @ 0 kV.
Saturday, July 24, 2021, 19:30: Auto-cooling to 0 A @ -2A/min
Monday, July 26, 2021, 09:00: IG1 @ 4.58e-7 T.
Monday, July 26, 2021, 09:17: No visible sparks
Monday, July 26, 2021, 09:22: Power sources off.
Monday, July 26, 2021, 13:20: After some tests I can conclude a couple of things:
- Anode/Cathode voltage power supply works fine and draws the right current for a 100 kOhm resistor.
- When all cables are disconnected from TBHT and TGHT F/Ts there is continuity between them and HV common.
Monday, July 26, 2021, 14:52: IV4 closed
Monday, July 26, 2021, 14:53: Turbos off.
Oops!, forgot to turned off IG1 but interlock did it for me :p
Monday, July 26, 2021, 17:19: After opening the vaccum chamber I found the portion of the capillary that goes to the target was touching the heatshield. Confirmed continuity with a multimeter.
Manually move it away and no continuity confirmed with multimeter.
FTs A-D recconected.
Bypassing anode interlock to check there is no short. Confirmed.
Preparing to close and pump.
|
Wednesday, June 30, 2021, 19:08, Fernando Maldonado, , LP-FEBIAD, , , , , Failed, FEBIAD parameter scan - efficiency measurements
|
Wednesday, June 30, 2021, 19:08: Roughing
Thursday, July 01, 2021, 08:57: Turbos on
Thursday, July 01, 2021, 09:11: TP1A timed out. Reset it. Waiting for CG1A to drop a bit more.
Thursday, July 01, 2021, 09:19: TSG:BV1A interlock bypassed so that can be opened. TSGTP1A open
TP1A at speed
Thursday, July 01, 2021, 09:20: Interlock bypassed was removed.
Thursday, July 01, 2021, 09:20: IG1 on.
Wednesday, July 07, 2021, 08:52 : IgG1 @ 4.64e-7 T.
Wednesday, July 07, 2021, 08:53: Waterlines open. No vacuum response. RGA does not respond, probably the filament burnt out.
Wednesday, July 07, 2021: Gas system has a tiny leak, probably from my initial checks about two weeks ago
Wednesday, July 07, 2021: During adjustments on the gas system the copper pipe yielded a bit and the leak clearly increases. I asked Maico to prepare new VCR connection for replacement (thanks!)
Thursday, July 08, 2021: The gas system inside the Faraday cage is not leaking anymore. However, the gauge inside the service cap does not respond to any pressure changes. It needs replacement.
Friday, July 09, 2021: Gas system troubleshooted with a small nitrogen bottle. Problem was on the two-stage regulator. Tighter connection fixed it.
Power supplies respond normal
Friday, July 09, 2021, 15:19: IV4 open.
Emittance meter power supply on.
Friday, July 09, 2021, 15:22: IG1 @ 4.40e-7 T.
Friday, July 09, 2021, 15:22: Auto-ramping TGHT/TBHT to 300 A / 150A @ 2A/min
Friday, July 09, 2021, 16:06: Emittance meter was not workin. Mike Rowen rebooted the IOC and that fixed the issue.
Sunday, July 11, 2021, 16:40: IG1 @ 5.13e-7 T.
Sunday, July 11, 2021, 16:42: Auto-ramping TGHT/TBHT to 550A / 250A @ 2A/min
Sunday, July 11, 2021, 16:43. Anode @ 100 V and 500 mA current limit.
Monday, July 12, 2021, 09:15: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. - AS
FM
Monday, July 12, 2021, 09:41: Auto-ramping TGHT/TBHT to 580A / 280A @ 2A/min
There seems to be an issue with the emittance meter. The scans seems to be successful but the plot is only noise.
Tuesday, July 13, 2021, 11:51: Telescope set on the magnet viewport: Grid is fine and I will check it continuosly.
The gauge inside the service cap is working now, as it actually never broke, a manual valve was still close inside the faraday cage.
I measured the voltage sent from the emittance PS, so the emittance meter receives voltage. I think the problem might be the faraday cup, either internally, or with the signal.
Tuesday, July 13, 2021, 15:54: Venting the beamline after the magnet to re-install the mass slit.
HV off
Tuesday, July 13, 2021, 16:19: TMS:BV6 open.
Tuesday, July 13, 2021, 16:21: TMS:BV2 open.
Tuesday, July 13, 2021, 16:27: TMSTP6 and TMSTP2 on.
Tuesday, July 13, 2021, 16:32: TMSIG6 On.
Tuesday, July 13, 2021, 16:40: HV on.
Wednesday, July 14, 2021: Troubleshooting the emittance meter. I think I saw some indications of beam so it might be that I just need more intensity for a proper measurement.
Moving on, I tested the code as I want to implement a a couple of things: record a bidimensional anode current to make sure I capture any chance with the coil (if any), use temperature estimation from heating power as well.
When running a magnet-anode scan on sodium I triggered the high efficienct regime. This indicates that the cathode is either hotter or closer. With 280 A I am inclined on the latter.
The regime is unstable as the voltage fluctates as well as the ion current. Over a period of two hours
Friday, July 16, 2021, 12:08: Hv off to increase upstream pressure from |200| to |240| kPa, which is the maximum I can achieve with my two-stage regulator.
Friday, July 16, 2021, 12:15: Mass scan.
Friday, July 16, 2021, 13:54: TBHT to 260 @ -2A/min.
Friday, July 16, 2021, 14:09: HV off.
Friday, July 16, 2021, 14:17: BIAS / EE / EZL @ 30 / -1.5 / 12.5 kV.
Friday, July 16, 2021, 14:17: Mass scan ongoing. Done for the day (on-site)
Saturday, July 17, 2021: Mass scans in both normal and anomalous regime.
Sunday, July 18, 2021, 07:42: Found TSG:CBC in a red state. Using the cfg button on the canbus utilities does not work. Likely the canbus card needs to be replaced.
Monday, July 19, 2021: AS fixed the CBC
Increased anode current limit to 600 mA. More ion current.
Anode voltage setpoint=500 A, anode voltage readback=250 V.
Moving the setpoint to 250 causes no effect. But when moving the setpoint to 245 V, the ion current, and the drain current decrease.
Putting together previous findings to discuss what to do next.
Grid still fine.
Tuesday, July 20, 2021, 17:22: TBHT to 240 @ -2A/min.
Around 16:30 there was a slight target voltage drop. This coincided with the anode getting current limited (500mA) at 100V.
Tuesday, July 20, 2021, 17:47: IG1 reacts to the "sparks" observed on the anode leackage current.
Lowering the anode voltage to 0 V. I'll go on-site tomorrow to check the state of the grid and to check if there are visible sparks inside the chamber.
Wednesday, July 21, 2021, 12:40: entries from early today lost I'll try to summarize what has happened:
grid still fine
Manually sweeping the anode but no visual of any kind inside the vacuum. IG1 still reacts to sudden increase of leakage current but nothing observed inside the vacuum chamber.
anode leakage current responds to decreasing the target heating current when lowering to 235A.
When going to 200 A, the anode leakage current drop to 0 mA when the cathode reached 211.
Now the cathode gets current limited as of 1 V.
grid still fine.
Wednesday, July 21, 2021, 12:44: TGHT/TBHT to 0 A @ -2A/min
Wednesday, July 21, 2021, 14:43: TBHT @ 0 A, TGHT @ 340 A. Setting the anode voltage to 500 V has a leakage current of 102.5 mA.
Wednesday, July 21, 2021, 22:19: IV4 closed
Wednesday, July 21, 2021, 22:21: BIAS / EE / EZL @ 0.000 kV.
Wednesday, July 21, 2021, 22:22: IG1 off. Turbos off.
Thursday, July 22, 2021, 10:44: Venting:
|
Monday, June 28, 2021, 09:22, Aaron Schmidt, , , , , , , , Empty Chamber
|
Monday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B on.
Monday, June 28, 2021, 10:22: TP1A on (Tripped)
Monday, June 28, 2021, 10:30: Both turbo pumps off. Leave it under a rough vacuum.
Fernando
Wednesday, June 30, 2021, 15:09 : Venting |
Friday, June 25, 2021, 11:18, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44691-4, 44378-4, Done, Ta#62 Conditioning - New
|
Replacement Ta target for the previous one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing.
Friday, June 25, 2021, 11:55: TP1B started.
Friday, June 25, 2021, 12:00: TP1B on. TP1 A started.
Friday, June 25, 2021, 12:08: IG1 on.
Friday, June 25, 2021, 12:23: Vacuum @ 1.06E-05T. Open waterline FS#5.
Friday, June 25, 2021, 12:26: Vacuum @ 9.97E-06T. OK.
Friday, June 25, 2021, 12:30: Power / sources PS on.
Friday, June 25, 2021, 12:34: Full check for remote use. IV4 open (OK)
Vacuum @ 6.70e-06T
TGHT / TBHT @ 10 / 10 A
BIAS / EE / EZL @ 1 / -0.1 / 0.5 kV.
Ready for operation.
Friday, June 25, 2021, 12:39: All back to 0 Kv / 0 A. Wait for vacuum stabilization.
Sunday, June 27, 2021, 03:55: Auto-ramping TGHT / TBHT to 500 / 150 A @ 2 A per min.
Sunday, June 27, 2021, 04:04: BIAS / EE / EZL @ 20 / -1.0 / 10 kV.
Sunday, June 27, 2021, 09:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Sunday, June 27, 2021, 10:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Sunday, June 27, 2021, 10:16: TGHT / TBHT @ 580 / 230 A. Vacuum @ 1.25e-06T.
Sunday, June 27, 2021, 11:20: Mass & wire scans complete. Vacuum @ 1.14e-06T. Auto-cooling @ 2 A per min.
Sunday, June 27, 2021, 15:07: BIAS / EE / EZL @ 0 kV. TGHT still cooling.
Monday, June 28, 2021, 06:17: IV4 closed (Needs reset). Sources, IG1, turbo pumps, off
Monday, June 28, 2021, 08:22: Power off. IV4 reset. Venting. |
Wednesday, June 23, 2021, 12:24, Aaron Schmidt, SiC#40, HP-SIS, ITE, TM4, 42218-8, 43515-8, In progress, SiC#40 Conditioning-2
|
Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22: TP1B on.
TP1B tripped.
Wednesday, June 23, 2021, 15:05: TP1B was restarted.
Wednesday, June 23, 2021, 15:15: TP1B on.
Wednesday, June 23, 2021, 16:21: TP1A started.
Wednesday, June 23, 2021, 16:30: IG1 on.
Wednesday, June 23, 2021, 17:53: FS#5 opened. Vacuum @ 7.52e-06T
Wednesday, June 23, 2021, 17:56: Vacuum Stable. Power on. TGHT / TBHT on.
Thursday, June 24, 2021, 05:40: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Thursday, June 24, 2021, 09:00: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.9 |
4.02 |
TBHT |
24.2 |
3.21
|
COIL + EE |
23.4 |
5.08 |
TGHT |
24.4 |
5.69 |
Thursday, June 24, 2021, 09:02: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, June 24, 2021, 09:10: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Optics on & set
Thursday, June 24, 2021, 12:52: Mass / Wire scans complete
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
30.2 |
3.99 |
TBHT |
25.0 |
3.20
|
COIL + EE |
24.1 |
5.05 |
TGHT |
25.3 |
5.71 |
Thursday, June 24, 2021, 14:00: Auto-cooling @ 2 A per min.
Thursday, June 24, 2021, 14:08: Auto-cooling aborted. TGHT / TBHT back to 580 / 230 A. Checking the emittance rig.
Thursday, June 24, 2021, 22:20: Auto-Cooling & HV off. - CB
Friday, June 25, 2021, 05:32: Sources off. IV4 closed. IG1 & Turbo pumps off.
Friday, June 25, 2021, 07:09: IV4 reset. Power off. Venting. |
Monday, June 21, 2021, 11:53, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, Failed, Ta#62 Conditioning - 2
|
Replace 9-pin back to normal grounded setup. Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing chamber.
Monday, June 21, 2021, 11:50: Removed backing window. Roughing beam line side.
Monday, June 21, 2021, 12:01: Multimeters removed. Back HV rack re-grounded. TP6 & TP2 on.
Monday, June 21, 2021, 12:02: TP1B on.
Monday, June 21, 2021, 12:13: TP1A on.
Monday, June 21, 2021, 12:21: IG1 on.
Monday, June 21, 2021, 14:37: Vacuum @ 3.96e-06T. Open FS#5
Monday, June 21, 2021, 14:39: Vacuum @ 3.76e-06T.
Monday, June 21, 2021, 14:42: Power / Sources on.
Monday, June 21, 2021, 14:43; IV4 opened & Optics on
Tuesday, June 22, 2021, 07:40: Quick system check ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.7 |
4.02 |
TBHT |
24.2 |
3.18
|
COIL + EE |
23.6 |
5.11 |
TGHT |
23.8 |
5.64 |
Tuesday, June 22, 2021, 07:42: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Tuesday, June 22, 2021, 09:36: TGHT / TBHT @ 300 / 150 A. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, June 22, 2021, 09:38: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, June 22, 2021, 09:46: External / cage sparks* Multiple.
Tuesday, June 22, 2021, 09:58: Turn down BIAS to 25 kV.
Tuesday, June 22, 2021, 12:45: BIAS to 30 kV.
Tuesday, June 22, 2021, 13:05: Odd. There was activity on FC0 right when the HV was turned on before the 580 ramp up. Now, no activity on FC0, or wire scans. Turning HV down / off.
Tuesday, June 22, 2021, 13:10: BIAS / EE / EZL @ 0 kV.
Tuesday, June 22, 2021, 13:41: Rear cage opened. Digital multi-meter was removed.
Tuesday, June 22, 2021, 13:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, June 22, 2021, 13:57: No beam. Auto-cooling @ 3 A per min.
Tuesday, June 22, 2021, 16:23: HV power off. Optics off. IV4 off. TGHT still cooling.
Wednesday, June 23, 2021, 04:31: IG1 & turbo pumps off.
Wednesday, June 23, 2021, 06:00: Venting. Power off. FS#5 purged. |
Wednesday, June 09, 2021, 14:31, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, In progress, Install MB1 window & 9 pin for V test.
|
Installed a new window on MB1 as per Aurelia. Connect modified 9 pin connector & voltage meters for Ta#62 testing.
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
Wednesday, June 09, 2021, 14:41: Pins connected source tray side: 1, 4, 5, 6
https://elog.triumf.ca/TIS/Test-Stand/721
ST 9-pin HV rack
Pin to L TGHT - 1 - Black / COM / 5
Pin to R TGHT - 6 - Red / 9
Pin to L TBHT - 4 - Black / COM / 2
Pin to R TBHT - 5 - Red / 1
Wednesday, June 09, 2021, 14:29: Window installed. Roughing - Beam line side.
Wednesday, June 09, 2021, 14:41: TP6 on.
Wednesday, June 09, 2021, 14:45: TP2 on.
Wednesday, June 09, 2021, 14:55: Roughing.
Wednesday, June 09, 2021, 16:09: TP1 on.
Thursday, June 10, 2021, 13:25: Power / sources on. FS#5 open.\
TGHT reading ok , TBHT odd? Internal connection.
Thursday, June 10, 2021, 14:45: Turbo pumps off.
Thursday, June 10, 2021, 15:25: Venting.
Thursday, June 10, 2021, 16:16: Fixed TBHT connection. Roughing.
Thursday, June 10, 2021, 16:20: Bypass used. TGHT / TBHT to 40 A each. Multimeter check ok.
Thursday, June 10, 2021, 16:24: TGHT / TBHT to 0 A. Bypass removed.
Thursday, June 10, 2021, 16:43: TP1B on.
Thursday, June 10, 2021, 16:48: TP1A on.
Thursday, June 10, 2021, 16:55: IG1 on
Tests Complete as per Aurelia.
Monday, June 21, 2021, 07:51: Power / sources off. IG1 & IG6 off. All TP off. FS#5 purged.
Monday, June 21, 2021, 09:40: Venting both ends. |
Wednesday, June 09, 2021, 11:51, Aaron Schmidt, , , , , , , Problems/Solutions, TPS:CB2 issue.
|
Tuesday, June 08, 2021, 08:25: IV4 open. Optics set minus TPS:CB2. Shows as green 'on', set to 500V, however read back shows as 0 V.
Wednesday, June 09, 2021, 08:37: HV off. Attempts made to restart TPS:CB2 unsuccessful. Controls notified.
Wednesday, June 09, 2021, 11:49: Card replaced by controls. Verified "Ok" in " LB Mode": RDVOL, RDCUR, RDDAC all similar. Operational again.
|
Monday, June 07, 2021, 14:40, Aaron Schmidt, , , , , , , Done, FC6 re-installed
|
Monday, June 07, 2021, 14:39: Roughing beam line section.
Monday, June 07, 2021, 14:46: TMS:TP6 on.
Monday, June 07, 2021, 14:49: TMS:TP2 on.
Wednesday, June 09, 2021, 10:00: FC6 wiring reconnected.
|
Monday, June 07, 2021, 13:45, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, In progress, Ta#62 Conditioning
|
Monday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B on. (Tripped shortly after?)
Monday, June 07, 2021, 14:32: Unstable. Venting.
Monday, June 07, 2021, 15:05: Changed gaskets. Left side suspect. Roughing.
Monday, June 07, 2021, 15:35: TP1B on.
Monday, June 07, 2021, 15:42: TP1B up to speed.
Monday, June 07, 2021, 15:45: TP1A on.
Monday, June 07, 2021, 16:01: IG1 on.
Monday, June 07, 2021, 16:02: FS#5 opened. No response on backing lines. TSG:IG1 ok.
Tuesday, June 08, 2021, 08:01: Power / sources on.
Tuesday, June 08, 2021, 08:07: Reset / CFG optics & steering.
Tuesday, June 08, 2021, 08:08: TGHT / TBHT @ 10 A ok. BIAS / EE / EZL @ 5 / -0.5 / 1 kV. Quick system check ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.9 |
4.02 |
TBHT |
22.4 |
3.15
|
COIL + EE |
21.9 |
4.99 |
TGHT |
22.0 |
5.58 |
Tuesday, June 08, 2021, 08:13: Auto ramping TGHT / TBHT to 350 / 150 @ 2 A per min.
Tuesday, June 08, 2021, 08:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Small spark near 30 kV while bringing up the HV.
Tuesday, June 08, 2021, 08:25: IV4 open. Optics set minus TPS:CB2. Shows as green 'on', set to 500V, however read back shows as 0 V.
Tuesday, June 08, 2021, 12:44: Auto ramping TGHT / TBHT to 580 / 230 @ 2 A per min.
Tuesday, June 08, 2021, 15:53: Beam on FC0 ok. Optics set minus TPS:CB2, however FC6 is disconnected. auto-cooling @ 3 A per min.
Tuesday, June 08, 2021, 18:32: Auto-cooling halted. TGHT @ 104.3 A.
Wednesday, June 09, 2021, 07:13: Auto-cooling continued @ 2 A per min.
Wednesday, June 09, 2021, 08:37: HV off. Attempts made to restart TPS:CB2 unsuccessful. Controls notified.
Wednesday, June 09, 2021, 10:33: Power / sources off. FS#5 purged. IV4 closed. IG1 & IG6 off. All turbo pumps off.
Wednesday, June 09, 2021, 11:52: Venting VV1 & VV6.
|
Wednesday, June 02, 2021, 10:45, Aaron Schmidt, UC#34 HS, LP-SIS, , TM2, 43044-13, 44378-1, In progress, UC#34 HS conditioning
|
Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06: Roughing.
Wednesday, June 02, 2021, 12:15: TP1B on.
Wednesday, June 02, 2021, 12:54: TP1 A on. IG1 on.
Wednesday, June 02, 2021, 14:58: Vacuum @ 2.24e-06T
Wednesday, June 02, 2021, 15:01: Waterlines opened. vacuum remained stable.
Wednesday, June 02, 2021, 15:02: Power / sources on.
Thursday, June 03, 2021, 11:18: Auto-ramping TGHT @ 2 A per min to 580A.
Sunday, June 06, 2021, 21:26: Auto-cooling @ 1 A per min.
Monday, June 07, 2021, 08:33: Power/sources off. IG1 off. Turbo pumps off. |
Wednesday, May 26, 2021, 14:29, Aaron Schmidt, UC#33 (HS), LP-SIS, ITW, TM2, , 44378-3, In progress, UC#33 HS conditioning
|
HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B on.
Wednesday, May 26, 2021, 15:36: TP1B off.
Wednesday, May 26, 2021, 16:37: Venting.
Wednesday, May 26, 2021, 18:03: VV1 closed.
Thursday, May 27, 2021, 07:05: Gaskets swapped. Connections inspected. Roughing.
Thursday, May 27, 2021, 07:47: TP1B on.
Thursday, May 27, 2021, 08:00: TP1A started.
Thursday, May 27, 2021, 08:16: IG1 on.
Monday, May 31, 2021, 08:08: Vacuum @ 7.29e-07T.
Monday, May 31, 2021, 08:10: Waterlines opened. Vacuum ok @ 7.26e-07T
Monday, May 31, 2021, 08:12: Power/Sources on.
Monday, May 31, 2021, 08:15: No response on TGHT. TBHT ok.
Monday, May 31, 2021, 11:30: Loose control cable found on the PS. Connected. Manually set TGHT / TBHT to 10 A & back ok. Checked FS#5 interlocks - OK.
Monday, May 31, 2021, 11:50: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Monday, May 31, 2021, 18:06: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, June 01, 2021, 15:40: Auto-cooling @ 1 A per min.
Wednesday, June 02, 2021, 07:57: Power / sources off. Ion gauge & turbo pumps off.
Wednesday, June 02, 2021, 07:58: FS#5 purged.
Wednesday, June 02, 2021, 10:12: Venting.
|
Wednesday, May 19, 2021, 16:02, Aaron Schmidt, , , , , , , , P2N HS conditioning
|
Parasitic assemblies on the lid & end plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing.
Thursday, May 20, 2021, 08:42: Turbo pumps were turned on last night. Vacuum @ 9.99e-07T.
Thursday, May 20, 2021, 08:44: FS#5 open. Vacuum ok.
Thursday, May 20, 2021, 08:45: Power / sources on.
Thursday, May 20, 2021, 09:34: Turbos OFF
Thursday, May 20, 2021, 10:37: Venting.
Thursday, May 20, 2021, 11:28: P2N legs no longer touching. Roughing.
Thursday, May 20, 2021, 12:05: Turbo pump TP1B on.
Thursday, May 20, 2021, 12:10: Turbo pump TP1A on.
LE:
Thursday, May 20, 2021, 15:00: Ramping stared at high warming rate. 10 or 5 A every 15 seconds
Friday, May 21, 2021, 01:31: Around midnight, the P2NHT current was very noisy for few hours, and then it dropped to zero. Turbos are now stopped to open up and investigate.
Friday, May 21, 2021, 05:45 P2N assembly removed, water lines closed and purged - one leg is fully broken
FBP:
HV tests Monday 24/05/2021 and Tuesday 25/05/2021
HS was ramped up to 30KV on monday, only 1 spark seen over night. BIAS/EZL/EE : 30KV/14KV/-1.5
Ramping to max HV on Tuesday.
40KV
AS:
Tuesday, May 25, 2021, 11:5: HV tapped down to 0 kV on BIAS / EE / EZL.
Wednesday, May 26, 2021, 07:23: Power / sources off. IG1 off. Turbo pumps off.
Wednesday, May 26, 2021, 09:04: Venting. Waterlines purged.
LE:
Wednesday, May 26, 2021, 10:37 Target removed from test stand and brought to cold lab
|
Wednesday, April 28, 2021, 22:34, Luca Egoriti, P2N test - Apr 2021, P2N-SIS, ITE, TM4, , , In progress, P2N heating test
|
Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A shine is already seen, which suggests that current is flowing in the P2N target properly, see picture attached.
Most of the ramping is carefully monitored because the good vacuum signal from the TTS ramping procedure is obviously not working (bypassed), and if the pressure goes past 1E-5T the whole ITS should interlock and abruptly drop the currents, which we want to avoid.
Wednesday, April 28, 2021, 23:16
P2NHT set current = 810 A
P2NHT read current = 800 A
Master and slave have balanced fully, TBHT ramping still proceeds manually. I'm trying to get it to ~200A before leaving.
Thursday, April 29, 2021, 00:54
Ramping successfully achieved.
P2NHT_Master = 594 A - 4.59 V
P2NHT_Slave = 611 A - 4.89 V
P2NHT = 1207 A
TBHT = 231 A - 2.29 V
Max temperature of welding cables = 40 deg
Zero current from the HV ground terminal (feedthrough I) to slave negative (feedthrough H) |
Monday, April 19, 2021, 14:58, Anders Mjos, , P2N-SIS, , , , , Problems/Solutions, Water leak on coil neg (H and F)
|
Determined on Friday April 16th that the water leak was on the coil negative circuit. This was determined by circulating water through once circuit at the time. Only HF and GE tested (not Extraction Electrode). |
Wednesday, April 14, 2021, 10:21, Luca Egoriti, P2N test - Apr 2021, HP-SIS, , , , , In progress, P2N test - Electrical reconfiguration
|
Wednesday, April 14, 2021, 10:18
Work started to bring the ATTS PS inside the ITS HV cage. HV grounding rod and metal sheet around breaker panel were removed - see picture.
Friday, April 16, 2021, Afternoon
HS line purged and turbos shut down.
Monday, April 19
Morning, Anders vented ITS
11AM, Dan found o-ring and indium seal on the same connector - likely this was the cause of the leak. replaced by a brand new indium seal, punched with the RH punchers, which seems the way to go.
Evening, Luca disinstalls FEBIAD from Fernando, and installs the P2N target. It has not been leak checked in the cold lab prior to installation (I'm not sure where all the equipment is), and no resistance measurements were carried out since I couldn't find Travis's ohm-meter.
Vacuum coming down, but slowly than I expected (took 1h to get from 2e-5 to 1e-5 T, is this right?)
Tuesday, April 20, 2021, 15:33
This morning Ray installed the controls cables connecting the ATTS PSs. They are still attached to the ATTS PLC, but their interlock signal now comes from the TBHT "enable" , through a 15V signal. Once the power is ON, he recommends checking that the TBHT sends the proper 15V (has to be higher than 12V) to the ATTS PLC, checking the voltage between the red and green/while cables on the PLC module labelled "TGHT:MAS". This should be done once the TBHT is "enabled", so the signal is sent.
The DC cables were installed going from the positive and negative poles of the ATTS:SLV. The order and number of 4/0 cables are:
Positive: One cable to G and two cables to E
Negative: One cable to H amd two cables to F
This should be checked with Arthur once he's on site (tomorrow).
A water leak was still seen, while the pressure was around 1E-6 T. Checking all three loops of FS#3, it's confirmed again that the leak is in HF. Will need top open up and pinpoint the leak.
Thursday, April 22, 2021, 13:45
The lines F and G were inspected for water leaks. After blanking them to inspect the solder joint along the lines, two new indium seals were repositioned, the lines sniffed and no signs of leaks were detected. TS closed up again, pumping down now.
Friday, April 23, 2021, 21:06
Pressure in ITS slowly coming down. This morning was ~3E-6T and now is 2E-6T. Water was flowing for most of the day, but I turned it off and purged FS#3 with no significant difference. I re-turned it on in order to run short PS tests with little current (up to ~10 A) for few seconds every time. Now I purged FS#3 again to leave the TS pumping over the weekend with air, so that opening the water in few hours/days might give us a better idea if the leak is still there.
As far as power supplies, we ran lots of tests today with Ray and Arthur (both were remotely connected through Teams). Initially the tests were unsuccesful because I kept turning off the main breaker when testing the electronics, and only later realized the ITS-PLC is connected to the same breaker.
After this realization, we progressed step by step: we confirmed that the enable signal (~13 V) was seen by both the ITS-TBHT and the ATTS-MASTER, however we realized that the ATTS:MASTER was *not* turning OFF when it should have. This is because the shutoff voltage signal was not zero, but was around ~1V, and was enough to turn OFF the TBHT (Xantrex) but not the ATTS:MASTER (TDK). Arthur suggested this could be due to the fact that two PLC are tied to each other, and see different "grounds", hence some voltage confusion might be coming from here. After taking a look at the connections in the ATTS PLC, we decided to try isolating the ATTS:MASTER module from its ground connection by disconnecting the yellow and green wires coming from the top of its PLC module, and this resolved the issue when the DB25 connector of the ATTS"MASTER is disconnected from the PS; however, once this DB25 is connected, the voltage seen by the MASTER is still ~1V and not zero, and still enables the PS when it should instead be shutoff.
Next week we should try to find the proper wire configuration that allows seeing zero V as shutdown signal and not ~1V.
Tuesday, April 27, 2021, 20:56
The new P2NHT power supply configuration is now operational at the test stand. A relay was added in the PLC cabinet to take a +15V signal from the TBHT PLC module and close a short circuit to "enable" the P2NHT master and slave (TDK-LAMBDA).
After initial ramping up to ~222A, I noticed the voltage read by the PS was about 0.45V, while extrapolating the results from the previous ITS-P2N run, the voltage should have been ~0.9V. I would like to measure the resistances of the lines to pick up potential shorts in the copper conductors in the vacuum chamber.
Wednesday, April 28, 2021, 11:30
This morning, the resistance matrix was measured between the feedthroughs of the test stand, see attached picture.
TBHT+ = A
TBHT- = B
P2NM- = C
P2NM+ = D
P2NS+ = G,E
P2NS- = F,H
Talking to Carla, we agree that the matrix seems correct and does not show any signs of short in the lines. But still, the voltages read by the PS seem too low compared to the previous run on July 2020.
Wednesday, April 28, 2021, 19:14
To make sure that current is not flowing where it is not supposed to be, the ion source only (A, B) was hooked up to the TBHT
Voltages:
A/C (TBHT+ / P2NM-)=-0.11 V
A/D (TBHT+ / P2NM+)=-0.11 V
B/C (TBHT- / P2NM-)=0.21 V
A/B (TBHT+ / TBHT-) = 0.33 V
While the PS reads 0.42 V --> The two lines made up by two welding cables each make up for the remaining 0.09 V
There's no current flowing anywhere else, all other feedthrough have V=0 between each other.
Wednesday, April 28, 2021, 20:01
Welding cables attached so that the P2NM and P2NS only (TGHT and COIL) are delivering current to the target.
At 230A of the P2N heater (130 on the master, 102 on the slave), the sum of all current coming and going to the feedthroughs balances out.
The voltages across feedthroughs make sense:
B/C (TBHT+ / P2NM-)= 0.20 V
B/D (TBHT+ / P2NM+)=0.22 V
A/B (TBHT+ / TBHT-) = 0.0 V
C/D (P2NM- / P2NM+) = 0.44 V
E/C (P2NS+/P2NM-) = 0.46V
The current going from I (HV common) to H (P2NS-) is zero (0.3A)
After checking these values, I see no reasons to believe the wiring is incorrect, and will proceed with the full installation of P2N heater and TBHT, and ramping up the whole system together. It was noticed though that the TBHT cannot be ramped automatically since the ITS TGHT is not connected to the PLC, and needs to be ramped by hand.
|
Tuesday, April 13, 2021, 13:27, Aaron Schmidt, , , , , , , , Indium gaskets installed FS#3
|
Changed the gaskets from C-seals on FS#3 water blocks E, F,& H. G was already done.
Tuesday, April 13, 2021, 13:23: FS#3 Waterline opened.
Tuesday, April 13, 2021, 13:25: No immediate water noticed visually or on the gloves.
Tuesday, April 13, 2021, 13:31: Visual leak present on (F). Purge the line.
Change the gasket.
Tuesday, April 13, 2021, 14:42: FS#3 Waterline opened.
Tuesday, April 13, 2021, 14:55: No water leak noticed visually or on the gloves.
Tuesday, April 13, 2021, 14:58: Roughing. Will leak check under vacuum tomorrow morning.
Tuesday, April 13, 2021, 16:01: TP1B on.
Tuesday, April 13, 2021, 20:53: TP1A on.
Tuesday, April 13, 2021, 20:58: IG1 on.
|
Sunday, April 04, 2021, 14:16, Carla Babcock, , , , , , , , Water leak problem persists
|
IG1 has been spiking randomly, causing everything to turn off. Looks like the water leak is still there.
AS - Multiple purges done on RP1 & the backing lines. Some water noted. FS#3 is closed.
Tuesday, April 06, 2021, 09:39: TP1B on.
Tuesday, April 06, 2021, 10:01: TP1A on.
Tuesday, April 06, 2021, 10:12: IG1 on. Vacuum @ 1.97e-05T.
Tuesday, April 06, 2021, 11:00: FS#2, #4, & #5 open. Vacuum @ 5.73e-06T.
Tuesday, April 06, 2021, 11:12: Vacuum @ 5.09e-06T. Open FS#3.
Tuesday, April 06, 2021, 11:17: IG1 @ 4.64e-06T. Open IV4. Reset optics & sources.
Tuesday, April 06, 2021, 11:20: Optics on.
Test were run
Thursday, April 08, 2021, 10:30: Power / sources off.
Thursday, April 08, 2021, 10:34: IG1 & turbo pumps off.
|
Tuesday, March 30, 2021, 13:19, Carla Babcock, , , , , , , , Second emittance meter testing
|
Emittance meter number 2 ready for beam shortly - installed and pumping down.
No beam found by Thursday evening, but beam seems to be coming out much differently than last time. Will check on emittance meter functionality and try to re-tune later.
Ramping things down for the next couple days.
Saturday, April 03, 2021, 10:41 :
Source heating ramped back up, everything back on. Will try to straighten out steering then see if I can get things back in the previous positions.
Saturday, April 03, 2021, 14:59 :
Nothing seems to be working, will vent the beamline and remove the slit.
Saturday, April 03, 2021, 15:36 :
Apparently closing the valve started a vacuum leak that tripped everything in the source. I noticed within the first minute and ramped everything back up, maybe too quickly....
Have now put everything in a holding state, will resume tomorrow.
Sunday, April 04, 2021, 14:17 :
Found everything off again this morning. Ramping back up in the hopes that I can get something done before the whole system trips again. The trips look like water leaks again.
Uninstalled the slit and left it in the bottom of the vacuum box. Swapped the window to the computer side for convenience. Seal on the other side on the CF flange is a bit weird, not sure if it is in properly...
Sunday, April 04, 2021, 18:43
Still no beam. TISA emittance FC won't come back on, so waiting for Mike Rowe to troubleshoot on Tuesday. Will ramp things down all the way, since I expect the vacuum to trip the source before I need it again.
Tuesday, April 06, 2021, 23:43
Found some beam, but looks really weird, like it is cut off. Good enough. Ramped everything down. |
Friday, March 26, 2021, 17:04, Carla Babcock, , , , , , , , Beam line vented for emittance meter exchange
|
Vented beamline and removed ARIEL emittance meter. In the process of swapping components, beamline left vented until Monday when we will finish the job. |
Thursday, March 25, 2021, 08:11, Aaron Schmidt, , , , , , , , Test Stand Tripped. (Water leak)
|
Lot's of water visually present in the chamber.
Wednesday, March 24, 2021, 13:17: Water lines purged.
Vent & wipe out the water inside the chamber. Setup a fan to aid in drying. Manually purge the water from the RP1 Scroll pump through the exhaust.
Thursday, March 25, 2021, 08:06: Gradually open each line to check the water blocks & fittings for a visual leak. Open the ballast plug on RP1, as well as manually purge the water from the RP1 Scroll pump through the exhaust again.
Thursday, March 25, 2021, 08:34: Leak found on FS#3 - Left Coil return (G) water block.
Thursday, March 25, 2021, 09:15: FEBIAD assembly & L-Coil line removed.
Thursday, March 25, 2021, 11:38: Re-connect RP1 to the exhaust port & re-insert the ballast plug.
Thursday, March 25, 2021, 11:40: RP1 Ok. CG1A & CG1 B around 0.048T & dropping. Chamber still open.
Indium gasket installed on G, C-Seal on E.
Friday, March 26, 2021, 08:21: Roughing.
Friday, March 26, 2021, 09:08: Vacuum @ 2.001 T. Opened FS#3 waterline. Quick test.
Friday, March 26, 2021, 09:11: Vacuum @ 1.901 T. No observable spike on CG1.
Friday, March 26, 2021, 09:12: Close FS#3 & purge
Friday, March 26, 2021, 09:27: Quickly open ballast plug.
Friday, March 26, 2021, 09:30: Re-insert plug.
Friday, March 26, 2021, 09:38: CG1 @ 2.253 T.
Friday, March 26, 2021, 09:41: Close BV1A & B.
Friday, March 26, 2021, 09:45: Manually purge water from the RP1 Scroll pump through the exhaust.
Friday, March 26, 2021, 09:51: Re-open BV1A & B.
Friday, March 26, 2021, 10:17: Close BV1A & B. Manually purge water from the RP1 Scroll pump through the exhaust.
Friday, March 26, 2021, 10:26: Close the exhaust & give the pump time to recover.
Friday, March 26, 2021, 10:36: Briefly vent the chamber to 30 T. Re-open BV1A & B.
Friday, March 26, 2021, 11:20: Vacuum @ 1.706T. Open FS#3. Allow to fill with water, then close off. No observable spike on CG1.
Friday, March 26, 2021, 11:25: Opened ballast cap. Close BV1A & B.
Friday, March 26, 2021, 11:26: Close ballast.
Friday, March 26, 2021, 11:29: Briefly vent the chamber to 30 T. Re-open BV1A & B.
Friday, March 26, 2021, 12:11: Vacuum @ 2.75T. Close BV1A & B. Vent chamber to setup a fan.
Monday, March 29, 2021, 09:00: LD & He attached. LD#2 as supplied via Vacuum group.
Monday, March 29, 2021, 09:01: Sniffer set. Leak Rate @ 2.0E-07 to 2.3E-07 atm-cc/sec
Monday, March 29, 2021, 09:03: Pressurize (E)(G) to 75 PSI.
Monday, March 29, 2021, 09:05: No major spike seen on LD.
Monday, March 29, 2021, 09:06: Pressurize (E)(G) to 100 PSI.
Monday, March 29, 2021, 09:09: No major spike seen on LD. Purge He from the lines.
Monday, March 29, 2021, 09:12: Roughing.
Monday, March 29, 2021, 09:22: Opened ballast cap to release water vapour while roughing.
Monday, March 29, 2021, 09:42: Closed the ballast cap. Purge cycle RP1 on & off for the next hour or so.
To purge cycle RP1 for water vapour. Close BV1A & B. Disconnect exhaust line from RP1 & open the upper ballast. Close PV1, Vent with TSG:VV1A till the line reaches atmosphere with dry nitrogen.
Close VV1 & open PV1. Water should spew out of the exhaust. Rough the backing lines down. Open BV1A & B to rough then chamber. Repeat leaving the upper ballast open.
Monday, March 29, 2021, 14:00: Purge RP1. Close upper ballast, re-connect exhaust.
Monday, March 29, 2021, 14:36: TP1B on.
Monday, March 29, 2021, 19:47: TP1A on.
Monday, March 29, 2021, 19:55: IG1 on.
Tuesday, March 30, 2021, 08:52: Vacuum @ 4.48e-06T.
LD to TP1B base @ 1.4E-08 to 1.9E-08 atm-cc/sec.
Tuesday, March 30, 2021, 08:58: He @ 55 PSI
Tuesday, March 30, 2021, 09:04: LD to TP1B base @ 2.4E-08 atm-cc/sec.
Tuesday, March 30, 2021, 09:12: Reconnect FS#3 to DI.
Tuesday, March 30, 2021, 09:14: Opened FS#3 w/ DI
Tuesday, March 30, 2021, 09:20: Vacuum @ 4.40e-06T.
Tuesday, March 30, 2021, 09:33: FS#2, 4, & 5 open. Vacuum ok @ 4.40e-06T
Tuesday, March 30, 2021, 09:34: Power/sources on.
Tuesday, March 30, 2021, 09:37: Auto-ramping TGHT / TBHT to 200 / 100 A @ 2 A per min.
Tuesday, March 30, 2021, 12:12: Auto-ramping TGHT / TBHT to 350 / 125 A @ 2 A per min.
Tuesday, March 30, 2021, 13:50: Vacuum @ 4.66e-06T. Auto-ramping TGHT / TBHT to 450 / 150 A @ 2 A per min.
Tuesday, March 30, 2021, 21:59: Vacuum @ 5.01e-06T. TGHT / TBHT @ 393 / 150 A. Reset Auto-ramping TGHT / TBHT to 550 / 200 A @ 2 A per min.
Wednesday, March 31, 2021, 11:46: IV4 opened. Optics & HV power switched on.
Wednesday, March 31, 2021, 11:52: HV check ok. Optics reset. BIAS / EE / EZL @ 1 / 0.1 / 1 kV. Coil @ 4 A. Anode @ 100 V
Wednesday, March 31, 2021, 11:54: Optics remain on. HV & coil back to 0. Ready to run once the Vacuum returns to a reasonable level. Vacuum @ 5.45e-06T.
Wednesday, March 31, 2021, 15:05: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min. |
Monday, March 15, 2021, 16:10, Carla Babcock, , , , , , , , TISA emittance meter testing with new FEBIAD source
|
Monday, March 15, 2021, 16:09 Target and ion source ramped to 400A/330A this afternoon
Monday, March 15, 2021, 18:53 : Tune through to final RPMs but not optimized. 5e-8 on FC0. Will turn down target and ion source values to TGHT/TBHT 350/250 until tomorrow. BIAS/EZL/COIL/ANODE all off.
Tuesday, March 16, 2021, 15:04 Mike is finished with emittance meter controls so ramping everything back up and trying to get beam through.
Thursday, March 18, 2021, 18:06 : Vacuum has been rising slowly over the past 20hrs from 9.3e-7 to 9.9e-7. Everything has been up since Tuesday. No beam through emittance meter, though beam can be found on the regular test stand emittance meter. Just discovered that both voltage plates are plugged into positive power supplies so waiting for a controls fix on that then will retry.
Friday, March 19, 2021, 17:08 : Finally success. New emittance meter shows same results as the standard test stand emittance rig. Will continue testing new controls next week |
Wednesday, March 10, 2021, 14:57, Aaron Schmidt, , HP-FEBIAD, , , , 42752-5, In progress, Emittance meter test with FEBIAD
|
Wednesday, March 10, 2021, 14:54: Roughing.
Wednesday, March 10, 2021, 14:57: BV1A open.
Thursday, March 11, 2021, 09:41: TP1B on.
Thursday, March 11, 2021, 09:44: TP1A on.
Thursday, March 11, 2021, 09:52: IG1 on.
Monday, March 15, 2021, 07:50: Vacuum @ 6.91e-07T. Open waterlines.
Monday, March 15, 2021, 07:52: Vacuum ok.
Monday, March 15, 2021, 07:55: Power / sources on.
Monday, March 15, 2021, 07:56: TGHT / TBHT @ 10 A.
Monday, March 15, 2021, 07:57: BIAS / EE / EZL @ 1 / 0.5 / 1 kV. Anode @ 25 V. Coil @ 5 A.
Monday, March 15, 2021, 08:02: All sources ok. Set back to 0. Ready for remote operation. Await word from MCR on Cu DI water system.
ref: https://elog.triumf.ca/TIS/Test-Stand/864
Tuesday, March 16, 2021, 09:53: IV4 Open |
Wednesday, March 10, 2021, 14:28, Aaron Schmidt, , , , , , , In progress, RP2 swap.
|
Swapped RP2 out from a Varian SH-110 to a Varian PTS06001.
Wednesday, March 10, 2021, 14:20: RP2 on.
Wednesday, March 10, 2021, 14:27: Turbo pumps on |
Wednesday, March 10, 2021, 11:10, Carla Babcock, , , , , , , , Venting for installation of emittance meters
|
Wednesday, March 10, 2021, 10:48 : Venting beamline section only for installation of emittance meters. |
Tuesday, March 02, 2021, 11:42, Aaron Schmidt, , , , , , , , TS Tripped.
|
Tuesday, March 02, 2021, 11:40: Fully reset
TGHT / TBHT set to 20 A ok. Anode w/ 30 V. ok.
Tuesday, March 02, 2021, 11:42: 10 A on coil. Increment was at 75 A. Set back to 1 A.
Tuesday, March 02, 2021, 11:44: BIAS / EE / EZL @ 1 / 0.5 / 1 kV.
|
Monday, March 01, 2021, 16:13, Fernando Maldonado, , , , , , , Done, Temporary RGA installation
|
Monday, March 01, 2021, 16:03: An ExTorr RGA has been installed in the ISAC test stand.
The original SRS 100 is still broken ( e-log 778)
The SRS 100 from the conditioning station will not be available this week. |
Monday, March 01, 2021, 12:58, Fernando Maldonado, , LP-FEBIAD, , , , , Done, FEBIAD parameter scans v2
|
Monday, March 01, 2021, 12:57: Roughing
Monday, March 01, 2021, 13:30: Turbos on. Started a bit late as I was distracted. They were ready at around 13:26
Monday, March 01, 2021, 13:41: IG1 on.
Monday, March 01, 2021, 14:08: Pumping aborted. I will install the ExTorr RGA available
Monday, March 01, 2021, 13:00 ExTorr RGA installed (e-log 859)
Monday, March 01, 2021, 16:07:Roughing
Monday, March 01, 2021, 16:37: Turbos on.
Monday, March 01, 2021, 16:46: IG1 on.
Monday, March 01, 2021, 17:25: RGA on, recording trendlines
Monday, March 01, 2021, 17:43: IG1 @ 1.1e-5 Torr
Monday, March 01, 2021, 17:43: Waterlines open. No response on RGA nor striptool.
Monday, March 01, 2021, 18:20: Power/Optics on.
Monday, March 01, 2021, 19:02: IG1 @ 5.2e-6
Monday, March 01, 2021, 19:20: RGA shows a clear response on the opening and closing of the gas lines.
Monday, March 01, 2021, 19:53: IG1 @ 3.76e-6 T
Monday, March 01, 2021, 19:53: Auto-ramp up TGHT/TBHT to 580/290 @ 2 A/min.
Monday, March 01, 2021, 19:57: BIAS/EZL/EE @ 30/13/1.5 kV, anode bias @ 150 V, coil current @ 0 A.
Tuesday, March 02, 2021, 07:43: IG1 @ 2.96e-6T.
Tuesday, March 02, 2021, 11:03: System tripped
Tuesday, March 02, 2021, 11:06: Vacuum started to increase when coil was set to 80 A.
Tuesday, March 02, 2021, 11:08: IG1 started to drop as soon as the system tripped, this indicates that this was not a vacuum incursion from the gas or water but rather something related to heat. Maybe some copper from the coil melted.
AS checked thing were OK (see elog 860)
Tuesday, March 02, 2021, 12:35: Auto-ramp up TGHT/TBHT to 580/290 @ 4 A/min.
Tuesday, March 02, 2021, 15:25: IG1 @ 1.66e-7 T.
Tuesday, March 02, 2021, 15:26: Increasing coil current, response in vacuum. RGA increases mass 44 ( CO2).
* The coil jacket is made of fiberglass, that Si with mass 28. Hence, the CO/N2 signal will increase if the jacket starts sublimating.
**from the future SiO with a mass of 44 will show an increase in "CO2" signal
Tuesday, March 02, 2021, 15:34: Coil @ 30 A IG1 @ 2.15e-6 T.
max IG1 = 2.25e-6T
Will remain at this current until vacuum starts decreasing.
Tuesday, March 02, 2021, 15:50: BIAS/EZL/EE @ 30/13/1.5 kV, anode bias @ 150 V
Tuesday, March 02, 2021, 17:23: IG1 @ 2.15e-6 T.
Tuesday, March 02, 2021, 17:26: Coil @ 40 A.
Tuesday, March 02, 2021, 17:33: Coil @ 45 A
max IG1 = 3.3e-6 T.
Tuesday, March 02, 2021, 18:39: IG1 @ 2.68e-6
Tuesday, March 02, 2021, 18:40: Coil to 55 A.
max IG1 = 3.87e-6 T
Tuesday, March 02, 2021, 20:07: IG1 @ 2.6e-6 T.
Tuesday, March 02, 2021, 20:07: Coil to 60 A.
max IG1 = 3.07e-6 T
Tuesday, March 02, 2021, 21:25: IG1 @ 2.59e-6T
Tuesday, March 02, 2021, 21:25: Coil to 70 A.
max IG1 = 4.1e-6 T
Tuesday, March 02, 2021, 22:31: IG1 @2.76e-6 T.
Tuesday, March 02, 2021, 22:32: Coil @ 80 A.
max IG1 = 4.35e-6 T
Tuesday, March 02, 2021, 23:31: IG1 @ 2.68e-6
Tuesday, March 02, 2021, 23:32 Coil @ 90 A.
max IG1 = 4.26e-6 T
Wednesday, March 03, 2021, 00:33: IG1 @ 2.68e-6 T.
Wednesday, March 03, 2021, 00:33: Coil to 100 A.
Voltage limited. Increasing from 1 A to 1.1 A.
max IG1 = 3.87e-6 T
Wednesday, March 03, 2021, 01:03: IG1 @ 3.23e-6 T.
Will let sit on here until it outgasses
Wednesday, March 03, 2021, 01:05: BIAS/EZL/EE/AND @ 0.000 kV
max IG1 = 3.87e-6 T
Wednesday, March 03, 2021, 07:27 : IG11.59e-6 T.
Wednesday, March 03, 2021, 07:28: Coil @ 110 A.
Voltage limited. Increasing from 1.1 A to 1.2 A.
Wednesday summary: tght remained at 400 A. Several tbht, anode, and coil scans. Went up to 345 on the TBHT, the current on the cathode was above 250 mA for a voltage of around 300 V. I stopped there as the large electron current could melt the grid.
Thursday, March 04, 2021, 08:43: Re taking some points from yesterday
Took several mass scans and emittance scans
Friday, March 05, 2021,
Investigated beam composition at different temperatures, I couldn't find a peak that is affected by argon injection. species with m/1 above 50 u only appear with tght>580 and tbht>295. These values are a bit tricky to work on as the FEBIAD has melted before near these values.
I will continue mass scans, emittance, and efficiency measurements. On the last day I will push towards higher temperatures.
Saturday, March 06, 2021,
Investigating beam composition. Mass scans and the parameter sweep on the dominant peaks both with and without gases. THBT is at 315 A.
Sunday, March 07, 2021:
Investigating Ar++ both with and without gas.
Investigating Ta++
Sunday, March 07, 2021, 11:15: TBHT to 320 A @ 2A/min
Sunday, March 07, 2021, 11:45: During a parameter scan, epics cut communication with my notebook. It seems like the HLA server might be down :/
Sunday, March 07, 2021, 12:32: Discussed with Spencer, he was upgrading jaya. Now things are up and running gain.
Sunday, March 07, 2021, 13:36: Ar+++ observed now at mass ~13.33 u, with a current of 3e-10A.
Sunday, March 07, 2021, 16:32: TBHT to 325 A @ 1A/min
Sunday, March 07, 2021, 20:06: Emittance measurements for same efficiency parameters of anode, coil. The tail of the emittance gets larger on some combinations.
Sunday, March 07, 2021, 20:07: TBHT to 330 A @ 1A/min
Sunday, March 07, 2021, 20:22: After increasing the TBHT to 330 A, the anode leakage current started to drop, this hasn't happened before. The TBHT voltage look stable so I don't think the cathode is failing ...yet
systematic measurement of emittance: fixed anode sweeping coild, and also fixed coil sweeping anode
Monday, March 08, 2021, 01:55: Investigating 39K at very low voltages. Taking emittance measurements and RPMs.
Monday, March 08, 2021, 02:25: Anode@ 0V Coil @ 50A. FC0 in
Monday, March 08, 2021, 07:22: TBHT to 335 A @ 1A/min
Monday, March 08, 2021, 09:48: Water cooling values. The temperature on the HS are likely higher because of the high temperature we are running the ion source. The flow on TBHT seems lower compared to what was registered on elog 856
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.83 |
3.515 |
TBHT |
23.49 |
2.674
|
COIL + EE |
23.80 |
1.562 |
TGHT |
25.56 |
4.902 |
Monday, March 08, 2021, 10:44: At anode voltgae aroun 400 the system got unstable in high voltage, likely due to almost 600 mA being sink on the anode PS.
Monday, March 08, 2021, 10:45 : TBHT to 331 A @ -1A/min
Monday, March 08, 2021, 13:38:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.571 |
3.553 |
TBHT |
22.135 |
2.697 |
COIL + EE |
22.86 |
1.577 |
TGHT |
24.452 |
4.87 |
08-Mar-21 16:47:54 32.463 3.517 21.183 2.701 22.075 1.61 23.494 4.918
Tuesday, March 09, 2021:
Investigating doubly charged species, increase tbht in steps of 1A. Anode voltage gets limited at around 300 V due to the high electron current
Tuesday, March 09, 2021, 08:30: TBHT to 340 A.
Tuesday, March 09, 2021, 10:27: TBHT to 341 A.
Tuesday, March 09, 2021, 11:26: TBHT to 345 @ 1A/min
Tuesday, March 09, 2021, 15:50: TBHT to 350 @ 1A/min. I think above this value there will be an anode-cathode short, or the transfer line will melt.
Tuesday, March 09, 2021, 17:1: TBHT to 360 @ 1A/min.
Tuesday, March 09, 2021, 19:26: TBHT to 370 @ 1A/min.
Tuesday, March 09, 2021, 19:32: TBHT voltage increasing but not the current. Increasing the TBHT voltage from 3.5 to 4 V.
Tuesday, March 09, 2021, 20:17: 358 A is stable, 359 A is a bit jumpy, but 360 A is quite jumpy.
Tuesday, March 09, 2021, 20:29: CG1A reached 1 T, tapping down from 363 to 361.
Wednesday, March 10, 2021, 00:20: It has been quite challenging to reach 370 A on the TBHT, the highest current reached is 368 A. At this current, it seems that an efficiency flattening has definitely started.
Wednesday, March 10, 2021, 00:21: Bringing TBHT to 325 A @ 2A/min
After a spark and during the last bit of the scan, it seems the anode shorted. The source is dead :/
Wednesday, March 10, 2021, 02:43: Auto-cooling TGHT/TBHT to 0 A @ 2A/min
Wednesday, March 10, 2021, 02:49: IV4 closed
Wednesday, March 10, 2021, 02:49: IV4 timed out.
Wednesday, March 10, 2021, 02:51: Cooling aborted.
Wednesday, March 10, 2021, 02:51: Auto-cooling TGHT/TBHT to 0 A @ 4A/min
Wednesday, March 10, 2021, 02:55: Biases to 0 kV.
Wednesday, March 10, 2021, 03:1: Cooling aborted.
Wednesday, March 10, 2021, 03:11 Auto-cooling TGHT/TBHT to 0 A @ 10A/min
Wednesday, March 10, 2021, 03:20: Short is not present anymore. Anode can hold voltage. |
Monday, February 22, 2021, 18:25, Fernando Maldonado, , HP-FEBIAD, , , , , Done, FEBIAD parameter scans
|
Monday, February 22, 2021, 17:48 Roughing
Monday, February 22, 2021, 18:17: Turbos on.
Monday, February 22, 2021, 18:25: IG1 on.
Monday, February 22, 2021, 19:01: Gas lines refilled with |50 kPa| or argon. Gauge reads -40kPa.
Monday, February 22, 2021, 19:01: IG1@3.48e-5T
Monday, February 22, 2021, 19:01: Waterlines open
Monday, February 22, 2021, 19:06: IG1 @ 3.04e-5 T.
Tuesday, February 23, 2021, 08:34: IG1@1.56e-6T.
Tuesday, February 23, 2021, 08:43: BIAS/EZL/EE @ 30/13/1.5 kV, anode bias @ 200 V. No problems with the bias ramp up. I will wait some time in here just to make sure it's OK, but it looks like the problem is solved now.
Tuesday, February 23, 2021, 08:52: BIAS/EZL/EE/AND @ 0.000 kV.
Tuesday, February 23, 2021, 08:55: Auto-ramp up TGHT/TBHT to 580/290 @ 4A/min
Tuesday, February 23, 2021, 09:35: Gauge reads -20kPa, that is, there was a 20 kPa air incursion over 18 hours.
Tuesday, February 23, 2021, 9:36: Roughing and re-filling the gas lines. Gauge reads again -40 kPa
Tuesday, February 23, 2021, 11:30: BIAS/EZL/EE @ 30/13/1.5 kV, anode bias @ 200 V.
Tuesday, February 23, 2021, 11:31: IV4 open.
Tuesday, February 23, 2021, 11:47: Sparks when anode is @ 500 V.
AS
Tuesday, February 23, 2021, 14:18: Mass & wire scans taken. Word doc attached.
FM
Tuesday, February 23, 2021, 22:17: All afternoon and evening running my code to get systematic measurements. They are still going but in summary:
For TGHT=580 A and TBHT=290 A, the temperature estimation is 1740 C, which is extremely cold for a FEBIAD. This explains why with this assembly I need to go around 310 to get something reasonable.
Tuesday, February 23, 2021, 22:52: Between 100 and 200 V the current always increases with coil current > 50 A. The maximum increase factor is around 4. As the voltage increases the current stops increases at coil >50A.
Tuesday, February 23, 2021, 23:59: Refilling gas lines.
TBHT to 310
Wednesday, February 24, 2021, 02:21: BIAS/EZL/EE/AND @ 0.000 kV:
Wednesday, February 24, 2021, 02:22: lowering tght/tbht to 520/250@ 4 A/min.
Wednesday, February 24, 2021, 09:18: Opening cage to increase upstream pressure for the calibrated leak.. Will go to |100 kPa|
Wednesday, February 24, 2021, 09:26: No vacuum response.
Wednesday, February 24, 2021, 09:30: Cage locked.
Wednesday, February 24, 2021, 09:31: Auto-ramping TGHT/TBHT to 580/290 @ 4A/min
Wednesday, February 24, 2021, 09:42: BIAS/EZL/EE @ 30/13/1.5 kV, anode bias @ 200 V.
Wednesday, February 24, 2021, 11:23 :Opening cage to increase upstream pressure for the calibrated leak.. Will go to |250 kPa|
Wednesday, February 24, 2021, 11:31: Actually my two-stage regulator limits how much higher I can go. Limited to |200kPa| for and Ar leak rate of 4e-6 mbar l /s.
Wednesday, February 24, 2021, 11:33: Gas line refilled, no vacuum response.
Wednesday, February 24, 2021, 11:34: Cage locked.
Wednesday, February 24, 2021, 11:37 : BIAS/EZL/EE @ 30/13/1.5 kV, anode bias @ 200 V.
Wednesday, February 24, 2021, 12:10: Mass scan completed.
Wednesday, February 24, 2021, 12:10: Auto-ramping TBHT to 310 A @ 2 A/min. This current should be around 1800-1850 C.
Wednesday, February 24, 2021, 15:0: Temperature estimation says 1700 C, I wonder if the temperature is colde because of the high power target.
Wednesday, February 24, 2021, 15:02 : Argon signal is quite noticeable as roughing the gas lines drop the current down to 0 .
Wednesday, February 24, 2021, 18:55: Emittance scans have failed for both argon and m/q=28. It might be related to the very low intensity of the beam. FC0 reads ~10 nA at TBHT=310.
Change several parameters but only noise is recorded.
Wednesday, February 24, 2021, 18:57 Auto-ramping TBHT to 315 @ 1A/min
Wednesday, February 24, 2021, 21:35: BIAS/EZL/EE/AND @ 0.000 kV:
Wednesday, February 24, 2021, 21:35: Cooling target @ 1 A/min
Thursday, February 25, 2021, 09:37: TGHT/TBHT @ 520,255 A IG1 @ 1.25e-6T.
Thursday, February 25, 2021, 09:38: Auto-ramping TGHT/TBHT to 580/290 A @ 4 A/min
Thursday, February 25, 2021, 09:46: BIAS/EZL/EE @ 30/13/1.5 kV, anode bias @ 175 V.
Thursday, February 25, 2021, 14:04: Efficiency is decreasing as TBHT current increases. This seems to be correlated to the apparent reduction in estimated temperature coming from the anode current readback.
This could indicate that the increase in TBHT current heats up the TGHT-TBHT system but given this is a HP target, maybe the heat is dissipated through the target.
On previous tests both at the isac test stand and the evaporator 2, I have seen the effect of tght current in cathode temperature.
I will lower the TGHT current and I will keep increasing the TBHT current to see what happens.
Thursday, February 25, 2021, 22:46: Several attemps for efficiency measurements as a function of temperature. Partially sucessful
Thursday, February 25, 2021, 22:47: TGHT/TBTH @ 450/290.
Thursday, February 25, 2021, 22:48: BIAS/EZL/EE/AND @ 0.000 kV:
Friday, February 26, 2021, 08:55: IG1 @ 1.07e-6 T.
Friday, February 26, 2021, 09:00: BIAS/EZL/EE @ 30/13/1.5 kV, anode bias @ 175 V.
Friday, February 26, 2021, 17:20: All day running efficiency measurements as a function cathode input current.
With the colder target I estimated a maximum cathode temperature of 1820 coming from TBHT current=330 A.
Despite this being an estimated temperature from the anode drain current, the fact that the maximum total source beam current is only some tens of nA, indicate very few electrons.
I finally managed tom take emittance measurements, so far the parameters on the emittance rig page were not compatible with the tune I am using.
Friday, February 26, 2021, 19:26: Mass scan left running at this high temperature.
MAss scan run at different coils
Friday, February 26, 2021, 23:18: Cooling TBHT to 290 @ 2 A/min.
Friday, February 26, 2021, 23:19: BIAS/EZL/EE/AND @ 0.000 kV:
Saturday, February 27, 2021, 18:12: TBHT voltage stable, IG1 stable. Despite putting a lot of heat, the system seems to be OK.
Most of the day I have been setting up routines for automatic sweeps.
they work fine
Sunday, February 28, 2021, 02:48: Experimental run will finish in about 1hr.
Code will set anode=5V and coil=0A.
Lot's of parameter mapping, efficiency measurements, some emittance scans, some rpms, some mass scans
Sunday, February 28, 2021, 23:12: Increasing voltage limit on the tbht heater from 3.001 to 3.5, just in case is necessary to reach 340 A.
bunch of mass scans run.
Monday, March 01, 2021, 05:02: BIAS/EZL/EE/AND @ 0.000 kV:
Monday, March 01, 2021, 05:0: Auto-cooling TGH/TBHT to 0 A at 2 A/min
AS
Monday, March 01, 2021, 09:00: Coil from 90 to 0 A. Power / sources off.
Monday, March 01, 2021, 09:02: IV4 closed / reset
Monday, March 01, 2021, 09:05: IG1 & Turbo pumps off.
Monday, March 01, 2021, 09:07: Purge FS#5
Monday, March 01, 2021, 10:44: Vented |
Friday, February 19, 2021, 13:44, Fernando Maldonado, , , , , , , Failed, FEBIAD parameter scans
|
Friday, February 19, 2021, 13:28: Roughing
Friday, February 19, 2021, 13:43: Power on
Friday, February 19, 2021, 13:59: Turbos on
Friday, February 19, 2021, 14:07: IG1 on.
Friday, February 19, 2021, 15:06: Water open. No vacuum response.
Friday, February 19, 2021, 15:06: IG1 @ 3.13e-5 T.
Friday, February 19, 2021, 15:47 :
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.26 |
3.92 |
TBHT |
23.09 |
6.15
|
COIL + EE |
23.09 |
1.80 |
TGHT |
23.02 |
5.06 |
Friday, February 19, 2021, 15:48: IG1 @ 1.65 e-5 T
Saturday, February 20, 2021, 09:19. IG1 @ 1e-6 T
Saturday, February 20, 2021, 09:20: Auto-ramping TGHT/TBHT to 300,150 A @ 2A/min
Saturday, February 20, 2021, 13:26: IG1 @ 1.78e-6 T
Saturday, February 20, 2021, 13:29: Anode @ 50 V. Coil @ 20 A.
Saturday, February 20, 2021, 13:52: Bias voltage only reaches 6 kV, the bias current seems a bit unstable, not sure now what the problem is.
Saturday, February 20, 2021, 14:58: Auto-cooling TGHT/TBHT to 0 A @ 2 A/min
Sunday, February 21, 2021, 11:24: Auto-ramping TGHT/TBHT to 580/290A @ 2A/min
Sunday, February 21, 2021, 16:39: Ramp up complete. IG1 @ 2.15e-6 T.
Will wait until vacuum is stable to try to put high voltage.
Sunday, February 21, 2021, 21:51: IG1 @ 2.06e-6 T. Unable to go above 5 kV.
Sunday, February 21, 2021, 22:00: Auto-cooling TGHT/TBHT to 0 A @ 2 A/min
Monday, February 22, 2021, 09:12: IG1@1.01e-7 T. Bias gets current limited as of 11 kV. The system does not spark so the current is leaking through somewhere.
Monday, February 22, 2021, 09:29: Grounding the TM2 F/T. No effects, same bias issues.
Monday, February 22, 2021, 11:3: the only way for this instabilities to occur is with a short between ground and HV. No such touch is occurring inside.
Monday, February 22, 2021, 11:37: Instability reacts with punching the cage, that is, shaking up the cage causes the instability to decrease.
Will re-accommodate the cage as it seemed slightly crooked, hence the motivation to punch it.
Monday, February 22, 2021, 14:00: Cage re-accommodated with the help of Aaron. Move a insulating cable that was touching a FT.
Monday, February 22, 2021, 14:30: Now sparks are visible between the coil/HS waterlines and ground waterlines (see pictures attached). I have to open the vacuum chamber.
Monday, February 22, 2021, 14:54: IG1 off. Turbos off.
Monday, February 22, 2021, 15:49: Venting
Monday, February 22, 2021, 16:43: Made clearance between HS/COIL to GND.
|
Thursday, February 18, 2021, 16:48, Fernando Maldonado, , , , , , , Failed, FEBIAD parameter scans
|
Thursday, February 18, 2021, 15:19: Gas lines roughed and refilled. Gauge reads -50 kPa. Absolute pressure is 50 kPa.
IG1 @ 9.7 e-7 T.
Thursday, February 18, 2021, 15:27: BIAS/EZL/EE @ 30/13/1.5 kV. No sign of instabilities as before. Bias current=0.08 mA.
This also means the leak, in this clean environment is fine.
Thursday, February 18, 2021, 15:28
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.25 |
3.71 |
TBHT |
22.11 |
6.16
|
COIL + EE |
21.94 |
1.71 |
TGHT |
22.06 |
5.02 |
Slightly drop in flow. Will check later as well.
Thursday, February 18, 2021, 15:37: BIAS/EZL/EE @ 35/13/1.5 kV.
Thursday, February 18, 2021, 15:39. Spark inside. Recover with no problem
Thursday, February 18, 2021, 16:27 : BIAS/EZL/EE @ 40/13/1.5 kV.
Thursday, February 18, 2021, 16:28: Spark
Thursday, February 18, 2021, 16:42:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.16 |
3.66 |
TBHT |
21.91 |
2.42
|
COIL + EE |
21.91 |
1.66 |
TGHT |
21.8 |
4.91 |
Thursday, February 18, 2021, 17:1: Logging water temperature and flow in the PC.
Thursday, February 18, 2021, 17:19: BIAS/EZL/EE @ 0.000 kV.
Thursday, February 18, 2021, 17:20: Auto-ramping TGHT/TBHT to
Thursday, February 18, 2021, 17:26: Anode is shorted. It seems that the Ta capillary is touching the HS. I have to open.
Thursday, February 18, 2021, 17:35: IG1 and turbos off.
Thursday, February 18, 2021, 18:2: Venting
Thursday, February 18, 2021, 18:42: Gauge reader at the service cap is now at -40 kPa. A 10 kPa incursion over 4 hours.
Friday, February 19, 2021, 11:04: The anode still has a short, returning all previous jumpers. Short present.
Unhooked anode cable can sustain voltage, hence the electric circuit has a short,
Friday, February 19, 2021, 11:48: Target removed. No short on anode-target. However there is no short in the service tray either, the voltage from the anode supply is held with no problem.
Friday, February 19, 2021, 12:41: Only when the tbht is bolted the power supply goes current limited.
Friday, February 19, 2021, 12:44: Source tray can hold anode voltage without drawing any current, as expected.
Friday, February 19, 2021, 12:52: Target legs to HS presents a short. When HS is removed the short is gone. Will try to find the contact point.
Friday, February 19, 2021, 12:56: Suspecting that is the gas line that goes to the back of the TGHT; is too high and touches the HS. Putting and insulator and installing the HS cover. No short.
Removing the insulator there is a short.
Will bend the gas line.
Friday, February 19, 2021, 13:08: Installed the open assembly, and the anode voltage is held in the system without drawing current, as expected.
Friday, February 19, 2021, 13:21: TIS assy re-installed, short is fixed. |
Thursday, February 18, 2021, 15:15, Fernando Maldonado, , , , , , , Done, HLA tests
|
Thursday, February 18, 2021, 15:01: With the help of Spencer Kiy, we tested the proper communication from python to epics.
Getting TSP:Q1 PV: successful both from the web application and jupyter notebook.
Setting TSP:Q1 PV: successful from the web application, failed jupyter notebook.
Issue fixed on the HLA server side
Setting TSP:Q1 PV: successful both from the web application and jupyter notebook.
Testing other potentially useful apps for ramping routines and a customized "striptool".
HLA developments only available from the ISAC test stand's PC and Fernando's PC.
|
Thursday, February 18, 2021, 11:03, Aaron Schmidt, , , , , , , Problems/Solutions, DI water pump configuration
|
https://elog.triumf.ca/TIS/Test-Stand/847
There was a previous DI CU-LCW pump trip as per the above elog. The CU-LCW pump was configured this morning. The water pressure is set to 80 PSI as per the MCR. Any further can overload & trip the pump.
Thursday, February 18, 2021, 10:55: Current flow rates & pressure read at the TS
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.30 |
3.8 |
TBHT |
22.14 |
6.27
|
COIL + EE |
22.08 |
1.74 |
TGHT |
22.16 |
5.04 |
DI water pressure as per the gauge on the supply side of the FS#2-5 manifold @ 85 PSI.
Noticeable flow rate reduction based on previous target conditioning logs. Previous pressure was around 100 PSI. |
Thursday, February 18, 2021, 10:47, Aaron Schmidt, , , , , , , , Optics loss / CANBUS failure.
|
Thursday, February 18, 2021, 10:45: TPS:Q3 & the TSB CBC CANBUS controllers had failed yesterday, as well as a cable was incorrectly seated. This was fixed this morning.
Before
After.
|
Tuesday, February 16, 2021, 14:52, Fernando Maldonado, , , , , , , Problems/Solutions, Leak checking gas lines.
|
Vacuum side
Tuesday, February 16, 2021, 13:42: The gas lines inside have been check. The inlet of the calibrated leak was not tighten properly and hence the large leak observed. FIXED.
Tuesday, February 16, 2021, 13:42: The only leak remaining INSIDE the vacuum is the one on the FT side which for 200kPa is around 7e-6 atm cc /s. At this pressure, the undesired leak is leak rate is around 1 % of the one getting into the source.
Atmosphere side
Tuesday, February 16, 2021, 14:49: Some minor leaks in connection points around 1e-6 atm cc/s. Not much I can do without changing all connection to glands with metal gaskets.
Tuesday, February 16, 2021, 14:50: SV5 was leak check on its own, the gas goes through quite noticeable, no need to sniff with leak detector. SV1 leak checked and it works.
Tuesday, February 16, 2021, 14:52: Valves swapped, labels changed.
Tuesday, February 16, 2021, 15:17: Roughing.
Tuesday, February 16, 2021, 15:53: Turbos on.
Tuesday, February 16, 2021, 15:59: IG1 on
Tuesday, February 16, 2021, 16:29: IG1 @ 5.3e-5 and dropping. Already better than Friday/Saturday.
Tuesday, February 16, 2021, 16:53: IG1 @ 2.9e-5 T.
Wednesday, February 17, 2021, 16:53: IG1 @ 1.5e-6 T.
Wednesday, February 17, 2021, 16:53: The Neon bottle seems to be empty. The leak on the lines were not as bad to have this happened. I suspect when squeezing the bottle I rotated the gauge enough to cause a leak there.
Wednesday, February 17, 2021, 17:00: Using a full nitrogen bottle, I confirmed that rotating the two-stage regulator causes a leak.
Wednesday, February 17, 2021, 18:00: Things look OK now. Water open. No response on vacuum. Will put power.
Wednesday, February 17, 2021, 20:00: Some items were timed out. Tried to recycle the PLC now all the items are red. Check tomorrow |
Friday, February 12, 2021, 16:38, Fernando Maldonado, , , , , , , Failed, FEBIAD parameter scan - efficiency measurements - energy spread.
|
Friday, February 12, 2021, 16:37: FEBIAD installed with mechanical calibrated leak
Friday, February 12, 2021, 16:38: Roughing.
Gas lines opened all the way to the sour. SV4 and SV5.
Friday, February 12, 2021, 18:47: Turbos on.
Friday, February 12, 2021, 18:55: IG1 on.
Friday, February 12, 2021, 23:22: IG1 @ 1.5E-4 T. I think the line inside the vacuum chamber is leaking
Friday, February 12, 2021, 23:23: SV5 closed.
Friday, February 12, 2021, 23:24: Vacuum dropping slightly.
Friday, February 12, 2021, 23:24: SV5 opened. IG1 responds to the opening of SV5. The lines from the feedthrough to the calibrated leak need to be re-done.
Tuesday, February 16, 2021, 10:21: IG1 off. Turbos off.
Tuesday, February 16, 2021, 11:21: Venting.
Aaron closed SV4 and the vacuum drop normally. Leak through SV5 as well. |
Friday, February 12, 2021, 12:16, Fernando Maldonado, , , , , , , Problems/Solutions, Grounding collimator cable from outside
|
Friday, February 12, 2021, 12:13: Since the collimator is not used, Carla and I installed a BNC short outside the cage. See picture. |
Wednesday, February 10, 2021, 09:49, Aaron Schmidt, , LP-SIS, , , 44691-8, 44378-2 / 44378-3, Failed, Energy spread calibration with SIS
|
Note* target has a ring on the TGHT - Right leg. EE & PE placed. Target to HS OL - OK.
Wednesday, February 10, 2021, 09:37: Roughing.
Wednesday, February 10, 2021, 09:45: Bypass / Force applied on IG1 to test Anode.
Wednesday, February 10, 2021, 09:46: Anode @ 10 V. Ok.
Wednesday, February 10, 2021, 09:47: Anode @ 200 V. Ok. No current.
Wednesday, February 10, 2021, 09:48: Anode to 0V & off. Bypass / Force removed from IG1.
Wednesday, February 10, 2021, 10:06: TP1B on.
Wednesday, February 10, 2021, 10:46: TP1A on.
Wednesday, February 10, 2021, 13:42: Vacuum @ 9.08e-06T. open FS#5
Wednesday, February 10, 2021, 13:46: Vacuum increased to 9.70e-06T as well as the backing pressure increased. Turbo pumps off. Going to swap the assembly out completely however continue with the same LP-SIS oven.
Wednesday, February 10, 2021, 15:20: HS 44378-3 Installed w/ LP-SIS oven #44691-8. Roughing
Wednesday, February 10, 2021, 15:48: TP1B on.
Wednesday, February 10, 2021, 16:02: TP1A on.
Wednesday, February 10, 2021, 16:11: Bypass / Force applied on IG1 to test Anode. Anode @ 200 V. Ok. No current.
Wednesday, February 10, 2021, 16:13: Anode to 0V & off. Bypass / Force removed from IG1. EZL & EE check ok. IG1 on for real.
Wednesday, February 10, 2021, 16:14: Vacuum @ 6.12e-05T & Dropping.
Wednesday, February 10, 2021, 16:16: FS#5 open. Both IG1 & the backing lines are pumping down quickly.
Contacted MCR. Reminder, mechanical services still intends to service the DI water pump. Constant DI water flow is not guaranteed.
https://elog.triumf.ca/TIS/Test-Stand/847
Thursday, February 11, 2021, 00:13: : Anode to 10V. Auto-ramping TGHT/TBHT to 200/100 A @ 2 A/min
Thursday, February 11, 2021, 09:03: Auto-ramping TGHT/TBHT to 400/200 A @ 2 A/min
From: Jas Uppal <juppal@triumf.ca>Sent: February 11, 2021 9:12 AM
To: Fernando Maldonado Millan <maldonado@triumf.ca>
Subject: Re: Cu-LCW water lines status for the ISAC test stand
Hi Fernando,
There are no plans for Cu-LCW system to be switched off today. I believe they are still working on correcting the issue that caused the trip two days ago. Once it is corrected and we are ready to switch to the secondary pump, the switch over "should" be relatively invisible with possibly a slight drop in line pressure.
Jas Uppal
Thursday, February 11, 2021, 10:31: TGHT/TBHT at 400/200 A. Anode still at 10 V
Thursday, February 11, 2021, 10:33: Auto-ramping TGHT/TBHT to 580/230 A @ 2 A/min
Thursday, February 11, 2021, 10:42: BIAS/EZL/EE @ 30/13/1.5 kV.
Thursday, February 11, 2021, 13:42: Uncapable of holding HV. Maybe the new heatshield needs more time to outgas.
Thursday, February 11, 2021, 13:44: BIAS/EZL/EE @ 0.000 kV
Friday, February 12, 2021, 10:07: In order to trouble shoot the ISAC TS, I let the sparks to continue. Initially, they occurred in the extraction electrode spark gap and were both visible and audible. However, they stop and the instabilitiy was present.
I rise the voltage again and let the spark happen for a longer period of time.
I saw how the collimator wire on the far back of the source tray was moving as if a hurricane was inside, which is very strange. I followed up the wire and I saw how it was sparking to something (see attached photo)
I say something because from the angle is difficult to say if it was going to the chamber itself or to the HS waterlines. Both scenarios are concerning
First of all the collimator is never biased and it if any case the jacket (MHV cable) is on ground ground
In case the discharge happened from wire to the chamber, then the collimator wire was charging up, it is extremely important o note that the jacketed cable goes outside the box very close to one of the turbos.
In the other scenario where the discharge was happening from the wire to the HS waterlines, that is, HV to ground, the simply creating a clearance should be enough. In this case as well is relevant to know that this jackted cable leaves the farday cage.
I will create clearance from collimator wire to HS waterlines.
Friday, February 12, 2021, 10:33: BIAS/EZL/EE @ 0.000 kV
Friday, February 12, 2021, 10:35: Auto-cooling TGHT/TBHT to 0 A @ 4A/min.
Friday, February 12, 2021, 11:05: Discharge confirmed visually to go into the HS waterlines, (HV to ground) (see second photo attached)
Friday, February 12, 2021, 11:06: Inside the blue rack, I could hear ticks that match the discharges, probably the collimator PS is there. Will check later with things off.
Friday, February 12, 2021, 13:17: Turbos off.
Friday, February 12, 2021, 14:36: Venting. |
Tuesday, February 09, 2021, 14:02, Aaron Schmidt, , , , , , , Problems/Solutions, DI water loss
|
Tuesday, February 09, 2021, 13:43: DI water flow completely stopped.
Control room contacted. DI water loss confirmed.
Tuesday, February 09, 2021, 13:52: DI water flow returned.
Control room contacted. DI water loss due to a "seamless" pump change over for the DI water supply & mechanical services. The supply was transferred over to a new pump which overloaded and failed. They had to switch back over to the (old) pump. Mechanical services will still try to do the switch over again. Either tomorrow or the day after. Running the TS up to 580A until then is not recommended. Control room to update tomorrow morning.
Fault# 13773: Cu-LCW south SA3-03 tripped on motor overload. |
Monday, February 08, 2021, 09:20, Aaron Schmidt, , LP-SIS, , , 44139-10, 44378-2, Failed, Energy spread calibration with SIS. No PE
|
Re-salted. PE removed. EE Cleaned
Monday, February 08, 2021, 09:17: Roughing.
Monday, February 08, 2021, 09:46: TP1B on
Monday, February 08, 2021, 11:45: Vacuum @ 6.70e-06T. Open waterlines
Monday, February 08, 2021, 11:49: Vacuum spike. Turn off IG1 & turbo pumps. Will vent to swap gaskets.
Monday, February 08, 2021, 12:45: Venting.
Swap & tighten.
Monday, February 08, 2021, 13:33: Roughing
Monday, February 08, 2021, 14:01: TP1B on.
Monday, February 08, 2021, 14:18: TP1A on.
Monday, February 08, 2021, 14:22: Opened waterline. Vacuum was in the e-05T range and dropping however it slowed and a spike was noted on CG1A & CG1B. Turbo pumps off to vent. Will inspect the seal face.
Monday, February 08, 2021, 15:08: Venting.
Monday, February 08, 2021, 15:57: Swapped out gaskets. Checked gasket faces & Re-installed HS. Roughing.
Monday, February 08, 2021, 16:44: TP1B on.
Monday, February 08, 2021, 16:51: TP1A on.
Monday, February 08, 2021, 16:58: IG1 on
Monday, February 08, 2021, 17:00: Opened waterlines. Backing pressure ok, Vacuum continuing to improve@ 7.90e-05T.
Monday, February 08, 2021, 17:03: Power/sources on. vacuum @ 5.19e-05T
FM
Tuesday, February 09, 2021, 00:46: IG1 @ 2.14e-6T. Auto-ramping to 580/230 @ 2A/min
Tuesday, February 09, 2021, 07:17. Anode got current limited again when TBHT/TGHGT were @ 215/215 A.
AS
Tuesday, February 09, 2021, 08:32: BIAS / EE / EZL @ 20 / -1.5 / 10 kV
Tuesday, February 09, 2021, 09:02: BIAS / EE / EZL @ 30 / -2.0 / 13 kV
Tuesday, February 09, 2021, 09:16: BIAS remains @ 30 kV. Adjusting Optics, EE, & EZL to tune. Minimal beam on FC0 noted.
Tuesday, February 09, 2021, 10:02: HV off. Check Anode & down stream.
Tuesday, February 09, 2021, 10:36: Auto-cooling @ 4 A per min
Tuesday, February 09, 2021, 10:40: Aborted. TGHT / TBHT back to 580 / 230 A. A few more checks.
Tuesday, February 09, 2021, 10:58: Auto-cooling @ 4 A per min
Tuesday, February 09, 2021, 11:08: HV off.
Tuesday, February 09, 2021, 13:41: Power / sources off. FS#5 closed off. Turbo pumps off.
FM.
After inspecting the ion source, and revising the electrical connections, I suspect that the TBHT was floating all the time and only when it was in contact with the plasma electrode it held HV.
When the plasma electrode was removed, there was no reference whatsoever, and the ions were not extracted.
It seems then that the resistor R4 (ISK4562D) is necessary to provide a reference to the TBHT in a similar way R1 provides one to extraction electrode.
Tuesday, February 09, 2021, 20:52: Installing R4. If the anode works this time, it will be worth checking why this reference is necessary. From the electric diagram, the chassis ground should be HV ground.
|
Thursday, February 04, 2021, 19:22, Fernando Maldonado, , LP-SIS, , , 44139-10 , 44378-2, Done, Energy spread calibration with SIS
|
See e-log entry: 884:
Thursday, February 04, 2021, 18:45: Roughing
Thursday, February 04, 2021, 19:13: Turbos on.
Thursday, February 04, 2021, 19:22: IG1 on.
AS
Friday, February 05, 2021, 06:20: Waterline FS#5 open. Vacuum ok @ 1.71e-06T.
Friday, February 05, 2021, 06:23:
Friday, February 05, 2021, 06:26: Tried to put 100 - 1000 V on the BIAS. Goes to 0.0 kV - BIAS:RDVOL / 0.029 mA - BIAS:RDCUR, straight to current limit. BIAS is shorted.
Friday, February 05, 2021, 06:32: Power / Sources / Optics off. Ion gauge & Turbo pumps off.
Friday, February 05, 2021, 07:28: Venting.
Friday, February 05, 2021, 08:37: Roughing. Target was re-salted. GE line was close/light touch to (B) line. Adjusted. Waterlines open on FS#5.
Friday, February 05, 2021, 09:06; Turbo pump TP1B on.
Friday, February 05, 2021, 09:14: Turbo pump TP1A on
Friday, February 05, 2021, 09:19: TP1A tripped. Wait on backing pressure.
Friday, February 05, 2021, 09:35: Vacuum Bypass on BV1A to turn on TP1A.
Friday, February 05, 2021, 09:39: TP1A at speed. Ion gauge on. Bypass removed.
Friday, February 05, 2021, 09:55: IG1 off. Bypass used on IG1. EE on, BIAS on.
Friday, February 05, 2021, 09:56: 500 - 1000 V - BIAS:RDVOL / 0.000 mA - BIAS:RDCUR. Ok.
Friday, February 05, 2021, 09:58: BIAS & EE off. Bypass removed. IG1 back on. Initial check ok. Vacuum to go below 1.0e-05T.
Friday, February 05, 2021, 11:37: Power / Sources / Optics on & set. Vacuum @ 6.46e-06T.
Friday, February 05, 2021, 11:42: BIAS / EE / EZL @ 10 / -1.0 / 7.5 kV
Friday, February 05, 2021, 11:50: BIAS / EE / EZL @ 20 / -1.5 / 13 kV. TGHT / TBHT @ 10 / 10 A.
Friday, February 05, 2021, 11:58: BIAS / EE / EZL @ 25 / -1.5 / 13 kV. TGHT / TBHT @ 10 / 10 A. Anode checked up to 100 V & down again. Ok.
Friday, February 05, 2021, 12:06: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. TGHT / TBHT @ 10 / 10 A.
Friday, February 05, 2021, 12:14: BIAS / EE / EZL @ 35 / -1.5 / 13.5 kV. TGHT / TBHT @ 10 / 10 A.
Friday, February 05, 2021, 12:24: It charged up and began sparking continuously around 12:23.
Friday, February 05, 2021, 12:33: BIAS / EE / EZL @ 15 / -1.0 / 10 kV. TGHT / TBHT @ 10 / 10 A. The sparks were both clearly audible & visible on the spark gap up top (Image to be included in word doc)
FM
Friday, February 05, 2021, 14:16: BIAS / EE / EZL @ 30/ -1.5 / 13 kV. Anode @ 50 V.
Friday, February 05, 2021, 14:18: Auto ramp-up TGHT/TBHT to 580/230 A @ 4A/min
Friday, February 05, 2021, 15:08: Anode shorted, I think the tube heater is touching the plasma electrode. TGHT/TBHT @ 209/209 A. TBHT voltage= 2.2. At the same time the bias current jump from 0.008 to 0.01.
Friday, February 05, 2021, 15:12: Reducing the TBHT to 190 A 2 V. Bias current linearly reducing with tbht current. The cathode is not current limited anymore. Wondering if the TBHT power supply is causing an electrical backflow or if the ion source is touching the plasma electrode.
Friday, February 05, 2021, 15:16: Auto ramp-up TGHT/TBHT to 580/230 A @ 2 A/min
Friday, February 05, 2021, 15:21: The same effect as before at TBHT=223 A. When reducing to 190 A, anode goes up.
Friday, February 05, 2021, 15:30: Auto ramp-up TGHT to 580 A @ 4A/min and TBHT to 230 @ 1 A/min.
Friday, February 05, 2021, 15:55: Sparks, not audible nor visible. I think I saw one on the top part of the water blocks. Lowering bias to 10 kV.
Friday, February 05, 2021, 15:56 : Auto-ramp range to 4A/min on both TGHT and TBHT
Friday, February 05, 2021, 19:23: almost 2.5 hours without sparks. RPM tests performed. Voltages to zero. Will rise later or tomorrow remotely.
Taped down to 180/500 A on TBHT/TGHT. All voltages to BIAS / EE / EZL @ 0.000 kV.
Saturday, February 06, 2021, 11:14: Auto ramp-up TGHT/TBHT to 580/230 A @ 4A/min
Saturday, February 06, 2021, 12:16: BIAS / EE / EZL @ 30/ 1.5 / 0kV.
Saturday, February 06, 2021, 12:30: The previous tune is not working anymore. I have to re-tune . EZL now helps to have a better tune, no need for extreme steering
Well well well, after several scans I observed the following:
- Bias readback changes by 14 V. This doesn't necessarily means this is the absolute value, it could be better or worse.
- Magnet oscillates around 1 gauss, enough to move the beam to the sides.
- Different settings on the rpm scans does not yield to different results in the data
- Intensity variations causes one of the rpms scans to be lower or higher.
- Total source scans are always mirrored as long as nothing else varies.
- Separated ion scans varied wildly. No two consecutive scans are the same. Likely a combination of Bias voltage and magnet current ripples.
- Following Baartman's proceedure on a cherry-picked data set, I estimated an energy spread of 11.75 eV. To be discussed with him
Saturday, February 06, 2021, 20:00 Biases to 0.000 kV
Saturday, February 06, 2021, 20:00 : Auto-cooling TGHT/TBHT to 400/150 A @ 3 A/min
Saturday, February 06, 2021, 21:02: On the way down, TBHT 150 A and when TGHT cross 480 A the anode came back to life. Wonder if this could help diagnose deflection on the surface ion source (might be helpful for the P2N)
Sunday, February 07, 2021, 08:26: Auto ramp-up TGHT/TBHT to 560/210 A @ 2A/min
Sunday, February 07, 2021, 09:18: Anode got current limited again when TGHT/TBHT @ 446/200 A
Sunday, February 07, 2021, 11:26: Auto ramp-up TGHT/TBHT to 560/210 A @ 2A/min
Sunday, February 07, 2021, 11:31: Once again, the latest tune did not work. I suspect the ion source deformation varied from thermal cycle to thermal cycle. With a crooked beam, the EZL will send the beam off-center and the quad will not compensate that. The double peak observed in the beam size scan indicates that the focusing is not correct.
Sunday, February 07, 2021, 18:41: With Baartman RPM scans, the x axis in in cm, as verified with an emittance scan.
New parameters on the emittance rig for this tune. Offset from 40 to -50. This shifts the phase space in the y axis such that is visible on the plot.
Even in a different mass, the position scans on the dispersion plan are not reproducible.
Sunday, February 07, 2021, 18:52: Auto-cooling TGHT/TBHT to 400/150 A @ 6A/min / 3 A/min, respectively.
Sunday, February 07, 2021, 18:53: Biases to 0.000 kV
I think the fast cool-down rate prevented the TBHTto be able to sustained voltage.
Sunday, February 07, 2021, 19:35: Auto-cooling TGHT/TBHT to 0 A @ 3A/min
TBHT able to sustain voltage once TBHT=191 A and TGHT=372 A
Monday, February 08, 2021, 07:14: IV4 close
Monday, February 08, 2021, 07:15: IG1 off. Turbos off. |
Thursday, February 04, 2021, 18:48, Fernando Maldonado, , LP-SIS, , , 44139-10, 44378-2 , Problems/Solutions, Energy spread calibration with SIS 6x
|
The system was vented to make clearance on the waterlines as a very small continuous discharge was observed.
The inspection revealed some marks on the HS water line (sideview photo). From the the bottom and from real close (zoom and backview photo) the marks are quite noticeable with shinny copper in the middle and dark circles around.
The GND line is routed in such a way that sits on top of the ion gauge chamber (gnd-ig1) this could explain why the vacuum had small oscillation during the current limited events.
Moreover, the GND line has the steerer cables tied to it, this could explain why one of the steerers got affected after the sparks.
Also, the GND line is in contact with a dark grime that goes all the way into the first skimmer (gnd-quad). I think the grime observed inside the test stand might have become conductive, or if this is trace from a previous flashover, this is good path to flash again.
The EE and the plasma electrode were removed and they show signs of buildup. Cleaned and reinstalled |
Monday, February 01, 2021, 08:38, Fernando Maldonado, , LP-SIS, , , 44139-10 , 44378-2 , Failed, Energy spread calibration
|
Monday, February 01, 2021, 08:38 : The anode seems to be shorted but we can still test the amount of dispersion at the image position, and correlate with energy spread.
Monday, February 01, 2021, 11:27: Bias/EZL/EE @ 30/0/1.5 kV.
Monday, February 01, 2021, 11:44: Mass scan in progress. The peaks appear to be shifted. Large peak at m/q160 and double peak at m/q 100u, where I think it should be 133Cs and 85Rb and 87Rb.
Monday, February 01, 2021, 14:04: HV turned itself off, nothing tripped nor change. Not sure if related to the emittance scan that I was running. Setting it to zero before restarting it.
Monday, February 01, 2021, 20:14: Ramping things down and call it a day. My laptop charger broke and I don't want to leave the HV on.
Wire scanners look fine but the emittance meter was not working. Keiko soft reboot it but to luck.
AS
Tuesday, February 02, 2021, 08:51: E-rig re-calibrated. Mass scans taken. It appears we have evaporated all the salts. Turning off the HV & auto-cooling @ 3A per min.
Tuesday, February 02, 2021, 12:18: IV4 closed, power/sources off. Turbo pumps off.
Tuesday, February 02, 2021, 12:50: Venting.
Remove, add salts, EE ok.
Tuesday, February 02, 2021, 13:58: Rouging.
Tuesday, February 02, 2021, 14:26: Turbo pump on - TP1B.
Tuesday, February 02, 2021, 14:37: Turbo pump on - TP1A. Ion gauge on.
AS
Wednesday, February 03, 2021, 07:36: Vacuum ok @ 1.01e-06 T.
Wednesday, February 03, 2021, 07:38: Opened FS#5. Vacuum ok.
Wednesday, February 03, 2021, 07:41; Power / Sources on. Optics on.
Wednesday, February 03, 2021, 07:43: Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.
Wednesday, February 03, 2021, 07:46: IV4 open
Wednesday, February 03, 2021, 07:48: BIAS / EE / EZL @ 20 / -1.0 / 0 kV to start. will go to 30 & 1.5 kV once the TGHT reaches 350 A.
Wednesday, February 03, 2021, 09:40: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Wednesday, February 03, 2021, 10:55: BIAS / EE / EZL @ 30 / -1.5 / 0 kV. Lot's of sparks on the initial conditioning from 8:30am until almost 10:20. Appears stable now.
FM
Wednesday, February 03, 2021, 13:01: Spark. The HV bias voltage remained at 10 kV for several seconds. TSG:CBC was @ 2500 V. Likely, a sustained discharge towards the steerer had the HV bias power supply to get current limited
Wednesday, February 03, 2021, 13:25: HV bias power supply gets current limited as of 15 kV. Setpoints to 0 to allow some discharge. Didn't work. Asking someone on site to have a look on the PS.
No sign whatsoever of a spark to any device.
Wednesday, February 03, 2021, 18:27: HV has been erratic all day. Waiting for some stabilization allowed the system to reach ~24 kV. Now it has dropped to 20 kV.
Wednesday, February 03, 2021, 18:28: Increasing current limit on the bias PS from 0.015 to 0.02 mA
Wednesday, February 03, 2021, 18:55: Spark in the water lines. Current drop 60% from 0.03 to 0.01 uA. Spark observed in the GND electrode water lines
Wednesday, February 03, 2021, 19:11: Able to reach 28 kV but a spark ocurred. TSG:CBC adn TSG:Q1 readback 2500 and 1500 V (similarly to the spark at 1 pm). Bias is current limited again, even at the new current limit.
- I think there might a short with one of the steerers cables, or a bit unlikely, to the quad.
- Slow charge up process, that does not discharges.
Wednesday, February 03, 2021, 19:32: Bias/EZL/EE @ 0.000 kV
Wednesday, February 03, 2021, 22:59: Tapped down TGHT/TBHT to 500/200 A to preserve the salts.
AS
Thursday, February 04, 2021, 06:42: Auto-cooling TGHT / TBHT down to 300 / 150 A.
Thursday, February 04, 2021, 09:14: Optics set to standard settings. Checking BIAS w/ EE & EZL
Thursday, February 04, 2021, 09:21: BIAS / EE / EZL to 16.5 / -1.0 / 10 kV. Actual on BIAS 14.5 to 15 kV on BIAS:RDVOL & w/ 0.029 mA on BIAS:RDCUR.
Thursday, February 04, 2021, 09:24: BIAS discharge. 16.5 kV on BIAS:RDVOL & w/ 0.004 mA on BIAS:RDCUR.
Thursday, February 04, 2021, 09:32: Brought BIAS up to 19 kV, but then it sparks and dropped to 13.5 kV on BIAS:RDVOL & w/ 0.029 mA on BIAS:RDCUR. Brought the BIAS down to 13 kV, & the current dropped out, then stabilized. Brought it back up to 16.5 kV. Holding 16.5 kV on BIAS:RDVOL & w/ 0.004 mA on BIAS:RDCUR.
Thursday, February 04, 2021, 09:36: BIAS / EE / EZL to 16.5 / -1.0 / 10 kV
Thursday, February 04, 2021, 09:39: Auto-cooling TGHT / TBHT down to 0 A.
Thursday, February 04, 2021, 09:40: 17 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 09:45: 17.5 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 09:51: 18 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 09:55: 18.5 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 10:00: 19 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 10:14: 19.5 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
Thursday, February 04, 2021, 10:20: 20 kV - BIAS:RDVOL / 0.005 mA - BIAS:RDCUR.
FM
Thursday, February 04, 2021, 12:54: 20.5 kV / 0.006 mA
Thursday, February 04, 2021, 12:58: 21 kV / 0.005 mA
Thursday, February 04, 2021, 13:02: 21.5kV / 0.006 mA
Thursday, February 04, 2021, 13:08: 22 kV / 0.005 mA.
Thursday, February 04, 2021, 13:12: 22.5 kV / 0.006 mA.
Thursday, February 04, 2021, 13:58: 30 kV / 0.008 mA.
Thursday, February 04, 2021, 14:04: Spark. Bias is current limited.
Thursday, February 04, 2021, 14:39 : Small bright spot at the TGHT or HS cooling lines from the solder of the GND water lines.
Without voltage this is not noticeable. Likely a corona discharge happening at this location and hence limiting the current.
Opening to create clearance. Also to troubleshot the cathode power supply.
Thursday, February 04, 2021, 16:07: Turbos off. |
Friday, January 29, 2021, 09:13, Aaron Schmidt, , LP-SIS, , , 44139-10, 44378-2, In progress, TS settings ok.
|
Friday, January 29, 2021, 09:11: CANBUS controller was replaced. Quick systems check ok. Sources, HV, & Optics all good.
Friday, January 29, 2021, 10:05: HV & Ramping check.
Friday, January 29, 2021, 10:08:
|
Thursday, January 21, 2021, 10:55, Fernando Maldonado, , , , , , , Done, Updated Good Vac value for TSG:IG1
|
On Tuesday the hard good vacuum level was changed from 7e-6 T to 1e-5 T to allow larger leak rates when testing FEBIAD.
Also this new level should allow faster heating rates (be mindful and cautious)
Work done as per WP C2021-01-19-9 |
Thursday, January 21, 2021, 10:10, Fernando Maldonado, , LP-SIS, , , 44139-10, 44378-2, Done, Energy spread calibration - SIS with TBHT negatively biased
|
Thursday, January 21, 2021, 10:05: Anodeless Negative Bias On Surface Ion Source, or ANBOSIS (still working on the acronym). installed to test energy spread vs position.
The SIS allow a more forgiving operation while calibrating such that other sources can have these type of measurements.
Thursday, January 21, 2021, 10:43: Electrical connection make sense inside the source tray both with and without TIS. Anode confirmed to be on HV common through 9-pin.
Thursday, January 21, 2021, 10:46: Roughing.
Thursday, January 21, 2021, 11:17: Turbos on.
Thursday, January 21, 2021, 11:25: IG1 on.
Thursday, January 21, 2021, 12:52: IG1@2.67e-5 T
AS
Friday, January 22, 2021, 07:04: Vacuum @ 4.57e-06T.
Friday, January 22, 2021, 07:07: FS#2 open. Vacuum ok @ 4.57e-06T
Friday, January 22, 2021, 07:13: FS#3 Open. Vacuum ok @ 4.57e-06T
Friday, January 22, 2021, 07:24: FS#4 Open. Vacuum ok @ 4.48e-06T
Friday, January 22, 2021, 07:30: FS#5 Open. Vacuum ok @ 4.48e-06T
Friday, January 22, 2021, 07:39: Reboot IOC (Optics page has a white out)
Friday, January 22, 2021, 07:44: Power / Sources on.
Friday, January 22, 2021, 07:49: Reboot PLC / IOC again. Surface source page ok. Optics page still in white out.
Friday, January 22, 2021, 07:52: Controls to TGHT / TBHT non-responsive. 10 / 5 A on TGHT / TBHT @ 0 / 0 A on epics & the PS.
Friday, January 22, 2021, 08:15: Tested HV. OK on both EZL & BIAS w/ 500 V each, then back to 0 V. TGHT / TBHT still not responding.
AS
Friday, January 29, 2021, 09:52: TS checks ok. Fixed. TGHT / TBHT @ 10 A each. BIAS / EE / EZL @ 500 / -200 / 300 V to check.
https://elog.triumf.ca/TIS/Test-Stand/842
Friday, January 29, 2021, 09:53: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Friday, January 29, 2021, 10:05: BIAS / EE / EZL @ 30 /-1.5/13 kV.
Friday, January 29, 2021, 10:08: Lot's of sparking*** Reduce BIAS / EE / EZL to 20 / -1.5 / 10 kV.
FM
Friday, January 29, 2021, 11:24: BIAS / EE / EZL @ 29 /-1.5/13 kV.. No Sparks. Ramping up to 30 kV in steps of 100V.
Friday, January 29, 2021, 11:28: Reached 30kV on bias. No sparks after 2 minutes. Previously, the sparks happened within seconds after reaching 30 kV, according to the striptool.
Friday, January 29, 2021, 11:41: There were five inaudible sparks. They are likely occurring inside as the target-ion source is being heated. Small rise in vacuum occurred and then the spark started.
Friday, January 29, 2021, 11:42: BIAS / EE / EZL to 0.000 kV to allow outgassing
Friday, January 29, 2021, 12:44 Auto-ramping TGHT / TBHT to 500 / 200 A @ 4 A per min.
Friday, January 29, 2021, 13:32: TGHT/TBHT @500/200 A.
Friday, January 29, 2021, 13:44. Spark on top.
Friday, January 29, 2021, 13:48 : BIAS / EE / EZL @ 30 /-1.5/13 kV.
Friday, January 29, 2021, 13:49: Anode gets current limited even at 1 V. Could this indicate a short, or that the anode is floating?
Friday, January 29, 2021, 13:53: Spark across extraction electrode spark gap.
Friday, January 29, 2021, 14:13: Auto-ramping TBHT to 225 A @ 3 A per min.
Friday, January 29, 2021, 14:32: 10 min ago, the IG6 timed out. Nothing tripped but the epics couldn't restarted. Manually turned Fil1 on controller but didn't work. Fil2 did the trick. Back to normal.
Friday, January 29, 2021, 14:42: Spark gap again. It turned the separator section yellow (except MB1)"
Friday, January 29, 2021, 15:08: Auto-ramping TGHT to 580 A @ 2 A per min. Good vac level set to 3.5e-7T
Friday, January 29, 2021, 15:17: Inaudible spark. First spark after 25 min.
Friday, January 29, 2021, 15:30: Playing with TBHT current. Couple of sparks when playing with the steerers and einzel lens. TGHT auto-ramp waiting for good vacuum.
Friday, January 29, 2021, 16:25: Vacuum reached bad vaccum level. Currentes were step back. No sparks for around 40 minutes.
Friday, January 29, 2021, 16:41: System seems to be dirty. It will likely take the weekend to reach nominal vacuum levels.
I will reduce the HV and keep the heaters on. I will keep an eye during the weekend.
Friday, January 29, 2021, 16:44: 50 minutes without sparks
Friday, January 29, 2021, 16:46: BIAS / EE / EZL to 0.000 kV to allow outgassing during the weekend.
Saturday, January 30, 2021, 11:59: Vacuum has steadily decrease over time allowing the auto ramp-up routine to make progress.
Saturday, January 30, 2021, 12:00 IG1 @ 3.58e-6T . TGHT/TBHT @ 566/230 A. All voltage still at 0 V.
Saturday, January 30, 2021, 12:56: TGHT/TBHT @ 580/230 A.
Sunday, January 31, 2021, 09:32: TGHT/TBHT @ 580/230 A. IG1@2.59e-6T.
Sunday, January 31, 2021, 10:48: BIAS / EE / EZL @ 30 /-1.5/13 kV. No sparks on the way up. Beam is now noticeable on the wire scanners, When I first tried with colder target current no beam.
Sunday, January 31, 2021, 13:31: After around 3 hours, only two sparks have occurred.
Sunday, January 31, 2021, 13:54: Spark. All of them seem to be going to EZL.
Sunday, January 31, 2021, 15:13: Spark. Separators optics turned yellow.
Sunday, January 31, 2021, 15:38: Spark.
Sunday, January 31, 2021, 16:11: Things were looking good so i decided t o try a mass scan , however a series of sparks started. I set all biases to 0 and stop the tests for today. |
Wednesday, October 30, 2019, 14:50, Fernando Maldonado, , , , , , , Problems/Solutions, Cathode bias mode configuration
|
Wednesday, October 30, 2019, 14:49: John C. changed the polarity of the anode power supply to negative, and Fernando M. rewired the cabling on the service cap. |
Wednesday, January 20, 2021, 11:30, Fernando Maldonado, , , , , , , Done, Cathode bias mode configuration confirmed
|
Fernando Maldonado wrote: |
Wednesday, October 30, 2019, 14:49: John C. changed the polarity of the anode power supply to negative, and Fernando M. rewired the cabling on the service cap.
|
Wednesday, January 20, 2021, 11:26: John Chow verified that the power supply was in negative mode.
Just as side note, I think the PS was in negative mode since the quoted entry from October 30 2019. Given that the SiC/FEBIAD was supposed to run in cathode mode, the test stand was rewired to this. The only rewiring after this was for the P2N. |
Wednesday, December 02, 2020, 16:18, Fernando Maldonado, , , , , , , Done, Gas delivery system upgrade
|
Yesterday, December 1st, I successfully installed and tested the gas system inside the faraday cage.
The changes performed were as follows:
- Remove He gas tank (to make room for new tank)
- Remove calibrated leak to connect new gas line
- Remove convectron gauge to install a high range dial manometer.
The tests were done manually and consisted as follows:
- Gas lines roughed by opening SV1.
- Tank regulator set to deliver 1 bar
- SV4 opened to allow the gas to enter the lines
- Dial manometer verified to match the pressure set by the regulator
- Alternatively roughed and pressurized the lines by opening/closing SV1/SV4
- Tank lines emptied with SV1 and SV4 open simultaneously.
The test involve the lines up to SV5. The gas line portion from SV5 to the top of the HV cage was not included as it was removed for TM3 HV tests (se entry #822)
When the HV tests are concluded I will install a new line that will include a gauge.
|
Thursday, January 14, 2021, 08:31, Fernando Maldonado, , , , , , , In progress, Gas delivery system upgrade
|
Fernando Maldonado wrote: |
Yesterday, December 1st, I successfully installed and tested the gas system inside the faraday cage.
The changes performed were as follows:
- Remove He gas tank (to make room for new tank)
- Remove calibrated leak to connect new gas line
- Remove convectron gauge to install a high range dial manometer.
The tests were done manually and consisted as follows:
- Gas lines roughed by opening SV1.
- Tank regulator set to deliver 1 bar
- SV4 opened to allow the gas to enter the lines
- Dial manometer verified to match the pressure set by the regulator
- Alternatively roughed and pressurized the lines by opening/closing SV1/SV4
- Tank lines emptied with SV1 and SV4 open simultaneously.
The test involve the lines up to SV5. The gas line portion from SV5 to the top of the HV cage was not included as it was removed for TM3 HV tests (se entry #822)
When the HV tests are concluded I will install a new line that will include a gauge.
|
Yesterday, January 13th I added back the gas line from SV5 to the service cap.
I temporarily added a gauge in between to measure the gas pressure. After successful tests I removed it from this location.
Finally, I added the gauge on the service cap, which its desired location (see attached picture). The tests corroborate no pressure losses from the gas bottle up to this location. |
Monday, January 11, 2021, 14:20, Carla Babcock, , , , , , , , Test stand wiring reverted to anode bias mode
|
I have rewired the test stand (service cap wiring only, not power supply wiring) to anode bias mode as shown in the diagram. This was not how it was wired before, there are several things I have removed that appear to be newer additions. I also removed the burned cable between TBHT(-) and COIL(-), and between the multipin feedthrough and ground (probably related to the other burned cable).
I tried to measure the resistances across the feedthroughs (as opposed to across the resistors themselves) but they all seem wrong. I get 27Ohms across the TGHT and TBHT circuits instead of 100Ohms. Between the TGHT and TBHT I get 100Ohms as expected. Across the coil circuit I get 6Ohms instead of 100Ohms. Probably only the 6Ohms really needs to be fixed, but if the resistors are damaged, then the varistors might be as well. |
Monday, January 04, 2021, 08:17, Aaron Schmidt, , , , , , , , Restart TS
|
Restarting TS after holidays & planned power outage.
Monday, January 04, 2021, 08:17: All epics controls in a 'white out' state.
Monday, January 04, 2021, 08:20: Rebooted PLC / IOC. Controls returned.
Monday, January 04, 2021, 08:22: Strip tools started / epics response ok.
Monday, January 04, 2021, 08:23: Switch on TMS:RP2 & TSG:RP1
Monday, January 04, 2021, 08:24: Open PV1 & PV2.
Monday, January 04, 2021, 08:26: Optics, steering, and archivers still in a non-responsive / 'white-out' state.
IOC rebooted on January 6. Controls returned to normal. |
Monday, December 21, 2020, 07:58, Aaron Schmidt, , , , , , , , Shutdown TS
|
Shutting down the ISAC TS for the planned outage on Dec 22.
Monday, December 21, 2020, 07:50: Ion gauges & turbo pumps off.
Monday, December 21, 2020, 07:51: Confirm wire scanner shutoff.
Monday, December 21, 2020, 07:55: Waterlines purged.
Monday, December 21, 2020, 07:57: Backing valves TMS:BV6 & TMS:BV2 off. PV1 & PV2 off. Roughing pumps off. |
Thursday, December 17, 2020, 08:16, Carla Babcock, Alexander Shkuratoff, , , , , , , ,
|
Ramping up to 75kV. Started drawing current at 63.5kV this time.
Now at 75kV, drawing 5uA of current. Ramp up easy.
Thursday, December 17, 2020, 13:02
Been at 75 kV since about 8:45. A single spark at 11:58.
Thursday, December 17, 2020, 18:10
75 kV. No sparks since that last one 6 hours ago. Current has been slowly decreasing over time, now sitting around 2 uA. Was about 5 uA around the time of the spark. Starting ramp down. Dumped data.
|
Wednesday, December 16, 2020, 10:32, Carla Babcock, Alexander Shkuratoff, , , , , , , , TM3 service tray prototype HV tests
|
Wednesday, December 16, 2020, 10:30 (Carla) :
Started ramping up about 45 mins ago, now at 50kV with no issues. No sparking, occasional current draw to get to the next voltage step. Test piece is no longer drawing any current, as opposed to yesterday when it was drawing around 4uA at this point. Trace left on insulator must have partially evaporated in the vacuum overnight.
Wednesday, December 16, 2020, 10:34 :
Starting to draw some current at 50.5kV. Drawing 4uA at 55kV.
Wednesday, December 16, 2020, 10:51 :
Back up to 60kV, no sparks so far and no issues, though it is still drawing 5uA of current, as it was yesterday.
Wednesday, December 16, 2020, 12:28 (Alexander)
No sparks at 60 kV for 1.5 hours. Starting voltage increases again at 250 V increments. Currently limiting current to 6 uA. Current draw is 4 uA.
Wednesday, December 16, 2020, 13:20
63 kV. Appears current limited, increased current limit to 7 uA. First spark was at 62.75 kV.
63.25 kV. Seems current limited again but eventually reached a stable voltage after a minute. Increased current limit to 8 uA for next voltage increase.
63.5 kV. Spark.
63.75 kV. Unstable trying to reach voltage, appears current limited. Small spark followed by a big one on the rise of the previous. Second one activated something pneumatic nearby. Reduced voltage by 250 V. Looked at vacuum system but nothing abnormal.
63.5 kV. Spark, not recorded on GoPro. Stable after 5 minutes. Continuing.
63.75 kV. No longer current limited and reached voltage stably. Dumped data.
Wednesday, December 16, 2020, 14:02
64.5 kV. May be current limited again, took over a minute to reach stable voltage.
Note: None of the sparks recorded today so far have produced a response in the vacuum, which is holding steady at 1e-6 Torr.
65 kV. Smooth transition to it. Drawing 5 uA.
65.25 kV. Spark after voltage instability and current draw at 8 uA limit. Moved the Faraday cup, which made a sound. This is the sound I heard earlier. Lower current draw after the spark, back at 5 uA.
Wednesday, December 16, 2020, 15:20
Stable at 65.25 for an hour, no sparks.
Spark at 66 kV. Current limited and unstable voltage for about 2 minutes afterwards, then stable with current back to 6 uA.
Spark at 66.5 kV after some voltage instability and current limiting. Afterwards current and voltage returned to stability.
67 kV, two sparks, one right after the other. The second produced a bump in the vacuum. Reduced voltage. Brought back up easily; current stable at 5 uA.
67.25 kV. Spark. No instability preceding it for a good 20 seconds.
67.5 kV. Spark. Instability before, none after.
Wednesday, December 16, 2020, 16:08
68 kV. Spark. Instability before, none after. Vacuum dropped about 20 seconds after recovering. Current also dropped to 4 mA, at about the same time the vacuum dropped. Dropping current limit to 7 uA.
68.25 kV. Vacuum jumped back up to earlier values and then an eventual spark after some instability. Returned to stability after spark. Current now at 5 uA.
68.75 kV. Spark.
69 kV. Carla went to look inside. Saw some small sparks towards the back between the HV sheath and GND sheath in the small gap side. Very little registered in EPICS, though. Just a couple jumps in current and small dips in voltage. Not visible in GoPro footage.
Wednesday, December 16, 2020, 16:38
69.25 kV. Two sparks. Stable after second. Third spark. Reviewed GoPro footage because third spark was suspicious. Appears on video but not near or on the prototype. Could have been the wire. Dumped data.
69.75 kV. Some instability paired with a change in vacuum for the same duration.
70 kV. Carla went to look. Nothing visible on the StripTool but Carla said she saw small sparks towards the back. Going to leave here for 20 minutes before raising again.
Wednesday, December 16, 2020, 17:12
Held for 20 minutes at 70 kV with no action. Starting voltage increases again.
70.25 kV. Two and a half minutes of voltage instability, raised vacuum, and limited current. All of them stopped and started at the same time. Seems like conditioning to me.
70.5 kV. Carla saw two very faint sparks towards the back on the small gap side. Little appeared in EPICS. Spark followed maybe a minute and a half later. 2nd spark four minutes after that. Before and between those sparks the current was generally at 5 uA. About a minute after the 2nd, the current dropped to 4 uA.
70.75 kV. Short conditioning (response from all 3 monitors) period of about 10 seconds.
71 kV. 2 sparks one minute apart with some conditioning in between and after.
71.5 kV. Spark followed by 2 minutes of conditioning.
71.75 kV. One minute of conditioning.
Wednesday, December 16, 2020, 18:06
72.25 kV. Spark followed by a minute and a half of conditioning.
72.75. About a minute of conditioning.
73 kV. Instant spark followed by about a minute of conditioning.
73.25 kV. 30 seconds of conditioning then a spark. 1 minute of conditioning, then another spark, and conditioning done right after. Second one sounded like it activated the Faraday cup.
73.75 kV. Sporadic and weak conditioning? A few blips in voltage and current over about a minute and a half.
74 kV. Similar to previous but even less significant.
74.5 kV. Two minutes of conditioning.
Wednesday, December 16, 2020, 18:52
75 kV. 30 seconds of conditioning. Spark. 2.5 minutes of conditioning. 2nd spark. 10 seconds. 3rd spark; lowering voltage by 250 V for stability to capture footage of previous 3 sparks. Stable here for 5 minutes.
Wednesday, December 16, 2020, 19:01
75 kV. Nothing happening. Gonna leave for 30 minutes.
Wednesday, December 16, 2020, 19:31
75 kV for 30 minutes. No sparks or any other anomalies. Vacuum has been around 9.5e-7 Torr. Current hovering around 5 uA. Starting voltage ramp down.
Wednesday, December 16, 2020, 19:43
Ramped down. Nothing interesting. Turned power supply off in EPICS. Still on physically such that ramp up tomorrow can start remotely. Dumped data. |
Tuesday, December 15, 2020, 11:24, Alexander Shkuratoff, , , , , , , , TM3 service tray prototype HV tests
|
Tuesday, December 15, 2020, 11:15
Vacuum at 1.0e-6 Torr. Turned bias power supply on, starting HV ramp at 500 V increments, increasing every 30-50 seconds seconds or so.
Tuesday, December 15, 2020, 12:47
Reached 50 kV. Not a single dip in voltage, significant current bump, or change in vacuum up to this point. Will hold for 10 minutes before continuing.
Tuesday, December 15, 2020, 12:57
Continuing voltage ramp. Decreasing increments to 250 V as this is uncharted territory, and that rate of increase seemed safe yesterday. Will also hold at each voltage for about 2 minutes after no signs of activity.
Tuesday, December 15, 2020, 13:04
Small dip in voltage and wiggle in current at 50.75 kV, no change in vacuum.
Spark at 51.25 kV with change in vacuum; reduced voltage temporarily. Did the same at 51.75 kV. Did the same at 52 kV, but let it sort itself out this time since it didn't seem too violent.
Actual spark at 52.25 kV with big voltage drop, and I saw it happen. On the vacuum gap side, somewhere in the flat plane and close to the middle. Another spark after about 3 minutes of holding. Just missed recording it but I saw it on the feed of the GoPro; maybe in a similar location as the previous. Another 1 minute later, didn't see it this time. The last two had no effect on vacuum.
Tuesday, December 15, 2020, 13:31
5 minutes since last spark. Raising voltage again, this time recording with GoPro. Spark captured at 53 kV. No change in vacuum... until a minute later.
Tuesday, December 15, 2020, 14:46
55 kV. Each time voltage is raised, it takes a couple seconds to reach a stable voltage. During this time the current limit of 0.005 mA seems to be drawn. Will reduce current limit to 0.001 mA to see effect. Dumped StripTool data at 55.25 kV.
Recorded spark at 56 kV. Voltage took longer to recover as a result of the reduced current limit.
58.5 kV. Effect of reducing current limit seems to make it take longer to reach a stable voltage. I think this is a good thing as it should smooth out the conditioning. Sparked here twice, reduced voltage for a bit before bringing back up again.
Tuesday, December 15, 2020, 16:23
60 kV. Sparked twice. Carla observed some: a couple small ones on the face of the insulator as the voltage was recovering from the first spark followed by a large one that went all the way across. Only the larger events seem to be captured by the GoPro.
Tuesday, December 15, 2020, 16:47
Finished holding at 60 kV to 20 minutes with no sparks other than the other two previously mentioned. Resuming voltage increases.
Tuesday, December 15, 2020, 17:02
61.5 kV. Small spark but not full breakdown, then a large spark that cut voltage to 0 V. Voltage dropped relatively slowly to about 48 kV. Lowered the voltage limit to 44 kV. During this entire time, 0.001 mA of current was being drawn. Carla started raising voltage while increasing the current limit as needed to reach the set voltage.
Tuesday, December 15, 2020, 17:44
Back at 60 kV and holding. Drawing 0.005 mA to 0.006 mA though. This is different from earlier when it was holding 60 kV with no current draw.
Tuesday, December 15, 2020, 19:02
Held 60 kV for an hour with current staying constant around 0.005 mA. Ramped down (first ramped down current to see effect) and then ramped down voltage. Shut off power supply.
|
Monday, December 14, 2020, 11:50, Alexander Shkuratoff, , , , , , , In progress, TM3 service tray prototype HV tests
|
Monday, December 14, 2020, 11:30
Switched off all breakers in HV cage. Started HV testing of TM3 prototype.
Monday, December 14, 2020, 12:58
Possible first spark at 18 kV.
Monday, December 14, 2020, 14:51
Nothing interesting since then, up to 33.5 kV now.
Monday, December 14, 2020, 14:56
Possible spark at 34.5 kV. 35.5 kV, 36.5, 37.5, 38.5, 39, 39.5, 40.5, 41, 41.5, 42.5, 43 (bigger current spike), 43.5, 44 (vacuum jumped for a bit), 44.5, 45 (voltage drop and vacuum jump).
Monday, December 14, 2020, 16:14
Holding at 45 kV for 10 minutes. Each of these previous "sparks" occurred just after raising voltage. Will decrease step size to 250 V from 500 V if these get more significant.
Monday, December 14, 2020, 16:19
45.5 kV. Went to observe possible spark while Carla raised voltage. Saw small flash towards bottom left, unsure of depth, but perhaps farther to the back.
46 kV. Sparking maybe in the same location. Carla reduced voltage.
Monday, December 14, 2020, 16:47
47 kV. Sort of unstable every time voltage is raised. Decreasing step size to 250 V.
Monday, December 14, 2020, 17:11
48.75 kV. Decreased current limit to 0.005 mA a couple steps previously to see effects. Seems like the current bumps at the start of each voltage raise have dropped from 0.010 mA to 0.005 mA. This seems to indicate that the current limiting is working and is controlled by EPICS. Pierre thinks the prototype must be pretty clean since the testing has been pretty smooth up to this point.
Monday, December 14, 2020, 17:29
49.75 kV. Heard what sounded like an air piston in the background and also saw a large drop in voltage. Voltage dropped in a similar manner a couple minutes after but without the sound. No effect on the vacuum though.
Monday, December 14, 2020, 17:45
50 kV. Held for 8 minutes and then a sound again occurred that sounded like some sort of pneumatic system; along with this a total drop in voltage, but no change in vacuum Otherwise completely stable. Will hold for another 10 minutes or so and ramp down.
Monday, December 14, 2020, 17:53
50 kV. Stable. Starting ramp down.
Monday, December 14, 2020, 18:11
Voltage ramped down. Vacuum has been at around 1.13e-6 Torr throughout this. Shut off power supply. Dumped data to TM3HVtest-20201214-Prototype_2, and earlier I dumped to TM3HVtest-20201214-Prototype. GoPro is taped to vacuum box window. |
Friday, December 11, 2020, 15:02, Carla Babcock, Sam McEwen, Aaron Schmidt, , , , , , , , Modifications to test stand for TM3 tests
|
Test piece installed with Sam, Aaron and Alexander. Ended up shimming the support stand (middle foot) since it seemed to be bowing a bit and distorting the gap between the containment box stand-in piece and the service tray piece. We should measure the gaps when testing is done with the same configuration. Installation was not too hard, installed the whole thing as one piece. Had to remove the middle foot on the long side to get it through the door but otherwise no problems.
Test stand re-wired for HV testing. Wire hooked up to test piece by pinching between two tubes. Verified GND and HV continuity. |
Tuesday, December 08, 2020, 11:54, Carla Babcock, , , , , , , , Modifications to test stand for TM3 tests
|
The copper tubes to be used in the TM3 test piece may have flux inside them from soldering the end caps on. There are holes along the length for outgassing, and we will try to bake them out in the test stand before installing them. There is still a dummy bake out target installed there, see the photo for how the tubes are loaded in. TGHT ramping started around 3pm.
I had to remove the grounding connections from the TGHT feedthroughs for this, so I redid them such that the tube is attached to the EZL. This target has no tube, so the connection between the tube and target is just through the 100Ohm resistor.
We must re-do the grounding before proceeding with HV tests.
Wednesday, December 09, 2020, 19:38 :
Target heater ramp down started. See attachment for vacuum progression during bake out. |
Friday, December 04, 2020, 13:39, Alexander Shkuratoff, , , , , , , Done, TM3 service tray prototype preparatory HV tests
|
Friday, December 04, 2020, 13:34
Vacuum is at 3.6e-6 Torr and possibly still dropping. Starting HV tests with just a tube and wire hanging down from the feedthrough. Turned on power supply and started raising voltage.
Friday, December 04, 2020, 15:13
Achieved 75 kV. No sparking at any point along the way. Vacuum is around 3.1e-6 Torr. Will hold for about 30 minutes to confirm.
Friday, December 04, 2020, 16:07
Held 75 kV for ~35 minutes. Ramped down and shut off power supply. Vacuum is at 2.7e-6 Torr. |
Friday, December 04, 2020, 08:53, Carla Babcock, , , , , , , , Modifications to test stand for TM3 tests
|
Friday, December 04, 2020, 08:52 :
Test stand roughed down to 29mT overnight. Started turbos for testing later. |
Thursday, December 03, 2020, 15:55, Carla Babcock, Alexander Shkuratoff, , , , , , , , Modifications to ISAC test stand for TM3 tests
|
Thursday, December 03, 2020, 15:54 :
Got sign off from John Chow to run the system, though the nylon insulator was not ready when he came by. But we went over everything together.
Installed blue nylon insulator with all vacuum surfaces cleaned at least with methanol. No NPT fitting or tube installed, just testing service cap.
Thursday, December 03, 2020, 17:31 :
Tested voltage on the blue nylon insulator up to 75kV, left it at 75 for ~30mins. No sparking, no current drawn except occasionally when changing voltage and only ~1uA then.
Cleaned (but not very well...) the NPT fitting, copper tube, alligator clip and section of copper wire and installed these in the vacuum chamber. Will pump down overnight for testing tomorrow.
See attached photos for insulator setup and wire inside vacuum chamber.
|
Wednesday, December 02, 2020, 08:32, Carla Babcock, , , , , , , , Modifications to test stand for TM3 tests
|
Wednesday, December 02, 2020, 08:31 :
Added copper wire connection to multipin screw terminals in HV cage to make sure they are grounded.
Attached grounding rod to back of HV cage. Not ideal, but couldn't find a better place without making a extension to the cable. Will see what John Chow says. EDIT: John says it is ok for the tests, not for permanent.
Vented test stand to swap window positions. Swapped rightmost window on the door with two windows with window on the door with only one window. Replaced one oring, that on the single window. Cleaned the inside surfaces of both windows with methanol before re-installing. Roughing down just to make sure there are no major issues, at 0.313T and falling. EDIT: down to 0.015T overnight.
All breakers on HV cage panel are OFF. |
Tuesday, December 01, 2020, 17:04, Carla Babcock, , , , , , , Problems/Solutions, Found another burned jumper cable
|
Between feedthroughs F (magnet coil) and B (tube heater negative), I found a jumper with two resistors that has been burned up. I am not sure when this happened, but it would be good to review the overall setup of the service cap wiring in the new year.
The cable connected to feedthrough Q where the multipin sits also looks burned. |
Tuesday, December 01, 2020, 11:56, Carla Babcock, , , , , , , In progress, Modifications to test stand for TM3 tests
|
Tuesday, December 01, 2020, 11:56 :
TSG:BIAS unplugged and controls pigtail (made by Ray) added in order to connect controls cable to TCS:BIAS, which is now installed in the same rack.
Basic controls testing done without turning on the power supply, controls max values scaled to 75kV, 5mA.
In process of grounding all features inside the faraday cage. New grounding will be marked with a label for easy identification later.
NOTE: we should get together in January to discuss test stand wiring, since I discovered another burned up connection (see next elog entry, #823).
Tuesday, December 01, 2020, 16:47 :
Grounding of all feedthroughs on the service cap complete and continuity checked.
Removed gas line with Fernando's approval, to make more space for our feedthrough.
Awaiting nylon insulator to proceed. |
Monday, November 23, 2020, 10:03, Aaron Schmidt, , , , , , , Problems/Solutions, RP2 Check / pump down issue
|
TMSRP2 has been struggling since the power bump occurred Nov 18, 2020
Monday, November 23, 2020, 09:48: Open TMS:PV2.
Monday, November 23, 2020, 09:51: Close TMS:PV2. CG2B @ 0.515T.
Monday, November 23, 2020, 09:52: TMS:RP2 off.
After disconnecting the backing line to RP2, a lot of water poured out of the line. May have back tracked from the vapour off of RP1 and the leaks on the chamber side. Both are on the same line.
Monday, November 23, 2020, 13:06: TMS:RP2 swapped w/ old Tri-Scroll pump. RP2 on.
Monday, November 23, 2020, 13:23: TMS:TP6 & TMS:TP2 on.
Monday, November 23, 2020, 13:29: Switch over FL1 to FL2 on IG6 Filament. IG6 on.
Monday, November 30, 2020, 10:12: CG2B @ 0.131T. TP6 & TP2 off. IG6 off. Close PV2 & shut off RP2.
Monday, November 30, 2020, 10:31: RP2 large Tri-scroll pump swapped back out for the small Varian RP.
Monday, November 30, 2020, 10:32: RP2 on.
Monday, December 07, 2020, 11:06: Turbo pump TP6 on.
Monday, December 07, 2020, 11:11: Turbo pump TP6 up to speed. TP2 on.
Monday, December 07, 2020, 11:14: IG6 on. |
Tuesday, November 10, 2020, 12:13, Aaron Schmidt, , , , , 43044-13, 44378-1, In progress, Pump down empty chamber / Leak.
|
U-Loop installed on FS#5
Tuesday, November 10, 2020, 12:13: Roughing.
Tuesday, November 10, 2020, 12:57: TP1B on
TS Tripped Thursday am. Leak noted Thursday am remotely. Control room noted water in the chamber.
Friday, November 13, 2020, 06:40: Confirmed. Cleanup
Friday, November 13, 2020, 08:30: FS#4 TBHT (A). Visible water dripping out from the water block. Line (A) removed.
Friday, November 13, 2020, 10:25 Set up Fan. Clean.
Removed, cleaned & leak checked (A) & (B).
(A) leaks at seat and solder
(B) OK.
Closed ballast on RP1. Lines stable.
Friday, November 13, 2020, 12:51: TS chamber to continue to air dry over the weekend.
Monday, November 16, 2020, 09:00: TBHT (B) line is installed. (A) blanked off. Roughing BV1A open.
Monday, November 16, 2020, 09:07: BV1B opened.
Monday, November 16, 2020, 11:41: Vacuum @ 1.965T. Open RP1 ballast. W/ Filter cap
Monday, November 16, 2020, 11:49: Vacuum @ 1.170 and dropping.
Wednesday, November 18, 2020, 10:16: Vacuum At 0.201T. Venting.
TBHT line (A) repaired and leak checked. Installed in TS. HS w/ horizontal tube oven installed for out gassing.
HS: 44378-1 (SIS Config)
Oven: 43044-13
Wednesday, November 18, 2020, 14:02: Roughing.
Wednesday, November 18, 2020, 14:45: TP1B on.
Wednesday, November 18, 2020, 15:54: TP1A on.
Wednesday, November 18, 2020, 16:03: IG1 on.
Wednesday, November 18, 2020, 19:05: Power bump shut down TS. Controls in whiteout. Restart attempt
Wednesday, November 18, 2020, 19:29: TP1B on.
Wednesday, November 18, 2020, 20:22: TP1A on.
Wednesday, November 18, 2020, 20:31: IG1 on
Thursday, November 19, 2020, 11:57: Vacuum @ 3.32e-06T.
Thursday, November 19, 2020, 11:58: Opened FS#2, FS#3 & FS#5. Vacuum ok
Thursday, November 19, 2020, 12:01: Opened FS#4..
Thursday, November 19, 2020, 12:03: Vacuum ok @ 3.32e-06T.
Thursday, November 19, 2020, 12:07: Power / sources on.
Thursday, November 19, 2020, 12:08: Restarted IOC/PLC.
Thursday, November 19, 2020, 12:13: Auto-ramping TGHT to 200 A @ 1 A per min.
Thursday, November 19, 2020, 15:58: Auto-ramping TGHT to 350 A @ 1 A per min.
Thursday, November 19, 2020, 17:35: Bypass TMS:PV1 open/close. leave as is. remove Bypasses.
Friday, November 20, 2020, 07:35: Auto-ramping TGHT to 580 A @ 1 A per min.
Saturday, November 21, 2020, 12:32: Check. Vacuum @ 4.13e-06T . TGHT @ 494 A.
Monday, November 23, 2020, 09:53: Check. Vacuum @ 2.97e-06T . TGHT @ 580 A.
On the beamline side:
https://elog.triumf.ca/TIS/Test-Stand/821
Monday, November 23, 2020, 14:03: Check. Vacuum @ 2.73e-06T . TGHT @ 580 A.
Tuesday, November 24, 2020, 12:58: Auto-cooling @ 0.5 A per min.
Wednesday, November 25, 2020, 09:30: Sources/power off. IG1 & Turbo pumps off. |
Friday, November 06, 2020, 12:53, Aaron Schmidt, Nb#9, LP-SIS, ITW, TM2, 44508-2, 43515-4, In progress, Conditioning Nb#9 w/ P/S Target & Bracket 7x
|
Attached end plate parasitic / symbiotic target & PEEK assembly bracket.
Friday, November 06, 2020, 12:24: Roughing.
Friday, November 06, 2020, 12:53: TP1B on.
Friday, November 06, 2020, 13:05: TP1A on.
Friday, November 06, 2020, 13:16: IG1 on.
Monday, November 09, 2020, 06:26: Vacuum @ 1.25e-06T.
Monday, November 09, 2020, 06:28: HS waterline opened. Vacuum ok @ 1.25e-06T.
Monday, November 09, 2020, 06:36: Power/sources on.
Monday, November 09, 2020, 06:39: Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.96 |
5.15 |
TBHT |
23.78 |
8.02
|
COIL + EE |
23.67 |
2.39 |
TGHT |
23.77 |
6.19 |
Monday, November 09, 2020, 06:4: Optics on.
Monday, November 09, 2020, 08:10: IV4 open.
Monday, November 09, 2020, 08:15: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, November 09, 2020, 08:19: Wire & Mass scans @ 350 / 150 A. Ok.
Monday, November 09, 2020, 08:27: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, November 09, 2020, 11:40: Mass & wire scans complete.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.27 |
7.12 |
TBHT |
24.88 |
9.73
|
COIL + EE |
24.65 |
3.26 |
TGHT |
24.88 |
7.05 |
Monday, November 09, 2020, 13:46: E-rig PS off.
Tuesday, November 10, 2020, 04:47: Auto-cooling @ 2A per min.
Tuesday, November 10, 2020, 06:21: HV @ 0 V.
Tuesday, November 10, 2020, 06:58: TBHT @ 0 A. TGHT @ 317 A. Auto-cooling @ 3A per min.
Tuesday, November 10, 2020, 09:06: IV4 Close. Sources off.
Tuesday, November 10, 2020, 09:07: IG1, power, & Turbo pumps off.
Tuesday, November 10, 2020, 10:15: Waterline purged. Venting. |
Monday, November 02, 2020, 08:52, Aaron Schmidt, , , , , , , Problems/Solutions, Leak check / Troubleshoot
|
Monday, November 02, 2020, 08:46:
Large Vacuum spike noted 5:30 approx. Tripped TS. On tail end of the Nb#9 conditioning run. HV & heating were completed last week
Monday, November 02, 2020, 08:47: Vacuum @ 2.66e-06T.
Monday, November 02, 2020, 08:50: Closed and purged all the TS waterlines. Vacuum dropped to 1.31e-06T and continues to drop.
Monday, November 02, 2020, 08:59: Vacuum @ 1.05-06T.
Monday, November 02, 2020, 09:00: FS#5 opened. No response on vacuum.
Monday, November 02, 2020, 09:05: Vacuum @ 1.05e-06T.
Monday, November 02, 2020, 09:07: FS#2 opened. No response on vacuum.
Monday, November 02, 2020, 09:12: Vacuum @ 9.98e-07T.
Monday, November 02, 2020, 09:13: Opened FS#3. No response on vacuum.
Monday, November 02, 2020, 09:19: Vacuum @ 9.96e-07T.
Monday, November 02, 2020, 09:21: Opened FS#4. Immediate vacuum spike noticed. 1.69e-06T and climbing.
Monday, November 02, 2020, 09:26: Closed & purged all the waterlines. Vacuum dropped back down to 9.97e-07T.
Monday, November 02, 2020, 09:27: IG1 off. Turbo pumps off.
Tuesday, November 03, 2020, 10:10: Indium gasket on FS#4 checked w/ sniffer / LD w/ He. ok.
Tuesday, November 03, 2020, 10:30: 120 PSI on line FS#4 feed through (A) Center - TBHT. 0.0E-07 atm-cc/sec.
Tuesday, November 03, 2020, 10:45: LD @ 0.0E-07 atm-cc/sec. Purge the line.
Tuesday, November 03, 2020, 10:51: 120 PSI on line FS#4 feed through (B) Sides - TBHT. 0.0E-07 atm-cc/sec.
Tuesday, November 03, 2020, 11:08: LD @ 0.0E-07 atm-cc/sec. Purge the line.
Tuesday, November 03, 2020, 11:12: 120 PSI on line FS#4 feed through (A) Center - TBHT. 0.0E-07 atm-cc/sec.
Tuesday, November 03, 2020, 11:20: Purge lines. Leak not found w/ LD-Sniffer.
Tuesday, November 03, 2020, 11:30: Roughing.
Tuesday, November 03, 2020, 12:24: TP1B on.
Tuesday, November 03, 2020, 13:04: TP1A & IG1 on.
Tuesday, November 03, 2020, 14:26: LD: 0.0E-09 atm-cc/sec. Vacuum @ 1.75e-05T
Tuesday, November 03, 2020, 14:26: Open to the chamber. LD: 2.6E-07 atm-cc/sec. Vacuum @ 1.66e-05T.
Tuesday, November 03, 2020, 14:29: Purged FS#4 w/ HPA.
Tuesday, November 03, 2020, 14:33: LD: 2.5E-07 atm-cc/sec. Vacuum @ 1.59e-05T.
Tuesday, November 03, 2020, 14:38: Connect 120 PSI on line FS#4 feed through (A) Center - TBHT. LD: 2.3E-07 atm-cc/sec. Vacuum @ 1.59e-05T.
Tuesday, November 03, 2020, 14:58: LD: 2.1E-07 atm-cc/sec. Vacuum @ 1.40e-05T. Purge line.
Tuesday, November 03, 2020, 15:02: Connect 120 PSI on line FS#4 feed through (B) Sides - TBHT. 2.2E-07 atm-cc/sec. Vacuum @ 1.31e-05T.
Tuesday, November 03, 2020, 15:22: LD: 2.7E-07 atm-cc/sec. Vacuum @ 1.24e-05T. Purge line.
Tuesday, November 03, 2020, 15:27: Disconnected LD. Disconnected HE. Purged FS#4 w/ HPA. Test again in the morning. FS#4 - B appears to be the source of the leak.
Wednesday, November 04, 2020, 08:35: LD: 0.0E-09 atm-cc/sec. Vacuum @ 2.40e-06T
Wednesday, November 04, 2020, 08:37: Open to the chamber. LD: 1.8E-08 atm-cc/sec. Vacuum @ 2.40e-06T.
Wednesday, November 04, 2020, 08:41: Connect 120 PSI on line FS#4 feed through (A) Center - TBHT. LD: 1.4E-08 atm-cc/sec. Vacuum @ 2.40e-06T.
Wednesday, November 04, 2020, 08:46: LD: 1.4E-08 atm-cc/sec. Vacuum @ 2.40e-06T.
Wednesday, November 04, 2020, 08:51: Connect 120 PSI on line FS#4 feed through (B) Sides - TBHT. 1.5E-08 atm-cc/sec. Vacuum @ 2.40e-06T.
Wednesday, November 04, 2020, 09:01: LD: 3.0E-08 atm-cc/sec. Vacuum @ 2.31e-06T.
Wednesday, November 04, 2020, 09:07: Disconnected LD. Flushed lines w/ HPA. Vacuum @ 2.31e-06T.
Wednesday, November 04, 2020, 09:10: Open FS#2 & FS#3. Vacuum @ 2.33e-06T. Ok.
Wednesday, November 04, 2020, 09:11: Opened FS#4. Vacuum @ 2.42e-06T.
Wednesday, November 04, 2020, 09:18: Vacuum @ 2.42e-06T.
Wednesday, November 04, 2020, 09:19: IG1 & turbo pumps off. Purge waterlines.
Wednesday, November 04, 2020, 10:28: Venting.
Opened / inspected water block (B) and the line. ok. Swap out O-rings w/ new ones w/ vacuum grease.
Wednesday, November 04, 2020, 12:06: Roughing.
Wednesday, November 04, 2020, 12:57: TP1B on.
Wednesday, November 04, 2020, 13:06: TP1A on.
Wednesday, November 04, 2020, 13:16: IG1 on.
Wednesday, November 04, 2020, 15:54: Vacuum @ 4.37e-06T.
Wednesday, November 04, 2020, 15:56: Opened FS#2 & FS#3. Vacuum @ 4.29e-06T. OK.
Wednesday, November 04, 2020, 15:59: Opened FS#4. Vacuum @ 4.29e-06T.
Wednesday, November 04, 2020, 16:12: Vacuum @ 4.02e-06T & dropping.
Friday, November 06, 2020, 06:02: Vacuum @ 1.34e-06T ok. IG1 off. Turbo pumps off.
|
Tuesday, October 27, 2020, 08:54, Aaron Schmidt, Nb#9 , LP-SIS, ITW, TM2, 44508-2, 43515-4, In progress, Nb#9 Conditioning
|
Tuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13: TP1B on.
Tuesday, October 27, 2020, 10:13: TP1A on.
Tuesday, October 27, 2020, 12:59: Vacuum @ 4.55e-06T
Tuesday, October 27, 2020, 13:01: Waterlines opened. Vacuum @ 4.26e-06T.
Tuesday, October 27, 2020, 13:03: Power / sources on.
Tuesday, October 27, 2020, 13:05: Optics on. IV4 open. TGHT / TBHT check ok.
Wednesday, October 28, 2020, 04:30: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Wednesday, October 28, 2020, 06:30:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.66 |
5.67 |
TBHT |
26.51 |
8.40
|
COIL + EE |
26.43 |
2.59 |
TGHT |
26.52 |
6.44 |
Wednesday, October 28, 2020, 06:42: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, October 28, 2020, 07:33: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Wednesday, October 28, 2020, 13:03:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.25 |
6.62 |
TBHT |
26.90 |
9.27 |
COIL + EE |
26.68 |
3.08 |
TGHT |
26.88 |
6.85 |
Thursday, October 29, 2020, 15:19: HV to 0 kV. Begin auto-cooling @ 1 A per min.
Large Vacuum spike noted 5:30 approx. Tripped TS.
Monday, November 02, 2020, 08:32: Vacuum @ 2.65e-06T. PS/optics off (Sources already tripped)
Monday, November 02, 2020, 08:33: IV4 closed.
https://elog.triumf.ca/TIS/Test-Stand/818 - Leak Checks (FS#4 confirmed)
Monday, November 02, 2020, 09:27: IG1 off. Turbo pumps off.
Monday, November 02, 2020, 10:38: Venting. |
Friday, October 16, 2020, 11:33, Aaron Schmidt, Ta#61, LP-SIS, ITE, TM4, 44508-1, 43515-1, In progress, Conditioning Ta#61
|
Friday, October 16, 2020, 11:11: Roughing.
Friday, October 16, 2020, 11:39: TP1B on.
Friday, October 16, 2020, 12:29: TP1A on.
Monday, October 19, 2020, 07:59: Waterlines opened. Vacuum ok @ 6.20e-07T
Monday, October 19, 2020, 08:01: Power / Sources on.
Monday, October 19, 2020, 08:02: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Monday, October 19, 2020, 08:03: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.43 |
5.86 |
TBHT |
23.34 |
8.52
|
COIL + EE |
23.36 |
2.65 |
TGHT |
23.27 |
6.45 |
Monday, October 19, 2020, 08:09: Optics on / set.
Monday, October 19, 2020, 08:16: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, October 19, 2020, 12:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, October 19, 2020, 15:50: Initial wire scans were good. MB1 requires a polarity reversal
Monday, October 19, 2020, 16:00: Auto-cooling TGHT / TBHT to 300 / 10 A @ 1 A per min. Stop manually.
Monday, October 19, 2020, 18:11: TBHT @ 100 A halt. Auto-cooling TGHT to 300 @ 1 A per min. Stop manually.
Monday, October 19, 2020, 19:16: TGHT @ 300 A halt.
Tuesday, October 20, 2020, 06:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, October 20, 2020, 09:30: HV off. IV4 closed. Switching MB1 polarity.
Tuesday, October 20, 2020, 13:30: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. MB1 on
Tuesday, October 20, 2020, 14:10: Mass scans working
Tuesday, October 20, 2020, 14:17:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.64 |
5.87 |
TBHT |
24.29 |
8.76
|
COIL + EE |
24.07 |
2.71 |
TGHT |
24.25 |
6.54 |
Tuesday, October 20, 2020, 15:15: IV4 opened.
Thursday, October 22, 2020, 11:35: HV to 0 kV.
Thursday, October 22, 2020, 11:36: Auto-cooling @ 1 A per min.
Monday, October 26, 2020, 11:40: IV4 closed / reset
Monday, October 26, 2020, 11:41: PS off.
Monday, October 26, 2020, 11:42: IG1 / Turbo pumps off. Purging waterlines.
Monday, October 26, 2020, 13:00: Venting. |
Tuesday, October 13, 2020, 12:34, Aaron Schmidt, , HP-FEBIAD, , , 38295-8, 42752-5, In progress, MB1 Check.
|
He & Ar calibrated leak bottles in.
Tuesday, October 13, 2020, 12:33: Roughing.
Tuesday, October 13, 2020, 13:17: TP1B on.
Tuesday, October 13, 2020, 14:19: TP1A on.
Tuesday, October 13, 2020, 15:44: Waterlines opened. Vacuum @ 9.58e-06T & dropping. Power on.
Tuesday, October 13, 2020, 15:49: Valve to Mini-pump was open & the pump happened to already be switched on.
Tuesday, October 13, 2020, 15:50: Open SV3 & SV4.
Tuesday, October 13, 2020, 15:55: Close mini-pump & switch off. SV3 & SV4. Briefly open/close SV5. Continue until vacuum stabilizes.
Tuesday, October 13, 2020, 15:59: SV5 open. Alt SV3 & SV4 w/ SV5 until stable.
Tuesday, October 13, 2020, 16:04: Gas lines SV3, SV4, SV5 open. Vacuum @ 9.96e-06T & dropping.
Tuesday, October 13, 2020, 22:30: PS on. Vacuum @ 2.13e-06T. Auto-ramping TGHT / TBHT to 300 / 150 A @ 1 A per min.
Tuesday, October 13, 2020, 22:33: Anode* Short? Halt auto-ramping.
Tuesday, October 13, 2020, 22:35: Auto-ramping TGHT / TBHT to 100 / 50 A @ 1 A per min. Coil @ 10 A.
Wednesday, October 14, 2020, 05:19: Auto-ramping TGHT / TBHT to 300 / 150 A @ 1 A per min.
Wednesday, October 14, 2020, 07:14: BIAS / EE / EZL to 20 / -1.5 / 10 kV. IV4 opened.
Wednesday, October 14, 2020, 10:30: Auto-ramping TGHT to 350 A @ 2 A per min.
Wednesday, October 14, 2020, 11:11: BIAS / EE / EZL to 30 / -1.5 / 13 kV.
Wednesday, October 14, 2020, 11:12: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, October 15, 2020, 14:13: MB1 connected.
Epics = Readback
10 A = 11.6 A
0.394 V = 0.39 V
Calibration required, but it's running.
Thursday, October 15, 2020, 14:33: Auto-Cooling. Tap down HV.
Thursday, October 15, 2020, 14:36: Gas lines closed.
Friday, October 16, 2020, 07:55: Power / sources off. IG1 off. Turbo pumps off.
Friday, October 16, 2020, 07:56: HS Waterlines purged.
Friday, October 16, 2020, 10:07: Venting. |
Wednesday, September 30, 2020, 06:23, Aaron Schmidt, C#2, LP-SIS, ITW, TM2, 44139-9, 43515-2, In progress, Conditioning C#2
|
Wednesday, September 30, 2020, 06:14: Power / sources on.
Wednesday, September 30, 2020, 06:17: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Wednesday, September 30, 2020, 06:22: Optics set (minus MB1).
Wednesday, September 30, 2020, 07:11: Pair of gradual vacuum spikes noticed. Up to 3.5e-06T & 2.6e-06T, then back down to 2.3e-06T.
Wednesday, September 30, 2020, 07:59: Auto-ramping TGHT / TBHT to 450 / 200 A @ 3 A per min.
Wednesday, September 30, 2020, 08:04: Abort auto-ramping. BIAS @ 10 kV. EZL Appears to have a short. EE up to -1.5 kV ok.
Wednesday, September 30, 2020, 08:11: BIAS back to 0 kV. Auto cooling @ 4A per min.
Wednesday, September 30, 2020, 09:21: Tap down TGHT to 0 from 40 A.
Wednesday, September 30, 2020, 09:22: Power/sources off.
Wednesday, September 30, 2020, 09:23: IG1 & Turbo pumps off.
Wednesday, September 30, 2020, 10:48: Venting.
Wednesday, September 30, 2020, 11:31: Wire found touching on EZL to chamber. Bypassed interlocks. EZL on. 200 V ok 500 V ok. Back to 0V.
Wednesday, September 30, 2020, 11:33: Bypasses removed.
Wednesday, September 30, 2020, 11:37: Roughing.
Wednesday, September 30, 2020, 12:22: Turbo pumps on.
Wednesday, September 30, 2020, 16:41: TGHT / TBHT to 10 / 10 A manually. BIAS / EE / EZL @ 1 / 0.1 / 1 kV. No shorts. Vacuum @ 2.60e-06T.
Wednesday, September 30, 2020, 16:47: HV & Heaters tapped back to 0 A & 0 kV.
Thursday, October 01, 2020, 05:27: Auto-ramping TGHT / TBHT to 150 / 75 A @ 3 A per min.
Thursday, October 01, 2020, 07:04: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Thursday, October 01, 2020, 07:29: Optics on. (MB1 Still interlocked but connected now)
Thursday, October 01, 2020, 07:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV
Thursday, October 01, 2020, 07:39: IV4 open.
Thursday, October 01, 2020, 07:55: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, October 01, 2020, 08:34: Voltage drops on BIAS. Auto ramping halted.
Thursday, October 01, 2020, 08:37: BIAS / EE / EZL @ 15 / -1.0 / 8.5 kV.
Thursday, October 01, 2020, 10:04: Auto-ramping TGHT / TBHT to 450 / 230 A @ 1 A per min.
Thursday, October 01, 2020, 11:13: Auto-ramping TGHT / TBHT to 580 / 230 A @ 1 A per min.
Thursday, October 01, 2020, 14:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. BIAS instability ongoing. although less than before. Initial RPM0A & RPM0B wire scans ok. MB1 Still interlocked.
Thursday, October 01, 2020, 14:42: BIAS current limit increased to 0.150 mA
Thursday, October 01, 2020, 16:24: BIAS / EE / EZL @ 20 / -1.5 / 6.5 kV.
Friday, October 02, 2020, 09:55: BIAS / EE / EZL @ 25 / -1.5 / 10 kV.
Friday, October 02, 2020, 10:43: Spark* Tripped Optics, IV4 & TP1A. Optics reset. Trouble on IV4 & TP1A
Friday, October 02, 2020, 10:58: IV4 reset. TP1A not back yet.
Friday, October 02, 2020, 11:22: TP1A reset and on.
Friday, October 02, 2020, 12:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Friday, October 02, 2020, 13:58: HV to 0 kV
Friday, October 02, 2020, 14:00: Auto-Cooling @ 1 A per min.
Tuesday, October 13, 2020, 08:07: Power / sources off. HS Waterlines purged.
Tuesday, October 13, 2020, 08:09: IG1 off. Turbo pumps off.
Tuesday, October 13, 2020, 10:31: Venting. |
Tuesday, September 29, 2020, 11:56, Aaron Schmidt, , LP-SIS, , , , , Problems/Solutions, Leak check 3.0
|
Installed Indium gasket on FS#2 - (C) water block / R- TGHT.
Tuesday, September 29, 2020, 11:23: Pressurize to 120 PSI at atmosphere.
LD: 0.0E-07 atm-CC/sec
Tuesday, September 29, 2020, 11:30: LD: 0.0E-07 atm-CC/sec checked & held on gasket / water block (C) for min minutes. No LD response.
Tuesday, September 29, 2020, 11:56: Roughing.
Tuesday, September 29, 2020, 12:28: TP1B on.
Tuesday, September 29, 2020, 13:10: TP1A on. IG1 on.
Tuesday, September 29, 2020, 16:10: Vacuum @ 8.66e-06T.
Tuesday, September 29, 2020, 16:13: FS#2 opened. Vacuum @ 8.48e-06T.
Tuesday, September 29, 2020, 16:23: Opened FS#5. Vacuum ok
Tuesday, September 29, 2020, 16:25: Opened FS#4. Vacuum ok
Tuesday, September 29, 2020, 16:27: Opened FS#3 Vacuum ok @ 8.13e-06T.
|
Thursday, September 03, 2020, 11:28, Aaron Schmidt, -, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Leak check 2.0
|
Out Gas & MB1 check (Or leak check 2.0)
Ref: https://elog.triumf.ca/TIS/Test-Stand/809 - Leak Checks
Ref: https://elog.triumf.ca/TIS/Test-Stand/803 - Fault
WP I2020-08-19-1 For MB1 work
Thursday, September 03, 2020, 11:23: Vacuum remains stable @ 1.03e-06T.. PS on. Auto-ramp TGHT / TBHT to 350 / 150 A @ 2 A per min.
Thursday, September 03, 2020, 13:06: TS Tripped. Vacuum Spikes again. Appears the water leak is still ongoing.
Thursday, September 03, 2020, 13:49 Waterlines are all close. Vacuum becoming more stable.
Tuesday, September 08, 2020, 07:40: Ion Gauge & turbo pumps off.
Wednesday, September 09, 2020, 06:13: Venting.
FS#2 - R TGHT (C) feed through and section had been removed and re-souldered both on the water block and the feed through.
Tuesday, September 15, 2020, 09:47: Roughing.
Tuesday, September 15, 2020, 10:47: TP1B on.
Tuesday, September 15, 2020, 14:35 :TP1A on.
Tuesday, September 15, 2020, 14:42 : IG1 on.
Wednesday, September 16, 2020, 07:44: Vacuum @ 6.00e-06T.
Wednesday, September 16, 2020, 07:47: FS#2 waterline opened. Vacuum stable @ 6.00e-06T.
Wednesday, September 16, 2020, 08:02: Vacuum @ 5.97e-06T. Vacuum stable.
Wednesday, September 16, 2020, 08:03: FS#3 open. Vacuum stable.
Wednesday, September 16, 2020, 08:09: FS#4 open. Vacuum stable.
Wednesday, September 16, 2020, 08:24: FS#5 open. Vacuum stable @ 5.91e-06T.
No vacuum spikes noted.
Wednesday, September 16, 2020, 08:42: PS on. Note: Once Vacuum reaches 3.5e-06T, begin auto-ramping.
Wednesday, September 16, 2020, 09:25: It appears the leak is still here. But very subtle. Vacuum @ 6.18e-06T. Many curse words uttered. PS off. Locked out. Purge waterlines.
Thursday, September 17, 2020, 08:21: Vacuum @ 3.32e-06T.
Thursday, September 17, 2020, 08:23: Opened FS#5.
Thursday, September 17, 2020, 08:55: Opened FS#4. Vacuum @ 3.12e-06T.
Thursday, September 17, 2020, 09:51: Opened FS#3. Vacuum @ 3.12e-06T
Thursday, September 17, 2020, 10:21: Opened FS#2 Vacuum @ 3.12e-06T.
Thursday, September 17, 2020, 10:52: Gradual climb on IG1. Vacuum @ 4.44e-06T.
Thursday, September 17, 2020, 10:53: IG1 & turbo pumps off. Purge water from FS#2.
Thursday, September 17, 2020, 11:37: Venting.
Checked: Upper line & Lower line independently. No obvious leak detected. Checked O-rings. Replaced w/ C-Seals.
Thursday, September 17, 2020, 13:31: Roughing.
Thursday, September 17, 2020, 14:06: TP1B on.
Thursday, September 17, 2020, 19:11: TP1A on.
Friday, September 18, 2020, 12:07: FS#2 opened. Vacuum @ 2.48e-06T
Friday, September 18, 2020, 12:12: FS#2 Closed. Vacuum spiked to near 6.0e-05T.
Friday, September 18, 2020, 12:15: FS#2 fully purged.
Tuesday, September 22, 2020, 06:51: Ion gauge & Turbo pumps off.
Tuesday, September 22, 2020, 08:10: Venting.
O-rings swapped for fresh new ones w/ vacuum grease on (C) & (D) water blocks.
Tuesday, September 22, 2020, 09:27: Roughing.
Tuesday, September 22, 2020, 10:10: TP1B on.
Tuesday, September 22, 2020, 12:20: TP1A on.
Tuesday, September 22, 2020, 15:02: Vacuum @ 2.97e-06T.
Tuesday, September 22, 2020, 15:05: Opened FS#2. No immediate response.
Tuesday, September 22, 2020, 15:13: Gradual vacuum spike to 2.6e-06T. Closed FS#2
Wednesday, September 23, 2020, 06:36: Ion gauge & turbo pumps off.
Wednesday, September 23, 2020, 11:38: TP1B on only. IG1 on.
Wednesday, September 23, 2020, 15:37: LD: 0.0e-09 atm-cc/sec. Vacuum @3.9e-06T.
Wednesday, September 23, 2020, 15:38: Open valve to TP1B.
Wednesday, September 23, 2020, 15:41:
LD: 0.0e-09 atm-cc/sec. Vacuum @3.67e-06T.
Wednesday, September 23, 2020, 15:51: LD: 0.0e-09 atm-cc/sec. Vacuum @3.67e-06T. No response on LD.
Wednesday, September 23, 2020, 15:57: 70 PSI of He on line (C) TGHT Right side. LD: 0.0e-09 atm-cc/sec. Vacuum @3.73e-06T. Flush line
Wednesday, September 23, 2020, 15:59: LD: 1.7e-09 atm-cc/sec. & Rising.
Wednesday, September 23, 2020, 16:00: LD: 4.1e-09 atm-cc/sec & rising. Line (C) confirmed again.
Wednesday, September 23, 2020, 16:04: LD & He disconnected. IG1 & TP1B off. Remove (C) Right TGHT line in the morning. Will aim to replace the source tray side. Feed through side has already been done.
Thursday, September 24, 2020, 07:16: Venting.
Remove FEBIAD & Source tray side R-TGHT line (C) from FS#2. Blank off with blind double block.
Thursday, September 24, 2020, 08:41: Roughing
Thursday, September 24, 2020, 09:12: TP1B on.
Thursday, September 24, 2020, 09:18: Ion gauge on.
Thursday, September 24, 2020, 10:17: TP1A on.
Thursday, September 24, 2020, 14:20: Connect LD & Set-up He. Vacuum @ 2.92e-06T. LD: 0.0e-09 atm-cc/sec.
Thursday, September 24, 2020, 14:22: Open valve to TP1B.
Thursday, September 24, 2020, 14:24: Vacuum @ 2.95e-06T. LD: 2.2e-08 atm-cc/sec. 70 PSI of He on line (C) TGHT Return side.
Thursday, September 24, 2020, 14:30: Vacuum @ 2.74e-06T. LD: 1.5e-08 atm-cc/sec.
Minimal change.
Tuesday, September 29, 2020, 04:50: IG1 off. Turbo pumps off. |
Tuesday, September 01, 2020, 14:01, Aaron Schmidt, , , , , , , Done, New tubing installed on loops
|
Tuesday, September 01, 2020, 14:00:
New tubing installed.
Blue on FS#4 loop (A)(B)
Yellow on FS#2 Loop (C)(D) |
Tuesday, August 25, 2020, 07:23, Aaron Schmidt, , , , , , , Problems/Solutions, Beam line side vacuum trip
|
Tuesday, August 25, 2020, 07:07: Beam line side of the TS appears to have tripped? Open BV6 & BV2.
Tuesday, August 25, 2020, 07:15: Beam line side TP6 & TP2 on.
Tuesday, August 25, 2020, 07:16: Venting Chamber side
Trip appears to have occurred at 6am on Saturday.
Contacted MCR. Power bump occurred.
|
Wednesday, August 19, 2020, 08:52, Aaron Schmidt, , , , , , , , Leak check / Troubleshoot
|
Wednesday, August 19, 2020, 08:52: Purging all lines, except FS#5, It was already purged / closed.
Wednesday, August 19, 2020, 11:24: Vacuum @ 1.76e-06T.
Wednesday, August 19, 2020, 11:29: FS#2 opened. Observable vacuum spike noted. vacuum @ 2.2e-06T. Purge & Close.
Wednesday, August 19, 2020, 11:34: Vacuum @ 1.76e-06T.
Wednesday, August 19, 2020, 11:36: FS#3 opened. Vacuum @ 1.74e-06T.
Wednesday, August 19, 2020, 11:44: Vacuum @ 1.67e-06T.
Wednesday, August 19, 2020, 11:47: FS#4 opened. Vacuum @ 1.65e-06T
Wednesday, August 19, 2020, 11:51: No spike observed
Wednesday, August 19, 2020, 11:52: Turbo Pumps off. To vent for Leak check w/ LD & He.
Thursday, August 20, 2020, 11:26: Blanked off & connected feed through (C) & (D) individually. Both to 120 PSI individually w/ He. No leak detected.
Thursday, August 20, 2020, 11:35: Roughing.
Thursday, August 20, 2020, 13:00: TP1B started.
Thursday, August 20, 2020, 13:09: Before opening back valve w/ LD:
LD: 0.0e-09 atm-cc/sec
Thursday, August 20, 2020, 13:10: Opened valve.
LD: 2.2e-07 atm-cc/sec & Dropping. Likely left over from the lines initial tests. Vacuum @ 3.2e-04T & dropping.
Thursday, August 20, 2020, 13:17: 120 PSI of He on line (D) TGHT left side.
LD: 1.3e-07 atm-cc/sec & Dropping. Vacuum @ 2.09e-04T & dropping.
Thursday, August 20, 2020, 13:27: LD: 1.0e-07 atm-cc/sec & Dropping. Vacuum @ 1.27e-04T & dropping. Disconnect He up top.
Thursday, August 20, 2020, 13:40: LD: 1.2e-07 atm-cc/sec. Vacuum @ 9.95e-05T & dropping. Connected He up top to line (C) TGHT right side.
Thursday, August 20, 2020, 13:43: 120 PSI on line. Spike occurring on TSG CG1A & TSG:CG1 B.
Thursday, August 20, 2020, 13:53: LD: 2.0e-07 atm-cc/sec. Vacuum @ 7.57e-05T & dropping. Gradual increase on leak rate for line (C)
Tuesday, August 25, 2020, 07:07: Beam line side of the TS tripped? Open BV6 & BV2.
Tuesday, August 25, 2020, 07:15: Beam line side TP6 & TP2 on.
Tuesday, August 25, 2020, 07:16: Venting Chamber side
Tuesday, August 25, 2020, 15:39: Aluminum water loop block installed. Roughing.
Tuesday, August 25, 2020, 19:11: Turbo pumps TP1A & TP1B on.
Tuesday, August 25, 2020, 19:13: TP1A off to avoid a trip.
Tuesday, August 25, 2020, 19:50: TP1A on. BV1A Bypass on
Tuesday, August 25, 2020, 19:58: Ion gauge on.
Wednesday, August 26, 2020, 06:15: BV1A Bypass off.
Multiple checks done on right TGHT (C) in the cold lab. Inconclusive leak detection
Reconnect He & LD to TS. TGHT (C) with Loop block in place.
Thursday, August 27, 2020, 08:09: Vacuum @ 1.49e-06T
Thursday, August 27, 2020, 08:11: Before opening back valve w/ LD:
LD: 0.0e-09 atm-cc/sec
Thursday, August 27, 2020, 08:13: Opened valve behind TP1B.
Thursday, August 27, 2020, 08:16:
LD: 0.0e-09 atm-cc/sec. Vacuum @ 1.49e-06T.
Thursday, August 27, 2020, 08:18: 120 PSI of He on line (C) TGHT Right side w/ loop block.
Thursday, August 27, 2020, 08:21: LD: 0.0e-09 atm-cc/sec. Vacuum @ 1.49e-06T.
Thursday, August 27, 2020, 08:31: Increase / bump noted on LD
Thursday, August 27, 2020, 08:34: LD: 1.4e-08 atm-cc/sec. Slowly increasing. Vacuum @ 1.49e-06T.
Thursday, August 27, 2020, 08:39: LD: 4.0e-08 atm-cc/sec. Slowly increasing. Vacuum @ 1.49e-06T.
Thursday, August 27, 2020, 08:42: Closed Valve behind TP1B. Purge He.
Thursday, August 27, 2020, 10:02: Ion gauge off. Turbo pumps off.
Thursday, August 27, 2020, 11:04: Venting:
Removed loop block. Polished/Cleaned seat surface to remove 2 scratches. Applied no o-rings w/ vacuum grease. Pressurized with 120 PSI on the line w/ sniffer. No leak detected.
Thursday, August 27, 2020, 13:44: Roughing.
Thursday, August 27, 2020, 13:46: BV1A opened.
Thursday, August 27, 2020, 17:39: TP1B on.
Thursday, August 27, 2020, 17:52: TP1A on
Tuesday, September 01, 2020, 07:44: Vacuum @ 8.23e-07T
Before opening back valve w/ LD: 0.0e-09 atm-cc/sec
Tuesday, September 01, 2020, 07:46: Opened valve behind TP1B.
Tuesday, September 01, 2020, 07:57: LD: 0.0e-09 atm-cc/sec. Vacuum @ 8.23e-07T.
Tuesday, September 01, 2020, 07:59: 120 PSI of He on line (C) TGHT Right side w/ loop block.
Tuesday, September 01, 2020, 08:20: LD: 0.0e-09 atm-cc/sec. Vacuum @ 8.16e-07T.
Tuesday, September 01, 2020, 08:21: Random Spike? Vacuum remained the same, however the LD jumped from 0.0e-09 atm-cc/sec to the mid-e-08 atm-cc/sec range. Literally for a couple seconds, then back to 0.0e-09 atm-cc/sec.
Odd, couple more random spikes.
Tuesday, September 01, 2020, 08:24: Closed valve behind TP1B to see if the spikes continue.
Tuesday, September 01, 2020, 08:34: Opened the TP1B valve. Immediate spike from 0.0e-09 atm-cc/sec to 2.2e-08 & 7.9e-08 atm-cc/sec noted.
Tuesday, September 01, 2020, 08:36: Close the valve behind TP1B. LD off.
Tuesday, September 01, 2020, 14:00:
New tubing installed.
Blue on FS#4 loop (A)(B)
Yellow on FS#2 Loop (C)(D)
Vacuum @ 8.30e-07T
Tuesday, September 01, 2020, 14:04: Opened FS#4 Vacuum stable @ 8.30e-07T.
Tuesday, September 01, 2020, 14:06: Opened FS#2 Vacuum stable @ 8.30e-07T.
Tuesday, September 01, 2020, 14:36: Closed FS#2 but not purged.. Vacuum stable @ 8.23e-07T.
Wednesday, September 02, 2020, 07:26: Ion gauge & Turbo pumps off.
Wednesday, September 02, 2020, 08:50: Venting.
Install right TGHT (C)(D) line. Install FEBIAD. Clean out odd buildup / powder beneath optics tray.
Wednesday, September 02, 2020, 10:48: Roughing.
Wednesday, September 02, 2020, 11:19: TP1B on.
Thursday, September 03, 2020, 11:00: Vacuum @ 1.05e-06T. Waterlines are to be opened.
Thursday, September 03, 2020, 11:03: Opened FS#2. Vacuum Stable @ 1.03e-06T.
Thursday, September 03, 2020, 11:05: Opened FS#3. Vacuum Stable @ 1.03e-06T.
Thursday, September 03, 2020, 11:06: Opened FS#4. Vacuum Stable @ 1.03e-06T.
Thursday, September 03, 2020, 11:08: Opened FS#5. Vacuum Stable @ 1.03e-06T.
Thursday, September 03, 2020, 11:23: Vacuum remains stable @ 1.03e-06T.. PS on. Auto-ramp TGHT / TBHT to 350 / 150 A @ 2 A per min.
|
Tuesday, August 18, 2020, 12:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, RP check & Mass magnet check.
|
Tuesday, August 18, 2020, 12:05: RP1 on
Tuesday, August 18, 2020, 12:10: RP1 off
Install Gas Ballast vapour port w/ filter.
Tuesday, August 18, 2020, 13:19: RP1 on
Disengage shipping locks*
Tuesday, August 18, 2020, 13:55: Turbo pumps on.
Tuesday, August 18, 2020, 14:02: TP1 A trip. TSG:CG1A pressure issue. Remove filter port on Gas ballast. Add blank.
TSG:CG1A pressure improving.
Tuesday, August 18, 2020, 14:37: TP1 A trip. TSG:CG1A pressure issue.
Tuesday, August 18, 2020, 14:48: Bypass BV1A. Switch on TP1 A.
Tuesday, August 18, 2020, 14:55: No trips* Bypass to remain until CG1A below 0.050T.
Tuesday, August 18, 2020, 21:58: Bypass removed. CG1A @ 0.041T.
|
Tuesday, August 18, 2020, 10:00, Aaron Schmidt, , , , , , , , IDP15 Scroll pump installed - RP1 replaced
|
PN: X3815-64000
SN: MY2005SA02
Description: IDP15 Scroll pump, Std.
Removed old Tri-Scroll, Check voltage setting. set to 115V.
Tuesday, August 18, 2020, 09:57: Installed & check. Roughing line to PV1
Tuesday, August 18, 2020, 10:04: Connection ok. Await chamber close after.
Tuesday, August 18, 2020, 13:30: Disengage shipping locks* |
Tuesday, August 11, 2020, 12:04, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly
|
HS target leg openings were milled. Short from previous test by the look of it. TBHT insulator on source side is cracked.
Wiring up top adjusted for better clearance. EE (K) Cap appears ok.
Tuesday, August 11, 2020, 12:03: Roughing.
Tuesday, August 11, 2020, 12:43: Turbo pumps on.
Tuesday, August 11, 2020, 12:50: Ion gauge on.
Wednesday, August 12, 2020, 06:47: Waterlines opened. Vacuum stable @ 1.76e-06T.
Wednesday, August 12, 2020, 06:51: Power / Sources / Optics on (Half to FC0).
Wednesday, August 12, 2020, 06:53: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Wednesday, August 12, 2020, 06:54: IV4 opened.
Wednesday, August 12, 2020, 11:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Wednesday, August 12, 2020, 14:10: TGHT / TBHT voltages ok.
Wednesday, August 12, 2020, 14:23: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, August 12, 2020, 15:00: BIAS / EE / EZL @ 35 / -1.7 / 15 kV.
Wednesday, August 12, 2020, 15:06: BIAS / EE / EZL @ 40 / -2.0 / 17 kV. Spark* audible.
reset steering & IG6.
Wednesday, August 12, 2020, 15:08: Spark*
Wednesday, August 12, 2020, 15:17: BIAS / EE / EZL @ 45 / 2.25 / 20. spark*
Sparks* Reset IV4, TP6, steering & IG6.
Wednesday, August 12, 2020, 15:20: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Wednesday, August 12, 2020, 15:24: Optics Q1 not resetting.
Wednesday, August 12, 2020, 15:29: HV to 0 kv
Thursday, August 13, 2020, 07:32: TPS:Q1 has not revived on the V+ setting. Comes back on V-. Multiple attempts to engage the PS, turning it off & on. Leaving it in "ON" status but 0V.
Thursday, August 13, 2020, 07:45: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, August 13, 2020, 08:27: Sparks* 3 audible, almost back to back. only TPS:Q1 affected. V- jumped from 0V to 1500V on it's own. Reset to 0V.
Thursday, August 13, 2020, 08:54: BIAS / EE / EZL @ 35 / -1.7 / 16 kV. Increased EZL V to stabilize it on the strip tool.
Thursday, August 13, 2020, 10:56: Reset IG6. Spark affected.
Thursday, August 13, 2020, 11:05: Audible spark* in behind TS?
Thursday, August 13, 2020, 11:06: TPS:Q1 affected. V- jumped from 0V to 1500V on it's own. Reset to 0V.
Thursday, August 13, 2020, 11:12: BIAS / EE / EZL @ 40 / -2.0 / 20 kV.
Thursday, August 13, 2020, 11:21: Spark* Charged up both TSG:CBC to 2500 V. Reset to 500 V.
Thursday, August 13, 2020, 13:50: BIAS / EE / EZL @ 45 / -2.2 / 21 kV.
Thursday, August 13, 2020, 14:11: Spark* Minor.
Thursday, August 13, 2020, 14:15: BIAS / EE / EZL @ 50 / -2.5 / 22.5 kV.
Thursday, August 13, 2020, 14:18: Spark. Knocked out IV4, TP6, & optics. Reset. Oh and would you look at that TPS:Q1 works now. Set to 790 V.
Thursday, August 13, 2020, 14:21: Spark*
Thursday, August 13, 2020, 14:24: Spark* but not audible. They're decreasing in size.
Thursday, August 13, 2020, 14:31: Audible spark*. Reset TSG:CBC & TPS:Q1
Thursday, August 13, 2020, 15:01: Observed the spark in the spark gap EE (K).
Thursday, August 13, 2020, 15:19: BIAS / EE / EZL to 0 kV. HV off. Optics off.
Monday, August 17, 2020, 10:57: Begin slow auto-cooling @ -0.75 A per min.
|
Wednesday, August 05, 2020, 10:01, Aaron Schmidt, , , , , , , Problems/Solutions, Roughing pump swap out.
|
Wednesday, August 05, 2020, 10:00: TP6 & TP2 off. IG6 off.
Wednesday, August 05, 2020, 12:20: RP2 swapped with a smaller roughing pump from the hot lab.
Wednesday, August 05, 2020, 12:25: Roughing.
Wednesday, August 05, 2020, 13:53: Open BV2 to beam line chamber.
Wednesday, August 05, 2020, 14:21: Turbo pumps on.
Wednesday, August 05, 2020, 14:25: Ion gauge on. Turbo pumps at speed. |
Tuesday, August 04, 2020, 15:07, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly
|
Tuesday, August 04, 2020, 15:04: Roughing.
Wednesday, August 05, 2020, 06:08: Turbo pumps on.
Thursday, August 06, 2020, 06:58: Vacuum @ 1.52e-06T
Thursday, August 06, 2020, 07:01: Waterlines opened. Vacuum ok @ 1.52e-06T
Thursday, August 06, 2020, 07:03: Power / Sources on.
Thursday, August 06, 2020, 07:05: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4A per min.
Thursday, August 06, 2020, 07:13: Adjust TBHT Voltage limit back to 3.001 V.
Thursday, August 06, 2020, 07:52: IV4 opened. HV PS on.
Thursday, August 06, 2020, 07:53: Optics up to FC0 on.
Thursday, August 06, 2020, 08:03: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, August 06, 2020, 08:27: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Thursday, August 06, 2020, 11:17: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
(monitor) Next set below
Thursday, August 06, 2020, 12:00: BIAS / EE / EZL @ 45 / 2.25 / 20.
Thursday, August 06, 2020, 12:17: BIAS / EE / EZL @ 50 / 2.5 / 22. Sparks on EE (K) cap sprak gap?
Thursday, August 06, 2020, 12:31: While tapping up the HV , (52 kV approx) , the system tripped due to a large spark around 12:25 pm. Reset req'd
Thursday, August 06, 2020, 12:33: Auto-ramping TGHT / TBHT to 580 / 230 A @ 6A per min.
Thursday, August 06, 2020, 12:43: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, August 06, 2020, 13:24: Halt auto ramp. Odd behaviour on TBHT CUR/VOL & TGHT VOL.
Thursday, August 06, 2020, 13:27: Warped. Visual short on TBHT. Auto-cool @ 4 A per min.
Thursday, August 06, 2020, 13:32: HV off. IV4 closed.
Tuesday, August 11, 2020, 07:02: Power/sources off.
Tuesday, August 11, 2020, 07:06: Ion gauge IG1, Turbo pumps off.
|
Tuesday, July 28, 2020, 13:27, Aaron Schmidt, , , , , , , Problems/Solutions, Water leak on magnet PS
|
Fault: 13334
Tuesday, July 28, 2020, 12:00: Leak discovered in ISAC Test Stand MB1 PS. Appears to be coming from hose barb soldered connection to heat sink of pass bank. Pass bank will need to be disassembled and heat sink soldered on a workbench. |
Wednesday, July 22, 2020, 08:56, Luca Egoriti, P2N test, HP-SIS, ITE, TM4, , , In progress, p2n heating test - electrical feedthrough configuration
|
The electrical feedthroughs at the top of the test stand module were reconfigured to deliver up to 1200A to the p2n target.
1) The two COIL lines (one + and one -) were disconnected from their terminals E and F
2) The TBHT terminals (two + and two -) were disconnected from A and B
3) The two TBHT positive terminals are connected to E and G respectively. The two TBHT negative terminals are both connected to F, and a 4/0 cable is run from F to H
4) The three TGHT + terminals are left connected to D. The three TGHT - terminals are left connected to C
In the vacuum chamber, COIL and TGHT terminals of the same polarity are shorted by means of thick copper bars specifically machined to match the test stand terminals geometry. The test can proceed by ramping both TGHT and TBHT up to 600 A each, possible at the same time and speed.
The wiring diagram is shown in the attached picture
Extech measurements before heating (µOhm):
TGHT Left leg Ta-Cu: 205, 215, 212, 201.
TGHT Right leg Ta-Cu: 287, 295, 275, 292.
TGHT Ta legs: 596, 606, 597, 598.
TBHT A: 1470, 1471.
TBHT B: 1469, 1469.
Wednesday, July 22, 2020, 16:21
Rampup finished around 2PM, looks good. Around 300+300A the TBHT voltage limit prevented the TBHT current to increase, and instead it decreased. Aaron ramped it down, adjusted the voltage limit and proceeded without issues.
The water flow and temperatures looked fine.
Attached the plots and a picture at 1200A
Thursday, July 23, 2020, 11:53
Frank Song checked for us the status of the test stand. Pictures looked good, despite the reflections, I can't see sign of the flexy legs glowing. Thank you Frank!
The voltage on the TGHT has dropped 0.02 V, and the voltage on the TBHT (COIL lines) has dropped by 0.04V in 20 hours. I think it's negligible, just a sign of some sintering.
The cooling parameters are as follows:
Input 1: 28.05 C
Input 2: 8.49 lpm
Input 3: 27.79 C
Input 4: 11.14 lpm
Input 5: 27.72 C
Input 6: 3.90 lpm
Input 7: 27.78 C
Input 8: 7.79 lpm
Friday, July 24, 2020, 16:42
This morning I saw the target for my first time and not in a picture. I could see a mild glow in the center of both flexy legs, while the external foils seemed cold. This seems really good, as expected!
Water parameters were checked:
Input 1: 27.75 C
Input 2: 8.38 lpm
Input 3: 27.52 C
Input 4: 11.13 lpm
Input 5: 27.37 C
Input 6: 3.93 lpm
Input 7: 27.53 C
Input 8: 7.78 lpm
Monday, July 27, 2020, 09:35
Aaron's measurement from today at 7:30am
Input 1: 26.61 C
Input 2: 8.25 lpm
Input 3: 26.35 C
Input 4: 11.19 lpm
Input 5: 26.21 C
Input 6: 3.84 lpm
Input 7: 26.35 C
Input 8: 7.76 lpm
FM
Thursday, July 30, 2020, 15:53: Auto-cooling TGHT/TBHT to 0 @ 4 A/min
Thursday, July 30, 2020, 23:02
Ramp down terminated around 7pm, the current was ramped smoothly but the voltage from both PS (TGHT and TBHT) had some bumps in correspondance with vacuum response. Maybe something was shorting? A thorough inspection of the heat shield and target might tell more.
Thanks Fernando for ramping down!
Tuesday, August 04, 2020, 07:33: PS / sources off. Lock out. IG & Turbo pumps off. Purge waterlines. - AS
Tuesday, August 04, 2020, 09:32
Started rewiring the test stand.
TBHT+ (A1 and A2): connected to A
TBHT- (B1 and B2): connected to B
COIL+ (A3): connected to E
COIL-(B3): connected to F
4/0 short connection from F to H removed
Tuesday, August 04, 2020, 15:27
Extech measurements after heating (µOhm):
TGHT Left leg Ta-Cu: 160, 176, 184, 180
TGHT Right leg Ta-Cu: 49, 48, 52, 53.
TGHT Ta legs: 470, 469, 463, 480.
TBHT A: 2400, 2229,2492.
TBHT B: 2361, 2411, 2412. |
Monday, July 20, 2020, 11:40, Aaron Schmidt, (Empty-Test), , , , 44160-1, 43822-2, In progress, Conditioning Test P2N
|
Salts added:
Cs - 15 uL
Li - 10 uL
Na - 10 uL
Rb - 10 uL
K - 5 uL
Empty target in use. Mirror installed inside to look at the target through the top cooling opening.
Monday, July 20, 2020, 14:36: Roughing. Assistance req'd to close the doors.
Monday, July 20, 2020, 15:12: Turbo pumps on.
Monday, July 20, 2020, 15:17: Ion gauge on.
Monday, July 20, 2020, 15:26: TP1A tripped.
Monday, July 20, 2020, 16:00: Continued backing trips. Await pump down.
Monday, July 20, 2020, 16:29: Attempt Bypass.
Monday, July 20, 2020, 16:32: Trip on TMS:TP2? Odd. Restarted quick.
Monday, July 20, 2020, 16:34: TSG:TP1A & TSG:TP1B up to speed. Ion gauge on. Pumping down.
See: https://elog.triumf.ca/TIS/Test-Stand/802 for wiring spec. TGHT / TBHT (on coil) connected.
Tuesday, July 21, 2020, 07:16: Water lines Opened. No response on vacuum. Ok @ 2.13e-06T.
Tuesday, July 21, 2020, 08:27: Ion gauge & Turbo pumps off. One more target / electrical check is required.
Tuesday, July 21, 2020, 09:50: Venting.
Tuesday, July 21, 2020, 10:19
Extech measurements (µOhm):
TGHT Left leg Ta-Cu: 205, 215, 212, 201.
TGHT Right leg Ta-Cu: 287, 295, 275, 292.
TGHT Ta legs: 596, 606, 597, 598.
TBHT A: 1470, 1471.
TBHT B: 1469, 1469.
Tuesday, July 21, 2020, 10:36: Roughing.
Tuesday, July 21, 2020, 13:06: Turbo pumps on.
Tuesday, July 21, 2020, 13:16: Ion gauge on.
Tuesday, July 21, 2020, 13:40: Lockout / power / sources on.
Wednesday, July 22, 2020, 09:28: Auto-ramping TGHT / TBHT to 100 / 100 A @ 4 A per min.
Wednesday, July 22, 2020, 09:54: Auto-ramping TGHT / TBHT to 200 / 200 A @ 4 A per min.
Wednesday, July 22, 2020, 10:30: Visual note @ 200 A. No glow noted on target or the legs. Auto-ramping TGHT / TBHT to 300 / 300 A @ 4 A per min.
Wednesday, July 22, 2020, 10:57: Visual note @ 300 A. The target is glowing & reflecting the glow on the legs. The glow is even. Vacuum @ 2.95e-06T (Allow to stabilize).
Wednesday, July 22, 2020, 11:05: Vacuum @ 2.24e-06T. Auto-ramping TGHT / TBHT to 400 / 400 A @ 4 A per min.
Wednesday, July 22, 2020, 11:26: Auto-ramp aborted. TGHT heating OK. TBHT moving off?
TGHT: "Set" to 384 A = 383.6 A
TBHT: "Set" to 384 A = 318.2 A
Wednesday, July 22, 2020, 11:34: Manually tap down by 10 A. TBHT increases as TGHT decreases.
TGHT: "Set" to 374 A = 373.6 A
TBHT: "Set" to 374 A = 325.4 A
Wednesday, July 22, 2020, 11:35: Manually tap down TGHT only by 10 A. TBHT increases as TGHT decreases.
TGHT: "Set" to 364 A = 363.4 A
TBHT: "Set" to 374 A = 331.3 A
Wednesday, July 22, 2020, 11:37: Manually tap down TBHT only by 10 A. No change.
TGHT: "Set" to 364 A = 363.4 A
TBHT: "Set" to 364 A = 331.4 A
Wednesday, July 22, 2020, 11:39: Manually tap down TGHT down to 350 A. TBHT increases as TGHT decreases.
TGHT: "Set" to 350 A = 349.5 A
TBHT: "Set" to 364 A = 339.0 A
Wednesday, July 22, 2020, 11:40: Tap down to TGHT & TBHT to 340 A.
Wednesday, July 22, 2020, 11:43: Adjust TBHT Voltage limit from 3.001 to 4.001 V.
Wednesday, July 22, 2020, 11:44: Manually tap up both TGHT &TBHT to 350 A.
TGHT: "Set" to 350 A = 349.5 A
TBHT: "Set" to 350 A = 348.9 A
Wednesday, July 22, 2020, 11:45: Auto-ramping TGHT / TBHT to 400 / 400 A @ 4 A per min.
Wednesday, July 22, 2020, 12:43: Auto-ramping TGHT / TBHT to 500 / 500 A @ 4 A per min.
Wednesday, July 22, 2020, 12:59: Adjust TBHT voltage limit from 4.001 to 6.001 V
Wednesday, July 22, 2020, 13:11: Visual note @ 500 A. The target is glowing bright. Vacuum @ 2.51e-06T
Auto-ramping TGHT / TBHT to 550 / 550 A @ 4 A per min.
Wednesday, July 22, 2020, 13:25: TGHT / TBHT @ 550 A. Vacuum @ 2.74e-06T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.59 |
8.17 |
TBHT |
27.37 |
11.06
|
COIL + EE |
27.18 |
3.78 |
TGHT |
27.32 |
7.65 |
Wednesday, July 22, 2020, 13:27: Auto-ramping TGHT / TBHT to 600 / 600 A @ 4 A per min.
Wednesday, July 22, 2020, 13:41: TGHT / TBHT @ 600 A. Vacuum @ 3.23e-06T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.69 |
8.61 |
TBHT |
27.44 |
11.30
|
COIL + EE |
27.28 |
3.97 |
TGHT |
27.43 |
7.91 |
Target visual. Center hot / Legs Ok. Bright. Use welding glasses to view. |
Monday, July 13, 2020, 14:52, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 43515-2, , UCx HS conditioning.
|
Broken LP-FEBIAD used to out gas.
Monday, July 13, 2020, 14:52: Roughing.
Monday, July 13, 2020, 15:29: Turbo pumps on.
Monday, July 13, 2020, 15:34: Ion gauge on.
Tuesday, July 14, 2020, 06:44: Waterlines opened.
Tuesday, July 14, 2020, 06:47: Power / sources on.
Tuesday, July 14, 2020, 06:49: Auto-ramping TGHT to 580 A @ 2 A per min.
Tuesday, July 14, 2020, 14:15: Vacuum @ 2.59e-06T
Friday, July 17, 2020, 10:54: Auto-cooling @ 1 A per min.
Monday, July 20, 2020, 06:51: Power / sources off.
Monday, July 20, 2020, 06:52: Ion gauge / Turbo pumps off.
Monday, July 20, 2020, 06:53: Re-attached N bottle / regulator for purging.
Monday, July 20, 2020, 06:57: Waterlines Purged. N bottle @ 1300 PSI. |
Monday, July 06, 2020, 05:28, Fernando Maldonado, Test FEBIAD , HP-FEBIAD, , , 38295-8 , 42752-5 , Done, FEBIAD development part 3/3
|
Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!
The plan for today Monday, July 06, 2020 is:
- Ramp up TGHT/TBH to 580/315 A.
- Anode sweep
- Mass scan without gas.
- Coil sweep without gas
- Gases in.
Mass scan with gases
Coil sweep with gasses
Efficiency measurements at highest and lowest FC6 current
COVID-19 protocol: buddy is Marla Cervantes
New idea: Screenshot e-log on the ISAC TS team notebook: 20-07-06 FEBIAD development part 3 (Web view)
Monday, July 06, 2020, 05:27: Auto-ramping TGHT/TBHT to 580/315 @ 2 A/min.
Monday, July 06, 2020, 14:2: IV4 open.
Monday, July 06, 2020, 14:41: Anode sweep completed. No anode current registered.
Monday, July 06, 2020, 14:42: HV spark. Anode current now show something. 13.431 mA. The source current however did not change after the spark.
Monday, July 06, 2020, 15:08: Anode sweep completed.
Monday, July 06, 2020, 15:19: IG1=2.57e-6T.
Monday, July 06, 2020, 15:43: Mass scan completed.
Monday, July 06, 2020, 16:02: Coil sweep completed.
Monday, July 06, 2020, 16:04: FC6=8.40e-11A. IG1=2.59e-6T.
Monday, July 06, 2020, 16:07: SV1 closed. SV3 and SV4 open/closed x5.
Monday, July 06, 2020, 16:10: SV3 and SV4 open.
Monday, July 06, 2020, 16:12: SV1 closed. SV5 open/closed x5.
Monday, July 06, 2020, 16:13: SV5 open. No trip!!!
Monday, July 06, 2020, 16:25: FC6=1.16e-10A. IG1=2.74e-6T.
Monday, July 06, 2020, 16:33: Closing gas lines to prevent more leakage.
Tomorrow I will move to mass 40, to see if the ionization changes with the small gas load.
Monday, July 06, 2020, 16:36: Done for the day.
The plan for today Tuesday, July 07, 2020 is:
- Gases in.
- Mass scan with gases
- Coil sweep with gasses
- Efficiency measurements at highest and lowest FC6 current
Tuesday, July 07, 2020, 13:38:FC6=4.46e-11A. IG1=2.41e-6T.
SV3 and SV4 open/closed x5. SV1 open.
Tuesday, July 07, 2020, 13:40: SV3 and SV4 open.
Tuesday, July 07, 2020, 13:41: SV1 closed. SV5 open/closed x5.
SV5 open. No trip!!!
Tuesday, July 07, 2020, 13:57: FC6=8.46e-11A. IG1=2.59e-6T.
Tuesday, July 07, 2020, 14:15: Mass scan completed.
Tuesday, July 07, 2020, 14:22: mass=39.82. A slight bump between the potassiums 38 and 41.
Tuesday, July 07, 2020, 14:38: Coil sweep completed.
Coil=0A. FC6=1.18e-11A. IG1=2.59e-6T.
Tuesday, July 07, 2020, 14:39: SV3 closed.
Tuesday, July 07, 2020, 14:47: FC6=1.26e-11A. IG1=2.59e-6T.
Tuesday, July 07, 2020, 14:48: SV4 closed.
Tuesday, July 07, 2020, 14:59: 1.15e-11A. IG1=2.41e-6T.
Tuesday, July 07, 2020, 15:00: SV5 closed.
Tuesday, July 07, 2020, 15:07: FC6=1.15e-11A. IG1=2.41e-6T.
Tuesday, July 07, 2020, 15:08: SV3 and SV4 open/closed x5. SV1 open.
Tuesday, July 07, 2020, 15:09: SV3 and SV4 open. SV1 closed.
Tuesday, July 07, 2020, 15:10: SV5 open/closed x5. SV5 open. No trip!!!
Tuesday, July 07, 2020, 15:2: FC6=1.26e-11A. IG1=2.59e-6T.
Tuesday, July 07, 2020, 15:32: SV3 closed.
Tuesday, July 07, 2020, 15:44: FC6=1.4e-11A. IG1=2.57e-6T
Tuesday, July 07, 2020, 15:44: SV4 closed.
Tuesday, July 07, 2020, 16:01: FC6=1.15e-11A. IG1=2.39e-6T.
Tuesday, July 07, 2020, 16:01: SV5 closed.
Tuesday, July 07, 2020, 16:31: Coil sweep with no gas completed.
Tuesday, July 07, 2020, 16:52: Mass scan completed.
Tuesday, July 07, 2020, 16:52: Done for the day.
The plan for today Wednesday, July 08, 2020 is:
- Ramp up TBHT to 580/320 A.
- Anode sweep
- Mass scan without gas.
- Coil sweep without gas
- Gases in.
- Mass scan with gases
- Coil sweep with gasses
- Efficiency measurements at highest FC6 current
- Coil sweep without gas
Wednesday, July 08, 2020, 15:00: IG1=2.41e-6T.
Wednesday, July 08, 2020, 15:29: Auto-ramping TBHT to 320A @ 2A/min.
Wednesday, July 08, 2020, 15:54: Anode sweep completed.
Wednesday, July 08, 2020, 16:33: Mass scan completed
Wednesday, July 08, 2020, 16:56: Coil completed.
Wednesday, July 08, 2020, 16:57. IG1=2.59e-6T. FC6=8.63e-11A.
Wednesday, July 08, 2020, 16:58: SV3 and SV4 open/closed x5. SV1 open.
Wednesday, July 08, 2020, 16:59: SV3 and SV4 open. SV1 closed.
Wednesday, July 08, 2020, 17:01: SV5 open/closed x5. SV5 open. No trip!!!
Wednesday, July 08, 2020, 17:12: FC6=9.20e-12A. IG1=2.65e-6T.
Wednesday, July 08, 2020, 17:44: Mass scan completed.
FC6=8.61e-12A. IG1=2.65e-6T.
Wednesday, July 08, 2020, 18:14: Coil sweep completed.
FC6=5.52e-11A. IG1=2.68e-6T.
Wednesday, July 08, 2020, 18:19: SV3 closed.
Wednesday, July 08, 2020, 18:25: FC6=6.8e-11A. IG1=2.65e-6T
Wednesday, July 08, 2020, 18:25: SV4 closed.
Wednesday, July 08, 2020, 18:39 : FC6=1.70e-11A. IG1=2.59e-6T.
Wednesday, July 08, 2020, 18:40 : SV5 closed.
Wednesday, July 08, 2020, 19:08: FC6=1.32e-11A. IG1=2.59e-6T.
Wednesday, July 08, 2020, 19:12: Sudden TBHT current increase of approx 2A. TBHT voltage seem to have droped a little 0.02V.
Wednesday, July 08, 2020, 19:14: Coil=0A. I'll wait until IG1 reading stabilizes.
Wednesday, July 08, 2020, 19:31: FC6=8.09e-12. IG1=2.48e-6T.
Wednesday, July 08, 2020, 19:31: TBHT returned to values pior to sudden jump.
Wednesday, July 08, 2020, 19:58: Coil sweep with no gas completed.
Wednesday, July 08, 2020, 19:58: Done for the day.
The plan for today Thursday, July 09,2020 is:
- Ramp down TBHT to 580/290 A.
- Anode sweep
- Coil sweep without gas
- Gases in.
- Coil sweep with gases
- Ramp down test stand
Thursday, July 09, 2020, 09:53: Manually tap down TBHT to 290A @ ~~2A/min
Thursday, July 09, 2020, 11:02: Anode sweep completed.
Thursday, July 09, 2020, 13:15: Coil=0A. IG1=2.24e-6T. FC0=2.48e-10A. FC6=7.43e-12A.
Thursday, July 09, 2020, 14:15: SV3 and SV4 open/closed x5. SV1 open.
Thursday, July 09, 2020, 14:16: SV3 and SV4 open. SV1 closed.
Thursday, July 09, 2020, 14:17 : SV5 open/closed x5. SV5 open. No trip!!!
Thursday, July 09, 2020, 14:31: FC6=3.03e-11A. IG1=2.50e-6T.
Thursday, July 09, 2020, 14:54: Coil sweep completed.
Thursday, July 09, 2020, 15:16: Anode=0 V.
Thursday, July 09, 2020, 15:16: SV3, SV4, SV5 closed
Thursday, July 09, 2020, 15:18: IV4 closed. timeout, reset it
Thursday, July 09, 2020, 15:20: BIAS/EZL/EE 0 kV.
Thursday, July 09, 2020, 15:21: Auto-cooling 2 A/min
Thursday, July 09, 2020, 15:25: Done for the day.
Monday, July 13, 2020, 07:01: Ion gauge & Turbo pumps off. Noted HV cage is already removed & PS locked out. |
Tuesday, June 30, 2020, 21:59, Fernando Maldonado, Test FEBIAD, HP-FEBIAD, , , 38295-8 , 42752-5 , Done, FEBIAD development part 2/3
|
Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!
The plan for today Wednesday, July 01, 2020 ( ) is:
- Coil sweep with gas lines opened.
- Coil sweep with gas lines closed
- Coil sweep with gas lines opened.
- Efficiency measurements at highest and lowest FC6 signal
- Mass scan.
COVID-19 protocol: buddy is Marla Cervantes
New idea: Screenshot e-log on the ISAC TS team notebook: 20-07-01 FEBIAD development part 2 (Web view)
Wednesday, July 01, 2020, 11:50: FC6=6.89e-12A. IG1=2.76e-6T.
FC6 has dropped 60% and the vacuum 15% with the respect to the last set of measurements.
Maybe the mass is not Ar+ but K? Or the decrease in pressure has this large correlation to FC6 magnitude.
Wednesday, July 01, 2020, 12:41: Coil sweep up and down completed.
Wednesday, July 01, 2020, 12:47: SV3, SV4, and SV5 close
IG1=2.59e-6T. The gas bottles are definitely running out, as there is no much change in pressure whether they are opened or closed
Wednesday, July 01, 2020, 13:15: Coil sweep completed.
Wednesday, July 01, 2020, 13:22: FC6 and IG1 increasing. Probably due to the coil still at 90A. reducing coil current.
Wednesday, July 01, 2020, 13:29: SV1 open. SV3 open/closed x5. SV4 open/closed x5.
Wednesday, July 01, 2020, 13:31: SV3 and SV4 open.
Wednesday, July 01, 2020, 13:32: SV1 closed. SV5 open/closed x5.
Wednesday, July 01, 2020, 13:33 SV5 open. No trip!!!
Wednesday, July 01, 2020, 14:30: Coil=0A.
Wednesday, July 01, 2020, 14:34 : SV3 closed.
Wednesday, July 01, 2020, 14:37:SV4 closed.
Coffee break.
Wednesday, July 01, 2020, 14:54: FC6~~9.76E-13A. IG1= 2.44e-6T
Wednesday, July 01, 2020, 15:11:SV1 open. SV3 open/closed x5. SV4 open/closed x5.
Wednesday, July 01, 2020, 15:13: SV3 and SV4 open.
Wednesday, July 01, 2020, 15:30: SV1 closed. SV5 open/closed x5.
Wednesday, July 01, 2020, 15:30: SV5 open. No trip!!!
Wednesday, July 01, 2020, 15:52: Coil=90A. FC6=1.41e-11A . IG1=2.68e-6T.
Wednesday, July 01, 2020, 15:57: FC6=1.16e-11A. IG1=2.68E-6T.
Wednesday, July 01, 2020, 15:58: SV3 closed.
Wednesday, July 01, 2020, 16:03: SV4 closed.
Wednesday, July 01, 2020, 16:07: 4.95e-12A. IG1=2.77e-6T.
Pressure increasing.
Wednesday, July 01, 2020, 16:14:SV1 open. FC6 decreasing momentarily, now increasing again due to the pressure increase.
Wednesday, July 01, 2020, 16:15: SV3 open/closed x5. SV4 open/closed x5.
IG1=3.1e-6T. FC6=6.00e-12A. Seems table now.
Wednesday, July 01, 2020, 16:17: SV3 and SV4 open.
Wednesday, July 01, 2020, 16:20: SV1 closed. SV5 open/closed x5.
Wednesday, July 01, 2020, 16:20: SV5 open. No trip!!!
Wednesday, July 01, 2020, 16:44: FC6=1.12e-11A. IG1=3.14e-6T.
Wednesday, July 01, 2020, 17:40: Mass scan completed. Peaks are really bad resolved.
Wednesday, July 01, 2020, 17:43;FC0 in. Coil=0A.
Wednesday, July 01, 2020, 17:43: Done for the day
The plan for today Thursday, July 02, 2020 is:
- Increase cathode current to 310A.
- Anode voltage sweep.
- Mass scan at nominal values.
- Coil sweep with gases
- Efficiency measurement at highest coil current.
- Coil sweep without gas.
- Mass scan without gas.
Thursday, July 02, 2020, 08:03: IG1=2.68e-6T. Vacuum decreased overnight, reading on FC0 decreased as well.
Thursday, July 02, 2020, 08:11: Auto-ramp TBHT to 310A @ 2A/min
Thursday, July 02, 2020, 09:15: FC0 increasing
Thursday, July 02, 2020, 10:30: FC0 seems to be stable now on 5.51e-9A.
Thursday, July 02, 2020, 11:10: Mass scan completed.
Thursday, July 02, 2020, 11:26: Mass=40.
Thursday, July 02, 2020, 13:47: Coil sweep completed.
Thursday, July 02, 2020, 13:48: Coil=90A. FC6=1.35e-10A. IG1=2.76e-6T.
Thursday, July 02, 2020, 13:49: SV3 closed.
Thursday, July 02, 2020, 13:52: SV4 closed.
Thursday, July 02, 2020, 14:00: SV5 closed.
Thursday, July 02, 2020, 14:02: FC6=5.80e-11A. IG1=2.59e-6T.
Thursday, July 02, 2020, 14:08 : SV1 open. SV3 open/closed x5. SV4 open/closed x5.
Thursday, July 02, 2020, 14:09: SV3 and SV4 open.
Thursday, July 02, 2020, 14:11: SV1 closed. SV5 open/closed x5.
Thursday, July 02, 2020, 14:11: SV5 open. No trip!!!
Thursday, July 02, 2020, 14:30: FC6=1.40e-10A. IG1=2.96e-6T.
Thursday, July 02, 2020, 14:32: SV3 closed.
Thursday, July 02, 2020, 14:35 : SV4 closed.
Thursday, July 02, 2020, 14:50 : SV5 closed.
Thursday, July 02, 2020, 15:28: FC6=3.34e-11A. IG1=2.59e-6T.
Thursday, July 02, 2020, 16:05: Coil sweep without gases finished.
Thursday, July 02, 2020, 16:35: Mass scan finished.
Thursday, July 02, 2020, 16:51: Coil=90A.
Thursday, July 02, 2020, 17:07: Mass scan completed.
Thursday, July 02, 2020, 17:07 : SV1 open. SV3 open/closed x5. SV4 open/closed x5.
Thursday, July 02, 2020, 17:09: SV3 and SV4 open.
Thursday, July 02, 2020, 17:10: SV1 closed. SV5 open/closed x5.
The mini-pump line was open for a moment while SV5 was opened, there was no trip but this might have added air into the system.
Thursday, July 02, 2020, 17:13: SV5 open. No trip!!!
Thursday, July 02, 2020, 17:21: FC6=4.10e-11A. IG1=2.76e-6T.
Thursday, July 02, 2020, 17:38: Mass scan completed.
Thursday, July 02, 2020, 17:40: Coil=0A.
Thursday, July 02, 2020, 17:56: Mass scan finished.
Thursday, July 02, 2020, 17:57: Done for the day.
The plan for today Friday, July 03, 2020 is:
- Emittance scans at difference coil values.
Friday, July 03, 2020, 11:45: Coil=0. Mass=40u
Friday, July 03, 2020, 11:45: FC6=4.12e-11A. IG1=2.72e-6T.
Friday, July 03, 2020, 12:13: Coil=0. Mass=28u. FC6=7.88e-10A. IG1=2.74e-6T.
Friday, July 03, 2020, 12:25: Test Stand tripped and the lights around flicker. EPICS whiteout. Even turbos shut off.
Friday, July 03, 2020, 12:27: Called control room and they told that there were a couple of power bumps.
Friday, July 03, 2020, 12:41: EPICS restarted but still whiteout problem similar to e-log 702. Likely to submit a faulty report
Friday, July 03, 2020, 12:57: PLC restarted, EPICS workings.
Friday, July 03, 2020, 12:58: Turbos at speed.
Friday, July 03, 2020, 13:25: Source/Optics on.
Friday, July 03, 2020, 13:36: BIAS/EZL/EE @ 30/13/1.5 kV.
Friday, July 03, 2020, 13:39: IG1=2.15e-6T.
Friday, July 03, 2020, 13:41: Auto-ramping TGHT/TBHT to 400/200A @ 2A/min for the weekend.
Friday, July 03, 2020, 13:44: Done for the day. To continue on Monday.
|
Thursday, June 25, 2020, 08:57, Fernando Maldonado, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, Done, FEBIAD development part 1/3
|
Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!
The plan for today Thursday, June 25, 2020 is:
- Optimize (tune) the beam to FC0 and then to FC6.
Compensate beam energy by substracting the value of anode voltage to the high voltage. Thursday, June 25, 2020, 16:07: FEBIAD is on cathode bias
- Perform an efficiency measurement to know the correct work of the mini pump and also the time needed for 1 measurement.
- Perform at least 3 efficiency measurements of the same configuration as a sanity check on the reproducibility of the measurements.
The system is prone to trip if the build-up pressure for the gas lines is higher than 7e-6T. I will try to wait as long as reasonably possible to make sure the gas lines are pumped to good vacuum levels.
COVID-19 protocol: buddy is Marla Cervantes
New idea: Screenshot e-log on the ISAC TS team notebook: 20-06-26 FEBIAD development day (Web view)
Thursday, June 25, 2020, 08:38: TGHT / TBHT @ 580 / 280. Coil @ 0A. Vacuum @ 3.71e-06T. BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 100 V.
Thursday, June 25, 2020, 10:34: TP6 tripped. Closed IV4 closed and reset it. TP6 on
Thursday, June 25, 2020, 10:41:IV4 open
Thursday, June 25, 2020, 10:54: Optimizing beam to FC0 with current tune.
Thursday, June 25, 2020, 12:19: New values for TPS:Q1,Q2,Q3,Q4. Better beam shape on RMP0A and 0B
Thursday, June 25, 2020, 12:33: I think there is something wrong with this FEBIAD as the mass scan does not show any peaks.
I've noticed the word document from Aaron, and he observed peaks likely from surface ionized species. Furthermore there is no anode current readback on epics nor on the power supply.
Possbile culprits. The anode is not well attached to the 9-pin. The cathode temperature is extremely low and there are no electron-impact ionized species.
Thursday, June 25, 2020, 12:52: Power supply is on cathode bias mode as well as all the service cap wiring.
Thursday, June 25, 2020, 13:03: Back to old tunes. Mass scan still showing only surfaced ionized species.
Thursday, June 25, 2020, 14:30: Mass scan for 0V finished. Peaks at 38 and 28 u. 38 is Potassium, but 28 is odd, closest surface ionized species might be Al27 with an ionization potential of about 5.8 eV.
Thursday, June 25, 2020, 15:20 : Mass scan for 100V finished. Peaks still at 38 and 28 but with different intensities. Now there are features what seem to be 18 and 14. Water and N respectively.
Thursday, June 25, 2020, 15:03: Manually tap TBHT to 290 A.
Thursday, June 25, 2020, 15:31: FC6 signal increased. Anode leakage current still showing 0.0 mA.
Thursday, June 25, 2020, 15:35: Manually tap TBHT to 295 A
Thursday, June 25, 2020, 15:58: Mass scan completed. More peaks showed up.
Thursday, June 25, 2020, 15:35: Manually tap TBHT to 300A. Anode leakage current still showing 0.0 mA.
Thursday, June 25, 2020, 16:30: Manually tap TBHT to 305A. Anode leakage current still showing 0.0 mA.
Increasing Anode to 500 V, now there is a reading of 1.2mA. However, there were sparks on the high voltage so this current might be a leakage current from the high voltage.
Thursday, June 25, 2020, 16:34: Lowering to 300A to run a mass scan.
Thursday, June 25, 2020, 16:59: Similar mass spectrum, the anode current is meaningless.
Thursday, June 25, 2020, 17:00: Mass 28 will be used for efficiency measurements.
Thursday, June 25, 2020, 17:15: SV3 closed.
Thursday, June 25, 2020, 17:20: SV4 closed.
Thursday, June 25, 2020, 17:38: SV5 closed.
Thursday, June 25, 2020, 17:39: SV1 opened (mini pump)
Thursday, June 25, 2020, 17:41: Opening and closing SV3 and SV4.
Thursday, June 25, 2020, 17:45: Opening SV5. System tripped.
Thursday, June 25, 2020, 17:51: I will open the cage to see if the mini pump is on.
Thursday, June 25, 2020, 17:58: The mini-pump was off and unplug. Now connected and running.
Thursday, June 25, 2020, 18:00: SV1 open.
Thursday, June 25, 2020, 18:10: SV1 closed
Thursday, June 25, 2020, 18:10: SV5 open. Negligible response on IG1.
Thursday, June 25, 2020, 18:13: SV5 off. SV3 and SV4 open.
Thursday, June 25, 2020, 18:14: SV1 open.
Thursday, June 25, 2020, 18:17: SV1 closed.
Thursday, June 25, 2020, 18:17: SV5 open/close/open. Maximum vacuum 6e-6T. This is very closed to the hard-coded interlock. Everything is off, so it will be better to have the vacuum response at least near 4 or 5 e-6T.
Thursday, June 25, 2020, 18:26: SV3 closed.
Thursday, June 25, 2020, 18:31: SV4 closed.
Thursday, June 25, 2020, 18:41: SV5 closed. SV1 open. Wait 15 min
Thursday, June 25, 2020, 19:02: Vacuum response 5e-6.
Thursday, June 25, 2020, 19:02: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
The plan for today Friday, June 26, 2020 is:
- Ramp up high voltage to operation values
- Mass scan at nominal values
- Send m=28 beam to FC6
- Perform an efficiency measurement to know the correct work of the mini pump and also the time needed for 1 measurement.
- Perform at least 3 efficiency measurements of the same configuration as a sanity check on the reproducibility of the measurements.
Friday, June 26, 2020, 11:31: BIAS/EZL/EE @ 30/13/1.5 kV. Anode @ 150 V
Friday, June 26, 2020, 11:58: Mass scan completed.
Friday, June 26, 2020, 12:0: Magnet set to m=28. FC9=1.17e-9A. IG1=3.42e-6T
Friday, June 26, 2020, 12:17: SV3 closed.
Friday, June 26, 2020, 12:24: No effect on FC6 reading.
Friday, June 26, 2020, 12:24: SV4 closed.
Friday, June 26, 2020, 12:35: FC6=5.5e-10T and seems to flatten.
Friday, June 26, 2020, 12:44: FC6=5.33e-10.
Friday, June 26, 2020, 12:45: SV5 closed. FC6=5.18e-10 and decreasing.
SV5 closes the gas line segment to the ion source. The response on the ion current indicates that once the leakage lines are closed, there is still some gas in the lines causing the slow decrease on ion current.
There is approximately a factor of 2 increase for m=28 when the argon is used.
Friday, June 26, 2020, 12:52: SV1 on.
Friday, June 26, 2020, 12:52: SV3 open/closed x5
Friday, June 26, 2020, 12:53: SV4 open/closed x5
Friday, June 26, 2020, 12:54: SV3 and SV4 opened.
Friday, June 26, 2020, 12:56: SV1 closed
Friday, June 26, 2020, 12:57: SV1 opened
Friday, June 26, 2020, 12:59 SV1 closed. SV5 open/closed x5
Friday, June 26, 2020, 13:00: SV5 opened. No trip!!!
Ion current increases when the valve is open. This indicated the build up pressure being release into the ion source. Max FC6=4.17e-9 A. Now decreasing.
Friday, June 26, 2020, 13:07: FC6 reading and IG1 reading approaching values previous to efficiency measurement.
Friday, June 26, 2020, 13:13: FC6=1.17e-9A. IG1=3.47e-6.
Total time for 1 efficiency measurement 50 minutes. The largest wait occurs for the current to stabilize.
Approximately 30 minutes when closing the valves, 15 minutes when opening them, and 10 minutes for roughing the lines.
Friday, June 26, 2020, 13:30: Same measurement for (my) sanity check. FC6=1.16e-9. IG1=3.51e-6T
Friday, June 26, 2020, 13:30: SV3 closed.
Friday, June 26, 2020, 13:35: SV4 closed.
Friday, June 26, 2020, 13:50: SV5 closed.
Friday, June 26, 2020, 13:51: SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Friday, June 26, 2020, 13:53: SV3 and SV4 opened.
Friday, June 26, 2020, 13:57: FC6=4.87e-10A. IG1=3.38e-6T.
Friday, June 26, 2020, 13:59: SV1 closed. SV5 open/closed x5.
Friday, June 26, 2020, 14:00: SV5 open. No trip!!!
Friday, June 26, 2020, 14:00: FC6=2.9e-9A. IG1=4.1e-6T. and decreasing.
Friday, June 26, 2020, 14:14: FC6=1.16e-9. IG1=3.56e-6T
Total time for eff measurement=45 minutes
Friday, June 26, 2020, 14:20: Last efficiency measurement for these values. Then lunch break.
Friday, June 26, 2020, 14:23: SV3 closed.
Friday, June 26, 2020, 14:29: SV4 closed.
Friday, June 26, 2020, 14:42: SV5 closed.
Friday, June 26, 2020, 14:43: SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Friday, June 26, 2020, 14:44: SV3 and SV4 opened
Friday, June 26, 2020, 14:49: FC6=4.71e-10. IG1=3.29e-6T.
Friday, June 26, 2020, 14:51: SV1 closed. SV5 open/closed x5.
Friday, June 26, 2020, 14:52: SV5 open. No trip!!!
Friday, June 26, 2020, 14:52: FC6=3.2e-9A. IG1=4.13e-6T.
Friday, June 26, 2020, 15:05: FC6=1.12e-9A. IG1=3.49e-6T.
Total time for eff measurement=43 minutes.
Friday, June 26, 2020, 15:33: By averaging all readings, the gas signal corresponds to 57.7% of the entire signal. There is an increase factor of 2.36. No efficiency can be estimated as the signal is not from the gas bottle.
Friday, June 26, 2020, 15:43: Switching to mass 40 (Ar+1).
Friday, June 26, 2020, 15:56: I think I am set on mass 40 (Ar+) The signal varies when adjusting the voltage. Proceeding to efficiency measurement.
Friday, June 26, 2020, 15:59: FC6=2.49e-11. IG1=3.67e-6T
Friday, June 26, 2020, 16:00: SV3 closed.
Friday, June 26, 2020, 16:05: SV4 closed.
Friday, June 26, 2020, 16:20 : SV5 closed.
Friday, June 26, 2020, 16:20 : SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Friday, June 26, 2020, 16:21 : SV3 and SV4 opened.
Friday, June 26, 2020, 16:21 : FC6=1.06e-11A. IG1=3.40e-6T
Friday, June 26, 2020, 16:24 : SV1 closed. SV5 open/closed x5.
Friday, June 26, 2020, 16:24 : SV5 open. No trip!!!
Friday, June 26, 2020, 16:25 FC6=3.7e-11. IG1=4.30e-6T
Friday, June 26, 2020, 16:28: The proportion between gas signal and background is 57.4% of the entire signal. Very similar result to previous mass. There is also an increase factor of 2.35 for Ar+1
Friday, June 26, 2020, 16:37: FC6=2.44e-11. IG1=3.58e-6
Friday, June 26, 2020, 16:43: Coil=20 A. This provides the smallest ion current signal FC6=1.13e-11.
Friday, June 26, 2020, 16:49: FC6=1.13e-11. IG1=3.58e-6T.
Friday, June 26, 2020, 16:50: SV3 closed.
Friday, June 26, 2020, 16:54 :SV4 closed.
Friday, June 26, 2020, 17:09 :SV5 closed.
Friday, June 26, 2020, 17:10 :SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Friday, June 26, 2020, 17:10 :SV3 and SV4 opened.
Friday, June 26, 2020, 17:10 :FC6=1.51e-12A. IG1=3.38e-6T
The proportion of this measurement is 86.63%.
Friday, June 26, 2020, 17:12 :SV1 closed. SV5 open/closed x5.
Friday, June 26, 2020, 17:12 :SV5 open. No trip!!!.
Friday, June 26, 2020, 17:22 : FC6=3.7e-11. IG1=4.30e-6T
Friday, June 26, 2020, 17:24: FC6 reading keeps decreasing and it's already below the initial current.
I suspect that the ion current that was read when the coil was changed corresponds to superposition of previously ionized species and the coil adjusted those charges. Once flushed, the neutral atoms will established a new equilibrium.
NOTE: Will setting the anode to 0 V flushed the source? Test it tomorrow.
Friday, June 26, 2020, 17:43: FC6 signal is increasing. I'll leave it as is.
Saturday, June 27, 2020, 11:47: FC6=1.06e-11A. IG1=3.40e-6T. Similar to the value of the current prior to the efficiency measurement.
The plan for today Saturday, June 27, 2020 is:
- Perform an efficiency for coil 20. This might be a long measurement if the value has to increases again. If after 1.5 h the signal still shows a mismatch, then I'll try to flush the source by setting the anode to 0V
- Redo efficiency measurement.
- Try another coil value.
Saturday, June 27, 2020, 11:52: FC6=1.06e-11. IG1=3.40e-6T
Saturday, June 27, 2020, 11:55: SV3 closed.
Saturday, June 27, 2020, 12:03 : SV4 closed.
Saturday, June 27, 2020, 12:20 : SV5 closed.
Saturday, June 27, 2020, 12:20: SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Saturday, June 27, 2020, 12:21 : SV3 and SV4 opened.
Saturday, June 27, 2020, 12:23 : FC6=6.76e-12A. IG1=3.14e-6T
Saturday, June 27, 2020, 12:26 : SV1 closed. SV5 open/closed x5.
Saturday, June 27, 2020, 12:27 : SV5 open. No trip!!!
Saturday, June 27, 2020, 12:42: FC6=1.01e-11A. IG1=3.38e-6T.
Saturday, June 27, 2020, 12:48Coil to 0, then to 20A. Anode voltage to 0V then to 150V. FC6=1.05e-11A.
Saturday, June 27, 2020, 12:50: SV3 closed.
Saturday, June 27, 2020, 12:55 : SV4 closed.
Saturday, June 27, 2020, 13:01: SV5 closed
Saturday, June 27, 2020, 13:01 : SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Saturday, June 27, 2020, 13:02: SV5 closed.
Saturday, June 27, 2020, 13:04: TSG:CB1 and TPS:VCB3 tripped. now on
Saturday, June 27, 2020, 13:04: FC6=6.64e-12A. IG1=3.23e-6T.
Saturday, June 27, 2020, 13:05: SV1 closed. SV5 open/closed x5.
Saturday, June 27, 2020, 13:07: SV5 open. No trip!!!
Saturday, June 27, 2020, 13:13: FC6=1.03e-11A. IG1=3.38e-6T.
Saturday, June 27, 2020, 13:15: Now I will sweep the coil from 0 to 20. Then run the efficiency measurement again.
Saturday, June 27, 2020, 13:22: Coil=15A provides the minimum current but I will stay with 20 A.
Saturday, June 27, 2020, 13:23 : SV3 closed
Saturday, June 27, 2020, 13:28 : SV4 closed.
Saturday, June 27, 2020, 13:37: SV5 closed.
Saturday, June 27, 2020, 13:42: FC6=6.60e-12A. IG1=3.23e-6T.
By averaging all the readings for coil 20. The proportion of current coming from the gas is only 36%. There is an increase factor of 1.56 compared to the no gas situation.
Saturday, June 27, 2020, 13:49: SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Saturday, June 27, 2020, 13:51: SV1 closed. SV5 open/closed x5.
Saturday, June 27, 2020, 13:52: SV5 open. No trip!!!
Saturday, June 27, 2020, 14:08 : FC6=1.00e-11A. IG1=3.38e-6T.
Saturday, June 27, 2020, 14:10: Coil=40A. This values gives a similar current as coil=0A.
Saturday, June 27, 2020, 14:11: FC6=2.65e-11A. IG1=3.38e-6T.
Saturday, June 27, 2020, 14:19: SV3 closed.
Saturday, June 27, 2020, 14:26: FC6=2.45e-11.
Saturday, June 27, 2020, 14:27:SV4 closed.
Lunch break.
Saturday, June 27, 2020, 15:23: IG1=9.65e-12. IG1=3.20e-6T.
Saturday, June 27, 2020, 15:24: SV5 closed.
Saturday, June 27, 2020, 15:33: SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Saturday, June 27, 2020, 15:34: SV3 and SV4 opened.
Saturday, June 27, 2020, 15:55: SV1 closed. SV5 open/closed x5.
Saturday, June 27, 2020, 15:56: SV5 open. No trip!!!
Saturday, June 27, 2020, 16:14: FC6=1.95e-11A. IG1=3.40e-6T.
Again, the base current with all the gas is note the same as prior to the effciciency measurment.
Saturday, June 27, 2020, 16:15 : Anode to 0V.
Saturday, June 27, 2020, 16:16 Anode=150 V. FC6=2.01e-11A.
Saturday, June 27, 2020, 16:18:Coil=0A.
Saturday, June 27, 2020, 16:19 Coil=40A. FC6=1.98e-11A.
Saturday, June 27, 2020, 16:20 Coil to 0. Anode to 0.
Saturday, June 27, 2020, 16:20 Anode=150V, coil=40A.
Saturday, June 27, 2020, 16:22: FC6=1.97e-11
Saturday, June 27, 2020, 16:32: Coil to 0. Anode to 0.
Saturday, June 27, 2020, 16:33: Coil=40A. Anode 150V.
Saturday, June 27, 2020, 16:34:FC6=1.97e-11A.
Saturday, June 27, 2020, 16:36: SV3 closed.
Saturday, June 27, 2020, 16:43: SV4 closed.
Saturday, June 27, 2020, 16:50: SV5 closed.
Saturday, June 27, 2020, 16:51: SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Saturday, June 27, 2020, 16:52 :SV3 and SV4 opened.
Saturday, June 27, 2020, 16:55: FC6=7.64e-12. IG1=3.31e-6
Saturday, June 27, 2020, 16:56 : SV1 closed. SV5 open/closed x5.
Saturday, June 27, 2020, 16:57 : SV5 open. No trip!!!
Saturday, June 27, 2020, 17:1: FC6=1.91e-11A
What's FC6 value for coil=0?
Saturday, June 27, 2020, 17:17: Coil=0
Saturday, June 27, 2020, 17:18: FC6=2.71e-11A.
Now coil=55A gives a similar current as coil=0... Back to coil=40A.
Saturday, June 27, 2020, 17:53: SV3 closed.
Saturday, June 27, 2020, 17:58: SV4 closed.
Saturday, June 27, 2020, 18:07: SV5 closed.
FC6=7.47e-12A. IG1=3.23e-6T.
Saturday, June 27, 2020, 18:07 : The second set of measurements for coil=40. The proportion of current coming from the gas is 59.94%. There is an increase factor of 2.50 compared to the no gas situation.
Saturday, June 27, 2020, 18:07: SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Saturday, June 27, 2020, 18:08: SV3 and SV4 opened.
Saturday, June 27, 2020, 18:18: SV1 closed. SV5 open/closed x5.
Saturday, June 27, 2020, 18:18 : SV5 open. No trip!!!
Saturday, June 27, 2020, 18:4: FC6=1.84e-11. IG1=3.38e-6T.
Saturday, June 27, 2020, 18:4: Done for today.
Sunday, June 28, 2020, 14:38: FC6=1.62e-11A. IG1=3.30e-6T.
The plan for today Sunday, June 28, 2020 is:
- Perform an efficiency measurement for coil=65A.
- Coil sweep with all gas lines closed.
Sunday, June 28, 2020, 14:50: Coil=65A. Provides highest current. For coil<100A.
Sunday, June 28, 2020, 14:59: FC6=2.16e-11A. IG1=3.31e-6T.
Sunday, June 28, 2020, 15:08: SV3 closed.
Sunday, June 28, 2020, 15:13:FC6=1.94e-11.A.
Sunday, June 28, 2020, 15:14. SV4 closed.
Sunday, June 28, 2020, 15:30:SV5 closed.
Sunday, June 28, 2020, 15:30: FC6=3.82e-12A. IG1=3.14e-8T.
Sunday, June 28, 2020, 15:32: SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Sunday, June 28, 2020, 15:32: SV3 and SV4 opened.
Sunday, June 28, 2020, 15:37:FC6=3.22e-12A. IG1=3.14e-6T.
Sunday, June 28, 2020, 15:38: SV1 closed. SV5 open/closed x5.
Sunday, June 28, 2020, 15:38: SV5 open. No trip!!!
Sunday, June 28, 2020, 15:55: FC6=1.79e-11A. IG1=3.31e-6T.
Sunday, June 28, 2020, 16:02: SV3 closed.
Sunday, June 28, 2020, 16:08: SV4 closed.
Sunday, June 28, 2020, 16:22: SV5 closed.
Sunday, June 28, 2020, 16:22: 3.31e-12A. IG1=3.05e-6T.
Sunday, June 28, 2020, 16:23: SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Sunday, June 28, 2020, 16:24: SV3 and SV4 opened.
Sunday, June 28, 2020, 16:25: SV1 closed. SV5 open/closed x5.
Sunday, June 28, 2020, 16:25: SV5 open. No trip!!!
Sunday, June 28, 2020, 16:37: 1.82e-11. IG1=3.23-8T.
Sunday, June 28, 2020, 16:51:SV5 closed.
Sunday, June 28, 2020, 16:51:SV3 and SV4 closed.
Sunday, June 28, 2020, 17:25: Coil sweep finished .
Sunday, June 28, 2020, 17:26: SV1 on. SV3 open/closed x5. SV4 open/closed x5.
Sunday, June 28, 2020, 17:27: SV3 and SV4 opened.
Sunday, June 28, 2020, 17:28: SV1 closed. SV5 open/closed x5.
Sunday, June 28, 2020, 17:28 :SV5 open. No trip!!!
Sunday, June 28, 2020, 17:29: Coil=0A.
Sunday, June 28, 2020, 17:33: Done for the day.
|
Monday, June 22, 2020, 07:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Test FEBIAD (Fernando)
|
Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!
Monday, June 22, 2020, 08:45: Roughing.
Monday, June 22, 2020, 09:17: Turbo pumps on.
Monday, June 22, 2020, 09:22: Ion gauge on.
Tuesday, June 23, 2020, 07:37: Waterlines opened. Vacuum ok @ 1.60e-06T. Power / Sources on.
Tuesday, June 23, 2020, 07:45: Turned on "mini-pump" Open SV1.
Tuesday, June 23, 2020, 08:01: Open SV3 & SV4. (NOTE* Do not Open SV2).
Tuesday, June 23, 2020, 08:14: Close SV1. Turn off "Mini pump". Slowly open and close SV5. Unplug mini-pump.
Open w/ SV3 & SV4.
Tuesday, June 23, 2020, 08:16: SV5 left open w/ SV3 & SV4. Vacuum Stabilizing @ 2.32e-06T & dropping.
Tuesday, June 23, 2020, 08:20: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4 A per min. Coil @ 20 A. IV4 open
Tuesday, June 23, 2020, 08:28: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 50 V.
Tuesday, June 23, 2020, 08:29: Optics on.
Tuesday, June 23, 2020, 09:59: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.
Tuesday, June 23, 2020, 12:59: Coil @ 50 A. Anode @ 100 vV. Vacuum @ 3.71e-06T
Tuesday, June 23, 2020, 13:10: Auto-ramping TBHT to 280 A @ 2 A per min.
Tuesday, June 23, 2020, 13:36: Mass, wire, & Emittance scans taken.
|
Tuesday, June 16, 2020, 11:03, Aaron Schmidt, Ta#60, LP-SIS, ITW, TM2, 44139-13, 43515-5, In progress, Conditioning Ta#60
|
Tuesday, June 16, 2020, 11:01: Turbo pumps on.
Wednesday, June 17, 2020, 07:49: HS waterlines opened. Vacuum stable @ 2.07e-06T.
Wednesday, June 17, 2020, 07:51: Power / Sources on.
Wednesday, June 17, 2020, 07:52: Opened IV4.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.89 |
6.17 |
TBHT |
27.73 |
8.71
|
COIL + EE |
27.66 |
2.82 |
TGHT |
27.74 |
6.68 |
Wednesday, June 17, 2020, 07:55: Auto-ramping TGHT / TBHT to 300 / 100 A @ 4 A per min. Optics on.
Wednesday, June 17, 2020, 08:03: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, June 17, 2020, 09:43: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
12:50 Approx TRIP*. Vacuum spike?
Wednesday, June 17, 2020, 13:10: Sources back on. Auto-ramping TGHT / TBHT to 450 / 150 A @ 4 A per min. Optics switched back on.
Wednesday, June 17, 2020, 13:42: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, June 17, 2020, 15:25: Auto-ramping TGHT / TBHT to 500 / 230 A @ 4 A per min.
Wednesday, June 17, 2020, 15:48: Auto-ramping TGHT / TBHT to 525 / 230 A @ 4 A per min.
Wednesday, June 17, 2020, 16:14: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.
Wednesday, June 17, 2020, 17:03: Scans complete
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.28 |
8.11 |
TBHT |
27.92 |
10.78
|
COIL + EE |
27.75 |
3.76 |
TGHT |
27.92 |
7.57 |
Wednesday, June 17, 2020, 17:09: TGHT brought down to 550 A. BIAS / EE / EZL @ 0 kV.
Wednesday, June 17, 2020, 17:10: IV4 closed
Wednesday, June 17, 2020, 17:13: TBHT to 200 A.
Wednesday, June 17, 2020, 22:25: TSG:CG1A & TSG:CG1B leveling off. Reducing ~ On the strip tool.
Thursday, June 18, 2020, 05:32: From 550 A / 200 A. Vacuum @ 5.63e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 1 A per min. Max loop reached (5.500e-06T). Allow to out gas.
Sunday, June 21, 2020, 11:07: Auto-cooling @ 0.5 A per min. vacuum @ 4.29e-06T.
Monday, June 22, 2020, 04:51: Auto-cooling @ 4 A per min. vacuum @ 1.49e-06T.
Monday, June 22, 2020, 05:10: Sources / power off.
Monday, June 22, 2020, 05:13: Ion gauge & Turbo pumps off.
Monday, June 22, 2020, 06:46: Venting. HS waterline purged. |
Wednesday, June 10, 2020, 08:23, Aaron Schmidt, C#1, LP-SIS, ITW, TM2, 43044-8, 43515-3, In progress, Conditioning C#1 7x
|
Salts:
Li - 10 uL
Na - 10 uL
K - 5 uL
Rb - 10 uL
Cs - 15 uL
Wednesday, June 10, 2020, 08:55: Roughing.
Wednesday, June 10, 2020, 09:30: Turbo pumps on.
Wednesday, June 10, 2020, 09:35: Ion gauge on.
Wednesday, June 10, 2020, 13:52: HS waterline opened. Vacuum ok @ 4.11e-06T.
Wednesday, June 10, 2020, 13:59: All main PS on. E-rig PS on. Optics on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.21 |
5.81 |
TBHT |
27.04 |
8.83
|
COIL + EE |
26.93 |
2.76 |
TGHT |
27.04 |
6.58 |
Wednesday, June 10, 2020, 14:02: Sources on.
Thursday, June 11, 2020, 07:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, June 11, 2020, 07:29: IV4 opened. BIAS / EZL / EE @ 30 / 13 / -1.5 kV.
Thursday, June 11, 2020, 09:56: BIAS reduced to 20 kV due to sparking / out gassing. MB1 having issues?
Thursday, June 11, 2020, 14:24: Halted auto ramp due to the vacuum. TGHT @ 500 A. Vacuum @ 7.08e-06T.
Thursday, June 11, 2020, 14:26: TBHT reduced to 200 A.
Thursday, June 11, 2020, 19:09: Auto-cooling @ 1 A per min.
Friday, June 12, 2020, 10:43: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Monday, June 15, 2020, 03:00: Vacuum @ 2.66e-06T. TGHT / TBHT @ 300 / 150 A. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, June 15, 2020, 05:30: Tap up BIAS. BIAS / EZL / EE @ 30 / 13 / -1.5 kV. TGHT @ 512 A. Vacuum @ 6.11e-06T.
Monday, June 15, 2020, 06:46:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.40 |
7.51 |
TBHT |
26.08 |
10.15
|
COIL + EE |
25.88 |
3.53 |
TGHT |
26.06 |
7.31 |
Mass scans complete w/ TGHT / TBHT @ 512 / 230 A. 30 kV.
Mass, wire, & emittance scans taken on: M7, M23, M38, M86, M125.
Monday, June 15, 2020, 09:52: Auto-cooling @ 1 A per min.
Monday, June 15, 2020, 21:23: BIAS / EE / EZL @ 0 kV.
Tuesday, June 16, 2020, 06:57: IV4 closed & reset.
Tuesday, June 16, 2020, 07:00: Sources / Power off. IG1 off. Turbo pumps off.
Tuesday, June 16, 2020, 08:06: Waterlines purged. N bottle @ 1450 PSI. Venting. |
Tuesday, May 19, 2020, 06:01, Aaron Schmidt, , , , , , 42972-8, Problems/Solutions, Leak check / Troubleshoot
|
https://elog.triumf.ca/TIS/Test-Stand/791
https://elog.triumf.ca/TIS/Test-Stand/792
Tuesday, May 19, 2020, 06:01: Venting.
Troubleshoot / Leak Check ISAC TS.
Tuesday, May 19, 2020, 06:35: Quite a bit of condensation was found inside the TS. Most lines had water on them.
Tuesday, May 19, 2020, 07:09: Wiped out the interior. Running a fan inside to aid in the drying.
Tuesday, May 19, 2020, 08:20:
Opened lines FS#2,3,4. No visual leaks detected.
Installed previously used/outgassed HS (Ferran's tests). Replaced all the bolts.
Roughing.
Tuesday, May 19, 2020, 08:32: Multiple attempts made to rough. Doors not sealing?
Tuesday, May 19, 2020, 08:58: IT FINALLY SEALED!!! (Assistance was provided on the doors)
Tuesday, May 19, 2020, 09:02: BV1B Open.
Tuesday, May 19, 2020, 10:54: Vacuum @ 15.339 T.
Tuesday, May 19, 2020, 10:59: FS#2 opened.
Tuesday, May 19, 2020, 11:02: Vacuum @ 15.069 T.
Tuesday, May 19, 2020, 11:03: FS#3 opened.
Tuesday, May 19, 2020, 11:06; Vacuum @ 15.069 T
Tuesday, May 19, 2020, 11:07: FS#4 opened.
Tuesday, May 19, 2020, 11:10: Vacuum @ 15.069 T.
Tuesday, May 19, 2020, 11:11: FS#5 Opened.
Tuesday, May 19, 2020, 11:13: Vacuum @ 15.069 T.
Tuesday, May 19, 2020, 11:30: Close & purge cooling lines. Observe Vacuum.
Left open overnight. Ran the fan on it this morning.
All water lines into the TS closed. FS# 2,3,4,5, & 8.
Wednesday, May 20, 2020, 08:35: Roughing.
Wednesday, May 20, 2020, 08:50: BV1B open. Vacuum at 8 T and dropping.
Wednesday, May 20, 2020, 10:12: Vacuum at 2.635 T.
Wednesday, May 20, 2020, 10:14: FS#2 opened.
Wednesday, May 20, 2020, 10:17: Vacuum @ 2.646 T.
Wednesday, May 20, 2020, 10:19: FS#3 opened.
Wednesday, May 20, 2020, 10:24: Vacuum @ 2.764 T
Wednesday, May 20, 2020, 10:25: FS#4 opened.
Gradual increase is noted, but no obvious spike.
Wednesday, May 20, 2020, 10:28: Vacuum @ 2.816 T.
Wednesday, May 20, 2020, 10:32: Vacuum @ 3.606 T.
Starting to spike.
Wednesday, May 20, 2020, 10:36: Closed supply / return. Purged. Closed the lines Vacuum @ 4.173 T.
Wednesday, May 20, 2020, 10:54: Vacuum @ 3.984 T.
Wednesday, May 20, 2020, 10:58: FS#2 opened.
Wednesday, May 20, 2020, 11:10: Vacuum @ 3.858 T.
Wednesday, May 20, 2020, 11:11: FS#3 opened. Vacuum spiking 4.3T +
Wednesday, May 20, 2020, 11:15: Closed supply / return. Purged. Closed the lines Vacuum @ 4.614 T.
Wednesday, May 20, 2020, 11:47: Venting.
Wednesday, May 20, 2020, 13:12: Significant leak discovered on FS#3. Pressurized the lines to full pressure with water and waited 15 minutes. Small drops seen pushing out from the water block.
Removed old O-ring (Appeared to have a warp/bulge, very faint) Replaced with Sn C-Seal "Small Package" MIL-DTL-117H-TII C-E S-I / MIL-PRF-131K C-II.
T= 0.095"
D= 0.424"
Wednesday, May 20, 2020, 14:02: Roughing.
Wednesday, May 20, 2020, 14:08: BV1B open.
Wednesday, May 20, 2020, 15:28: Vacuum @ 1.242 T
Wednesday, May 20, 2020, 15:29: Open FS#3.
Wednesday, May 20, 2020, 15:31: Close FS#3 supply / return. Purged. Closed the lines Vacuum @ 2.462 T.
Wednesday, May 20, 2020, 15:42: Start venting to 200 T.
Removed Right coil line on FS#3 and blanked it off (G) (H).
Monday, May 25, 2020, 14:00: Roughing.
Monday, May 25, 2020, 14:02: BV1B open.
Monday, May 25, 2020, 15:16: Turbo pumps on.
Monday, May 25, 2020, 15:25: Ion gauge on.
Wednesday, May 27, 2020, 10:28: Ion gauge & turbo pumps off.
FS#(G)(H) right coil line - Lower G water block replaced leak checked / cleaned.
Line re-installed.
Wednesday, May 27, 2020, 12:56: Roughing.
Wednesday, May 27, 2020, 13:39: Turbo pumps on.
Wednesday, May 27, 2020, 13:47: Ion gauge on.
Monday, June 01, 2020, 06:47: Vacuum @ 5.12e-06T
Monday, June 01, 2020, 06:50: FS#3 opened. Vacuum @ 5.12e-06T.
Monday, June 01, 2020, 06:57: FS#2 opened. Vacuum @ 5.12e-06T.
Monday, June 01, 2020, 07:01: FS#4 opened. Vacuum @ 5.12e-06T.
Monday, June 01, 2020, 07:04: FS#5 opened. Vacuum @ 5.10e-06T.
Monday, June 01, 2020, 07:12: PS on
Monday, June 01, 2020, 07:15: FS#8 opened. Vacuum @ 5.03e-06T.
Monday, June 01, 2020, 07:16: Sources on.
Monday, June 01, 2020, 07:18: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min. Vacuum limits adjusted:
7.000e-06 Vacuum ok, increment when less than this value.
8.000e-06 Vacuum exceeds, the last increment on TGHT / TBHT is backed off.
Monday, June 01, 2020, 09:17: Halt, adjust. Continue Auto-ramping TGHT / TBHT to 350 / 200 A @ 2 A per min.Vacuum @5.19 e-06T
Monday, June 01, 2020, 10:37: Auto-ramping TGHT / TBHT to 400 / 200 A @ 2 A per min.Vacuum @ 6.29e-06T.
Monday, June 01, 2020, 11:05: Auto-ramping TGHT / TBHT to 450 / 200 A @ 2 A per min.Vacuum @ 6.70e-06T.
Monday, June 01, 2020, 12:18: Tripped* restarted* Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.Vacuum @ 6.70e-06T.
Tripped as the TGHT / TBHT "good vac" interlock is at 7.30e-06T.
Monday, June 01, 2020, 17:10: Lowered TGHT to 325A to avoid a trip and continue outgassing. Vacuum @ 7.00e-06T.
Tuesday, June 02, 2020, 06:06: Manually tap TGHT up to 350 A.
Tuesday, June 02, 2020, 06:39: Manually tap TGHT up to 375 A.
Wednesday, June 03, 2020, 09:37: Manually tap TGHT up to 400 A. Vacuum, @ 6.68e-06T.
Wednesday, June 03, 2020, 09:44: Manually tap TGHT up to 400 A. Vacuum, @ 6.90e-06T.
Wednesday, June 03, 2020, 10:45: Tripped* restarted* Auto-ramping TGHT / TBHT to 400 / 200 A @ 4 A per min.Vacuum @ 5.53e-06T.
Friday, June 05, 2020, 06:19: Manually tap TGHT up to 425 A.
Tuesday, June 09, 2020, 19:57: Auto-Cooling from 475 A to 0 A @ 1 A per min.
Wednesday, June 10, 2020, 06:32: PS off. Ion Gauge off. Turbo pumps off. |
Friday, March 27, 2020, 11:30, Aaron Schmidt, , , , , , , , Vacuum loss / spike / Shutdown
|
The ISAC was left with the turbo pumps and water supplies running. Just the power supplies off. Monday, March, 23, 2020.
Check daily
Thursday, March 26, 2020, 13:25: Vacuum ok at 3.2e-07T. All status ok.
Friday, March 27, 2020, 09:00: Checked via epics. There appears to have been a trip.
Vacuum at 7.953T . The trip looks to have occurred around midnight. (See attached*)
Friday, March 27, 2020, 11:15: MCR shut down supply / return on DI water supply to be on the safe side.
Friday, March 27, 2020, 11:20: Monitor. Control room has my cell number now as well as it's on my TRIUMF profile. Beam line side ok.
Monday, March 30, 2020, 06:26: Vacuum @ 8.583T.
Tuesday, March 31, 2020, 10:03: Vacuum @ 8.016T.
Wednesday, April 01, 2020, 11:51: Vacuum @ 8.205T.
Thursday, April 02, 2020, 11:41: Vacuum @ 8.709T.
Friday, April 03, 2020, 05:05: Vacuum @ 9.213T.
Tuesday, April 07, 2020, 10:46: Vacuum @ 11.922T.
Tuesday, April 28, 2020, 11:11: Venting. |
Tuesday, April 07, 2020, 10:53, Anders Mjos, , , , , , , , Vacuum loss / spike / Shutdown
|
Aaron Schmidt wrote: |
The ISAC was left with the turbo pumps and water supplies running. Just the power supplies off. Monday, March, 23, 2020.
Check daily
Thursday, March 26, 2020, 13:25: Vacuum ok at 3.2e-07T. All status ok.
Friday, March 27, 2020, 09:00: Checked via epics. There appears to have been a trip.
Vacuum at 7.953T . The trip looks to have occurred around midnight. (See attached*)
Friday, March 27, 2020, 11:15: MCR shut down supply / return on DI water supply to be on the safe side.
Friday, March 27, 2020, 11:20: Monitor. Control room has my cell number now as well as it's on my TRIUMF profile. Beam line side ok.
Monday, March 30, 2020, 06:26: Vacuum @ 8.583T.
Tuesday, March 31, 2020, 10:03: Vacuum @ 8.016T.
Wednesday, April 01, 2020, 11:51: Vacuum @ 8.205T.
Thursday, April 02, 2020, 11:41: Vacuum @ 8.709T.
Friday, April 03, 2020, 05:05: Vacuum @ 9.213T.
Tuesday, April 07, 2020, 10:46: Vacuum @ 11.922T.
|
Tuesday, April 07, 2020, 10:53:
Tried pumping down chamber with roughing pump. Looks like there is water in the system. Will leave it as is for now.
Tuesday, April 28, 2020, 12:30
Removed SiC#40 target and pumped down with HS lines blanked off. Used recycled SST gaskets.
Tuesday, April 28, 2020, 13:00
Still problem with water in the system. CG1 at about 25 Torr. Purging all water lines and pumping down again. |
Tuesday, March 17, 2020, 11:40, Aaron Schmidt, SiC#40, HP-SIS, ITW, TM2, 42218-8, 43515-8, In progress, Conditioning SiC#40
|
Tuesday, March 17, 2020, 11:37: Roughing.
FS# 3 re-connected. All waterlines re-opened except FS#5 (HS cooling).
Tuesday, March 17, 2020, 12:08: Turbo pumps on.
Tuesday, March 17, 2020, 12:13: IG1 on.
Wednesday, March 18, 2020, 04:31: Waterlines open. Vacuum ok @ 8.45e-07T.
Wednesday, March 18, 2020, 04:37: HV rack / 9-pin grounded.
Wednesday, March 18, 2020, 04:40: Power / Sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.42 |
4.04 |
TBHT |
24.39 |
6.72
|
COIL + EE |
24.21 |
1.63 |
TGHT |
24.30 |
5.76 |
Wednesday, March 18, 2020, 04:43: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Wednesday, March 18, 2020, 04:51: BIAS / EE / EZL @ 30 / -1.5 / 12.5 kV.
Wednesday, March 18, 2020, 04:52: Optics on / set. IV4 open.
Wednesday, March 18, 2020, 07:45: Fluctuation noticed on BIAS. No audible sparks. Conditioning.
Wednesday, March 18, 2020, 07:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Wednesday, March 18, 2020, 09:44: EZL Increased to 13 kV.
Wednesday, March 18, 2020, 09:51: Reset MB1 manually. Ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.76 |
5.00 |
TBHT |
25.49 |
7.61
|
COIL + EE |
25.35 |
2.04 |
TGHT |
25.32 |
6.14 |
Wednesday, March 18, 2020, 10:57: Mass, wire, & emittance scans complete.
Thursday, March 19, 2020, 11:41: Auto-cooling @ 1 A per min.
Thursday, March 19, 2020, 11:46: BIAS / EE / EZL @ 0 kV.
Monday, March 23, 2020, 05:15: IV4 closed / reset.
Monday, March 23, 2020, 05:17: Power / sources off.
|
Wednesday, March 11, 2020, 13:31, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing - 2
|
Thermocouples installed on EE. Double checked continuity & used a heat gun.
Wednesday, March 11, 2020, 13:30: Roughing.
Wednesday, March 11, 2020, 15:03: Turbo pumps on, interlocks by-passed (No water at the moment)
Wednesday, March 11, 2020, 15:10: IG1 on.
Thursday, March 12, 2020, 06:08: Vacuum @ 2.33e-06T. Opening waterlines.
Thursday, March 12, 2020, 06:11: Waterlines all open. Vacuum Stable @ 2.31e-06T
Thursday, March 12, 2020, 06:13: Bypass on TP1A & B removed.
Thursday, March 12, 2020, 06:18: Power / Sources on TGHT / TBHT @ 0 / 0 A.
Thursday, March 12, 2020, 06:20: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.
Thursday, March 12, 2020, 07:34: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.
Thursday, March 12, 2020, 08:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.
Thursday, March 12, 2020, 08:30: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.
Thursday, March 12, 2020, 08:55: Ramping aborted. TGHT / TBHT @ 488 / 230 A. Vacuum limit reached at 3.30e-06T.
Thursday, March 12, 2020, 08:56: Vacuum limit increased to 5.0e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.
Thursday, March 12, 2020, 09:27: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.
W/ Water cooling on EE
TGHT / TBHT Current (A) |
EE Temp (A - T1 - Red/Black wire - 1,2)
[C] |
EE Temp (B - T2 - White/Black wire 8,9)
[C] |
0 / 0 |
17.7 |
17.8 |
250 / 150 |
26.4 |
28.1 |
350 / 200 |
34.1 |
39.0
|
450 / 230 |
41.4 |
48.0 |
580 / 230 |
43.1 |
49.0 |
Thursday, March 12, 2020, 09:31: Auto-cooling @ 6A per min.
Thursday, March 12, 2020, 11:09: PS off. Lock up. Remove HV cage for FS#3 EE route & water purge.
Thursday, March 12, 2020, 11:27: PS on. Locks off. FS#3 re-routed (K line - EE isolated). Water on. Vacuum ok @ 2.07e-06T
W/O Water cooling on EE
TGHT / TBHT Current (A) |
EE Temp (A - T1 - Red/Black wire - 1,2)
[C] |
EE Temp (B - T2 - White/Black wire 8,9)
[C] |
0 / 0 |
15.5 |
15.6 |
250 / 150 |
26.6 |
27.6 |
350 / 200 |
35.0 |
38.9
|
450 / 230 |
42.6 |
48.1 |
580 / 230 |
46.3 |
51.9 |
580 / 230 @ 2:41 pm |
43.3 |
49.3 |
Thursday, March 12, 2020, 11:28: Power / Sources on TGHT / TBHT @ 0 / 0 A.
Thursday, March 12, 2020, 11:29: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.
Thursday, March 12, 2020, 12:33: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.
Thursday, March 12, 2020, 13:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.
Thursday, March 12, 2020, 13:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.
Thursday, March 12, 2020, 14:11: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.
Thursday, March 12, 2020, 14:41: Auto-cooling @ 4A per min.
Tuesday, March 17, 2020, 05:26: IG1 & turbo pumps off. Water lines closed for FS#3 & HS.
Tuesday, March 17, 2020, 05:31: Waterlines FS#5 & FS#3 purged.
Tuesday, March 17, 2020, 07:08: Venting. |
Wednesday, March 04, 2020, 17:15, Fernando Maldonado, , , , , , , Problems/Solutions, Emittance rig communication
|
Wednesday, March 04, 2020, 17:13: EPICS page indicated a sucesful scan but data was empty.
Wednesday, March 04, 2020, 17:13: Power suppply didn't respond to the voltage sweep
Wednesday, March 04, 2020, 17:14: Problem most likely similar to elog entry 531.
Wednesday, March 04, 2020, 17:14: Keiko contacted for a soft reboot.
Wednesday, March 04, 2020, 17:14: Emittance power supply now responds. |
Monday, March 02, 2020, 14:42, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Full TS testing w/ HV using Ta#60
|
Monday, March 02, 2020, 14:36: Roughing.
Monday, March 02, 2020, 15:08: Turbo pumps on.
Remove HV cage (top). Reroute FS#3 back to cool EE
Tuesday, March 03, 2020, 08:11: Waterlines open. Vacuum ok @ 6.52e-07T.
HV cage top on. Data Logger removed. Wiring grounded.
Tuesday, March 03, 2020, 09:00: Power / sources / HV on.
Tuesday, March 03, 2020, 09:03: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4 A per min.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.65 |
4.38 |
TBHT |
25.50 |
6.97
|
COIL + EE |
25.39 |
1.06 |
TGHT |
25.82 |
5.84 |
Tuesday, March 03, 2020, 09:08: BIAS / EE / EZL on.
Tuesday, March 03, 2020, 09:11: BIAS / EE / EZL @ 10 / 7.5 / -1 kV.
Tuesday, March 03, 2020, 09:15: BIAS / EE / EZL @ 20 / 12.5 / -1.5 kV. Read back on PS same / ok.
Tuesday, March 03, 2020, 09:17: BIAS / EE / EZL @ 30 / 12.5 / -1.5 kV.
Tuesday, March 03, 2020, 09:18: IV4 Opened.
Tuesday, March 03, 2020, 09:24: Optics on / set.
One spark noted. Reset optics.
Tuesday, March 03, 2020, 11:32: Auto-ramping TGHT / TBHT to 500 / 200 A @ 4 A per min.
One spark noted. Reset optics.
Tuesday, March 03, 2020, 12:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.
FM
Tuesday, March 03, 2020, 18:30: BIAS/EE/EZL @ 0 kV.
Tuesday, March 03, 2020, 18:31: TGHT / TBHT to 400 / 200 A @ 4 A per min.
Nothing observed on the emittance scan regardless of the tune
Wednesday, March 04, 2020, 09:09: Auto-ramping TGHT / TBHT to 500 / 210 A @ 4 A per min.
Wednesday, March 04, 2020, 10:47: Auto-ramping TGHT / TBHT to 580/ 230 A @ 4 A per min.
*Got busy in the morning, starting later than expected
Wednesday, March 04, 2020, 13:47: BIAS / EE / EZL @ 30 / 12.5 / -1.5 kV.
*Seminar at 2:30 I'll continue later
Wednesday, March 04, 2020, 16:08: Emittance rig troubleshoot (see e-log 778)
Wednesday, March 04, 2020, 19:00: BIAS/EE/EZL @ 0 kV.
Wednesday, March 04, 2020, 19:09: TBHT to 200A to try preserver some salts for tomorrow tests
Friday, March 06, 2020, 17:50: Auto-cooling 4 A/min .
Monday, March 09, 2020, 12:08: IV4 closed
Monday, March 09, 2020, 12:08: IG1 Off.
Monday, March 09, 2020, 12:09: Turbos off
Monday, March 09, 2020, 16:19: Venting |
Thursday, February 27, 2020, 07:20, Aaron Schmidt, , , , , , , , FS#3 - Fitting change out
|
Thursday, February 27, 2020, 07:10: Swapped out an old brass fitting on the supply line going into FS#3 - Line K.
Replaced w/ SS fitting for interchangeability w/ other lines in case a bypass is needed. |
Thursday, February 20, 2020, 11:41, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing
|
Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04: Roughing.
Thursday, February 20, 2020, 14:38: Turbo pumps on (Leak check in am).
Thursday, February 20, 2020, 14:43: IG1 on.
Friday, February 21, 2020, 06:36: Waterlines opened. No vacuum response. Vacuum ok @ 8.69e-07T.
Friday, February 21, 2020, 06:38: Turbo pumps off.
EE Thermocouples req'd.
Friday, February 21, 2020, 11:15: Vented.
9-pin removed. Thermocouples installed.
Friday, February 21, 2020, 13:52: Roughing.
Friday, February 21, 2020, 14:24: Turbo pumps on.
EE Waterline - On
Wednesday, February 26, 2020, 07:40: Waterlines re-opened. Vacuum ok. @ 3.51e-07T
Wednesday, February 26, 2020, 07:43: Power / sources on.
Wednesday, February 26, 2020, 07:45: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 150 A.
TGHT / TBHT Current (A) |
EE Temp (A - T1 - Upper left)
[C] |
EE Temp (B - T4 - Lower right)
[C] |
250 / 150 |
20.8 |
24.0 |
350 / 200 |
22.5 |
29.7
|
450 / 230 |
20.1 |
30.9 |
580 / 230 |
14.5 |
28.8 |
580 / 230 @ 2:52 pm |
6.2 |
21.6 |
Wednesday, February 26, 2020, 09:52: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 200 A.
Wednesday, February 26, 2020, 11:04: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.
Wednesday, February 26, 2020, 11:57: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.
Wednesday, February 26, 2020, 13:03: TGHT / TBHT @ 580 / 230 A.
Wednesday, February 26, 2020, 14:52: Temp check (thermocouple reversed on T1?)
Wednesday, February 26, 2020, 14:54: Auto-cooling @ 2A per min.
Thursday, February 27, 2020, 06:30: Power/sources off, locked out. FS#3 purged. Cage open.
Thursday, February 27, 2020, 07:20: Line K (EE) disconnected from FS#3. Old fitting swapped for new one. See https://elog.triumf.ca/TIS/Test-Stand/786.
No water/cooling running into EE.
Thursday, February 27, 2020, 07:26: All waterlines open. Vacuum ok.
Thursday, February 27, 2020, 07:28: Power / Sources on.
TGHT / TBHT Current (A) |
EE Temp (A - T1 - Upper left)
[C] |
EE Temp (B - T4 - Lower right)
[C] |
0 / 0 |
22.8 |
22.9 |
50 / 25 |
22.6 |
22.7 |
100 / 50 |
22.6 |
22.6
|
150 / 100 |
22.2 |
23.3 |
200 / 150 |
22.0 |
24.9 |
200 / 150 7am Day 2 |
21.2 |
23.9 |
250 / 200 |
23.3 |
29.3 |
300 / 230 |
22.4 |
30.6 |
350 / 230 |
19.2 |
27.7 |
450 / 230 |
18.5 |
29.7 |
580 / 230 |
13.4 |
27.3 |
Thursday, February 27, 2020, 07:35: Auto ramping TGHT / TBHT @ 2 A per min to 50 / 25 A.
Thursday, February 27, 2020, 08:00: Auto ramping TGHT / TBHT @ 2 A per min to 100 / 50 A.
Thursday, February 27, 2020, 08:56: Auto ramping TGHT / TBHT @ 2 A per min to 150 / 100 A.
Thursday, February 27, 2020, 10:29: Auto ramping TGHT / TBHT @ 2 A per min to 200 / 150 A.
Friday, February 28, 2020, 06:56: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 200 A.
Friday, February 28, 2020, 07:38: Auto ramping TGHT / TBHT @ 2 A per min to 300 / 230 A.
Friday, February 28, 2020, 09:54: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 230 A.
Friday, February 28, 2020, 13:20: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.
Friday, February 28, 2020, 14:15: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.
Friday, February 28, 2020, 15:42: Last temperature measurement Taken. TGHT / TBHT @ 580 / 230 A.
Friday, February 28, 2020, 15:44: Auto-cooling @ 2A per min.
Monday, March 02, 2020, 07:37: Power / Sources off. Waterlines purged (A little over 2000 PSI left in the N Bottle)
Monday, March 02, 2020, 07:38: IG1 & Turbo pumps off. |
Wednesday, February 12, 2020, 11:04, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-1, In progress, Conditioning HS
|
Using a broken LP-FEBIAD oven for out gassing. Tentative UC#31*
Wednesday, February 12, 2020, 10:57: Roughing.
Wednesday, February 12, 2020, 11:30: Turbo pumps on.
Thursday, February 13, 2020, 07:19: Waterlines opened. Vacuum ok @ 6.91e-07T.
Thursday, February 13, 2020, 07:22: Power / Sources on. TGHT only.
Thursday, February 13, 2020, 07:25: Auto-ramping TGHT @ 2A per min to 580 A.
Friday, February 14, 2020, 14:03: Auto-cooling @ 1 A per min.
Thursday, February 20, 2020, 07:33: PS, sources off, locked out.
Thursday, February 20, 2020, 07:34: Turbo pumps & IG1 off.
Thursday, February 20, 2020, 07:35: Waterlines purged. Nitrogen Bottle around 2050 PSI.
Thursday, February 20, 2020, 09:22: Venting.
|
Tuesday, February 11, 2020, 14:27, Aaron Schmidt, , , , , , , , Pump down empty Chamber
|
Tuesday, February 11, 2020, 14:27: UC#32 HS removed.
Tuesday, February 11, 2020, 14:27: Roughing.
Wednesday, February 12, 2020, 09:05: Venting. |
Friday, February 07, 2020, 14:02, Aaron Schmidt, C#(1), LP-SIS, , , 43044-8, 43515-3, In progress, Conditioning C#(1) HS
|
Was for UC# 32* - Schedule change, now for C#1* - Last HS conditioning revealed a TGHT to HS lid short. Milled the lid back 1/8" - Aaron S.
Friday, February 07, 2020, 14:00: Roughing.
Friday, February 07, 2020, 14:33: Turbo pumps on.
Friday, February 07, 2020, 14:38: IG1 on.
Monday, February 10, 2020, 07:39: HS waterlines opened. Vacuum ok @ 4.12e-07T.
Monday, February 10, 2020, 07:41: Power / sources on.
Monday, February 10, 2020, 07:43: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, February 10, 2020, 13:01: Heating appears ok. No voltage abnormalities or short.
Monday, February 10, 2020, 13:02: Auto-Cooling @ 1 A per min.
Tuesday, February 11, 2020, 06:39: Power / Sources off.
Tuesday, February 11, 2020, 06:40: Waterlines purged. Nitrogen bottle @ 2100 PSI approx.
Tuesday, February 11, 2020, 06:42: IG1 off. Turbo pumps off.
Tuesday, February 11, 2020, 09:59: Venting.
|
Thursday, January 30, 2020, 15:25, Aaron Schmidt, C(#1), LP-SIS, , , 43044-8, 43515-3, In progress, Conditioning C(#1) HS
|
Was for UC# 32* - Schedule change, now for C#1
Thursday, January 30, 2020, 15:13: Roughing.
Thursday, January 30, 2020, 15:46: Turbo pumps on.
Thursday, January 30, 2020, 15:50: IG1 on.
Friday, January 31, 2020, 08:14: Waterlines opened. No Vacuum response. Vacuum ok @ 6.10e-07T.
Friday, January 31, 2020, 08:16: Power / sources on
Friday, January 31, 2020, 08:18: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, February 03, 2020, 12:56: Auto-cooling @ 2 A per min.
Wednesday, February 05, 2020, 09:07: Power / sources off. Waterlines purged. IG1 & turbo pumps off.
Friday, February 07, 2020, 11:45:
Short was found on the HS Lid from the TGHT on the left. Milled out 1/8" off both HS lid / TGHT gaps. Lots of clearance now. Reheat req'd. |
Friday, January 03, 2020, 11:56, Anders Mjos, , , , , , , Problems/Solutions, Upgrading BIAS Power Supply
|
A new power supply was installed today by John Chow. Due to differences in pin configuration of the controls, a change to the cabling is required. Contacted controls (Julie) for support. |
Friday, January 24, 2020, 16:01, Anders Mjos, , , , , , , Problems/Solutions, Upgrading BIAS Power Supply
|
Anders Mjos wrote: |
A new power supply was installed today by John Chow. Due to differences in pin configuration of the controls, a change to the cabling is required. Contacted controls (Julie) for support.
|
Ray from controls has updated EPICS and changed the cabling today. The power supply is operational.
NOTE: Current limit will need to be set in EPICS. Default value should be 0.1 mA for now. |
Thursday, January 23, 2020, 16:05, Anders Mjos, , , , , , , Problems/Solutions, Vacuum tripped due to PLC/EPICS for for the new BIAS
|
Thursday, January 23, 2020, 16:05: Restarting vacuum and TPs |
Tuesday, January 21, 2020, 13:45, Aaron Schmidt, , , , , , , Problems/Solutions, RGA Communications error
|
Tuesday, January 21, 2020, 13:42: The RGA was unable to connect. Typically connects on COM4, however it did not register. RGA Offline.
Brought in a separate RGA. Was able to connect & see the 2nd RGA ID on COM4. Removed 2nd RGA.
We likely need to replace / repair our communication chip again.
Wednesday, January 22, 2020, 13:21: The chip was replaced and the RGA reinstalled, however, the RGA is still no connecting on COM4. |
Tuesday, January 21, 2020, 09:38, Aaron Schmidt, SiC#40, LP-SIS, , , 43044-8, 43515-8, In progress, Conditioning SiC#40 HS
|
Was intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34: BV1A open Roughing.
Tuesday, January 21, 2020, 09:38: BV1B open.
Tuesday, January 21, 2020, 10:05: Turbo pumps on.
Tuesday, January 21, 2020, 10:10: Ion gauge on.
Monday, January 27, 2020, 07:07: PS / Sources on. Waterlines already opened.
Monday, January 27, 2020, 07:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, January 28, 2020, 14:45: Auto-Cooling @ 2 A per min.
Thursday, January 30, 2020, 11:31: PS / Source off.
Thursday, January 30, 2020, 11:33: IG1 off. Turbos off.
Thursday, January 30, 2020, 13:00: Venting. |
Friday, December 20, 2019, 07:59, Aaron Schmidt, , , , , , , , Holiday TS shut down
|
Friday, December 20, 2019, 07:58: Turn off ion gauges. Shut off turbo pumps TP6, TP2, TP1A, & TP1B. Close backing valves.
Friday, December 20, 2019, 08:06: PV1 & PV2 off. RP1 & RP2 off.
Monday, January 06, 2020, 09:35: Restarting TS. RP1 & RP2 on. (BIAS PS upgraded / Note: https://elog.triumf.ca/TIS/Test-Stand/776 ). No HV as yet.
Monday, January 06, 2020, 09:37: Turbo pumps (TP6, TP2, TP1A, & TP1B) on.
Monday, January 06, 2020, 09:42: Ion gauges on (IG1 & IG6).
Monday, January 20, 2020, 08:17: Ion gauge. Turbos pumps off.
Monday, January 20, 2020, 10:26: Venting. |
Monday, December 02, 2019, 16:01, Fernando Maldonado, , , , , , , In progress, Ferran irradiation copper end plate tests (aka MIST)
|
Friday: Test to validate Ferran's assembly. The plan is to ramp up to operating current, apply high voltage, and possibly extract beam.
Turbos on. IG1. Power on.
Monday, December 02, 2019, 15:59: Auto-ramp to 230/600 A for TBHT/TGHT @ 2A/min and 4A/min (0.5A/15 s 1 A/15s.)
Tuesday, December 03, 2019, 15:30: Sources on.
Tuesday, December 03, 2019, 15:41: Bias/EZL/EE @ 30/13/1.5 kV
Bias/EE/EZL to 40/2.0/17 kV.
Bias/EE/EZL to 50/2.5/22 kV.
Bias/EE/EZL to 50/2.6/22.5 kV.
Spark. Inaudible
Tuesday, December 03, 2019, 17:26: Bias/EZL/EE to 0kV.
Tuesday, December 03, 2019, 17:26: Auto-cooling @ 2A/min
Wednesday, December 04, 2019, 09:37: Power/sources off |
Wednesday, November 27, 2019, 16:01, Fernando Maldonado, , , , , , , Problems/Solutions, New Controller for TP6
|
Wednesday, November 27, 2019, 15:31: During HV tests, bias was around 55kV when a spark occur and almost immediately the controller for TP6 made a noticeable noise and smoke started to come out of it.
Control room notified about the smoke.
Both turbo and IG6 were not affected.
Eddie was contacted for assessment, and a new controller (from OATIS) was installed and tested. Turbo turned on without any issue.
Wednesday, November 27, 2019, 16:00: Resuming HV tests |
Friday, November 22, 2019, 19:06, Fernando Maldonado, Ferran Boix Pamies, , , , , , , , PEEK seal tests
|
Friday, November 22, 2019, 19:02: The new design for the PEEK irradiation will be tested.
Blinds were removed and a new LP-SIS assembly with a modify heatshield was installed. Three termocuples installed.
Friday, November 22, 2019, 19:04: Roughing
Friday, November 22, 2019, 19:38: Turbos on
Friday, November 22, 2019, 19:46: TSGIG1 on
Monday, November 25, 2019, 15:43: Vacuum stable@ 5.73E-7T
Monday, November 25, 2019, 15:47: Waterlines open. No response on Vacuum
Monday, November 25, 2019, 15:51: RGA on.
Tuesday, November 26, 2019, 08:41: Vacuum stablet@ 5.2E-7T
Tuesday, November 26, 2019, 15:04: Power on
Tuesday, November 26, 2019, 17:17: Auto-ramping to 300A/150A on the TGHT/TBHT @ 6 A/min
Tuesday November 26, 2019 20:00: Thermocouple 3 gives signs to have a bad contact with the HS. "Luckily" it is the one attached to the HS itself. TH 1 and 2 show similar temperatures below 40degC at 500A. Ramping to 600A
Tuesday November 26, 2019 20:46: 600A TH1 and 2 around 40degC slightly going down. Tomorrow it will be known the final steady-state temperature. The test shows tho that the temperature evolves similarly between the copper piece and the Peek assembly. Showing good contact.
FM
Wednesday, November 27, 2019, 13:47: Th1=35, Th2=34.8, Th3=19.6 C.
Wednesday, November 27, 2019, 13:49: Closing Farady cage to proceed with HV tests.
Wednesday, November 27, 2019, 13:56: HV on. Optics set.
Wednesday, November 27, 2019, 14:01: RGA off to protect it from potential sparks.
Wednesday, November 27, 2019, 14:18: Bias/EE/EZL to 30/1.5/13 kV.\
Wednesday, November 27, 2019, 14:25: Bias/EE/EZL to 40/2.0/17 kV.
Wednesday, November 27, 2019, 14:28: Audible spark on top @ 48kV
Wednesday, November 27, 2019, 14:29: Bias/EE/EZL to 50/2.5/22 kV.
Wednesday, November 27, 2019, 14:35: Spark noticed on striptool, not audible.
Wednesday, November 27, 2019, 14:36: Audible spark on top. not as loud as previous one.
Wednesday, November 27, 2019, 14:39: Spark noticed on striptool, not audible.
Wednesday, November 27, 2019, 14:39: Moving to 55kV to condition for 10 minutes then coming down to 50kV
Wednesday, November 27, 2019, 14:42: Audible spark at 59kV. TP6 and CB knocked out.
Wednesday, November 27, 2019, 14:46: Bias/EE/EZL to 55/2.8/24 kV.
Wednesday, November 27, 2019, 14:50: Audible spark. TP6 , CB, optics knocked out..
Wednesday, November 27, 2019, 14:51: Audible spark. TP6 , CB, optics knocked out.
Wednesday, November 27, 2019, 15:01: Thermal incident (see elog 773)
Wednesday, November 27, 2019, 15:03: All HV to 0 V
Wednesday, November 27, 2019, 16:01: Resuming HV test. Max HV=50kV.
Wednesday, November 27, 2019, 16:10: Bias/EE/EZL to 30/1.5/13 kV.
Wednesday, November 27, 2019, 16:38: Bias/EE/EZL to 40/2.0/17 kV.
Wednesday, November 27, 2019, 16:50: Spark
Wednesday, November 27, 2019, 17:01: Spark
Wednesday, November 27, 2019, 17:09: Spark to EZL. Instabilitiesafter this, TBHT insulator glowing blue
Wednesday, November 27, 2019, 18:11: Bias/EE/EZL to 0 kV.
Wednesday, November 27, 2019, 18:11: Auto-cooling at 10 A/min (2.5A/15s).
Wednesday, November 27, 2019, 19:13: IG1 off. Turbos off.
Wednesday, November 27, 2019, 20:35: Venting. Tighten the 4 bolts from the heatshields as they were not done before the tests. Removing thermocouples as they might be causing some sparks.
Wednesday, November 27, 2019, 20:42: Roughing
Thursday, November 28, 2019, 07:00: Turbo pumps on.
Thursday, November 28, 2019, 07:06: Ion gauge on.
|
Friday, November 15, 2019, 10:35, Aaron Schmidt, , , , , , , , Pump down empty Chamber
|
Friday, November 15, 2019, 09:35: Roughing.
Friday, November 15, 2019, 10:34: Turbo pumps on.
Wednesday, November 20, 2019, 09:19: Turbo pumps off. Ion gauge off.
Wednesday, November 20, 2019, 11:20: Roughing. U-Line removed from HS waterline. Blanks installed. Do not open HS waterline.
|
Friday, November 08, 2019, 14:21, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-9, In progress, Nitrogen Bottle leak test
|
Friday, November 01, 2019, 14:00: Nitrogen bottle installed. Purged waterlines HS / FS#5. Purge done in conjunction with SiC#38
4.8 Purity
35-40 PSI pressure.
Successfully purged the line after 5 minutes.
Friday, November 08, 2019, 14:16: Begin FS#5 waterline purge w/ Nitrogen. Purge done in conjunction with UC#30 HS & assy.
4.8 Purity
12-14 PSI line pressure.
2500 PSI bottle pressure.
Full stream for a minute or so, then purged lightly. Drops / mist outgoing.
Friday, November 08, 2019, 14:24: Line Pressure at 10-11 PSI, brought back up to 14 PSI.
2400 PSI bottle pressure. Water / mist outgoing still.
Friday, November 08, 2019, 14:31: No water appears on line with purge.
Approx 2350 PSI bottle pressure.
Line pressure increased to 40 PSI. No water appeared on the purge line.
Friday, November 08, 2019, 14:34: Purge complete. 14 PSI appears successful. |
Friday, November 01, 2019, 16:01, Fernando Maldonado, , LP-SIS, , , 41790-9, 43515-9 , In progress, Peek seal tests on UCx#30 HS
|
Friday, November 01, 2019, 15:47: A symbiotic peek seal assembly was installed on the manipulator grip to verify the temperature at high voltage and high current.
Friday, November 01, 2019, 15:48: Three thermocouples added for temperature readings.
Friday, November 01, 2019, 15:47: Roughing
Friday, November 01, 2019, 16:19: Turbos on.
Friday, November 01, 2019, 16:27: IG1 on.
Friday, November 01, 2019, 16:29: RGA on.
AS
Monday, November 04, 2019, 07:41: Waterlines opened. No response on RGA. Vacuum ok @ 3.97e-07T.
Monday, November 04, 2019, 07:44: Power / sources on.
Monday, November 04, 2019, 07:47: Auto-ramping TGHT to 300 A @ 2 A per min.
Monday, November 04, 2019, 10:57: Auto-ramping TGHT to 400 A @ 2 A per min.
FM
Monday, November 04, 2019, 12:11: Auto-ramping TGHT to 500 A @ 2 A per min.
Monday, November 04, 2019, 13:35: Auto-ramping TGHT to 600 A @ 2 A per min.
Monday, November 04, 2019, 14:48: Bias/EE/EZL @ 30/1.5/13 kV.
Monday, November 04, 2019, 15:03: Bias/EE/EZL @ 40/2.0/17 kV.
Monday, November 04, 2019, 15:04: Sparks observed after reaching 40 kV. TMS:TP6 down. Back down to 32 kV.
Monday, November 04, 2019, 15:04: Bias to 40 kV. One spark only. Seems stable now.
Sparks occurred sparsely. Max time without a spark was 26 minutes.
Monday, November 04, 2019, 16:09: Bias/EE/EZL @ 30/1.5/13 kV.
Monday, November 04, 2019, 16:16: RGA restart.
AS
Tuesday, November 05, 2019, 08:30: RGA Restarted.
Tuesday, November 05, 2019, 08:32: Begin bringing up HV to 35 kV on BIAS.
Tuesday, November 05, 2019, 08:35: BIAS / EE / EZL @ 35 / 1.8 / 15 kV.
Tuesday, November 05, 2019, 08:55: No sparks after 20 minutes. Move up to 40 kV.
Tuesday, November 05, 2019, 08:59: BIAS / EE / EZL @ 40 / 2.0 / 20 kV.
Tuesday, November 05, 2019, 09:34: Audible Spark*. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6. Appears on EZl cur.
Tuesday, November 05, 2019, 09:37: RGA off. Leave it off.
Tuesday, November 05, 2019, 09:38: Audible Spark* but not loud at all. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6.
Tuesday, November 05, 2019, 10:00: BIAS / EE / EZL @ 35 / 1.8 / 17.5 kV.
Tuesday, November 05, 2019, 10:06: BIAS / EE / EZL @ 0 / 0 / 0 kV.
Tuesday, November 05, 2019, 10:07: Auto-cooling TGHT to 500 A @ 4 A per min.
Wednesday, November 13, 2019, 07:29: Turbo pumps & ion gauge off. RGA was already off.
Friday, November 15, 2019, 08:43: Venting.
|
Thursday, October 31, 2019, 13:22, Fernando Maldonado, , , , , , , Problems/Solutions, 9pin connector not fully in contact with baseplate
|
Thursday, October 31, 2019, 13:20: After inspecting the interior, the 9 pin bracket was found not making full contact with the baseplate (pic attached).
After pushing it and re doing the bolts conctact works. |
Thursday, October 31, 2019, 11:37, Fernando Maldonado, , , , , , , Problems/Solutions, Probing anode bias supply on the service cap
|
Thursday, October 31, 2019, 10:41: Cage removed. Tape put on the limit switches. Anode interlock bypassed.
Thursday, October 31, 2019, 10:42: Measuring voltage between F/T B and cable tray.
Thursday, October 31, 2019, 10:42: Readings match EPICS readback, i.e, 4 V readsback 3.7V and multimeter shows -3.816V
Thursday, October 31, 2019, 10:44: Probing from F/T B to J reads 0 V as expected. Anode is on common
Thursday, October 31, 2019, 10:45: Probing from F/T B to other F/T show 0V.
Thursday, October 31, 2019, 11:37: Current draw from the power supply matches the on neede for the 50 kOhm resistor.
|
Monday, October 28, 2019, 09:24, Fernando Maldonado, , , , , , , Problems/Solutions, TSG:CG1A checked with local reader
|
Monday, October 28, 2019, 09:22: The local reader indicated 42 mTorr while EPICS showed 51mTorr.
CG1B showed 8.9mTorr while EPICS shows 14mTorr.
After reconnecting CG1A, EPICS shows 16mTorr. Anthony suggest replacing the gauge. |
Friday, October 25, 2019, 12:04, Anders Mjos, , , , , , , Problems/Solutions, ISG:TP1A found stopped
|
Restarted TP. Note that CG1A is above 50 mTorr. CG1B shows 15 mTorr |
Wednesday, October 23, 2019, 09:51, Aaron Schmidt, , , , , , , Problems/Solutions, Water leak in Magnet PS
|
Wednesday, October 23, 2019, 09:50:
Fault: 12797
WP: C2019-10-23-2
ISAC test stand power supply MB-1 leak.
Water can be seen underneath and behind power supply cabinet. Repairs as per WP.
Friday, October 25, 2019: Power supply operational. AM |
Friday, October 18, 2019, 15:01, Aaron Schmidt, SiC#38, HP-FEBIAD, ITE, TM2, 42464-4, 42752-1, In progress, Conditioning SiC#38 HP-FEBIAD 12x
|
Friday, October 18, 2019, 14:58: Roughing.
Friday, October 18, 2019, 15:30: Turbo pumps on.
Friday, October 18, 2019, 15:35: Ion gauge on.
Friday, October 18, 2019, 15:39: RGA on.
Tuesday, October 22, 2019, 08:37: Restart RGA.
Tuesday, October 22, 2019, 08:39: Waterlines opened. No response on RGA. Vacuum stable @ 4.76e-07T.
Wednesday, October 23, 2019, 09:15: Calibrated He leak bottle installed on line labeled as "Neon"
Wednesday, October 23, 2019, 09:45: Do not start TS. Magnet PS water leak issue.Fault: 12797
FM
Monday, October 28, 2019, 09:10: Magnet leak repaired on Friday. Checked by Anders. The polarity might need to be reversed.
Monday, October 28, 2019, 09:20: Vacuum gauges checked and reconnected ( see elog 765)
Monday, October 28, 2019, 09:28: RGA restarted.
FM
Tuesday, October 29, 2019, 9:00: Power/Sources on.
Tuesday, October 29, 2019, 10:29 :
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.56 |
5.23 |
TBHT |
22.35 |
8.03
|
COIL + EE |
22.30 |
2.17 |
TGHT |
22.40 |
6.29 |
Tuesday, October 29, 2019, 10:29: Gas lines opened
Tuesday, October 29, 2019, 10:45: BIAS/EZL/EE to 30 / 13 / 1.5 kV.
Tuesday, October 29, 2019, 10:56: Vacuum stable @ 7.28e-07T.
Tuesday, October 29, 2019, 10:54 : Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Tuesday, October 29, 2019, 11:01: IV4 open.
Tuesday, October 29, 2019, 11:01: Optics set to "old nominal" tunes.
Rick has provided new tunes that have been tested recently and show better beam quality. If times allows it I'll checked them again for this source
Tuesday, October 29, 2019, 14:02: Spark. Left monitor flickered.
Tuesday, October 29, 2019, 17:45: Mass scan @200V only showing surface ionized items. Either the anode is disconnected or the electron current is particularly low.
Wednesday, October 30, 2019, 09:10: TBHT tapped up to 310 A. No response on the anode leakage current,
Wednesday, October 30, 2019, 09:17 After talking with Anders, the system will be ramped down and switched to cathode bias.
Wednesday, October 30, 2019, 09:21: Auto-cooling to TGHT / TBHT to 0/ 0 @ 6A per min.
Wednesday, October 30, 2019, 11:04: : BIAS/EZL/EE to 0V
Wednesday, October 30, 2019, 14:50 Now on Cathode bias mode. See elog 766
Wednesday, October 30, 2019, 14:53: Power/ Sources on.
Wednesday, October 30, 2019, 15:02: Gas lines open
Wednesday, October 30, 2019, 15:04: Optics set
Wednesday, October 30, 2019, 15:30: BIAS/EZL/EE to 30 / 13 / 1.5 kV.
Anode@200V. Coil@40A
Wednesday, October 30, 2019, 15:30: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2A per min.
Wednesday, October 30, 2019, 15:59: Auto-ramping aborted.
Wednesday, October 30, 2019, 16:00: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4A per min.
FM
Thursday, October 31, 2019, 08:05: Auto-ramping TGHT / TBHT to 580/ 290A @ 4A per min.
Thursday, October 31, 2019, 08:54: TBHT at set current and glowing but no leakage current on the anode.
Thursday, October 31, 2019, 08:56: Ramping aborted.
Thursday, October 31, 2019, 09:19: Manually tapping TBHT to 300 A. Still no leakage current.
Thursday, October 31, 2019, 09:08: Auto-cooling to TGHT / TBHT to 0/ 0 @ 8A per min.
Thursday, October 31, 2019, 09:35: BIAS/EZL/EE to 0V
Thursday, October 31, 2019, 10:16: Gas lines closed.
Thursday, October 31, 2019, 10:16: IV4 closed.
Thursday, October 31, 2019, 10:16: IG1 off.
Thursday, October 31, 2019, 10:17: RGA off.
Thursday, October 31, 2019, 10:17: Turbos off.
Thursday, October 31, 2019, 11:41 Venting
Thursday, October 31, 2019, 11:41: HS waterline purged.
Thursday, October 31, 2019, 13:00: Inspecting the interior, 9 pin connector slightly de attached but now reattached (see elog 768)
Thursday, October 31, 2019, 13:07: Roughing
Thursday, October 31, 2019, 13:40: Turbos on
Thursday, October 31, 2019, 13:44: Gas lines open
Thursday, October 31, 2019, 13:47: IG1 on
Thursday, October 31, 2019, 13:48 RGA on.
Thursday, October 31, 2019, 16:09: Waterlines opened. No response on RGA. Vacuum stable @ 2.41e-06T.
Thursday, October 31, 2019, 16:15: Power/ sources on.
Thursday, October 31, 2019, 16:15 BIAS/EZL/EE to 30 / 13 / 1.5 kV.
Thursday, October 31, 2019, 16:16: Optics set
Thursday, October 31, 2019, 16:17
Thursday, October 31, 2019, 08:05: Auto-ramping TGHT / TBHT to 580/ 290A @ 4A per min.
Thursday, October 31, 2019, 16:17: IV4 open
Thursday, October 31, 2019, 17:27: Readback current is not displayed on EPICS. However, electron impact ionized species are present in the mass scan.
Thursday, October 31, 2019, 17:29: Auto-ramping aborted. TBHT/TGHT 290/292 A. Vacuum stable@2.32-6 T
Friday, November 01, 2019, 08:35: Auto-ramping TGHT to 580 A @ 4A per min. TBHT @ 290 A. - AS
Friday, November 01, 2019, 12:09: Auto-cooling to TGHT / TBHT to 0/ 0 @ 8A per min.
Friday, November 01, 2019, 13:13: Anode to 0V.
Friday, November 01, 2019, 13:13: Gas lines closed
Friday, November 01, 2019, 13:25 BIAS/EZL/EE to 0V
Friday, November 01, 2019, 13:26: IV4 closed
Friday, November 01, 2019, 13:32: Power / Sources off. Ion gauge & Turbo pumps off.
Friday, November 01, 2019, 14:36: Venting. |
Wednesday, October 02, 2019, 13:42, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-9, In progress, Conditioning UC#(30) HS
|
Wednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13: Turbo Pumps started.
Wednesday, October 02, 2019, 14:19: Ion gauge on.
Wednesday, October 02, 2019, 14:24: RGA on.
Thursday, October 03, 2019, 07:35: Waterlines opened. No response on RGA. Vacuum ok @ 7.53e-07T
Thursday, October 03, 2019, 07:37: Power / Sources on.
Thursday, October 03, 2019, 07:38: Auto-ramping TGHT to 580 A @ 2 A per min.
Friday, October 04, 2019, 14:53: Auto-cooling @ 2 A per min.
Wednesday, October 16, 2019, 10:17: RGA off.
Wednesday, October 16, 2019, 10:19: Power / Sources off. IG1 off. Turbo pumps off. |
Friday, September 27, 2019, 11:54, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-6, , Conditioning UC#(29) HS
|
Using broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53: Roughing.
Friday, September 27, 2019, 13:14: Turbo pumps on.
Friday, September 27, 2019, 13:20: Ion gauge on.
Friday, September 27, 2019, 13:24: RGA on.
Monday, September 30, 2019, 07:30: Waterlines Opened. No response on RGA. Vacuum ok @ 5.39e-07T.
Monday, September 30, 2019, 07:34: Power / Sources on.
Monday, September 30, 2019, 07:35: Auto-ramping TGHT to 580 A @ 2 A per min.
Tuesday, October 01, 2019, 14:29: Auto-Cooling TGHT @ 2A per min.
Wednesday, October 02, 2019, 08:24: Power / sources off.
Wednesday, October 02, 2019, 08:25: RGA off.
Wednesday, October 02, 2019, 08:26: Ion gauge & Turbo pumps off.
Wednesday, October 02, 2019, 12:50: Venting & Waterlines purged. |
Thursday, September 26, 2019, 11:30, Aaron Schmidt, , , , , , , Problems/Solutions, Replace CANBUS board TSG:CB1
|
Thursday, September 26, 2019, 11:28: The control board to TSG:CB1 was removed and replaced.
Thursday, September 26, 2019, 11:30: All optics & steering operational. Board replacement successful. |
Monday, September 23, 2019, 13:30, Aaron Schmidt, Ta#59, LP-SIS, ITE, TM2, 44062-5, 42752-10, In progress, Conditioning Ta#59 Assy 9x
|
Monday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38: Closed BV1A / Opened BV1 A & B to open both @ 35.0 T.
Monday, September 23, 2019, 14:20: Turbo pumps started.
Monday, September 23, 2019, 14:27: Ion gauge on.
Tuesday, September 24, 2019, 08:04: RGA on.
Tuesday, September 24, 2019, 08:07: Waterlines opened. No response on RGA. Vacuum ok @ 1.52e-06T.
Tuesday, September 24, 2019, 08:12: Power / sources on.
Tuesday, September 24, 2019, 08:16: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Tuesday, September 24, 2019, 08:19: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.
Tuesday, September 24, 2019, 08:20: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.33 |
5.00 |
TBHT |
28.19 |
7.75
|
COIL + EE |
28.08 |
2.13 |
TGHT |
28.18 |
6.15 |
Tuesday, September 24, 2019, 08:28: BIAS / EE / EZL @ 27 / -1.5 / 13 kV. Spark*
Tuesday, September 24, 2019, 08:30: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 24, 2019, 09:07: Optics set.
Tuesday, September 24, 2019, 10:45: Clusters of sparks noted. Especially around 10:20.
Tuesday, September 24, 2019, 10:58: RGA reset.
Tuesday, September 24, 2019, 11:05 Sparks ongoing. spaced from 1 minutes apart to 15 minutes apart. The TBHT insulator is glowing blue on the left right side again.
Tuesday, September 24, 2019, 11:06: Abort Target heating.
Tuesday, September 24, 2019, 11:12: BIAS to 23 KV. Blue glow less pronounced / almost gone.
Tuesday, September 24, 2019, 11:15: BIAS to 30 KV. Blue glow remains.
Tuesday, September 24, 2019, 11:31: Continue auto-ramping @ 2A per min.
Tuesday, September 24, 2019, 11:39. HV off.
Tuesday, September 24, 2019, 11:49: Halt ramp. Auto-cooling @ 4 A per min.
Remove loose wiring / connection from 9-pin area in the back. Ground other loose connections.
Tuesday, September 24, 2019, 13:28: Auto-ramping TGHT / TBHT to 250 / 200 A @ 4A per min.
Tuesday, September 24, 2019, 13:31: HV sources on. Optics on.
Tuesday, September 24, 2019, 13:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 24, 2019, 14:32: Auto-ramping TGHT to 280 A @ 4A per min.
Tuesday, September 24, 2019, 14:40: TGHT / TBHT @ 280 / 200 A.
EPICS issues* ? Won't open at the ISAC TS computer.
Wednesday, September 25, 2019, 07:30: Auto-ramping TGHT to 350 A @ 2 A per min.
Wednesday, September 25, 2019, 07:44: EPICS Error at my desk as well. Able to restart it and continue ramping.
Wednesday, September 25, 2019, 07:56: EPICS Issue ongoing. Halted ramping @ 290 A on TGHT.
Wednesday, September 25, 2019, 10:44: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Wednesday, September 25, 2019, 11:57: FM: Sparks have been occurring for the past 20 min with a rate approx of 0.5/min. The TBHT insulator is again showing a glowing blue. I managed to saw one spark flashing up the TBHT insulator.
Wednesday, September 25, 2019, 12:59: RGA restarted.
Wednesday, September 25, 2019, 13:36: Spark* knocked out TSG:CB1 during RPM6A wire scan. Controls notified.
Wednesday, September 25, 2019, 14:45: After investigation with controls, replacement of the control board to TSG:CB1 likely req'd.
Thursday, September 26, 2019, 06:30: HV off. Prep to remove control board for TSG:CB1.
Thursday, September 26, 2019, 11:28: The control board to TSG:CB1 was removed and replaced. https://elog.triumf.ca/TIS/Test-Stand/759
Thursday, September 26, 2019, 11:30: All optics & steering operational. Board replacement successful.
Thursday, September 26, 2019, 11:36: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, September 26, 2019, 12:31: Mass, wire, & emittance scans successful
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.23 |
7.59 |
TBHT |
26.86 |
10.02
|
COIL + EE |
26.65 |
3.27 |
TGHT |
26.89 |
7.29 |
Thursday, September 26, 2019, 12:33: Auto-cooling to TGHT / TBHT to 530 / 180 @ 4A per min.
Thursday, September 26, 2019, 12:45: TGHT / TBHT @ 530 / 180A. Hold*
Thursday, September 26, 2019, 13:17: No Sparks*. Auto-cooling to TGHT / to 500 @ 4A per min.
Thursday, September 26, 2019, 13:25: No Sparks*. FC0 'in'.
Thursday, September 26, 2019, 13:26: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Thursday, September 26, 2019, 14:28: Auto-cooling @ 2A per min.
Friday, September 27, 2019, 07:17: HV off.
Friday, September 27, 2019, 07:19: RGA off
Friday, September 27, 2019, 07:21: Close & reset IV4.
Friday, September 27, 2019, 07:23: Power / Sources off. Ion gauge & Turbo pumps off.
Friday, September 27, 2019, 10:29: Venting. Waterlines purged. |
Monday, September 16, 2019, 10:05, Fernando Maldonado, , , , , , , Problems/Solutions, Alignment pin reinstalled
|
Monday, September 16, 2019, 10:03: The rightmost alignment pin has been reinstalled (see picture attached). It was previously removed for Ferran's test. |
Thursday, August 29, 2019, 14:47, Fernando Maldonado, , , , , , Ferran's heat shield, Problems/Solutions, Rewiring-Baking out
|
Thursday, August 29, 2019, 14:47 : Changing back to the nominal wiring
Thursday, August 29, 2019, 17:01: TIS changed to Ferran's heat shield.
Thursday, August 29, 2019, 17:02: 9-pin FT redone.
Friday, August 30, 2019, 00:28: Turbos on
Friday, August 30, 2019, 00:36: IG1 on.
Tuesday, September 03, 2019, 09:09: RGA on. Vacuum stable @ 2.1e-6T
Tuesday, September 03, 2019, 15:00. Wire redone. Crosschecked by Arthur Leung.
Tuesday, September 03, 2019, 15:16: Turbos tripped. TSG:CG1A above 50 mTorr
Wednesday, September 04, 2019, 09:34 : Turbos on. After the bakeout it will be better to have TSG:CG1A checked.
Wednesday, September 04, 2019, 09:43: IG1 on
Wednesday, September 04, 2019, 09:45: RGA on
Wednesday, September 04, 2019, 12:42 : Waterlines opened. No response on RGA. Vaccum stable @ 3.1e-6 T
Wednesday, September 04, 2019, 14:53 : Auto-ramping TGHT / TBHT to 100/ 100 A @ 4 A/min.
Wednesday, September 04, 2019, 16:04: Auto-ramping TGHT / TBHT to 250/ 250 A @ 4 A/min.
Wednesday, September 04, 2019, 17:33: Final auto-ramping of the day TGHT / TBHT to 290/ 290 A @ 4 A/min. Vacuum stable@2.7e-7T
NB: Ferran's HS doesn't have an extraction electrode. Since the purpose of the heating is to "baked-out" the system, this is actually great as the shine will go downstream the beamline.
Thursday, September 05, 2019, 08:05: Auto-ramping TGHT to 580 A @ 2 A/min. Vacuum stable @2.97e-7T
Thursday, September 05, 2019, 09:30: TGHT PS is voltage-limited @440A and 5.2V. Stopping auto-ramping to increase the voltage limit to 7.7 (from previous screenshots).
Thursday, September 05, 2019, 09:31: Auto-ramping TGHT to 580A @ 2A/min.
Wednesday, May 15, 2019, 08:58: Optics/ HV on.
Monday, September 09, 2019, 16:05: Optics set. IV4 open.
Monday, September 09, 2019, 17:26: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Twenty minutes w/o sparks
Monday, September 09, 2019, 17:52 Optics/HV off
Tuesday, September 10, 2019, 10:05: Auto-cooling 4A/min
Tuesday, September 10, 2019, 13:27: IV4 closed.
Tuesday, September 10, 2019, 13:27: IG1 off. RGA off
Tuesday, September 10, 2019, 13:28: Turbos off
Wednesday, September 11, 2019, 09:21: Venting.
Wednesday, September 11, 2019, 09:24 HS waterline purged
Wednesday, September 11, 2019, 10:54: Cleaned the interior of chamber with methanol and Kim-wipes. Some dust and debris were removed with
Wednesday, September 11, 2019, 10:54 : Adding EE to the Assy.
Wednesday, September 11, 2019, 11:03: Roughing.
Wednesday, September 11, 2019, 11:35: Turbos on
Wednesday, September 11, 2019, 11:47: Turbos at speed.
Wednesday, September 11, 2019, 11:48: IG1 on
Wednesday, September 11, 2019, 11:54: RGA on
Friday, September 13, 2019, 08:56: RGA off. IG1 off.
Friday, September 13, 2019, 08:56: Turbos off
Monday, September 16, 2019, 08:11: Venting
Monday, September 16, 2019, 09:58: Assembly removed. |
Thursday, August 15, 2019, 16:33, Fernando Maldonado, , , , , , , Problems/Solutions, 9-pin connection modification
|
Thursday, August 15, 2019, 16:17: Q FT undone to remove the connection to the 9-pin
The idea is to change the cables to have individual signals. This will allow 4 thermocouple readings.
NB: The FT is not vacuum tight as of now (gasket needs to be replaced and flange needs to be tight) |
Tuesday, August 13, 2019, 12:03, Aaron Schmidt, , , , , , , Problems/Solutions, Replace RP1
|
Tuesday, August 13, 2019, 11:55: Close PV1. Turn off RP1.
Tuesday, August 13, 2019, 12:02: RP1 replaced.
Tuesday, August 13, 2019, 13:24: TS exhaust / screen cleaned out.
Tuesday, August 13, 2019, 13:25: RP1 on
Tuesday, August 13, 2019, 13:59: Turbo pumps on.
Tuesday, August 13, 2019, 14:05: IG1 on.
Wednesday, August 14, 2019, 09:17: Revising the archiver, on July 8th at around 4 am, the vacuum on GC1A increased from normal levels to around 0.2 T. This happened while the target was held at a high combined current from both TGHT PS and Coil PS. See screenshots attached.
Thursday, August 15, 2019, 09:57: Vacuum is only around 1.06e-06T. Turbo pumps off. Ion gauge off.
Tuesday, August 20, 2019, 08:59: Ion gauge acting funny. CG1A unplugged & re-plugged in. Seems to work now? |
Thursday, August 08, 2019, 09:12, Aaron Schmidt, , LP-FEBIAD, , , , 42752-7, In progress, P2N Setup - LP-FEBIAD target 8x
|
Inserted a used (heating) LP-FEBIAD target with a basic heat shield assembly with no end plate foil on the window side to observe heating. The P2N Coil / TGHT connections were added.
Test whether the TS connections are affecting the P2N heating or if it's the P2N target itself.
-Heat the TGHT only, observe, then ramp down.
-Heat Coil only, observe, then ramp down.
-Heat TGHT w/ Coil, observe, then ramp down.
Note* Heating should be even across the target. Elog & take pictures.
NO HV ALLOWED!!!!
Thursday, August 08, 2019, 09:05: Roughing.
Thursday, August 08, 2019, 09:14: BV1A closed to allow pressure stabilization. Opened about within 2 seconds later with BV1B.
Thursday, August 08, 2019, 09:41: Turbo pumps on.
Thursday, August 08, 2019, 09:47: Ion gauge on.
Thursday, August 08, 2019, 10:37: RGA on.
TSG:CG1A & TSG:CG1B do not appear to be pumping down efficiently - May need to swap out TSG:RP1 after this test. Last done April 18, 2018. elog: 655.
Friday, August 09, 2019, 08:49: Power on.
Friday, August 09, 2019, 08:51: Waterlines opened. No response on RGA. Vacuum ok @ 3.03e-06T
Friday, August 09, 2019, 08:56: Auto-ramping TGHT @ 4 @ per min to 150 A.
Friday, August 09, 2019, 10:10: Ramping the TGHT down from 150 A to 0A.
Friday, August 09, 2019, 10:39: Anode Current @ 200 mA w/ 19V? Anode PS on. Voltage & current dropped off.
Friday, August 09, 2019, 11:18: TGHT and TBHT power supplies ramped to 150A each, total of 300A in the target
Friday, August 09, 2019, 13:12: Target glows symmetrically. TGHT and TBHT ramped from 150A to 200A each for a total of 400A on the target
Friday, August 09, 2019, 14:05: RGA error.
Friday, August 09, 2019, 14:08: RGA Restarted.
Friday, August 09, 2019, 14:08: Target heating evenly on total 400 A.
Friday, August 09, 2019, 15:57: Auto-ramping TGHT/TBHT @ 4 @ per min to 250/250 A.
Friday, August 09, 2019, 16:28: Vacuum limit reach at 241 and 238 A for TGHT and TBHT, respectively.
Friday, August 09, 2019, 16:28: Auto-cooling started at 4A/min
Monday, August 12, 2019, 09:22: Sources off. RGA off.
Monday, August 12, 2019, 10:04: Power off. Ion gauge off. Turbos off. |
Wednesday, August 07, 2019, 15:19, Fernando Maldonado, , , , , , , Problems/Solutions, Test stand inspection
|
Wednesday, August 07, 2019, 15:12: Arthur helped inspected the electric connections on the TS.
One of the coil positive waterlines was touching a HS waterline. Manually adjusted them to have a better clearance.
|
Wednesday, August 07, 2019, 08:18, Luca Egoriti, P2N - 1, , ITE, TM2, , , Problems/Solutions, p2n heating test 4
|
Tuesday, August 06, 2019, 16:00
Start ramp up to 300+300 = 600 A
Tuesday, August 06, 2019, 17:30
Target glowing, see images. Ramp down started
Wednesday, August 07, 2019, 08:11
The same p2n target was installed in the test stand, taking off the ion source since we thought it could have been shorting to the reference electrode and providing a return path for the current, hence generating the asymmetric heating that was noticed on the target.
On Tuesday 6th afternoon, the p2n was ramped up to 600 A (300 + 300 A from TGHT and TBHT in parallel). The target and its right flexible leg were still glowing. After noticing it, the current was ramped down wating to open up for inspection. |
Friday, August 02, 2019, 13:16, Aaron Schmidt, P2N - 1, , , , , , In progress, p2n heating test 4
|
Friday, August 02, 2019: p2n target installed in the test stand, the ion source was fully removed to avoid any risk of shorting. The Central ion source current lead is attached to the target body so it was left there and attached to its electrodes.
Friday, August 02, 2019, 13:15: Roughing.
Friday, August 02, 2019, 13:58: BV1A closed to allow pressure stabilization. Opened about 10-15 seconds later with BV1B.
Friday, August 02, 2019, 14:00: Turbos pumps on.
Friday, August 02, 2019, 14:09: Ion gauge on.
Friday, August 02, 2019, 15:15: RGA cycled. Now the filament can start. RGA on.
Tuesday, August 06, 2019, 07:49: RGA Error. Halted.
Tuesday, August 06, 2019, 07:53: Restarted RGA.
Tuesday, August 06, 2019, 09:32: Waterlines opened on FS#5. No response on RGA. Vacuum ok @ 1.16e-06T.
Power on. |
Tuesday, July 30, 2019, 12:19, Luca Egoriti, P2N - 1, HP-FEBIAD, ITE, TM2, , , Problems/Solutions, p2n heating test - target inspection
|
The p2n target was taken out of the test stand for inspection. Comments and measurements on the container below:
- Initially, continuity measurements were mode between the target and heat shield (HS) while they were still in the test stand, and looks like they were shorted. However, after removing the HS from the test stand, no short was seen, not even after moving the target legs. Instead, we confirmed that the short was happening in the test stand, so some water lines were touching each other.
- The target look in one piece, except for the ion source that came off right after manufacturing. (see picture)
- The insulator connecting the bottom section of the ion source central current lead, to the HS, was broken (see picture)
- The annular disc of the connecting the inner and outer tube of the ion source was bulging outwards, maybe the ion source was heating too much while we put current in it (see picture).
- The screw connecting the top part of the central ion source current lead, is now of a blue-ish color
Resistance measurementts:
- Copper to copper: 1008 microOhm
- Copper to bottom flexy leg: 101 microOhm
- Bottom-to-top (flexy): 30-45 microOhm
- Target: 476 microOhm
- Copper to top flexy: 261 microOhm
- Copper to bottom flexy (left): 100 microOhm
- Copper to bottom flexy (right): 94 microOhm
- Top Flexy - botton target assy (left): 88 microOhm
From left to right:
- Cu to bottom flexy leg: 102
- Flexy bottom to flexy top: 31
- Flexy top left to flexy top right: 473
- Flexy top to flexy bottom: 0 (???)
- flexy bottom to Cu: 93 |
Sunday, July 28, 2019, 14:22, Luca Egoriti, P2N - 1, HP-FEBIAD, ITE, TM2, p2n - test1, p2n - test1, Problems/Solutions, p2n heating test 3
|
Friday. July 26th 2019
A new electrical configuration of the test stand was decided and installed. The TGHT and TBHT were parallelized in order to deliver up to 600 + 600 Amperes to the p2n target.
Connections:
TGHT+: D
TGHT-: C
TBHT+: one cable to E and one cable to G (both going down to the coil terminal blocks, which are connected to the target terminal blocks through a copper short.
TBHT-: both cables to F. One 4/0 cable was run from F to H to achieve the same configuration as for TBHT+. The H terminal is connected to I (HV ground, conencted to the target copper heat shield) through a braided cable
One braided cable was connected from C to H so the target line should have the same potential as the TBHT/coil lines.
Saturday, July 27th
The current was ramped from the TBHT and TGHT in parallel up to 400+400=800A.
Sunday, July 28th
One leg of the target is glowing a bit, while the other doesn't. This suggests the current path is not straightforward as we planned.
Temperature measurements of the cables on top of the test stand were performed using a mini IR thermometer (FLUKE, borrowed from Arthur).
Temperature of the braided cable from C to H = ~50 °C --> This points to an imbalance of current between the two lines (TGHT and COIL lines). This might be alright.
Temperature of the braided cable from H to I = ~130 °C. This likely points to a short circuit between the target and the copper heat shield.
Monday, July 29th
In order to understand if the target is broken or touching the heat shield, we opened up the service cap.
- The braided cable from H to I was removed
- The braided cable from H to Q was disconnected
These two modifications were made so that the current cannot come back from the heat shield, but has to go through the target lines.
The 4/0 cables from the PS to the feedthroughs were removed so that we could confirm there is a short between C (target) and I(HV ground/heat shield). The 4/0 were than put back on the feedthrough connections.
Under advice of Dan Louie and Arthur, we did not change any configuration of the power supplies. We know that the current would go through the controls loop, but the impedance of this electronics should be high enough to sustain the current load.
At 3pm, the ramping was still increasing the current on the target, but one leg (the right one) was still glowing. By this time, the total current in the target assembly is ~500 amperes, so there should be no signs of any glowing happening. Probably there's something wrong with the target itself. We're opening up to check the status of the target.
Tuesday, July 30, 2019, 10:00: Venting.
Tuesday, July 30, 2019, 10:03: Purging heat shield water loop.
Tuesday, July 30, 2019, 11:46: P2N removed
|
Friday, July 19, 2019, 13:48, Fernando Maldonado, , , , , , , Problems/Solutions, RMP0A and FC6 gains signal redirection to another channel
|
After submitting a fault report (FR - ISAC Fault 12461) a Work Permit was issued (WP - C2019-07-19-1),
Controls tunnel the faulty signal to another ADC by removing signal no longer used at the Test Stand.
Test successful with a constant current power supply in the range 1 nA-40 nA.
TBD: does this work with beam? |
Tuesday, July 16, 2019, 10:28, Fernando Maldonado, P2N, , , , , , , P2N 1200 A test
|
Tuesday, July 16, 2019, 10:27: The idea of this run is to have the full 600 A from TGHT and the full 600 A from TBHT.
This will done based on the rewiring done previously (see entry 745)
Tuesday, July 16, 2019, 12:16: Jumper cable F-H burning while target was at 600 A total. Ramp up aborted and auto-cooling started to remove the jumper.
Jumper removed.
TBHT cables on both positive coil FT.
Jumper E-G removed.
High current cable connecting F-H.
Tuesday, July 16, 2019, 16:49
Current ramped up to 300A + 300A on TGHT and TBHT in parallel, for an equivalent of 600A on the target. No burn to anything noticed, PS ramping nicely together. Stopped ramping up and started ramp down for the night. |
Monday, July 15, 2019, 15:59, Fernando Maldonado, P2N, , , , , , Done, Re-wiring on service cap.
|
Monday, July 15, 2019, 15:54 : TBHT high current cables moved to Coil feedthroughs.
Coil high current cables moved to TBHT feedthroughs.
Resistor across Coil feedthroughs E and F are now moved between TBHT feedthroughs A and B.
Tuesday, July 16, 2019, 09:00
A braided cable between F and H was changed due to the burnt aspect it had. Most likely this cable was burnt along the previous ones (see entry 740) but since it was uniformed blacked and not broken I didn't noticed it.
Resistor/Varistor between TGHT and TBHT removed.
|
Monday, July 08, 2019, 09:20, Luca Egoriti, p2n1, , ITE, , , , In progress, p2n heating test
|
(see entry 742)
p2n target heated over the weekend after the connections between the bottom target legs and the copper connector has been modified from rivets to M3 screws. Target hold current nicely with no major voltage spikes.
The plan now is to cycle the current heating few times to "stress test" the target. |
Thursday, July 04, 2019, 15:16, Aaron Schmidt, , , , , , , Problems/Solutions, TBHT insulator changed
|
Thursday, July 04, 2019, 15:00: TBHT insulator was swapped out on the source tray side.
The old one is very chipped. |
Thursday, July 04, 2019, 15:15, Aaron Schmidt, P2N - 1, , , , , , , P2N - 1 - 2 - 2019
|
Screws instead of rivets on target leg. Insulator changed.
Thursday, July 04, 2019, 15:14: Roughing
Thursday, July 04, 2019, 16:00: Turbos on.
Thursday, July 04, 2019, 16:12: IG1 on. RGA on
Friday, July 05, 2019, 08:12: Waterlines opened. No response on RGA. Vacuum ok @ 4.57e-06T.
Friday, July 05, 2019, 08:14: Power / sources on.
LE,FM
Friday, July 05, 2019, 10:00: Autoramping TGHT/TBHT to 250/100 A @ 3 A/min. Vacuum limits change to 5e-6 T and 5.5e-6 T. Vacuum ok @ 4.2e-6 T.
Friday, July 05, 2019, 11:42 :
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.06 |
6.46 |
TBHT |
27.91 |
9.01 |
COIL + EE |
27.82 |
2.80 |
TGHT |
27.93 |
6.82 |
Friday, July 05, 2019, 11:45 : Auto ramping TGHT/TBHT to 300/150A @ 3 A/min.
Friday, July 05, 2019, 17:32:
Friday, July 05, 2019, 13:56: Source/Optics on
Friday, July 05, 2019, 14:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.
Friday, July 05, 2019, 17:32: BIAS / EE / EZL @ 0 for the weekend. Heater will be left on.
FM
Monday, July 08, 2019, 15:12: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, July 08, 2019, 18:59: BIAS / EE / EZL @ 0.00 kV
Tuesday, July 09, 2019, 13:42: TBHT/TGHT @ 590/230A.
Tuesday, July 09, 2019, 13:49 BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, July 09, 2019, 14:04: Dipole magnet not responding. Cycling the PS on EPICS didn't work. Cycling the PS directly worked.
Tuesday, July 09, 2019, 17:28: BIAS / EE / EZL @ 0.00 kV
|
Tuesday, July 02, 2019, 18:25, Fernando Maldonado, , , , , , , Done, Blank on FEBIAD gas line installed
|
Tuesday, July 02, 2019, 18:24: A blind is installed on the FEBIAD gas line (see attached picture) to rule out the possibility of gases entering the TIS. |
Thursday, June 27, 2019, 09:51, Fernando Maldonado, , , , , , , Problems/Solutions, Melted cables changed
|
See elog 737
Fernando Maldonado wrote: |
Tuesday, June 25, 2019, 16:15: While inspecting the 9-pin connection with Ferran, it was noticed how two braided cables were burnt out pretty bad to the point they were separated in half (see attached pictures). Additionally the plastic insulator for the anode wire was melted.
Tuesday, June 25, 2019, 16:30: Braided cables need to be changed and anode wire redone.
Tuesday, June 25, 2019, 17:16: Wondering if this happened during TM4 source tray conditioning given the following entries in the elog (entry 725):
Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait*
Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.
|
Thursday, June 27, 2019, 09:45: The cables showing burnt marks were changed with new ones on Wednesday 26th. The grounding cables were insulated with yellow heatshrink. The anode wire connection was redone. |
Wednesday, June 26, 2019, 14:41, Carla Babcock, none, , , , , , Problems/Solutions, Issues with test stand wiring in service cap area
|
The wiring on the top of the test stand was burned, see entry 737.
Probable cause of this is as follows:
Coil lines are connected by a wire to HV common, the 9-pin feedthrough etc to maintain same voltage on all the insulator tops. This is also directly connected to the extraction electrode spark gap. When this sparks, it momentarily changes the potential in that line (normally HV common) which then can make this path the best route for current from the coil to return to ground.
See attached diagram.
Best solution to this problem is to disconnect the high current section from the low current section, and attach each separately to HV common.
Other possible improvements to wiring:
1. Remove jumpers between positive coil lines (and neg. coil lines) since these feethroughs are physically connected by the copper pipe.
2. Add a resistor to the jumper between coil - and TBHT - since this will eliminate all possibility of current flowing between the two.
3. Add a resistor in line where the high current section is connected to HV common to avoid possibility of current going through jumpers. |
Wednesday, June 26, 2019, 11:34, Aaron Schmidt, Test Ta, HP-SIS, , TM4, No Target oven #, 42972-4, In progress, Test target for TM4 checks
|
The HP-SIS uses the older center block. No serial number found.
Loaded with Tantalum. Rough Target description:
Comment on the bag - 0.9 cm space
Total Ta foils = 525
Foil Thickness = 0.025mm (assumed)
Target density = ?
Target length = 7.3 cm
Total Mass = ?
Total mass w/ Target oven= 1242 g.
Assembly voltage checks - OK. Note* Spacers between insulator & Target.
Thermocouple wires attach to the 9-pin connector.
Wednesday, June 26, 2019, 14:47: roughing.
Wednesday, June 26, 2019, 15:30: Turbos on.
Wednesday, June 26, 2019, 15:51: IG1 on. Vacuum @ 1.14e-4 T.
Thursday, June 27, 2019, 07:11: Waterlines opened. No response on RGA. Vacuum stable @ 3.49e-06T.
Thursday, June 27, 2019, 07:14: Power / sources switched on. Omega switched on to read thermocouples.
Thermocouple readings:
T1 - 24.8 C & T2 - 24.9 C.
Thursday, June 27, 2019, 07:16:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.40 |
5.21 |
TBHT |
27.11 |
7.91
|
COIL + EE |
27.01 |
2.26 |
TGHT |
27.12 |
6.26 |
Thursday, June 27, 2019, 12:43: Auto-ramping TGHT / TBHT to 350 / 125 A @ 2 A per min
Friday, June 28, 2019, 07:02: HV on, IV4 opened.
Friday, June 28, 2019, 07:09: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Friday, June 28, 2019, 07:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Friday, June 28, 2019, 07:12: Spark*
Friday, June 28, 2019, 07:15: Optics on. Some instability noticed on the BIAS.
Friday, June 28, 2019, 07:17:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.02 |
5.73 |
TBHT |
26.87 |
8.29
|
COIL + EE |
26.78 |
2.43 |
TGHT |
26.86 |
6.47 |
Thermocouple readings:
T1 - 106.7 C & T2 - 106.8 C.
Friday, June 28, 2019, 07:24: Halt auto ramping. TGHT / TBHT @ 375 / 150 A. BIAS / EE / EZL @ 0 kV. Unusual amount of sparks and instability.
Friday, June 28, 2019, 08:45: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Sparks seen immediately.
The TBHT insulator on the source tray side is glowing blue. Very neat.
Sparks observed striking inside the vacuum on the thermocouples / heat shield from the TBHT.
Friday, June 28, 2019, 08:57: BIAS / EE / EZL @ 0 kV. Auto-cooling @ 4 A per min.
Friday, June 28, 2019, 10:45: Disconnect mini pump, connect OMEGA thermometer to ground.
Friday, June 28, 2019, 10:59: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No sparks.
Friday, June 28, 2019, 11:03: manually bump up TGHT / TBHT to 50 A.
Friday, June 28, 2019, 11:05: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.
Friday, June 28, 2019, 11:39: Spark*
Friday, June 28, 2019, 11:57: Auto-ramping TGHT / TBHT to 500 / 200 A @ 4 A per min.
Friday, June 28, 2019, 12:15: TGHT / TBHT @ 322 / 200 A. Sparking*
Friday, June 28, 2019, 12:17: Halt auto-ramping. Sparking*. Manually bring down current.
Friday, June 28, 2019, 12:23: Sparks ceased. TGHT / TBHT @ 300 / 150 A
Friday, June 28, 2019, 12:24: BIAS / EE / EZL @ 0 kV. Auto-cooling @ 4 A per min.
Friday, June 28, 2019, 12:32: new video taken. After reviewing the video, the spark originates at the heat shield / thermocouples and moves to the TBHT insulator.
Friday, June 28, 2019, 15:26: Auto-ramping TGHT / TBHT to 200/ 100A @ 4 A per min.
Tuesday, July 02, 2019, 07:58: RGA restarted.
Tuesday, July 02, 2019, 08:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No sparks. Vacuum @ 7.08e-07T.
Tuesday, July 02, 2019, 08:08: Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.
Tuesday, July 02, 2019, 08:37: Halt auto ramp. TGHT / TBHT @ 310 / 150 A. Two sparks*. Vacuum @ 2.32e-06T. Allow to stabilize.
Tuesday, July 02, 2019, 08:55: Auto-ramping TGHT to 350 A @ 4 A per min. Vacuum @ 1.08e-06T.
Tuesday, July 02, 2019, 09:05: TGHT @ 350 A. Vacuum @ 1.08e-06T
Tuesday, July 02, 2019, 09:07: Spark*
Tuesday, July 02, 2019, 09:16: Spark*
Tuesday, July 02, 2019, 09:24: Spark*
Tuesday, July 02, 2019, 09:38: Auto-cooling @ 4 A per min.
Tuesday, July 02, 2019, 09:45: BIAS / EE / EZL @ 0 kV.
Tuesday, July 02, 2019, 11:39: IG1 off. Turbos off. RGA off |
Tuesday, June 25, 2019, 17:19, Fernando Maldonado, , , , , , , Problems/Solutions, Burnt cables on top of the test stand
|
Tuesday, June 25, 2019, 16:15: While inspecting the 9-pin connection with Ferran, it was noticed how two braided cables were burnt out pretty bad to the point they were separated in half (see attached pictures). Additionally the plastic insulator for the anode wire was melted.
Tuesday, June 25, 2019, 16:30: Braided cables need to be changed and anode wire redone.
Tuesday, June 25, 2019, 17:16: Wondering if this happened during TM4 source tray conditioning given the following entries in the elog (entry 725):
Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait*
Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.
|
Monday, June 24, 2019, 15:41, Fernando Maldonado, , , , , , , Problems/Solutions, TMS:Q3 polarity
|
Monday, June 24, 2019, 15:25: Current quadrupole polarities:
|
Top/Bottom |
North/South |
TSP Q1 |
Positive |
Negative |
TSP Q2 |
Negative |
Positive |
TSP Q3 |
Positive |
Negative |
TSP Q4 |
Negative |
Positive |
TMS Q1 |
Positive |
Negative |
TMS Q2 |
Negative |
Positive |
TMS Q3 |
Negative |
Positive |
TMS Q4 |
Positive |
Negative |
TMS Q5 |
Negative |
Positive |
TMS Q6 |
Positive
|
Negative |
Monday, June 24, 2019, 15:35 : The polarity on TMS:Q3 is reversed. The top and bottom poles should be at a positive voltage similar to TMS:Q4, however a negative tagged cable is connected to it.
Monday, June 24, 2019, 15:39 : Swapping the cables on TMS:Q3.
|
Top/Bottom |
North/South |
TSP Q1 |
Positive |
Negative |
TSP Q2 |
Negative |
Positive |
TSP Q3 |
Positive |
Negative |
TSP Q4 |
Negative |
Positive |
TMS Q1 |
Positive |
Negative |
TMS Q2 |
Negative |
Positive |
TMS Q3 |
Positive |
Negative |
TMS Q4 |
Positive |
Negative |
TMS Q5 |
Negative |
Positive |
TMS Q6 |
Positive
|
Negative |
|
Saturday, June 22, 2019, 17:05, Luca Egoriti, p2n, , , , , , Done, Test stand installation
|
I opened the test stand because I forgot to install tantalum heat shields around the target. Everything was reinstalled as before (with heat shields). I could turn on the TSGTP1B but TSGTP1A does not turn on for some reason. I tried multiple times opening/closing its valve (BV1A) but the pump never starts.
Will keep pumping over the weekend with TP1B only. |
Friday, June 21, 2019, 15:12, Aaron Schmidt, P2N - 1, , , , , , , P2N - 1 - 2019
|
Friday, June 21, 2019, 14:48: Roughing.
Friday, June 21, 2019, 15:18: Turbo pumps on.
Friday, June 21, 2019, 15:31: IG1 on.
Friday, June 21, 2019, 15:42: Vacuum@9.31e-5 T
Friday, June 21, 2019, 15:51: RGA switched on.
Friday, June 21, 2019, 16:30: Luca wants to put heat shields on his target. Aborting pumping.
Friday, June 21, 2019, 16:57: IG1 off
Friday, June 21, 2019, 16:57: Turbo pumps off.
Friday, June 21, 2019, 16:57: RGA switched off
AS
Monday, June 24, 2019, 07:18: Restart TP1A (Timeout) Global Reset. Restart again.
Monday, June 24, 2019, 07:29: TP1A to speed. Monitor. Vacuum @ 4.31e-06T
Monday, June 24, 2019, 07:31: Restart RGA.
Monday, June 24, 2019, 08:57: Waterlines opened. No response on RGA. Vacuum @ 3.23e-06T.
Monday, June 24, 2019, 09:03: Power / sources on. (No HV)
Monday, June 24, 2019, 09:04: TGHT / TBHT / Coil PS ready. Vacuum @ 3.23e-06T.
Monday, June 24, 2019, 10:09: Auto-ramping TGHT / TBHT to 150 / 75 A @ 2 A per min.
Monday, June 24, 2019, 10:57: Auto-ramping was halted @ 35 A. Coil increased. TGHT, TBHT, Coil brought back to 0 A
Monday, June 24, 2019, 10:58:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.27 |
5.47 |
TBHT |
26.11 |
8.20
|
COIL + EE |
26.03 |
2.36 |
TGHT |
26.12 |
6.33 |
Monday, June 24, 2019, 11:01: Auto-ramping TGHT / TBHT to 150 / 75 A @ 2 A per min. Manually ramp coil to 150 A @ approx the same rate.
Monday, June 24, 2019, 12:20: Halt at 140A TGHT / Coil. Vacuum limit?
Monday, June 24, 2019, 13:23: Increasing good vac limit. From 3e-6 to 4.5e-6 T
Monday, June 24, 2019, 13:29: Auto-ramping TGHT / TBHT to 300 / 120 A @ 2 A per min. Manually ramp coil from 140 to 150 A @ approx the same rate.
Monday, June 24, 2019, 13:37
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.97 |
5.95 |
TBHT |
26.82 |
8.62
|
COIL + EE |
26.70 |
2.60 |
TGHT |
26.80 |
6.54 |
Monday, June 24, 2019, 14:4: TGHT @ 270 A. Vacuum limits reached 3.05e-06T. Gradual out-gassing w/ cont'd auto ramp.
Tuesday, June 25, 2019, 07:53: Auto-ramping TGHT / TBHT to 550 / 120 A @ 2 A per min.
Tuesday, June 25, 2019, 08:34:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.30 |
5.75 |
TBHT |
25.08 |
8.40
|
COIL + EE |
24.96 |
2.47 |
TGHT |
25.08 |
6.55 |
Tuesday, June 25, 2019, 10:09: At approx 9:45am a vacuum spike tripped the test stand. All heaters at 0 A. Power supplies checked.
Tuesday, June 25, 2019, 10:11: TGHT / TBHT / Coil @ 6 A. Bumped up manually.
Tuesday, June 25, 2019, 10:12: Auto-ramping TGHT / TBHT to 300 / 100 A @ 2 A per min. Manually ramp coil to 150 A.
Tuesday, June 25, 2019, 11:01: One sheet on the target leg is shining red.
Tuesday, June 25, 2019, 11:01: Aborting the ramping.
Tuesday, June 25, 2019, 11:08 :
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.50 |
6.29 |
TBHT |
27.28 |
8.88
|
COIL + EE |
27.20 |
2.74 |
TGHT |
27.30 |
6.73 |
Tuesday, June 25, 2019, 11:18: Continue auto ramping
Tuesday, June 25, 2019, 11:37: Auto-cooling @ 12 A per min. Coil tapped down manually.
Tuesday, June 25, 2019, 11:58: Sources off. RGA off. Power off.
Tuesday, June 25, 2019, 11:59: IG1 off. Turbos off. |
Wednesday, June 19, 2019, 17:25, Fernando Maldonado, , , , , , , Done, Thermocouple connection
|
Wednesday, June 19, 2019, 17:13 Ferran and Fernando tested the 9-pin connector to have a reading on a thermocouple following the connections used by Aurelia (see elog 721).
Wednesday, June 19, 2019, 17:24: Test succesful!
|
Thursday, June 13, 2019, 14:05, Aaron Schmidt, , , , , , , Done, Spare TGHT PS installed.
|
Thursday, June 13, 2019, 14:04: Spare TGHT PS installed / tested. The old one is to be sent out for repair.
|
Tuesday, June 11, 2019, 14:33, Aaron Schmidt, Test FEBIAD, LP-FEBIAD, , , 395530-3, 42752-5, In progress, ISAC Source tray re-installed w/ optics tray.
|
Tuesday, June 11, 2019, 14:33: Roughing.
Wednesday, June 12, 2019, 08:18: Venting to install FEBIAD.
Wednesday, June 12, 2019, 09:13: LP-FEBIAD installed. Roughing.
Wednesday, June 12, 2019, 11:13: Turbo pumps on.
Wednesday, June 12, 2019, 11:21: Ion gauge on.
Wednesday, June 12, 2019, 11:48: RGA re-connected & switched on.
Thursday, June 13, 2019, 10:27:
He Leak TEST:
Vacuum Group Leak detector LD#4.
Thursday, June 13, 2019, 10:28: Vacuum @ 1.60e-06T
LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec
Thursday, June 13, 2019, 10:35: LD baseline after opening valve to turbo pumps: 1.2e-09 atm-cc/sec
Full open base:
Vacuum @ 1.60e-06T. RGA status:
Water: 2.20e-006
He: 4.55e-010
LD: 1.2e-09 atm-cc/sec
Thursday, June 13, 2019, 10:35:
Open line FS#2 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 10:40 Vacuum @ 1.54e-06T . RGA status:
Water: 2.20e-006
He: 4.20e-010
LD: 0.1e-09 atm-cc/sec. Purge and close FS#2.
Thursday, June 13, 2019, 10:45: Open line FS#3 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 10:50: Vacuum @ 1.52e-06T. RGA status:
Water: 2.18e-006
He: 3.68e-010
LD: 0.7e-09 atm-cc/sec. Purge and close FS#3.
Thursday, June 13, 2019, 10:50: Open line FS#4 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 10:55: Vacuum @ 1.54e-06T. RGA status:
Water: 2.16e-006
He: 9.24e-011
*LD: 3.7e-09 atm-cc/sec. Run for another 5 minutes.
Thursday, June 13, 2019, 11:00: Vacuum @ 1.52e-06T. RGA status:
Water: 2.15e-006
He: 2.06e-010
*LD: 0.7e-08 atm-cc/sec. Potential He escaping through o-rings*
Purge and close FS#4.
Thursday, June 13, 2019, 11:01: Open line FS#5 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 11:06: Vacuum @ 1.52e-06T. RGA status:
Water: 2.13e-006
He: 2.75e-010
LD: 1.7e-08 atm-cc/sec. Purge and close FS#5
Thursday, June 13, 2019, 11:07: Depressurize lines. Connect HPA & Purge all lines.
Thursday, June 13, 2019, 11:12: Vacuum @ 1.54e-06T . RGA status:
Water: 2.12e-006
He: 6.21e-010
LD: 3.3e-08 atm-cc/sec
Close Valve & disconnect LD. HE LEAK TEST COMPLETE
Thursday, June 13, 2019, 11:20: Vacuum @1.52e-06T :Begin gradually opening the waterlines.
Thursday, June 13, 2019, 11:22: Open FS#2. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:23: Open FS#3. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:23: Open FS#4. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:24: Open FS#5. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:28: Power sources: Tested. TGHT PS is still a no go. Power switched off, lock out.
Thursday, June 13, 2019, 14:03: New TGHT PS installed.
Thursday, June 13, 2019, 14:06: Power / sources on.
Thursday, June 13, 2019, 14:20: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :)
Thursday, June 13, 2019, 14:21: Spark*
Thursday, June 13, 2019, 14:29: Sources to 0 kV. FS#8 needs re-connection.
Thursday, June 13, 2019, 14:43: FS#8 connected. Vacuum ok @ 1.52e-06T. No response on RGA.
Thursday, June 13, 2019, 14:45: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Friday, June 14, 2019, 06:52: Restart RGA.
Friday, June 14, 2019, 08:37: Run mini pump to prep gas-lines.
Friday, June 14, 2019, 08:44: Close SV1, manual valve & turn off mini pump. Gradually open gas lines.
Friday, June 14, 2019, 08:48: Gas lines fully opened.
Friday, June 14, 2019, 08:49: Auto-ramping TGHT / TBHT to 570 / 270 A @ 2 A per min.
Friday, June 14, 2019, 08:52: HV sources ready.
FM
Friday, June 14, 2019, 11:11: Anode current @ 0V 7.326mA. Setting Anode to 150 V.
AS
Friday, June 14, 2019, 11:16: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Friday, June 14, 2019, 11:18: Optics set.
Friday, June 14, 2019, 11:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.
Friday, June 14, 2019, 14:39: Multiple wire scans attempted since 1pm. Controls & Diagnostics contacted. Ongoing troubleshooting.
Monday, June 17, 2019, 08:34: TMS:MB1 - Reset.
Monday, June 17, 2019, 09:18: Auto-ramping TBHT to 310 A @ 2 A per min.
FM
Monday, June 17, 2019, 10:30: TBHT manually tapped to 320 A ~2A/min
Tuesday, June 18, 2019, 18:42 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.
Tuesday, June 18, 2019, 18:43: Begin auto-cooling @ 2A per min.
AS
Wednesday, June 19, 2019, 07:10: IV4 Closed.
Wednesday, June 19, 2019, 07:12: Gas lines & Sources / power off.
Wednesday, June 19, 2019, 07:15: RGA off.
Wednesday, June 19, 2019, 07:16: IG1 & Turbo pumps off.
Wednesday, June 19, 2019, 08:35: Purging / venting. |
Monday, June 10, 2019, 14:35, Aaron Schmidt, , , , , , , Done, Optics Tray / EZL inspection.
|
Monday, June 10, 2019, 13:00: Optics Tray removed.
Megger'd @ 1000V on EZL and Collimator. Passed. Open it.
Monday, June 10, 2019, 14:34: 3 cracked insulators found. 1 quite broken on the threads (see attached pictures). Replaced insulators & re-assembled optics tray.
Megger'd @ 1000V on EZL and Collimator. Passed.
Thursday, June 13, 2019, 14:23: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :) |
Monday, June 10, 2019, 14:34, Aaron Schmidt, , , , , , , Done, Removed TM4 Source Tray
|
Monday, June 10, 2019, 09:30: TM4 Source Tray removed - To HC area. |
Friday, June 07, 2019, 16:56, Carla Babcock, , , , , , , , TM4 source tray state
|
TM4 source tray left in test stand over weekend, just the rouging pumps on. Ready to be removed Monday morning.
Monday, June 10, 2019, 06:35: Venting - Aaron S. |
Monday, June 03, 2019, 14:13, Aaron Schmidt, , , , TM4, 395530-3, 42752-5, Done, TMS:TP6 Turbo pump issue. (Ok now)
|
Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud hum / buzz sound. The vacuum pressure is steadily increasing on IG6. Edi Contacted. Turbo pump likely failing.
The sound tapered off.
Monday, June 03, 2019, 14:32: Sound was the turbo pump spinning down. Edi restarted & reset the main controller. It was knocked out by one of the morning sparks.
|
Monday, June 03, 2019, 11:35, Aaron Schmidt, , LP-SIS, , TM4, 395530-3, 42752-5, Problems/Solutions, TGHT PS Failed.
|
Monday, June 03, 2019, 10:36: BIAS Near 55 kV, brought back down to 50 kV. Multiple sparks. Optics tripped, wire scanners & FC0 began running independently. Anode current dropped from 7.328 mA to 6.105 mA. Knocked out the TGHT
The target heater dropped from 580A to 3.1 A. Attempted reset. Non-responsive.
Monday, June 03, 2019, 10:46: TGHT Still non-responsive. Bump down HV to open the cage & cycle the PS.
PS model: Xantrex XPR 10-600
Message lights on the front of the power supply:
OTP - INT - OVP - SNS Triggered.
Front Panel Display, Status Annunciators
1. AC: The AC input is out of range and has
caused the output of
the supply to be
shut down (red)
2. OTP: The internal Over Temperature
Protection threshold has been exceeded,
disabling the supply output until the sensor
s cool to within the normal operating
temperature range (red)
3. INT: The external shutdo
wn line has been asserted, disabling the output of the
supply (green)
4. OVP: The output Over Voltage Prot
ection threshold have been exceeded,
latching the supply output off (red)
5. SNS: The remote sense line protection
circuit has been activated, latching the
supply output off (red)
6. ON: The supply output
is enabled (green)
7. OFF: The supply output
has been disabled (green)
8. LCL: The supply is in
Local control mode (green)
9. RMT: The supply is in Remote program mode (green)
10. CV: The supply is operating in
Constant Voltage mode (green)
11. CC: The supply is operating in
Constant Current mode (green)
Thursday, June 13, 2019, 14:05: ELOG 732 - PS replaced. |
Tuesday, May 28, 2019, 15:05, Aaron Schmidt, Test FEBIAD / TM4, LP-FEBIAD, , TM4, 395530-3, 42752-5, In progress, TM4 Source Tray - Episode II
|
SEE ELOG 724
Tuesday, May 28, 2019, 15:02: Roughing
Tuesday, May 28, 2019, 15:32: Turbos on.
Wednesday, May 29, 2019, 07:08: RGA on.
Wednesday, May 29, 2019, 07:10: Waterlines opened on FS#5. No response on RGA. Vacuum ok @ 1.32e-06T.
Power on.
Wednesday, May 29, 2019, 07:13: Mini-pump & manual valve opened. Prep / rough gas lines.
Alternate SV1, SV3, & SV4.
Wednesday, May 29, 2019, 07:27: Shut off mini-pump, manual valve, & SV1. Open / close SV5, SV3, & SV4.
Wednesday, May 29, 2019, 07:32: Gas lines fully opened.
Wednesday, May 29, 2019, 07:37: Sources on.
Wednesday, May 29, 2019, 07:39: Anode to 50 V. No response on EE. EE to -100 V. Current response normal @ 34.188 uA.
Wednesday, May 29, 2019, 07:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode to 100 V. Coil to 10 A. Small sparks heard around 23 kV.
Wednesday, May 29, 2019, 07:54: IV4 opened.
Wednesday, May 29, 2019, 07:57: Auto ramping TGHT / TBHT to 350 / 150 A @ 2A per min. Vac limit increased to 3.000e-06T for out gassing.
Wednesday, May 29, 2019, 07:57: Spark* Computer screens flickered. RGA knocked out.
Wednesday, May 29, 2019, 08:00: Shut off & unplug the RGA.
Wednesday, May 29, 2019, 08:04: Optics set.
Wednesday, May 29, 2019, 08:23: Small spark* Nothing affected.
Wednesday, May 29, 2019, 08:35: Small spark* TSG:CBC restarted.
Wednesday, May 29, 2019, 10:26: Small spark* TSG:CBC boosted from 500 V to 2501 V. Reset to 500 V. TPS:Q1 boosted from 790 / 675 V to 1500 / 1230 V. Reset.
Wednesday, May 29, 2019, 12:04: Auto ramping TGHT / TBHT to 580 / 270 A @ 2A per min. Over 100 minutes spark free.
Wednesday, May 29, 2019, 12:14: Spark* Reset optics & TSG:CBC
Wednesday, May 29, 2019, 12:35: Note*: Gradual climb on EZL current noticed as ramping current climbs.
Wednesday, May 29, 2019, 13:01: Spark* Reset optics & TSG:CBC
Wednesday, May 29, 2019, 13:50: Spark* Reset optics & TSG:CBC. TSG:CBC was boosted from 500 V to 2501 V.
Wednesday, May 29, 2019, 13:54: A small but notable out gassing event, without an audible spark occurred. Brief instability in BIAS voltage & current. Vacuum spike to over 3.0e-06T.
Wednesday, May 29, 2019, 14:01: Auto ramping TBHT to 290 A @ 2A per min. TGHT at 577 (580.4 A)
Wednesday, May 29, 2019, 14:15: Wire Scans taken. TMS:RPM0A (X Axis) revealed no beam / peak. TMS:RPM0B (Y Axis) revealed a beam peak. Will attempt to steer TMS:RPM0A (X Axis) until beam peak is revealed.
Wednesday, May 29, 2019, 14:49: Further tuning required. Optics (TPS) Q1, Q2, Q3, Q4 all adjusted. FEBIAD source side (TSG) CB1, VCB1, & CBC all adjusted. Small peak found on RPM0A (X Axis). TMS:RPM0B (Y Axis) revealed a beam peak
Mass scans have not been successful. Yet.
Wednesday, May 29, 2019, 15:00: BIAS / EE / EZL brought to 0 kV. Allow out gassing of the source tray & protect equipment overnight.
Thursday, May 30, 2019, 07:43: BIAS / EE / EZL @ 30 / -1.5 / 13 kV
Thursday, May 30, 2019, 07:55: Spark* Reset optics & TSG:CBC.
Thursday, May 30, 2019, 08:37: Spark* Tripped TMS:TP6 turbo pump. Closed IV4. Tripped & Boosted TPS:Q1. Reset optics & TSG:CBC. Open IV4.
Thursday, May 30, 2019, 09:00: Spark* Visible inside TS on the back of the optics tray off one of the EZL wires. EZL current spiked 1440 uA. Voltage dropped and became unresponsive over 8.5 kV.
Thursday, May 30, 2019, 09:13: BIAS / EE / EZL brought to 0 kV. Anode to 0 V. Coil to 0 A.
EZL to 7000V - Current spikes to over 500 uA.
Thursday, May 30, 2019, 09:32: Auto-cooling @ 2 A per min.
Thursday, May 30, 2019, 09:41: Auto-cooling @ 3 A per min.
Thursday, May 30, 2019, 09:49: IV4 closed. Gas lines closed. All sources expect TGHT / TBHT off.
Thursday, May 30, 2019, 12:24: Halt auto-cooling. Sources on.
Thursday, May 30, 2019, 12:32: BIAS @ 20 kV.
Thursday, May 30, 2019, 12:34: BIAS @ 30 kV.
Thursday, May 30, 2019, 12:38: BIAS / EE @ 30 / -1.5 kV
Thursday, May 30, 2019, 12:42: BIAS / EE @ 39.5 / -2 kV. Two sparks* Shut off turbos
Thursday, May 30, 2019, 12:45: Turbo pumps TP6 & TP1B restarted. Optics reset.
Thursday, May 30, 2019, 12:51: BIAS / EE / EZL @ 40 / -2 / 5.25 kV. Spark* Shut off turbos / reset.
Thursday, May 30, 2019, 12:56: BIAS / EE / EZL @ 41.5 / -2.5 / 7.5 kV. Spark* Shut off turbos / Optics. Reset.
Thursday, May 30, 2019, 13:01: BIAS / EE / EZL @ 45 / -2.5 / 7.5 kV. Visible spark inside the vacuum* Shut off turbos / Optics. Reset.
Thursday, May 30, 2019, 13:26: BIAS / EE / EZL @ 46.25 / -2.5 / 7.5 kV. Visible spark inside the vacuum, off multi-pin corner? * Shut off turbos / Optics. Reset. FC0 affected. Reset.
Thursday, May 30, 2019, 13:38: Go pro setup
Thursday, May 30, 2019, 13:41: BIAS / EE / EZL @ 48 / -2.5 / 7.5 kV. Visible spark inside the vacuum, Did the go pro catch it? * Shut off turbos / Optics. Reset. FC0 affected. Reset.
*Spark seen by Carla on the back of multi-pin (Anode wire perhaps?).
Thursday, May 30, 2019, 13:52: BIAS / EE / EZL @ 48.9 / -2.5 / 7.5 kV. Visible spark inside the vacuum, Did the go pro catch it? * Shut off turbos / Optics. Reset. FC0 affected. Reset.
*Spark seen on the base of the EZL.
Thursday, May 30, 2019, 14:00: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.
Thursday, May 30, 2019, 14:07: Spark* No trips
Thursday, May 30, 2019, 14:15: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV. * Shut off turbos / Optics. Reset. FC0 affected. Reset.
Thursday, May 30, 2019, 14:24 BIAS / EE / EZL @ 51.3 / -2.5 / 7.5 kV. * Shut off TP6 / Optics. Reset. RPM6B affected, ran up & down on its own. Reset.
Thursday, May 30, 2019, 14:25: BIAS back to 50 kV.
Thursday, May 30, 2019, 14:31: BIAS / EE / EZL @ 51.9 / -2.5 / 7.5 kV. Visible spark inside the vacuum, from source tray to the rear ground electrode plate * Shut off turbos / Optics. Reset. FC0 affected. Reset.
IG6 ion gauge & TMS TP6 tripped. Fix. Switched to filament 2.
Thursday, May 30, 2019, 14:43: BIAS / EE / EZL @ 52.8 / -2.5 / 7.5 kV. Visible spark inside the vacuum, Bottom corner of multi-pin bracket * Shut off turbos / Optics. Reset. FC0 affected. Reset. RPM6B Reset.
Thursday, May 30, 2019, 14:54: BIAS / EE / EZL @ 53.5 / -2.5 / 7.5 kV. Sparks*
Thursday, May 30, 2019, 14:59: BIAS / EE / EZL @ 54 / -2.5 / 7.5 kV. Visible spark inside the vacuum, Source tray EE over insulators to ground (Matt got a video, really nice)* Shut off turbos / Optics. Reset. FC0 affected. Reset. RPM6B Reset.
Thursday, May 30, 2019, 15:06: BIAS / EE / EZL @ 54.7 / -2.5 / 7.5 kV. Spark. Reset a bunch.
Thursday, May 30, 2019, 15:15: BIAS @ 55 kV.
Thursday, May 30, 2019, 15:24: BIAS / EE / EZL @ 0 kV.
Thursday, May 30, 2019, 15:24: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Friday, May 31, 2019, 07:22: BIAS @ 10 kV. IV4 opened.
Friday, May 31, 2019, 07:33: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V. Coil @ 20 A. FC0? No response.
Friday, May 31, 2019, 07:48: Coil @ 50 A. FC0 BIAS off. Troubleshoot FC0.
Friday, May 31, 2019, 08:01: Nothing on wire scans. FC0 randomly gaining, but no BIAS response. Rod N contacted on FC0.
Friday, May 31, 2019, 09:56: FC0 Fixed by Rod. N. MB1 acting up. Fixed itself through power / Canbus cycling?. Wire scans: RPM0A (X) non-responsive, RPM0B (Y) responds. Turn down HV to prep for gases.
Friday, May 31, 2019, 10:14: BIAS / EE / EZL / Anode @ 0 kV.
Friday, May 31, 2019, 10:18: Mini pump on. Manual valve opened. Prep / rough gas lines.
Alternate SV1, SV3, & SV4.
Friday, May 31, 2019, 10:31: Shut off mini-pump, manual valve, & SV1. Open / close SV5, SV3, & SV4.
Friday, May 31, 2019, 10:36: Gas lines fully opened.
Friday, May 31, 2019, 10:48: Vacuum stable @ 1.25e-06T. HV sources back on.
Friday, May 31, 2019, 11:04: BIAS / EE / EZL @ 30 / -1.5 / 8.25 kV. Anode @ 200 V. Coil @ 50 A.
Friday, May 31, 2019, 11:32: Spark knocked out Optics & Steering. Wire scanners to zero. Unable to pick up wire scan for X or Y.
Friday, May 31, 2019, 11:35: BIAS / EE / EZL @ 30 / -2.0 / 7.5 kV.
Friday, May 31, 2019, 12:05: Tuning adjusted. RPM0A (X) no response. RPM0B (Y) Response (It's back!!!).
Friday, May 31, 2019, 12:13: But it sparked...* Reset Optics. Re-scan to recover. Wire scanners to zero. Unable to pick up wire scan for X.
Carla, Fernando, Matt K.
Friday, May 31, 2019, 12:33 Using Brad's tuning values we see a nice peak at the first set of wire scanners on the y axis but nothing on the x axis. Using CB2, went from 200V to 900V in steps of 100V and saw nothing on the x axis. This seems to indicate x axis scanner is broken. Proceeding without x axis readout. Also tried with CB1 steerers, same effect.
Friday, May 31, 2019, 13:30: Auto-ramping TBHT to 305 A @ 2 A per min.
Friday, May 31, 2019, 13:31: EZL @ 8 kV.
Friday, May 31, 2019, 13:36: Coil to 0 A.
Friday, May 31, 2019, 15:32: Successful wire scans across RPM0A & RPM0B (X,Y) and RPM6B & RPM6A (Y,X).
Friday, May 31, 2019, 16:27 : Wire scanners after the magnet look ok, but not enough beam to do a good emittance scan. Raised the tube heater to 310 A set point, got about 0.5nA at FC6. Probably could be solved with tuning, to be done Monday. Turning everything off but leaving target heating on. See pasted screenshots for current tune on mass 28.
Monday, June 03, 2019, 07:35: BIAS / EE / EZL @ 30 / -1.5 / 7 kV. Anode @ 200 V. Coil @ 10 A.
Monday, June 03, 2019, 07:38: Coil @ 30 A.
Monday, June 03, 2019, 07:41: IV4 opened.
Monday, June 03, 2019, 07:48: BIAS / EE / EZL @ 0 kV. A named Hossein Rafighi with IT began poking around the HV rack and running cable w/ permission reference to Dale Nagra. Locked it out. No work permit was issued. Main Control Room Contacted.
Monday, June 03, 2019, 08:03: Cable run complete. Lock off. Sources on again.
Monday, June 03, 2019, 08:23: BIAS / EE / EZL @ 30 / -1.5 / 7 kV. Anode @ 200 V. Coil @ 30 A.
Monday, June 03, 2019, 08:35: BIAS / EE / EZL @ 40 / -2 / 8 kV
Monday, June 03, 2019, 08:40: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.
Monday, June 03, 2019, 08:41: BIAS @ 45 kV.
Monday, June 03, 2019, 08:45: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset. Mass Magnet MB1 left off.
Monday, June 03, 2019, 08:55: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.
Monday, June 03, 2019, 08:58: BIAS / EE / EZL @ 50 / -2 / 8 kV.
Monday, June 03, 2019, 09:07 : Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.
Monday, June 03, 2019, 09:21: 2 Sparks* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.
Monday, June 03, 2019, 09:29: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset. BIAS @ 54 kV.
Monday, June 03, 2019, 09:31: BIAS / EE / EZL @ 55 / -2.5 / 8 kV.
Monday, June 03, 2019, 09:35: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset
Monday, June 03, 2019, 09:44: Spark* Optics tripped. Turbo pumps TP6 & TP1A Tripped. Close / re-open IV4. Reset
Monday, June 03, 2019, 09:49: Near BIAS 57.5 kV. Multiple sparks. BIAS unable to hold. Optics tripped, wire scanners & FC0 began running independently. Turbo pumps tripped.
Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait*
Monday, June 03, 2019, 09:57: Spark* Reset Optics. Turn off Optics for now.
Monday, June 03, 2019, 10:19: Spark* Reset Optics & Wire scanners. Anode current dropped from 10.989 mA to 7.768 mA
Monday, June 03, 2019, 10:36: BIAS Near 55 kV, brought back down to 50 kV. Multiple sparks. Optics tripped, wire scanners & FC0 began running independently. Anode current dropped from 7.328 mA to 6.105 mA. Knocked out the TGHT
The target heater dropped from 580A to 3.1 A. Attempted reset. Non-responsive.
Monday, June 03, 2019, 10:46: TGHT Still non-responsive. Bump down HV to open the cage & cycle the PS.
Monday, June 03, 2019, 11:02: BIAS / EE / EZL / Anode @ 0 kV.
Monday, June 03, 2019, 11:36: TGHT PS determined to have failed. Run w/ TBHT and test up to 50 kV.
Monday, June 03, 2019, 11:41: Sources on.
Monday, June 03, 2019, 13:17: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.
Monday, June 03, 2019, 13:24: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV.
Monday, June 03, 2019, 13:37: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.
Monday, June 03, 2019, 13:49: Odd sound from Turbo pump TP6?
Vacuum @ 1.13e-06T. Was in the 5e-07 range earlier. Strip tool revealing gradual increase.
Monday, June 03, 2019, 13:52: Spark* Optics tripped, wire scanners & FC0 running independently. Reset
Monday, June 03, 2019, 14:13: Spark* Optics tripped. Loud, outside vacuum chamber.
Monday, June 03, 2019, 14:55: BIAS / EE / EZL @ 0 kV. Anode to 0 V.
Tuesday, June 04, 2019, 08:40: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.
Tuesday, June 04, 2019, 08:54: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV.
Tuesday, June 04, 2019, 09:09: BIAS / EE / EZL @ 45 / -2.5 / 7.5 kV.
Tuesday, June 04, 2019, 09:23: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.
Tuesday, June 04, 2019, 10:21: Spark* Optics & Turbo pump TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber.
Tuesday, June 04, 2019, 10:23: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV. Almost 1 hour of no sparks.
Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.
Tuesday, June 04, 2019, 10:32: BIAS / EE / EZL @ 51 / -2.5 / 7.5 kV.
Tuesday, June 04, 2019, 10:39: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.
Tuesday, June 04, 2019, 11:02: BIAS / EE / EZL @ 53.5 / -2.8 / 7.5 kV.
Tuesday, June 04, 2019, 11:07: Spark* Outside TS. IG6 tripped / reset. BIAS current spike. EZL current dropped afterwards near 460 uA from 550 uA.
Tuesday, June 04, 2019, 11:22: BIAS / EE / EZL @ 54.5 / -2.9 / 7.5 kV.
Tuesday, June 04, 2019, 11:27: BIAS / EE / EZL @ 55 / -3.0 / 7.5 kV.
Tuesday, June 04, 2019, 11:35: Spark* Optics & Turbo pump - TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber.
Tuesday, June 04, 2019, 11:39: Spark* Optics tripped. Loud*, outside the vacuum chamber, above TS. EZL current jumped back up to 550 uA
BIAS current gradually increasing. from 50 uA to 55 uA since 11:35 spark.
Tuesday, June 04, 2019, 12:01: Runaway sparks* Turbo pumps & ion gauges tripped. Optics tripped. Wire scanners running independently. Both quiet & loud sparks. 3 Consistent marks in the strip tool. Reset.
Brought BIAS down to 55 kV. EE to -2.5 kV. BIAS & EZL currents have a small drop.
Tuesday, June 04, 2019, 13:21: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV. Over 1 hr no sparks.
Tuesday, June 04, 2019, 13:34: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.
Tuesday, June 04, 2019, 13:40: BIAS / EE / EZL @ 53.5 / -2.8 / 7.5 kV.
Tuesday, June 04, 2019, 13:41: Spark* Optics & Turbo pump - TP6 tripped. Wire scanners and FC0 operated independently. Restarted. Quiet spark* Inside Vacuum chamber.
Tuesday, June 04, 2019, 13:46: Spark* Loud*, outside the vacuum chamber, above TS. EZL current jumped from 580 uA to 610 uA approx & is gradually increasing. BIAS current slowly decreasing.
Tuesday, June 04, 2019, 14:02: BIAS / EE / EZL @ 54.5 / -2.9 / 7.5 kV. Variation in EZL & BIAS currents noted.
Tuesday, June 04, 2019, 14:08: BIAS / EE / EZL @ 55 / -3.0 / 7.5 kV.
Tuesday, June 04, 2019, 14:28: 20 minutes. No Spark.
Tuesday, June 04, 2019, 14:47: BIAS / EE / EZL @ 0 kV. Anode to 0 V.
Wednesday, June 05, 2019, 08:34: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.
Wednesday, June 05, 2019, 08:35: Coil down from 30 to 0 A.
Wednesday, June 05, 2019, 08:36: Open IV4.
Wednesday, June 05, 2019, 08:37: Optics on / reset.
Wednesday, June 05, 2019, 08:38: Anode to 400 V.
Wednesday, June 05, 2019, 08:44: Anode to 450 V. TBHT @ 305 A.
Wednesday, June 05, 2019, 11:15: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV. Anode @ 200 V.
Wednesday, June 05, 2019, 11:30: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.
Wednesday, June 05, 2019, 11:40: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.
Wednesday, June 05, 2019, 11:53: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 12:04: Spark* Optics & Turbo pump - TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber. bias to 54.9 kV.
Wednesday, June 05, 2019, 12:04: IV4 closed.
Wednesday, June 05, 2019, 12:15: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 12:16: Spark* Loud*, outside the vacuum chamber, above TS. EZL current came down from 601 uA to 537uA . IG6 off. Restarted. Bias to 54.9 kV.
Wednesday, June 05, 2019, 12:24: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 12:35: Spark* inside vacuum chamber. Optics & turbo pumps tripped
Wednesday, June 05, 2019, 13:35: Note* 1 hour @ 55 kV no sparks.
Wednesday, June 05, 2019, 13:42: BIAS / EE / EZL @ 56 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 13:49: BIAS / EE / EZL @ 57 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 13:52: TSG:CB1 went red. Communication lost it.
Wednesday, June 05, 2019, 13:54: BIAS / EE / EZL @ 57.5 / -2.8 / 7.5 kV.
Wednesday, June 05, 2019, 14:01: Spark* inside vacuum chamber. Optics & turbo pumps tripped. Appears to be on the Anode. The test stand phone also redialed the last number contacted on its own.
Wednesday, June 05, 2019, 14:25: BIAS / EE / EZL @ 0 kV. Anode to 0 V. Auto-cooling @ 2 A per min.
Thursday, June 06, 2019, 09:10: Gas lines closed. Sources off. Optics off.
Thursday, June 06, 2019, 09:13: EE / BIAS on.
Thursday, June 06, 2019, 09:20: BIAS @ 30 kV.
Thursday, June 06, 2019, 09:30: BIAS @ 40 kV.
Thursday, June 06, 2019, 09:40: BIAS @ 45 kV. EZL slowly charging (Not on) from 12 to 420 V. EE with -15 V.
Thursday, June 06, 2019, 09:48: BIAS @ 50 kV. EZL / EE @ 606 / -17 V.
Thursday, June 06, 2019, 10:06: BIAS @ 52.2 back to 50 kV. Loud buzzing heard up top. Charge on EZL from 600 V to 1200 - 2000 V fluctuations. EZL & EE to be brought up before we break something.
Thursday, June 06, 2019, 10:16: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.
Thursday, June 06, 2019, 10:27: BIAS / EE / EZL @ 55 / -2.7 / 7.5 kV.
Thursday, June 06, 2019, 10:39: BIAS / EE / EZL @ 57.5 / -2.8 / 7.5 kV.
Thursday, June 06, 2019, 11:04: BIAS / EE / EZL @ 58 / -2.9 / 7.5 kV.
Thursday, June 06, 2019, 11:06: Buzzing / crackling up top in the cage again. Unstable voltage drops. BIAS to 57 kV.
Thursday, June 06, 2019, 11:11: BIAS / EE / EZL @ 58 / -2.9 / 8.25 kV.
Thursday, June 06, 2019, 11:27: BIAS was up to 58.5 & EZL to 9 kV. Buzzing / crackling. Unstable voltage drops / Current increase. BIAS / EZL to 57.5 / 8.5 kV.
Thursday, June 06, 2019, 11:36: BIAS was up to 58.0 & EZL to 9 kV. Buzzing / crackling. More unstable voltage drops / Current increases. BIAS dropped on it's own to 56.1 kV. BIAS / EZL to 56 / 7.5 kV.
Thursday, June 06, 2019, 11:36: Spark*. Inside chamber. Turbo pumps tripped. Buzzing stopped.
Thursday, June 06, 2019, 11:51: Unable to surpass 57 kV before voltage breakdown. Buzzing comes back. Breakdown dropped to 51 kV on BIAS.
Thursday, June 06, 2019, 11:53: BIAS @ 50 kV. EZL to 0, PS off, in attempt to relieve EZL current.
Thursday, June 06, 2019, 11:56: BIAS @ 50 kV. EZL to 7.5 kV w/ 1245 uA. Typically at 550-600 uA on EZL. Unable to relieve the current.
Thursday, June 06, 2019, 12:18: BIAS / EE / EZL @ 55 / -2.7 / 7.5 kV. Current: BIAS / EZL @ 65 / 1306 uA.
Thursday, June 06, 2019, 13:14: BIAS / EE / EZL @ 56 / -2.7 / 7.25 kV. Current: BIAS / EZL @ 70 / 1450 uA.
Thursday, June 06, 2019, 13:15: Voltage breakdown. Buzzing / crackling back. Breakdown dropped to 56.2 kV on BIAS. BIAS set to 56.1 kV to stabilize.
Thursday, June 06, 2019, 13:19: EZL current limit increased.
Thursday, June 06, 2019, 13:30: BIAS / EE / EZL @ 56.5 / -2.7 / 7.00 kV. Current: BIAS / EZL @ 70 / 1856 uA.
Thursday, June 06, 2019, 13:31: Passed to BIAS 56.6 kV. Voltage breakdown. Buzzing / crackling. Breakdown dropped to 55.6 kV on BIAS. BIAS set to 55.5 kV to stabilize.
Thursday, June 06, 2019, 13:51: BIAS / EE / EZL @ 56.2 / -2.7 / 7.00 kV. Current: BIAS / EZL @ 70 / 1950 uA.
Thursday, June 06, 2019, 13:52: BIAS 56.3 kV. Voltage breakdown. Buzzing / crackling. Breakdown dropped to 55.1 kV on BIAS. BIAS set to 55.0 kV to stabilize. Unable to regain HV. Decreases each time we go up.
Thursday, June 06, 2019, 14:00: Limited via the test stand voltage breakdown up in the cage. Source tray held @ 58 kV.
Bring it down.
Thursday, June 06, 2019, 14:31: BIAS / EE / EZL @ 0 kV.
Friday, June 07, 2019, 06:41: Power / Sources off.
Friday, June 07, 2019, 06:43: IG1 & Turbo pumps off.
|
Saturday, May 25, 2019, 12:43, Aaron Schmidt, Test FEBIAD / TM4, LP-FEBIAD, , TM4, 395530-3, 42752-5, In progress, Installed TM4 Source Tray
|
Silver bolts on TGHT & Coil Lines. Oxide steel bolts on TBHT. Filed target to suit / fit (Previously heated). Rubber O-rings used instead of C-seals on the water blocks.
Saturday, May 25, 2019, 12:38: Leak check ok. 0.0E-07 Torr-I/sec. He @ 30 PSI. Carla checked the multi-pin connection. OK.
Saturday, May 25, 2019, 12:46: Roughing.
Saturday, May 25, 2019, 14:30: Turbo pumps started.
Saturday, May 25, 2019, 14:34: Ion gauge on.
Monday, May 27, 2019, 07:09: RGA on.
He Leak TEST #1:
Vacuum Group Leak detector LD#4.
08:39: Vacuum @ 1.58e-06T
LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec
08:40: LD baseline after opening valve to turbo pumps: 3.7e-10 atm-cc/sec
Full open base:
Vacuum @ 1.60e-06T. RGA status:
Water: 2.36e-006
He: -1.05e-009
LD: 3.4e-07 atm-cc/sec
Monday, May 27, 2019, 08:50: Open line FS#2 . Pressurize to 30 PSI. Record after 10 minutes
Monday, May 27, 2019, 09:00: Vacuum @ 1.60e-06T . RGA status:
Water: 2.33e-006
He: -4.89e-010
LD: 3.4e-07 atm-cc/sec. Purge and close FS#2.
Monday, May 27, 2019, 09:05: Open line FS#3 . Pressurize to 30 PSI. Record after 10 minutes
Monday, May 27, 2019, 09:15: Vacuum @ 1.58e-06T. RGA status: (Small He Spikes noted)
Water: 2.29e-006
He: -4.19e-009
LD: 3.6e-07 atm-cc/sec. Purge and close FS#3.
Monday, May 27, 2019, 09:26: Open line FS#4 . Pressurize to 30 PSI. Record after 10 minutes
Monday, May 27, 2019, 09:35: Vacuum @ 1.58e-06T. RGA status: (Small He Spikes noted, continued from FS#3)
Water: 2.25e-006
He: -7.36e-009
LD: 4.0e-07 atm-cc/sec. Purge and close FS#4.
Monday, May 27, 2019, 09:45: Open line FS#5 . Pressurize to 30 PSI. Record after 10 minutes
Monday, May 27, 2019, 09:55: Vacuum @ 1.58e-06T. RGA status:
Water: 2.21e-006
He: -3.16e-010
LD: 4.2atm-cc/sec. Purge and close FS#5
Monday, May 27, 2019, 10:00: Depressurize lines. Connect HPA & Purge all lines.
After 5 minutes: Vacuum @ 1.58e-06T . RGA status:
Water: 2.20e-006
He: -5.73e-010
LD: 4.3e-07 atm-cc/sec
Close Valve & disconnect LD. HE LEAK TEST COMPLETE
Note: He spikes ongoing after opening line FS#3. Likely due to the use of rubber o-rings.
Monday, May 27, 2019, 10:51: Begin gradually opening the waterlines.
Monday, May 27, 2019, 10:54: Open FS#2. Vacuum @ 1.56e-06T. No Response on RGA.
Monday, May 27, 2019, 10:56: Open FS#3. Vacuum @ 1.58e-06T. No Response on RGA.
Monday, May 27, 2019, 11:00: Keiko stopped by. Soft restart done on PLC.
Monday, May 27, 2019, 11:04: Open FS#4. Vacuum @ 1.58e-06T. No Response on RGA.
Monday, May 27, 2019, 11:06: Open FS#5. Vacuum @ 1.58e-06T. No Response on RGA.
Waterlines Ok.
Prep to open gas lines.
Monday, May 27, 2019, 11:24: SV1 open w/ mini pump. Vacuum @ 1.49e-06T. No Response on RGA.
Monday, May 27, 2019, 11:25: Open SV3 & SV4 w/ mini pump. Vacuum @ 1.58e-06T. No Response on RGA. Allow 10 min.
Monday, May 27, 2019, 11:35: Mini pump switched off. SV1 Closed.
Monday, May 27, 2019, 11:37: Begin quickly opening and closing gas lines until the a stable vacuum is reached.
Monday, May 27, 2019, 11:40: Gas lines: SV3, SV4, & SV5 open.
Monday, May 27, 2019, 13:29: Power / Sources on.
Monday, May 27, 2019, 13:30: Auto ramping TGHT / TBHT to 350 / 150 A @ 2A per min. Vac limit increased to 3.000e-06T for out gassing.
Monday, May 27, 2019, 13:44: Open IV4.
Tuesday, May 28, 2019, 07:10: Gradually bring up HV to BIAS / EE / EZL @ 30 / -1.5 / 13.5 kV in increments of 500 / 100 / 250
Tuesday, May 28, 2019, 07:22: Halted and brought back down. BIAS / EE / EZL @ 10 / -0.2 / 8.5 kV. Unusual current noticed on the EE. Only went to -200 V and the current increased to 1300uA. Typically at -1500V the current sits at 515uA.
Tuesday, May 28, 2019, 09:21: 50V added top Anode. EE current increases to 310.134uA. Odd. EE voltage increases affect the Anode current as well.
Tuesday, May 28, 2019, 09:22: Auto-cooling @ 4A per min.
Tuesday, May 28, 2019, 11:15: Power off. Gas lines closed.
Tuesday, May 28, 2019, 11:36: Connection discovered between Anode & EE. (Inside Vacuum). RGA off. IV4 closed.
Tuesday, May 28, 2019, 11:38: IG1 off. Turbos off.
Tuesday, May 28, 2019, 12:40: Venting
Tuesday, May 28, 2019, 15:02:
Short found on EE to Anode. Wires touching inside chamber. Fixed. Tubes touched to coil. No longer touching. Electrical check of source tray complete. Target re-installed.
Roughing. |
Wednesday, May 22, 2019, 13:47, Aaron Schmidt, , , , , , , , Calibrated Masscorr
|
Wednesday, May 22, 2019, 13:44: Calibration Confirmed.
New Masscorr setup:
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2019-05-22-13-42%20ZrC%238 |
Tuesday, May 14, 2019, 10:22, Aaron Schmidt, ZrC#8, LP-SIS, ITE, TM2, 43044-5, 42972-3, In progress, Conditioning ZrC#8 HS
|
Tuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo pumps on.
Tuesday, May 14, 2019, 11:05: Ion gauge, RGA on.
Wednesday, May 15, 2019, 08:42: Waterlines opened. Vacuum Ok @ 6.45e-07T. No response on RGA.
Wednesday, May 15, 2019, 08:58: Power / sources on.
Wednesday, May 15, 2019, 09:00: Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.
Wednesday, May 15, 2019, 09:02: Optics set. IV4 open.
Wednesday, May 15, 2019, 09:09: BIAS / EE / EZL @ 30 / -1.5 / 13.5 kV.
Wednesday, May 15, 2019, 09:10:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.34 |
5.24 |
TBHT |
26.28 |
8.23
|
COIL + EE |
26.11 |
2.18 |
TGHT |
26.21 |
6.44 |
Wednesday, May 15, 2019, 10:39: Abort auto-ramp. Significant out gassing note. Vacuum @3.12e-06T
TGHT / TBHT @ 77 A. Hold until stable again. Effect noted similar to ZrC#7 ( https://elog.triumf.ca/TIS/Test-Stand/450 ). Resume Auto ramp in 1 hour to TGHT / TBHT 350 / 150 A.
Wednesday, May 15, 2019, 11:54: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per min.
Wednesday, May 15, 2019, 14:47: TGHT / TBHT @ 146 / 146 A. Ramping to 350 / 150 A overnight.
Thursday, May 16, 2019, 07:30: Restarted RGA.
Thursday, May 16, 2019, 07:54: Mass scan taken albeit still ramping. TGHT / TBHT @ 280 / 150 A.
Thursday, May 16, 2019, 09:10: Ramping aborted @ TGHT / TBHT @ 285 (287.6) / 150 A. Allow for further out gassing.
Thursday, May 16, 2019, 13:22: Vacuum limit increased to 2.0e-06T. Vacuum @ 7.86E-07T.
Thursday, May 16, 2019, 13:23: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per min.
Tuesday, May 21, 2019, 07:03: Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.
Tuesday, May 21, 2019, 12:30: TGHT Stopped at 557.2A. Readout at 578. Moved readout to 557. Readback @ 557.2A.
Wednesday, May 22, 2019, 07:09: TGHT was at voltage limit. The limit was increased. Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.
Wednesday, May 22, 2019, 07:32: TGHT 579.9 A / 8.051 V.
Wednesday, May 22, 2019, 13:45: Masscorr calibration confirmed.
Wednesday, May 22, 2019, 13:51: Auto-cooling @ 2A per min.
Thursday, May 23, 2019, 13:27: Sources / Power off. RGA off.
Thursday, May 23, 2019, 13:31: IV4 Closed. Turbo pumps off. |
Tuesday, May 07, 2019, 13:16, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, , In progress, 9-pin connection configuration (Using Ta#58)
|
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
Pins connected source tray side: 1, 4, 5, 6
ST 9-pin HV rack
Pin to L TGHT - 1 - Black / COM / 5
Pin to R TGHT - 6 - Red / 9
Pin to L TBHT - 4 - Black / COM / 2
Pin to R TBHT - 5 - Red / 1
Tuesday, May 07, 2019, 15:20: Roughing.
Turbo pumps switched on w/ Ion gauge around 4pm.
Wednesday, May 08, 2019, 08:05: Multi-meters tested & connected.
Wednesday, May 08, 2019, 08:09: Power / sources on.
Wednesday, May 08, 2019, 08:13: RGA on
Wednesday, May 08, 2019, 08:14: Auto-ramping TGHT / TBHT to 575 (580) / 230 A @ 2A per min.
Wednesday, May 08, 2019, 08:30: Voltage reading off on TBHT? Connection to source tray side is wrong.
Wednesday, May 08, 2019, 08:40: Halt auto ramping. Manually tap down TBHT / TGHT
Wednesday, May 08, 2019, 08:42: Sources / RGA off.
Wednesday, May 08, 2019, 08:43: Turbo pumps off.
Wednesday, May 08, 2019, 10:40: Roughing.
Wednesday, May 08, 2019, 11:01: Turbo pumps on.
Wednesday, May 08, 2019, 13:10: Power / sources on. Vacuum @ 4.37e-06T
Wednesday, May 08, 2019, 13:19: Auto-ramping TGHT to 575 (580) A @ 2A per min. However, the vacuum is not quite ready. Increment value set to 3.000e-06T to ramp. Once the vacuum is reached, the heaters will start to ramp automatically.
Wednesday, May 08, 2019, 14:23: Auto-ramping ongoing successfully. TGHT @ 32A +. Vacuum @ 2.66e-06T
Thursday, May 09, 2019, 07:05: Auto-ramping TGHT to 575 (580) A @ 2A per min from 400 A.
Monday, May 13, 2019, 08:00: TSG:TP1A appears to have tripped over the weekend. (Around 7pm Saturday)
Closed IV4 / reset. Reset TP1A. Reset BV1A. Turn on TP1A.
Monday, May 13, 2019, 08:32: TBHT & TGHT switched back on.
Ramped down around 10 PM.
Tuesday, May 14, 2019, 07:10: Power / RGA off.
Tuesday, May 14, 2019, 07:12: IV4 closed, Ion gauge & turbo pumps off.
Tuesday, May 14, 2019, 08:35: Waterlines purged. Venting. |
Friday, May 03, 2019, 08:30, Anders Mjos, , , , , , , In progress, Training
|
Training: Venting and pump down
Friday, May 03, 2019, 08:30: Turbo pumps stopped. |
Friday, April 26, 2019, 13:45, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, 42972-7, In progress, Conditioning Ta#58 HS 7x
|
Friday, April 26, 2019, 13:43: Roughing.
Friday, April 26, 2019, 14:12: Turbo pumps on.
Friday, April 26, 2019, 14:58: RGA on.
Monday, May 06, 2019, 07:05: RGA restarted.
Monday, May 06, 2019, 07:10: Waterlines opened. Vacuum ok @ 5.13e-07T. No response on the RGA.
Monday, May 06, 2019, 07:16: Power / sources on.
Monday, May 06, 2019, 07:20: Optics set.
Monday, May 06, 2019, 07:23: Auto-ramping TGHT / TBHT to 575 / 200 A @ 2A per min.
Monday, May 06, 2019, 07:28: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.
Monday, May 06, 2019, 07:39: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, May 06, 2019, 07:57: Reset DaqPro. Ref data sheet.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.8 |
5.52 |
TBHT |
25.7 |
7.93
|
COIL + EE |
25.6 |
1.92 |
TGHT |
25.70 |
6.29 |
Monday, May 06, 2019, 09:07: TBHT at 200A ok. Halt auto ramp. Set TBHT. Cont'd auto-ramping TGHT / TBHT to 575 / 230 A @ 2A per min.
Monday, May 06, 2019, 09:47: RGA restarted. Updates?
RGA timed out around 10:30.
Monday, May 06, 2019, 11:00: RGA error. Initial communications errors, would not connect. Restarted the computer and allowed updates to take effect. EM7 error displayed.
Monday, May 06, 2019, 11:27: RGA restarted.
Monday, May 06, 2019, 13:10: EZL to 14.3 kV
Monday, May 06, 2019, 14:48 :
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.4 |
7.78 |
TBHT |
27.0 |
10.30
|
COIL + EE |
26.8 |
3.01 |
TGHT |
27.1 |
7.09 |
Tuesday, May 07, 2019, 07:26: Noticed a discrepancy on the mass scan. The mass peaks appear to have moved further along the mass / q. They are identical to what we used to see on previous scans, just further down the line. A calibration / scaling may be appropriate.
Element |
Mass |
Mass/q |
Beam Current |
Lithium |
6.941 |
7.508 |
1.04401e-10 |
Sodium |
22.9897 |
27.556 |
9.85687e-10 |
Mass 27 (Al) |
26.9815 |
32.2943 |
2.97834e-08 |
Potassium |
39.0983 |
46.3293 |
7.49146e-10 |
|
(peak 2) |
47.6191 |
1.568e-10 |
Rubidium |
85.4678 |
100.355 |
2.79327e-10 |
|
(peak 2) |
102.904 |
1.04431e-10 |
Cesium |
132.9055 |
156.6 |
8.6103e-10 |
|
(peak 2) |
162.532 |
2.4408e-10 |
The discrepancy appears to get larger the further we move along the masses.
Tuesday, May 07, 2019, 07:39: Auto-cooling @ 2 A per min to TGHT / TBHT @ 350 / 0 A. Check around 9:20am.
Tuesday, May 07, 2019, 09:30: Auto-cooled to TGHT / TBHT @ 350 / 0 A.
Tuesday, May 07, 2019, 11:06: Auto-cooling @ 2A per min.
Tuesday, May 07, 2019, 11:09: Auto-cooling @ 4A per min.
Tuesday, May 07, 2019, 12:51: Power / sources off. IV4 closed / reset. RGA off.
Tuesday, May 07, 2019, 12:54: Turbo pumps off.
Tuesday, May 07, 2019, 14:00: Venting. |
Tuesday, April 23, 2019, 14:39, Aaron Schmidt, , LP-SIS, , , , 42752-8, Done, Conditioning UC#28 HS
|
Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo pumps started.
Tuesday, April 23, 2019, 15:18: Ion gauge on.
Wednesday, April 24, 2019, 07:33: RGA on.
Wednesday, April 24, 2019, 07:37: Waterlines opened. Vacuum ok @ 7.99e-07T. No response on RGA
Wednesday, April 24, 2019, 07:41: Power / sources on.
Wednesday, April 24, 2019, 07:43: Auto-ramping TGHT to 575 @ 2A per min. Vacuum limit remains at 3.000e-06T.
Thursday, April 25, 2019, 14:07: Auto-cooling @ 2 A per min.
Friday, April 26, 2019, 07:53: sources off.
Friday, April 26, 2019, 07:55: RGA off. Power off.
Friday, April 26, 2019, 07:57: Turbos off.
Friday, April 26, 2019, 08:00: HS waterlines purged. |
Monday, April 15, 2019, 14:42, Aaron Schmidt, , LP-SIS, , , , 42972-1, Done, Conditioning UC#27 HS & test FS#3
|
New coil lines installed for P2N testing later.
Monday, April 15, 2019, 14:15: Roughing.
Monday, April 15, 2019, 14:49: Turbo pumps on.
Tuesday, April 16, 2019, 08:20: RGA on.
Gradually open each line. Wait 5 minutes & monitor the response.
Tuesday, April 16, 2019, 08:30: Open Return & Supply main valves.
Tuesday, April 16, 2019, 08:32: Open FS#5. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:37: Vacuum @ 4.37e-06T
Tuesday, April 16, 2019, 08:38: Open FS#4. Vacuum @ 4.37e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:43 Vacuum @ 4.29e-06T
Tuesday, April 16, 2019, 08:44 Open FS#3. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:49: Vacuum @ 4.26e-06T.
Tuesday, April 16, 2019, 08:50: Open FS#2. Vacuum @ 4.29e-06T. No response on RGA (water).
Tuesday, April 16, 2019, 08:57: Vacuum @ 4.29e-06T.
Wednesday, April 17, 2019, 08:30: Power/sources on. Vacuum @ 2.46e-06T.
Wednesday, April 17, 2019, 10:30: Auto-ramping TGHT to 150 @ 2A per min. Vacuum limit increased to 3.000e-06T.
Wednesday, April 17, 2019, 11:53: Auto-ramping TGHT to 300 @ 2A per min. Vacuum @ 2.50e-06T.
Wednesday, April 17, 2019, 13:10: Auto-ramping TGHT to 350 @ 2A per min. Vacuum @ 2.95e-06T.
Thursday, April 18, 2019, 07:23: Auto-ramping TGHT to 575 @ 2A per min. Vacuum @ 2.40e-06T.
Tuesday, April 23, 2019, 06:45: Auto-Cooling TGHT @ 2A per min. Vacuum @ 9.22e-07T.
Tuesday, April 23, 2019, 08:29: RGA error. Shut off RGA.
Tuesday, April 23, 2019, 11:34: Power/sources off.
Tuesday, April 23, 2019, 11:37: IG1 off. Turbos off.
Tuesday, April 23, 2019, 12:53: Venting. |
Friday, April 05, 2019, 07:02, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, TS operation test - LP FEBIAD
|
Due to previous issues, a full run / test should be performed on the ISAC Test Stand.
Friday, April 05, 2019, 07:00: RGA on.
Friday, April 05, 2019, 07:03: Begin opening / closing gas lines until they can be opened & stable.
Friday, April 05, 2019, 07:14: Gas lines open.
Friday, April 05, 2019, 07:16: Power / sources on. Vacuum down to 1.25e-06T
Friday, April 05, 2019, 07:18: Optics on & Set.
Friday, April 05, 2019, 07:19: IV4 Opened.
Friday, April 05, 2019, 07:21: Auto-ramping TGHT / TBHT to 300 / 200 A @ 2A per min
Friday, April 05, 2019, 07:28: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode @ 200 V.
Friday, April 05, 2019, 09:40: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min
Friday, April 05, 2019, 14:01: Beam on FC0 & wire scans. Mass scan provides no reading. (Max current after CONST2 has changed). Inquire why.
No sparks have occurred on this run. Operationally, appears the PS switches were effective.
Friday, April 05, 2019, 14:05: Begin auto-cooling @ 2A per min.
Friday, April 05, 2019, 14:56 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.
Monday, April 08, 2019, 06:57: RGA off. Gas lines closed. IV4 Closed.
Monday, April 08, 2019, 07:01: Power / Sources off.
Monday, April 08, 2019, 07:01: IG1 off. Turbo pumps off.
Monday, April 08, 2019, 08:11: Venting. |
Wednesday, March 27, 2019, 11:01, Aaron Schmidt, , , , , , , Problems/Solutions, BIAS PS replaced. Test
|
Wednesday, March 27, 2019, 10:25: BIAS @ 1 kV
952V - 548uA on controls readback - Scaling req'd
964V direct from the PS - 25 uA
Wednesday, March 27, 2019, 10:28:
2.75 kV
2725V - 1515uA on controls readback
2696V direct from the PS - 65.8 uA - Scaling req'd
Wednesday, March 27, 2019, 10:31:
5.5kV
5465V - 3022uA on controls readback
5.478kV direct from the PS - 137.5uA - Scaling req'd
Wednesday, March 27, 2019, 11:00: PS runs ok. Longer connection cable req'd to link to TS source. Contact controls over scaling.
Wednesday, March 27, 2019, 14:25: Sources on. BIAS connected.
Wednesday, March 27, 2019, 14:34: BIAS / EZL @ 5.5 / 1 kV. No spark.
Wednesday, March 27, 2019, 14:51: BIAS / EZL @ 10 / 5 kV. No spark.
Wednesday, March 27, 2019, 14:57: BIAS / EZL @ 20 / 10 kV. No spark.
Scaling done IOC Restarted.
Thursday, April 04, 2019, 10:33: BIAS / EZL @ 20 / 10 kV. No spark.
Thursday, April 04, 2019, 10:35: BIAS / EZL / EE @ 30 / 13 / -1.5 kV. Anode at 200 V. No spark.
Thursday, April 04, 2019, 10:49: Sources brought to 0. No spark & scaling appears complete. |
Tuesday, March 26, 2019, 10:44, Aaron Schmidt, , , , , , , Problems/Solutions, EZL PS replaced. Test
|
EZL checked. OK @ 5kV
BIAS PS issues.
2.3kV on screen. Read back on PS 3kV. Direct measurement reads 5.8 kV
Readback does not increase with the controls. Stops at 2.4kV & the current climbs very quickly.
Tuesday, March 26, 2019, 11:00: EZL PS routed to TS BIAS, but still controlled via EZL controls. EZL line grounded.
Brought up to 20kV, no sparks.
New EZL PS confirmed ok. BIAS PS has issues. |
Thursday, March 21, 2019, 08:33, Aaron Schmidt, , , , , , , , Pump down TS
|
Thursday, March 21, 2019, 08:32: Roughing. |
Monday, March 11, 2019, 13:56, Aaron Schmidt, , , , , , , Done, TGHT PS replaced
|
Monday, March 11, 2019, 13:55: The TGHT PS was replaced.
Brought up to 20 A. Operation. ok. |
Thursday, March 07, 2019, 07:55, Aaron Schmidt, , LP-FEBIAD, , , , , Problems/Solutions, TS restart - Troubleshoot BIAS spark
|
Thursday, March 07, 2019, 07:48: IV4 reset, BV6 & TMS TP6 reset.
Turbo pump restarted.
Auto cooling @ 2A per min.
Thursday, March 07, 2019, 08:40: Speed up Auto-cooling to 4A per min.
Thursday, March 07, 2019, 11:06: Power cycled the control boxes for the turbo pumps one by one. Operation in back to normal.
Thursday, March 07, 2019, 11:09: Switched to filament 2 on IG6. Reset.
Sparks from BIAS to EZL noticed at 1 kV. A wire was moved away from insulator 'O'
Sparks from BIAS to EZL @ 3kV
Friday, March 08, 2019, 11:00: Power supplies checked with John Chow.
BIAS (V) ------------------- EZL (V)
Set@-Read-Actual-----Set@-Read-Actual
1000- 982- 816---------1000- 987- 996
1500-1480-1300-------1500-1475-1530
2000-1993-1600-------2000-1993-1997
2500-2491-2070-------10000-9993-9964
3000-2989-2500
3500-3487-2900
4000-3985-3360
5000-4982-4145
Note* Lower reading on BIAS. Check the scaling with controls group.
Friday, March 08, 2019, 11:14: RGA, Ion gauge, Turbo pumps off.
Friday, March 08, 2019, 13:01: Venting for visual inspection.
Visual & Multimeter checks appear ok.
Friday, March 08, 2019, 14:37: Roughing.
Friday, March 08, 2019, 15:00: Turbos on.
Monday, March 11, 2019, 09:00: Switch everything on & slowly increase EZL & BIAS together
Monday, March 11, 2019, 09:30: Spark at approx 12-13 kV on BIAS. TGHT to 600A? Readback.
TGHT PS readback issues. John C contacted.
Power down.
Prep for TGHT PS removal. Possible capacitive effect? Test TS w/o TGHT PS after.
Monday, March 11, 2019, 13:55: New TGHT PS installed.
Tuesday, March 12, 2019, 08:37: Power / sources on
Tuesday, March 12, 2019, 08:50: BIAS to over 3kV. EZL set to 1 kV, but charged to over 5.5 kV on its own.
Tuesday, March 12, 2019, 09:30: Electrical check in the HV cage revealed a light oxide coating on the EZL post 'O'. This appears to have insulated the nut & feed through. Will require venting & removal to clean.
Ion gauge, turbo pumps off.
Tuesday, March 12, 2019, 11:10: Venting.
Wednesday, March 13, 2019, 08:30: Roughing. The brass nut & spark cap were polished, cleaned and re-installed. Other connections & wires cleaned.
Wednesday, March 13, 2019, 09:10: Turbo pumps started. Wiring up top re-connected.
Update* EZL PS removed. Tested by John C & Tomislav. The HV enable circuit wouldn't activate. Upon further investigating into the control and voltage regulating circuits of the PS, they found that the control ICs are 40% under powered, only getting 10V instead of 15V from its voltage regulator.
EZL PS to be replaced.
Wednesday, March 20, 2019, 07:03: Turbo pumps off
Wednesday, March 20, 2019, 08:28: Venting |
Friday, March 01, 2019, 14:51, Aaron Schmidt, , LP-FEBIAD, , , , , , Gas lines test & Emissions measurement prep
|
Friday, March 01, 2019, 14:50:
SV5 replaced with a new valve.
SV1 disconnected from the He line and linked to the mini pump line.
Tuesday, March 05, 2019, 08:05: Roughing.
Tuesday, March 05, 2019, 08:36: Turbo pumps on.
Tuesday, March 05, 2019, 10:03: Vacuum at 1.30e-05T
Open SV3 & SV4. Vacuum remains unchanged. No response on the RGA.
Tuesday, March 05, 2019, 10:05: SV1 opened & closed. Responds well.
Tuesday, March 05, 2019, 10:06: Mini-pump on. MP manual valve closed.
Tuesday, March 05, 2019, 10:17: MP manual valve opened. No response on RGA. Vacuum stable / going down @ 1.13e-05T.
Tuesday, March 05, 2019, 10:25: SV1 open. No response on RGA. Vacuum stable / going down @ 1.02e-05T.
Tuesday, March 05, 2019, 10:35: SV1, SV3, SV4 closed. SV5 opened / closed. Minor response on RGA & Vacuum.
Tuesday, March 05, 2019, 10:40: SV5 opened fully to pump down.
Tuesday, March 05, 2019, 10:42: SV3 & SV4 opened fully to pump down.
Tuesday, March 05, 2019, 12:56: SV5 closed.
Tuesday, March 05, 2019, 12:57: SV3 & SV4 closed.
Tuesday, March 05, 2019, 12:59: SV1 to mini pump opened.
Tuesday, March 05, 2019, 13:06: SV3 & SV4 opened.
Tuesday, March 05, 2019, 13:27: SV1 closed. SV5 opened / closed in 'quick bursts'
Tuesday, March 05, 2019, 13:31: SV5 fully opened.
Tuesday, March 05, 2019, 13:43: Mini pump off.
Wednesday, March 06, 2019, 07:56: Mini-pump on. TS locked up. Power on. Gas lines open.
Wednesday, March 06, 2019, 07:59: RGA reset.
Wednesday, March 06, 2019, 08:00: Sources & optics on.
Wednesday, March 06, 2019, 08:02: Auto-ramping TGHT / TBHT to 100 / 75 A @ 2A per min.
Wednesday, March 06, 2019, 08:07: BIAS / EZL / EE @ 10 / 5 / 0.5 kV - Low settings stable.
Wednesday, March 06, 2019, 08:19: IV4 opened.
Wednesday, March 06, 2019, 11:05: SV3 closed.
Wednesday, March 06, 2019, 11:10: SV4 & SV5 closed.
Wednesday, March 06, 2019, 11:11: SV5 re-opened.
Wednesday, March 06, 2019, 11:15: SV5 closed.
Wednesday, March 06, 2019, 11:16: SV1 to mini pump (running) opened.
Wednesday, March 06, 2019, 11:22: Sv3 & SV4 opened. No response on vacuum or RGA. SV5 good.
Wednesday, March 06, 2019, 11:30: Closed SV1, SV3, & SV4. open / close SV5 until stable.
Wednesday, March 06, 2019, 11:33: SV3 & SV4 opened.
Wednesday, March 06, 2019, 11:36: SV5 fully opened. No trip.
Wednesday, March 06, 2019, 11:40: Auto-ramping TGHT / TBHT to 350 / 250 A @ 2A per min.
Thursday, March 07, 2019, 07:23: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Thursday, March 07, 2019, 07:28: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode 200 V
Thursday, March 07, 2019, 07:38: Something in the BIAS went horribly wrong. The Test Stand was crackling like a fire cracker. Very loud.
BIAS / EZL / EE / Anode off. Begin auto cooling.
Optics tripped. TMS:TP6 tripped
|
Friday, February 22, 2019, 11:11, Aaron Schmidt, , LP-FEBIAD, , , , , , Gas line backing pump tests
|
Backing "mini pump" testing.
-Open gas lines & auto ramp (If using HV, close up the back)
-HV on
-Close SV5, SV4, SV3 when ready. Wait until stable. Take measurement (1/2 hr approx)
-Turn down HV. Interlock, leave heaters on.
-Turn on mini pump.
-Open, SV4, SV3 carefully.
-Open MP valve. Wait 15 min. Close MP valve
-Carefully open SV5. Quick open & shut. Monitor vacuum 7.0e-06T trip limit.
-Monitor / record. Carefully open & close until stable.
-Close up TS w/ interlock
-HV on again & test.
Friday, February 22, 2019, 11:06: Auto-ramping TGHT / TBHT to 100 / 75 A. Gas lines open.
Friday, February 22, 2019, 11:31: HV on. BIAS / EZL / EE @ 5 / 1 / 0.1 kV. Anode @ 25 V - Low settings to check for trip and practice.
Friday, February 22, 2019, 11:43: HV unstable. Bump up. BIAS / EZL / EE @ 10 / 5 / 0.2 kV. Anode @ 25 V - Low settings stable.
Friday, February 22, 2019, 12:36: SV3 closed (Neon)
Friday, February 22, 2019, 12:46: SV4 (Argon), SV5 closed.
Friday, February 22, 2019, 12:57: HV off.
Friday, February 22, 2019, 13:00: Interlock complete. Mini pump on.
Friday, February 22, 2019, 13:10: MP valve opened manually.
Friday, February 22, 2019, 13:16: SV3 open. SV4 open.
Friday, February 22, 2019, 13:19: MP valve closed. pump off. SV5 opened / closed fast & intermittent.
Friday, February 22, 2019, 13:22: SV5 open fully. Gas lines all open.
Friday, February 22, 2019, 13:24: HV on. Interlock out.
Friday, February 22, 2019, 13:27: BIAS / EZL / EE @ 10 / 5 / 0.2 kV. Anode @ 25 V - Low settings stable.
Friday, February 22, 2019, 13:30: Setting reset, including optics. TGHT / TBHT did not trip.TEST 1 SUCCESS!.
Monday, February 25, 2019, 07:36: Auto-ramping TGHT / TBHT to 580 / 290 A. Gas lines open.
Monday, February 25, 2019, 11:04: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode @ 200V
Monday, February 25, 2019, 13:38 : SV3 closed.
Monday, February 25, 2019, 14:25: SV5 closed.
Monday, February 25, 2019, 14:45: HV off.
Monday, February 25, 2019, 14:50: Mini-pump on.
Monday, February 25, 2019, 14:53: Open MP valve
Monday, February 25, 2019, 14:57: Open SV3 & SV4
Monday, February 25, 2019, 14:59: Close MP valve.
Monday, February 25, 2019, 15:00: Open / Close SV5 intermittently until stable.
Monday, February 25, 2019, 15:01: SV5 Open.
Monday, February 25, 2019, 15:04: Locked up. Power back to HV. Optics switched on. FC0 closed. Ready for HV
Wednesday, February 27, 2019, 08:11: Auto-cooling @ 2 A per min
Wednesday, February 27, 2019, 13:23: gas lines closed.
Friday, March 01, 2019, 10:35: IV4 reset
Friday, March 01, 2019, 10:42: Ion gauge 1 & the turbo pumps off. |
Thursday, January 24, 2019, 08:42, Aaron Schmidt, , , , , , , , IG6 fix (w/ instruction)
|
TMS:IG6 had continued communication errors post power outage & would not switch on. After a power loss, IG6 switches automatically to Filament 1. Filament 1 is burnt out.
Thursday, January 24, 2019, 08:14: TMS:IG6 fixed. Switched from Filament 1 to Filament 2. FIL2 runs ok.
Instructions from Edi:
-Using the + / - keys move the cursor on the control box to select FIL2. The control box is located above the beam line turbo pump control boxes / inside the black cabinets under the TS.
-Press ok to switch FL2 : ON
-Turn IG6 on with the computer (EPICS) before it times out.
-Now IG6 is connected and can be switched on / off from the computer. |
Monday, January 21, 2019, 10:55, Aaron Schmidt, , , , , , , , 2019 Anode tests FM-1
|
Monday, January 21, 2019, 10:50: RGA on.
Monday, January 21, 2019, 10:54: Waterlines opened. No response on RGA. Vacuum ok @ 8.4e-07. IG6 not responding. Ok for this test.
Monday, January 21, 2019, 11:00: Power / Sources on.
Monday, January 21, 2019, 11:03: Anode to 300 V - 0.000 mA.
Monday, January 21, 2019, 11:05: Auto-ramping TGHT to 300 A @ 2 A per min.
Tuesday, January 22, 2019, 08:10: Auto-ramping TGHT to 580 A @ 2 A per min.
FM
Tuesday, January 22, 2019, 09:43 : Lowering the voltage to turn off Anode PS in order to replace the multimeter battery.
Tuesday, January 22, 2019, 09:51: Multimeter battery replaced. Turning on Anode PS and increasing the voltage to 300 V.
Tuesday, January 22, 2019, 10:46 : Auto-ramping TBHT to 200 A @ 2 A per min. Vaccum ok @1.29e-6 T
Tuesday, January 22, 2019, 13:08 : Auto-ramping TBHT to 270 A @ 2 A per min. Vaccum ok @1.56e-6 T
Tuesday, January 22, 2019, 15:18 : Auto-ramping TBHT to 290 A @ 2 A per min. Vaccum ok @1.67e-6 T
Tuesday, January 22, 2019, 16:00: Manually-ramping TBHT to 295 A @ 2 A per min. Vaccum ok @1.76e-6 T
FM
Wednesday, January 23, 2019, 09:35 : Manually-ramping TBHT to 300 A @ 2 A per min. Vaccum ok @1.21e-6 T
Wednesday, January 23, 2019, 10:49 : Auto-ramping TBHT to 310A @ 2 A per min. Vaccum ok @1.12e-6 T
Wednesday, January 23, 2019, 12:07 : Manually-cooling TBHT to 270A @ 2 A per min. Vaccum ok @1.12e-6 T
Wednesday, January 23, 2019, 14:25: Auto-ramping TBHT to 330A @ 2 A per min. Vaccum ok @1.03e-6 T
Wednesday, January 23, 2019, 16:23: Anode drain current was in runaway situation. When decreasing the TBHT current, the increment was set to 10 instead of 1 so there was a 10 A decrease from 330 to 320 A. This large decrease was unintended
Wednesday, January 23, 2019, 16:25: Manually-cooling TBHT to 300A @ 2 A per min. Vaccum ok @1.12e-6 T
Wednesday, January 23, 2019, 17:18 : Manually-cooling TBHT to 290A@ 2 A per min. Vaccum ok @1.12e-6 T
FM
Thursday, January 24, 2019, 13:18: Manually-cooling TBHT to 270A@ 2 A per min. Vaccum ok @9.02e-7 T
Thursday, January 24, 2019, 15:28 : Manually-cooling TBHT to 250A@ 2 A per min. Vaccum ok @8.67e-7 T
FM
Friday, January 25, 2019, 14:59 : Manually-cooling TBHT to 240A@ 2 A per min. Vaccum ok @7.04e-7 T
Friday, January 25, 2019, 16:26 : Manually-cooling TBHT to 230A@ 2 A per min. Vaccum ok @5.18e-7 T
FM
Monday, January 28, 2019, 10:27: Auto-ramping TBHT to 290A @ 2 A per min. Vaccum ok @4.91e-7 T
Monday, January 28, 2019, 11:32: Manually-cooling TGHT to 570A@ 2 A per min. Vaccum ok @5.10e-7 T
Monday, January 28, 2019, 14:43: Auto-ramping TBHT to 300A @ 2 A per min. Vaccum ok @5.46e-7 T
Monday, January 28, 2019, 15:57 : Manually-cooling TBHT to 290A@ 2 A per min. Vaccum ok @5.54e-7 T
FM
Tuesday, January 29, 2019, 15:42 : Manually-cooling TGHT to 560A@ 2 A per min. Vaccum ok @5.54e-7 T
FM
Wednesday, January 30, 2019, 17:23: Manually-cooling TGHT to 550A@ 2 A per min. Vaccum ok @4.65e-7 T
FM
Friday, February 01, 2019, 14:45: Manually-cooling TGHT to 540A@ 2 A per min. Vaccum ok @4.74e-7 T
Friday, February 01, 2019, 16:49: Auto cooling TGHT to 0A@2 A per min.
Friday, February 01, 2019, 22:22: Auto cooling TBHT to 0A@2 A per min.
FM
Saturday, February 02, 2019, 10:07: Auto-ramping TBHT to10A and TGHT to 10A@ 2 A per min. Vacuum ok @3.13e-7 T
AS
Monday, February 04, 2019, 09:20: Restarted RGA. TGHT, TBHT, Anode, off. Prep to open gas lines.
Monday, February 04, 2019, 09:24: Open / Close SV4 only. Vacuum spike t0 5.5e-05T. Alternate between SV4 & SV5 to fully open Argon.
Monday, February 04, 2019, 09:48: Vacuum Stable @ 5.3e-07T
Monday, February 04, 2019, 09:49: Anode to 200 V. TBHT & TGHT on.
Monday, February 04, 2019, 09:51: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
FM
Tuesday, February 05, 2019, 12:01 : Power / Sources on.
Tuesday, February 05, 2019, 12:02 : BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.
Tuesday, February 05, 2019, 12:10 : Cancelled! I need to remove first the multimeter in order to have high voltage.
Tuesday, February 05, 2019, 12:10 : Auto-cooling.
Wednesday, February 06, 2019, 07:55: Reset IV4. -AS
FERNANDO! CALL ME OR CHECK YOUR EMAIL BEFORE YOU CONTINUE.
Wednesday, February 06, 2019, 09:35: Cage off. Multimeter removed. Cage replaced.
Wednesday, February 06, 2019, 09:48: Power on. Gas lines (Ar) open
Wednesday, February 06, 2019, 10:00: Sources on.
Wednesday, February 06, 2019, 10:10: Anode 200 V. BIAS / EZL / EE @ 30 / 13 / -1.5 kV.
Wednesday, February 06, 2019, 10:11: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Wednesday, February 06, 2019, 10:12: IV4 open. Optics on.
Wednesday, February 06, 2019, 10:16: Optics set.
FM
Thursday, February 07, 2019, 09:59 : Mass scan attempted and nothing shows. The current needs to be inverted. This was noted also by checking previous runs and the magnetic field on the epics optics window shows a negative magnetic field, while now is showing a positive value.
Thursday, February 07, 2019, 12:55: MB1 set from Reverse to Normal manually. Auto range 'On' FC6. Use 'Prepare down" & 'Down' to scan. - AS
Thursday, February 07, 2019, 16:55 : Auto-ramping TBHT to 310 A @ 2A per min.
FM
Friday, February 08, 2019, 09:04: FC0 current stable. Starting measurements of ion curres as a function of coil current, anode voltage, and possibly tbht. I'll be looking argon and CO.
FM
Friday, February 15, 2019, 15:38 Auto cooling TGHT/TBHT to 0A @ 2A/min
Tuesday, February 19, 2019, 08:34: BIAS / EZL/ EE @ 0 kV. Power to HV also turned off. - AS
Tuesday, February 19, 2019, 14:36 : Starting vacuum peak tests: For this I will close the valve and wait untill the vacuum has stabilized, then I will open the valve to see the maximum vacuum peak obtained.
Thursday, February 21, 2019, 11:58: Restart RGA - AS
Thursday, February 21, 2019, 14:05: SV5 closed, then SV3 & SV4
Thursday, February 21, 2019, 14:15: Mini pump started. Vacuum ok
Thursday, February 21, 2019, 14:20: Valve from mini pump opened. Vacuum jumped to 8.30e-07T after 2 minutes.
Thursday, February 21, 2019, 14:25: SV4 & SV3 opened. Vacuum @ 9.0e-07T with mini pump running.
Thursday, February 21, 2019, 14:30: Mini pump valve closed. Mini pump off. SV5 opened. Vacuum to 3.1e-06T |
Monday, January 14, 2019, 09:47, Aaron Schmidt, , , , , , , , TS restart after power outage
|
Monday, January 14, 2019, 09:00: Epics white out
Ref: Fault report 11993 (11981 & 11817)
Monday, January 14, 2019, 09:35: Vacuum page came back. Restarted Roughing pumps. All other pages still in whiteout state.
Wednesday, January 16, 2019, 14:05: FEBIAD installed. Turbo pumps on for Beamline side. Roughing Chamber. Vacuum contols working. All else still in 'whiteout'
Monday, January 21, 2019, 10:30: Epics whiteout state ended. IOC Power cycled by Rod N. IG6 timing out? Contact vacuum group. |
Thursday, January 10, 2019, 11:38, Aaron Schmidt, , , , , , , , Power outtage prep
|
Thursday, January 10, 2019, 11:32: Power down TS. Lock out.
Thursday, January 10, 2019, 11:36: RGA switched off full.
Thursday, January 10, 2019, 11:38: All ion gauge and turbos off. BV's closed.
Friday, January 11, 2019, 07:30: Vent TS.
Friday, January 11, 2019, 08:10: Purge FS#5 waterlines and close off main supply / return.
Friday, January 11, 2019, 08:12: Closed PV1 & PV2. Shut off the roughing pumps. |
Wednesday, January 09, 2019, 09:10, Aaron Schmidt, , , , , , , , Cathode to Anode. PS to Positive
|
Wednesday, January 09, 2019, 09:09: Upper HV cage set to Anode / Positive as per dwg ISK4523D Rev 6.
Thursday, January 10, 2019, 10:00: Switch Anode PS to positive
Thursday, January 10, 2019, 11:29: Anode switched on. Short discovered. 10 V = 0 V & 100 mA. |
Tuesday, January 08, 2019, 08:11, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, TS restart
|
Tuesday, January 08, 2019, 08:00: Epics white out fixed. Ref: Fault report 11981.
Tuesday, January 08, 2019, 08:10: IV4 reset. Turbo Pumps on
TMS:IG6 & TSG:IG1 not responding. Timing out. Edi contacted
TMS:IG6 - Filament switched on controller.
TSG:IG1 - Filament switched over. Cable to ion gauge is burnt. Black wire inside the housing had melted along with the edges of the plastic. Replaced the entire cable & reconnected the ion gauge to the controller.
Tuesday, January 08, 2019, 08:48: IG6 & IG1 operation resumed. Vacuum pump down continued.
Tuesday, January 08, 2019, 08:55: FS5 waterline tightened for leak check. All lines closed.
Tuesday, January 08, 2019, 09:03: RGA restarted/on.
Tuesday, January 08, 2019, 09:05: Opening waterlines. vacuum at 2.66e-06T. Control room notified.
Tuesday, January 08, 2019, 09:10: Waterlines opened. Vacuum @ 2.57e-06T. No response on RGA.
Tuesday, January 08, 2019, 09:14: No leak noted on the FS#5 paddle wheel. Fixed with tightening.
Tuesday, January 08, 2019, 09:20: Control room noted 7.6L fill (1/4" drop approx) in DI water on this line. (Note this next year) |
Thursday, December 20, 2018, 13:55, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, , Holiday shut down.
|
High winds caused a brief power outage that completely shutoff the ISAC test stand.
Locked out the power.
RGA checked & shutoff complete
Epics failure, computer restarted.
Thursday, December 20, 2018, 13:52: Shutting ISAC test stand down for the holidays. Checking Epics & operation first.
Thursday, December 20, 2018, 13:55: Roughing pump operating. Turbos left off. Backing valves opened. Epics whiteout on TS sources & optics.
TBHT, TGHT, Anode all brought to zero on epics, although still mostly white out.
Thursday, December 20, 2018, 14:14: Waterlines shut off at the main source & the TS is purged.
Note* Small leak directly on the fittings noticed on FS#5 right after the flow meter paddle wheel on the supply end. All water flow was briefly halted during the power bump.
Epics still whited out.
Monday, January 07, 2019, 11:13: Fault report 11981 submitted. |
Monday, December 17, 2018, 12:03, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, , Anode leak current check.
|
Monday, December 17, 2018, 12:01: Connected Multimeter through feedthroughs J & L. Blue wire removed.
To run TGHT, TBHT, Anode ONLY. HV will remain locked with yellow tape over the keyhole. Currently locked out.
Tuesday, December 18, 2018, 08:37: Power / sources on
TGHT, TBHT, Anode, Coil on. NO HV.
Tuesday, December 18, 2018, 08:40: Turn off. Anode reading before PS on?
We found a steady climb on the Anode current via the epics controls, however no reading turned up on the multimeter. Disappears once the Anode PS is switched on.
Tuesday, December 18, 2018, 08:46: Power / sources on
TGHT, TBHT, Anode, Coil on. NO HV.
Tuesday, December 18, 2018, 08:49: Auto-ramping TGHT to 580 A @ 2 A per min.
Tuesday, December 18, 2018, 08:50: Anode set to 300 V.
FM Tuesday, December 18, 2018, 13:42: TGHT @ 580 A Anode@300 V. Epics and the power supply shows ~20 mA. However the multimeter doesn't show any reading.
FM Tuesday, December 18, 2018, 14:25: Strange behavior noted on EE while doing the anode voltage scan. Screenshot added to the word document.
FM Tuesday, December 18, 2018, 14:25: Auto-ramping TBHT to 100 A @ 2 A per min
FM Tuesday, December 18, 2018, 15:40: Auto-ramping TBHT to 150 A @ 2 A per min
FM Tuesday, December 18, 2018, 16:26: Auto-ramping TBHT to 200 A @ 2 A per min
FM Tuesday, December 18, 2018, 17:08: Auto-ramping TBHT to 250 A @ 2 A per min
FM Tuesday, December 18, 2018, 17:38: Auto-ramping TBHT to 300 A @ 2 A per min
FM Tuesday, December 18, 2018, 17:20: Auto-ramping TBHT to 250 A @ 2 A per min
FM Tuesday, December 18, 2018, 18:37 : Nothing register on the multimeter, maybe we need to connect between A-B, or B-F. Cooling down to inspect the multimeter connection tomorrow.
FM Tuesday, December 18, 2018, 18:37: Auto-cooling TBHT/TGHT@ 2 A per min
FM Wednesday, December 19, 2018, 09:29: For the lasts 10 hours, the anode drain current has shown a steady value of 10.989 mA even though both the TBHT and the TGHT are off.
FM Wednesday, December 19, 2018, 10:47: Power supplies turned off in EPICS, Anode drain current still shows 4.839 on the readback.
Wednesday, December 19, 2018, 14:25: Power / Sources on. Anode to 300 V. - AS
Wednesday, December 19, 2018, 14:26: Auto-ramping TGHT to 300 A @ 2 A per min. - AS
Thursday, December 20, 2018, 06:42: Auto-ramping TGHT to 580 A @ 2 A per min. - AS
FM Thursday, December 20, 2018, 11:12 : Auto-ramping TBHT to 200 A @ 2 A/min
Thursday, December 20, 2018, 13:05 (Roughly) Power bump due to winds. Full TS shutdown. |
Wednesday, December 12, 2018, 13:22, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, Anode leak current check.
|
Wednesday, December 12, 2018, 13:15: Power / Sources on.
Wednesday, December 12, 2018, 13:20: RGA on / set.
Wednesday, December 12, 2018, 13:29: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.
Wednesday, December 12, 2018, 13:30: Auto-ramping TGHT / TBHT to 10A @ 2A per min.
Wednesday, December 12, 2018, 13:36: IV4 open.
Wednesday, December 12, 2018, 13:37: Begin Anode check
Anode: 10 V. Current: 0.000 mA
Anode: 25 V. Current: 0.000 mA
Anode: 50 V. Current: 0.000 mA
Anode: 75 V. Current: 0.000 mA
Anode: 100 V. Current: 0.000 mA
Anode: 125 V. Current: 0.000 mA
Anode: 150 V. Current: 0.000 mA
Anode: 200 V. Current: 0.000 mA
Anode: 250 V. Current: 0.000 mA
Wednesday, December 12, 2018, 13:42: Coil to 10A. Anode: 250 V. Current: 0.000 mA
Wednesday, December 12, 2018, 13:43: Coil to 25A. Anode: 250 V. Current: 0.000 mA
Wednesday, December 12, 2018, 13:56: Auto-ramping TGHT / TBHT to 150A @ 2A per min.
Wednesday, December 12, 2018, 14:09: Auto-ramping halted @ 35A. Anode to 0 V. Monitor activity on FC0. 5 minutes.
Wednesday, December 12, 2018, 14:13: No changes observed on FC0. Anode back to 250 V.
Wednesday, December 12, 2018, 14:14: Auto-ramping TGHT / TBHT to 150A @ 2A per min.
Wednesday, December 12, 2018, 14:31: Optics all reset.
Thursday, December 13, 2018, 07:31: Auto-ramping TGHT / TBHT to 200A @ 2A per min.
Thursday, December 13, 2018, 10:04: Auto-ramping TGHT / TBHT to 250A @ 2A per min.
FM Thursday, December 13, 2018, 10:40 : Auto-ramping TGHT / TBHT to 270A @ 2A per min.
FM Thursday, December 13, 2018, 12:44: Auto-ramping TGHT / TBHT to 290A @ 2A per min.
FM Thursday, December 13, 2018, 12:56: FC0 gain set to 33nA
FM Thursday, December 13, 2018, 16:54: Anode drain current register at 310. Value was 1 mA. The resistor calculates is 30kOhm. Which is close to what was measured on the resistor on top 34kOhm.
With this new information. I will let the TBHT@290A and the TGHT@300A overnight.
Note to Aaron: Could you please heat up the target to 580A with the current settings we have.
Friday, December 14, 2018, 07:04: Auto-ramping TGHT 580A @ 2A per min. TBHT remains @ 290 A. FC0 back in.
Friday, December 14, 2018, 14:15: Anode @ 250 V & 12.201 mA.
Friday, December 14, 2018, 14:22: BIAS / EZL / EE to 0 V. Anode remains unchanged.
FM Friday, December 14, 2018, 18:04: TBHT down to 50. Anode drain current is still 12.21mA.
FM Friday, December 14, 2018, 18:05 Auto-cooling. i will keep monitoring the strip tools remotely. |
Thursday, December 06, 2018, 11:02, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Bellows Replacement.
|
Thursday, December 06, 2018, 11:02: Turbo pumps (TP6 & TP2) off on beamline side. IG6 off.
Thursday, December 06, 2018, 14:06: Turbo pumps restarted. FC0 bellows replacement to occur Monday.
Monday, December 10, 2018, 11:00: Vented on beam side of IV4. Turbo pumps & backing valves closed preemptively on chamber side due to shared airlines.
Pulled FC0, disassemble, check, clean, remove / install bellows, Re-align, assemble.
Monday, December 10, 2018, 12:52: Re-installed repaired FC0. Roughing beam side. Chamber side turbos back on.
Monday, December 10, 2018, 13:48: Turbo pumps on.
Monday, December 10, 2018, 13:51: Ion gauge on. IG6 @ 5.73e-06T and still dropping.
Tuesday, December 11, 2018, 09:26: IG6 Vacuum @ 3.56e-07T. Connected cables.
Tuesday, December 11, 2018, 09:27: Drive out FC0. Vacuum @ 3.75e-07T. Ok. Setup LD & drive FC0 back in.
Tuesday, December 11, 2018, 09:32: LD baseline before opening valve to beam line turbo & RP pumps: below 0.0e-09 T-l/sec
Tuesday, December 11, 2018, 09:36: Full open base, FC0 in:
Vacuum @ 3.56e-07T.
LD: 0.0e-09 atm-cc/sec
Spray w/ He:
No change.
Tuesday, December 11, 2018, 09:42: FC0 out:
Vacuum @ 3.60e-07T.
LD: 0.0e-09 atm-cc/sec.
Spray w/ He:
No Change. Sprayed all flanges and seals all around FC0 and it's connection to the beam line. OK.
Tuesday, December 11, 2018, 09:46: Closed FC0 & line to the turbo & RP pumps. LD off.
FC0 Bellows replacement a success.
More pictures uploaded to Docushare.
Home ---> ISAC Test Stand Test Stand Refurbishing FC0 Bellows Replacement Listing |
Wednesday, December 05, 2018, 10:22, Aaron Schmidt, , , , , , , Problems/Solutions, RGA Filament & Ionizer replacement 12x
|
RGA Ionizer & Filament replaced as per SRS RGA manual.
The ionizer was found to be dirty and the previous RGA filament was broken. Initially the old filament appeared to have warped and looked stuck to the anode grid/cage.
Both were replaced with clean parts. the support rods were also cleaned with acetone & methanol.
Parts used from the Replacement Ionizer Kit - SRS# O100RI
Repeller Cage - SRS Part# 7-00592
Anode Grid - SRS Part# 7-00591
Focus & Plate - SRS Part# 7-00590
ThO2/Ir Filament - SRS Part# 7-00611-720
Wednesday, December 05, 2018, 10:16: Roughing.
Probe bake out & RGA tuning required.
Wednesday, December 05, 2018, 11:08: Turbo pump on.
Wednesday, December 05, 2018, 11:13: Ion gauge on.
Wednesday, December 05, 2018, 13:38: TSG:BV1A Randomly shut off? TP1A tripped. Restarted.
Wednesday, December 05, 2018, 13:40: RGA switched on including the filament.
Thursday, December 06, 2018, 10:17: Vacuum @ 5.68e-07T on IG1 before Degas. Begin degas cycles 200 sec each, 1 min apart, 3 times.
Thursday, December 06, 2018, 10:30: Degas complete. Minimal change in IG1 Vac @ 5.70e-07T.
|
Monday, November 19, 2018, 14:22, Aaron Schmidt, , , , , , , Problems/Solutions, Vacuum issues.
|
1) When opening FC0 a spike occurs in the vacuum on IG6 & IG1 (though not as bad). This spike trips off the optics, and if left unchecked, will trip off the TGHT / TBHT / Sources.
2) RGA is also unresponsive
3) Leak rates also noted in the Ar gas bottle for the FEBIAD source. Previous trips had occurred in the most recent FEBIAD tests.
Optics tripped during FC0 removal. Vacuum spikes also detected on IG1 & IG6. No response on RGA.
Monday, November 19, 2018, 11:17: RGA providing no data. Stop, restart, multiple times.
Monday, November 19, 2018, 11:25: RGA shut down. No response from and attempt to restart.
Monday, November 19, 2018, 11:30: FC0 opened. Optics tripped. Vacuum increased on IG6 up to 7.9e-06T & IG1 increased to 4.4e-06T. Shut again to avoid tripping the entire system as the vacuum climbed.
Monday, November 19, 2018, 11:34: Auto-cooling @ 2A per min. Ramp down & trouble shoot after.
Monday, November 19, 2018, 14:11: Tap down HV on sources to 0V. Close & reset IV4. After closing IV4, spike in Vacuum on IG6 noted. Drop in vacuum on IG1 noted.
Monday, November 19, 2018, 14:33: FC0 opened/closed. Vacuum Spike on IG6 noted from 1.5e-06T to 1.02e-05T and back down to 1.5e-06T. IG1 unaffected with IV4 closed.
Source gas lines remain off. Setup for LD on FC0.
Tuesday, November 20, 2018, 08:30: Pump switched on. Convectron gauge @ 18.6 mTorr, spiked to 125 mTorr after opening the valve to the pump. IG1 @ 3.0e-07T.
Allow time for the small pump to pump lines down before re-opening.
Tuesday, November 20, 2018, 08:38: Small vacuum spike noticed on IG1 up to 4.0e-07T after reopening line to the small pump. Convectron gauge spiked to 1.75T.
Tuesday, November 20, 2018, 09:05: Opened valve to the small pump. Small vacuum spike noticed on IG1 up to 5.77e-07T after reopening line to the small pump. Convectron gauge spiked to 3.55 Torr from 125 mTorr.
The small leak in SV5 allows the lines to 'pump down into the mTorr range, however upon opening the line to the pump, the line pressure increases.
Tuesday, November 20, 2018, 10:44: Opened valve to the small pump. Small vacuum spike noticed on IG1 up to 5.02e-07T after reopening line to the small pump. Convectron gauge spiked to 3.25 Torr from 18.6 mTorr.
Pump ineffective at pumping out the gas lines. Replace
Tuesday, November 20, 2018, 10:48: Small pump shut off. Move forward with LD of FC0
Tuesday, November 20, 2018, 13:21 : Valve opened w/ LD connected. Base:
IG6: 1.91e-06T
Leak rate: 7.4e-09 atm-cc/sec.
Apply He around FC0 (cup in):
IG6: 1.91e-06T
Leak rate: 5.5e-05 atm-cc/sec. Wait for leak rate stablization.
Tuesday, November 20, 2018, 13:48:
Apply He around FC0 (cup out):
IG6: 2.75e-05T
Leak rate: 9.9e-05 atm-cc/sec. Wait for leak rate stabilization. Bellows specifically will max out the LD.
-Leak confirmed on the bellows of FC0 as suspected. Submitting a fault report.
-RGA scans checked and taken. No response/noted 'noise'. No error messages displayed, however we will check/swap out the filament for a new one to confirm.
Monday, November 26, 2018, 08:10: Turbos & ion gauges off.
Monday, November 26, 2018, 09:32: Quick vent shot & hold. |
Thursday, November 08, 2018, 14:13, Aaron Schmidt, , , , , , , , Ar & Ne gas bottle replacement.
|
Thursday, November 08, 2018, 14:05: Fresh / recently calibrated Neon & Argon bottles installed.
Leak rates: Argon=2.02E-7 atm*cc/sec
Neon=1.75E-7 atm*cc/sec
Datasheet attached.
|
Thursday, November 08, 2018, 10:54, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps
|
Silver bolts used on Coil, TGHT, & TBHT. Back panel opened for new gas bottles.
Thursday, November 08, 2018, 10:52: Roughing
Thursday, November 08, 2018, 10:53: Doors sealed.
Thursday, November 08, 2018, 14:10: Turbo pumps started.
Thursday, November 08, 2018, 14:15: Ion gauge on.
Thursday, November 08, 2018, 14:23: RGA on.
Friday, November 09, 2018, 07:38: Waterlines opened. No response on RGA. Vacuum ok @ 5.18e-07T
Friday, November 09, 2018, 07:44 : Slowly start opening gas lines. Opened / closed SV5 initially, no response. Note* Opened SV3 with SV5 closed. Massive spike seen in vacuum.
Friday, November 09, 2018, 07:55 : SV3 opened / closed in conjunction with SV5 until stable vacuum reached. Begin opening SV4 w/ SV5 closed.
Friday, November 09, 2018, 08:09 : SV3 & SV4 opened with SV5, Stable vacuum reached. Begin opening SV2/SV1 w/ SV5 closed.
Friday, November 09, 2018, 08:15: All gas lines opened. Sources on.
Friday, November 09, 2018, 08:22: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. IV4 opened. Optics switched on.
Friday, November 09, 2018, 08:40: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min. Loop to max values, increase of 0A until vacuum gets below 1.0e-06T. Vacuum 1.12e-06T.
Friday, November 09, 2018, 10:45: The vacuum wouldn't drop below 1.12e-06T. Ramping halted and gas lines closed. Vacuum dropped to 7.48e-07T. Gas lines opened again. Vacuum stable around 1.12e-06T. Significant Argon noted on RGA.
Friday, November 09, 2018, 10:52: Auto-ramping TGHT / TBHT to 450 / 200 A @ 2A per min. Vacuum increment limit increased to 2.0e-06T
Tuesday, November 13, 2018, 08:32: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Tuesday, November 13, 2018, 11:08: Mass scans ok. Auto-ramping TBHT to 330 A @ 2A per min.
FM
Tuesday, November 13, 2018, 16:44: The anode drain current has increased 17mA since 11:23 am, however FC0 is still decreasing. I will keep monitoring to see if the behaviour of the anode drain current continues once FC0 has stabilized. If the anode drain current keeps increasing maybe we will observe the same failure from the previous FEBIAD.
FM
Wednesday, November 14, 2018, 11:02 FC0 is stable but the anode drain current is still increasing and now is at 85 mA. It started at ~52mA. From the strip tool it seems to be a 2-hour period where the anode drain current is stable.
Wednesday, November 14, 2018, 16:14 : Magnet tune for 40Ar. TMS:MB1=101.56126 A
Coil=50 A. FC6=19.37 nA
Wednesday, November 14, 2018, 16:16 : Closing Neon valve.
Wednesday, November 14, 2018, 16:26 : FC6=13.77 nA.
Wednesday, November 14, 2018, 16:27: Closing Argon valve
Wednesday, November 14, 2018, 17:10: 0.119 nA.
Wednesday, November 14, 2018, 17:15 Assuming the 720 nA from Brad (I will recompute this value based on the new bottles). Efficiency with both gasses open= 2.67375% . Efficiecy with Argon bottle only=1.84%. Anode drain current~87.5mA
Wednesday, November 14, 2018, 17:53: When opening the Neon valve, the vacuum reached ~1e-5 T and the test stand tripped. Ion source off, high voltage and some of the optics as well. Leaving the test stand as is.
Wednesday, November 14, 2018, 17:58: Note to myself: How am i gonna take an efficiency measurement if every time I turned the gas valves the vacuum will increase to 1e-5 T.
Thursday, November 15, 2018, 08:33: Sources at zero. Bring values to 0 before restarting. Reset optics.
Thursday, November 15, 2018, 08:45: Power to sources off. Open the back & double check gas bottles. All are tight.
Thursday, November 15, 2018, 09:35: All gas bottles opened.
Thursday, November 15, 2018, 09:58: Power/sources reset/on.
Thursday, November 15, 2018, 10:04: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. IV4 opened.
Thursday, November 15, 2018, 10:05: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Thursday, November 15, 2018, 10:07: Optics reset.
FM
Thursday, November 15, 2018, 18:46: Coil to 50 A.
Friday, November 16, 2018, 08:40: Emittance Rig reset & calibrated.
FM
Friday, November 16, 2018, 11:30 : Auto-ramping TBHT to 310 A @ 1A per min.
Friday, November 16, 2018, 16:28 Friday, November 16, 2018, 16:28 : Gain in FC0 seems off. Reading on FC0 was 2.8e-8A but reading on FC6 was 4.5e-8A. In the last mass scan, I add up the highest peaks above 1e-9A and the values was roughly 7e-8A. Switching the gain to 94uA in FCO shows 8.32e-8 A. This seems a better reading than before.
Friday, November 16, 2018, 16:30 Changing gacin on FC0 from 1 uA to 94 uA.
FM
Monday, November 19, 2018, 09:34 : Scanning from 0-450 V and recording Anode drain current.
IG1 reading is 3.01e-6 T.
Monday, November 19, 2018, 10:01 : When Moving away FC0, the optics goes yellow. Not sure which interlock is activated.
AS
Optics tripped during FC0 removal. Vacuum spikes also detected on IG1 & IG6. No response on RGA.
Monday, November 19, 2018, 11:17: RGA providing no data. Stop, restart, multiple times.
Monday, November 19, 2018, 11:25: RGA shut down. No response from and attempt to restart.
Monday, November 19, 2018, 11:30: FC0 opened. Optics tripped. Vacuum increased on IG6 up to 7.9e-06T & IG1 increased to 4.4e-06T. Shut again to avoid tripping the entire system as the vacuum climbed.
Monday, November 19, 2018, 11:34: Auto-cooling @ 2A per min. Ramp down & trouble shoot after.
Monday, November 19, 2018, 14:11: Tap down HV on sources to 0V. Close & reset IV4. After closing IV4, spike in Vacuum on IG6 noted. Drop in vacuum on IG1 noted. |
Tuesday, November 06, 2018, 08:52, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber
|
Tuesday, November 06, 2018, 08:50: Roughing
Tuesday, November 06, 2018, 08:51: Doors sealed.
Tuesday, November 06, 2018, 09:51: Turbo pumps on.
Thursday, November 08, 2018, 06:45: Ion gauge & Turbo pumps off.
Thursday, November 08, 2018, 08:36: Venting. |
Monday, October 29, 2018, 11:03, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, Done, Test FEBIAD w/ Silver bolts & sealed end caps
|
Restarting FEBIAD
Monday, October 29, 2018, 10:56: Restart roughing & Turbo pumps.
Monday, October 29, 2018, 11:03: Ion gauges on.
Monday, October 29, 2018, 11:10: Power on
Monday, October 29, 2018, 11:12: Gas lines opened to pump down with TS. Vacuum @ 1.20e-05T.
Monday, October 29, 2018, 11:20: RGA restarted.
Tuesday, October 30, 2018, 07:24: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V.
Tuesday, October 30, 2018, 07:26: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.
Tuesday, October 30, 2018, 07:31: Optics set.
Tuesday, October 30, 2018, 07:32 : IV4 Opened.
Tuesday, October 30, 2018, 08:50: Auto ramping aborted. While the source does increment, the actual power supply does not. It's not actually ramping.
Tuesday, October 30, 2018, 08:51: Unable to bump up the coil either. Tapping down the all the voltage to 0.
Tuesday, October 30, 2018, 08:55: IV4 closed. Gases closed.
Tuesday, October 30, 2018, 08:57: Power shut off & restarted.
Tuesday, October 30, 2018, 09:01: Gases re-opened.
Tuesday, October 30, 2018, 09:03: Sources switched on. Manually bumped up TGHT & TBHT. No response.
Tuesday, October 30, 2018, 09:04: Gases closed. Sources off.
Tuesday, October 30, 2018, 10:41: IV4 Opened.
Tuesday, October 30, 2018, 10:47: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. Voltage limits reset for the TGHT, TBHT, & Coil. Responses given
Tuesday, October 30, 2018, 10:49: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.
Tuesday, October 30, 2018, 10:55: Optics reset.
Tuesday, October 30, 2018, 11:01: Gases reopened. Vacuum @ 4.52e-07T.
Wednesday, October 31, 2018, 06:59: Auto-ramping TBHT to 330 A @ 2A per min.
Wednesday, October 31, 2018, 07:00: Coil @ 50 A.
Wednesday, October 31, 2018, 10:57 : Mass & wire scans appear ok.
FM:
Wednesday, October 31, 2018, 12:10 : Auto-ramping TBHT to 340 A @ 1A per min.
Wednesday, October 31, 2018, 12:49 : Vacuum @ 5.90e-07T.
Wednesday, October 31, 2018, 12:54 : Auto-ramping TBHT to 350 A @ 1A per min.
Wednesday, October 31, 2018, 15:25 : Vacuum @ 6.03E-7T.
Wednesday, October 31, 2018, 15:28 : Auto-ramping TBHT to 360 A @ 1A per min.
Wednesday, October 31, 2018, 15:34 : Changing Gain in FC0 from 33 nA to 100 nA
Wednesday, October 31, 2018, 15:42 : Increasing Gain in FC0 from 100 nA to 1 uA.
Voltage drop from 200 to 196 V. The anode is current limited. Increasing the current limit on the anode from 100 mA to 110 mA .
Voltage back to 200 V
FM
Thursday, November 01, 2018, 11:35 : Optics set to the previous tune. Check entry 688.
Anode set to 150 V. FC6 stable
Thursday, November 01, 2018, 11:37 Closing Neon Valve
Thursday, November 01, 2018, 12:38 : FC6 stable. Closing Argon valve.
Thursday, November 01, 2018, 13:05 : Assuming 720 nA entering the source (from Brad). Efficiency measurement = 0.96%. Almost a factor of two larger than previous measurement with the same conditions!
Thursday, November 01, 2018, 13:08 : Opening the valves
Thursday, November 01, 2018, 15:41 : FC6 stable 5.38e-9A. Closing neon valve.
Thursday, November 01, 2018, 16:50 : FC6 stable overall 5.33e-9A. Closing argon Valve
Thursday, November 01, 2018, 18:42 : FC6 stable 1.44e-10A. efficiency= 0.72%
Opening gas valves
FM
Friday, November 02, 2018, 09:39 : Increasing AV to 200V.
Friday, November 02, 2018, 09:47 : Increasing anode current to 150 mA.
Friday, November 02, 2018, 18:01 : Coil sweep from 0-80 A for AV=25,50 completed. Efficiencies of 0.035 % and 0.34% respectively.
Leaving the cathode hot to continue test tomorrow morning.
Saturday, November 03, 2018, 18:01: Coil sweep from 0-80 A for AV=75,100 completed. Efficiencies of 0.56 % and 0.77% respectively.
Sunday, November 04, 2018, 09:01 : Anode current increased from 56 to around 95 mA overnight under the same conditions. This could indicate a cleaner surface on the cathode and hence a better emission or, the anode cathode distance is reducing fue to the thermal expansion.
Cooling down manually TBHT to 300 A @ 2A per min.
Monday, November 05, 2018, 09:00: Short on TBHT appeared around 8 am. Investigate.
Monday, November 05, 2018, 09:15: Auto-cooling TGHT / TBHT @ 2 A per min.
Monday, November 05, 2018, 14:22: Gas lines closed.
Monday, November 05, 2018, 14:32: Sources/power off.
Monday, November 05, 2018, 14:40: Short confirmed up top. RGA off.
Monday, November 05, 2018, 14:43: IV4 closed/reset, Ion gauge off, Turbos off. |
Monday, October 29, 2018, 10:56, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, Problems/Solutions, TS communications issues.
|
Sometime around 00:30 Sunday, October 28, 2018, the ISAC test stand lost communication to the PLC and shut down abruptly.
Monday, October 29, 2018, 09:00: PLC communications issues.
Rod N. was contacted this morning& the issues fixed by controls group. |
Monday, October 22, 2018, 11:07, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps
|
Restarted post power outage.
Water & Turbos on.
Monday, October 22, 2018, 10:55: Power / sources on. MB1?
Monday, October 22, 2018, 11:07: Open gas lines slowly.
Monday, October 22, 2018, 11:11: Gas lines all opened. Vacuum @ 2.37e-06T & decreasing.
Tuesday, October 23, 2018, 08:00: MB1 PS on.
Tuesday, October 23, 2018, 08:03: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Tuesday, October 23, 2018, 08:08: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.
Tuesday, October 23, 2018, 08:10: Epics lost. Communication error. Internet loss.
Tuesday, October 23, 2018, 08:21: Auto ramp found halted in communication loss. Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min restarted from 14.0A.
Tuesday, October 23, 2018, 08:23: Anode @ 200 V.
Tuesday, October 23, 2018, 08:28: Optics set. IV4 opened.
Tuesday, October 23, 2018, 13:03: Auto-ramping TBHT / 320 A @ 2A per min.
Tuesday, October 23, 2018, 14:00: Coil @ 50 A. TBHT @ 330 A.
Tuesday, October 23, 2018, 14:30: Mass scans ok. TBHT back @ 320.
Emittance rig not calibrating?
Wednesday, October 24, 2018, 08:17 : E-rig drive motor PS re-plugged in. Switched on. E-rig calibrated & ready.
FM:
Wednesday, October 24, 2018, 12:40 : Vacuum 6.52e-7T. Auto-ramping TBHT to 320 A @ 2A per min.
Wednesday, October 24, 2018, 13:02 : Auto-ramping finished. Anode Current@8.54mA. Vaccum ok @ 6.86E-7T
Wednesday, October 24, 2018, 13:40 : Vacuum 6.58e-7T. Auto-ramping TBHT to 340 A @ 2A per min.
Wednesday, October 24, 2018, 13:55 : Auto-ramping finished. Anode Current@19.53mA. Vaccum ok @ 6.67E-7T
Wednesday, October 24, 2018, 15:18 : Vacuum 6.68e-7T. Auto-ramping TBHT to 350 A @ 2A per min.
Wednesday, October 24, 2018, 15:27: Auto-ramping finished. Anode Current@41.51mA. Vaccum ok @ 6.82E-7T
Thursday, October 25, 2018, 08:27: IG6 Tripped off around 3am this morning. Attempts to restart, unsuccessful.
Thursday, October 25, 2018, 08:29: IV4 Closed. Vacuum group notified..
Thursday, October 25, 2018, 08:40: Filament burnt out. Vac group switched on IG6 secondary filament.
Thursday, October 25, 2018, 08:44: IV4 re-opened. Optics reset.
Friday, October 26, 2018, 13:49: Auto-ramping TBHT / 360 A @ 1A per min.
Friday, October 26, 2018, 14:08:
TBHT @ 359.0 A / 3.074 V.
Anode @ 200 V / 94.017 - 95.238 mA.
Friday, October 26, 2018, 14:34: Mass & wire scans complete w/ screen shots on the word doc (FEBIAD COIL TEST 6-3 Caps in).
Sunday, October 28, 2018, 13:19: Remotely connect to check the status. Something happened around midnight. See attached screenshots.
It seems there is no bias. EPICS control whiteout. Not sure how to proceed. Leaving evreything as is. |
Monday, October 22, 2018, 07:18, Aaron Schmidt, , , , , , , , TS restart after power outage
|
Friday, October 19, 2018, 10:00 (Approx): Site wide power outage. TS completely shut down.
Power brought back Saturday
Monday, October 22, 2018, 07:15: Full white out on screens. To restart PLC.
Monday, October 22, 2018, 07:42: Multiple attempts made to restart the PLC. Controls white out continues
Also attempted restart of the Vacuum. All 4 turbo pumps switch back to red on any restart attempt.
The turbo pumps had been manually switched off from the controllers to protect them once the power was switched back on.
Monday, October 22, 2018, 09:28: Turbo pumps restarted.
Monday, October 22, 2018, 11:01: All back except the magnet.
|
Monday, October 15, 2018, 14:38, Aaron Schmidt, , , , , , , Problems/Solutions, Anode / Cathode PS to Negative
|
Monday, October 15, 2018, 13:00-14:00 Anode / Cathode BIAS PS polarity reversed by John Chow.
PS: Negative |
Monday, October 15, 2018, 14:23, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps
|
Anode / Cathode BIAS PS polarity reversed by John Chow. PS: Negative
Monday, October 15, 2018, 14:12: Power/sources on
Monday, October 15, 2018, 14:17: RGA on.
Monday, October 15, 2018, 14:22: Gas-lines opened. Vacuum ok @ 4.38e-07T
Monday, October 15, 2018, 14:29: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Monday, October 15, 2018, 14:30: Optics on
Monday, October 15, 2018, 14:33: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Monday, October 15, 2018, 14:35: Anode @ 200 V.
Monday, October 15, 2018, 14:36: IV4 Open.
Tuesday, October 16, 2018, 06:33: Auto-ramping TBHT to 320 A @ 2A per min.
Tuesday, October 16, 2018, 07:15: Coil @ 50 A.
Tuesday, October 16, 2018, 14:40: FC6 Auto range & Polarity set. Mass scans work now.
FM
Wednesday, October 17, 2018, 10:02 : Auto-ramping TBHT to 330 A @ 2A per min.
Wednesday, October 17, 2018, 13:21: Auto-ramping TBHT to 340 A @ 2A per min.
Wednesday, October 17, 2018, 13:45: Increasing TBHT voltage from 3.001 to 3.5 to avoid voltage limitation when increasing the current
Wednesday, October 17, 2018, 13:48: Auto-ramping TBHT to 345 A @ 2A per min.
Wednesday, October 17, 2018, 13:54: FC0 start decreasing once the ramp up finished. Vacuum ok @ 5.17e-7T.
Wednesday, October 17, 2018, 17:16: FC0 stable. Probably outgassing. Vacuum ok @ 5.37e-T
Wednesday, October 17, 2018, 17:16: Auto-ramping TBHT to 350 A @ 2A per min.
Wednesday, October 17, 2018, 17:30: Ramping finished. FC0 decreasing again. Vacuum ok @5.57e-7T
Wednesday, October 17, 2018, 17:51: Potassium signal seems to be decreasing and now the Argon is slightly higher than Potassium.
Wednesday, October 17, 2018, 17:51: Mass optimized for 40Ar, which is shown in the mass scan as ~39.52. Dipole current=102.2736 A
Wednesday, October 17, 2018, 17:52: Starting steerers an einzel lense tuning to increase FC6 signal. Will continue tomorrow
FM
Thursday, October 18, 2018, 08:03: FC0 signal is stable now. Auto-ramping TBHT to 355 A @ 2A per min.
Thursday, October 18, 2018, 08:08 Ramping finished. Vacuum ok @5.26e-7T. Anode current=65 mA.
Thursday, October 18, 2018, 09:55: FC0 looks stable now. Manually tapping 2 A to have TBHT=357A.
Thursday, October 18, 2018, 11:40: Vaccum ok @ 4.56e-7T
Thursday, October 18, 2018, 16:25: Vacuum ok @ 5.28e-7T
Thursday, October 18, 2018, 16:26: Manually tapping 2 A to have TBHT=359A.
Thursday, October 18, 2018, 17:29: Steerers, einzel lens and dipole tune to increase signal on FC6. Argon current=4 nA. Total source current=54 nA.
Thursday, October 18, 2018, 17:37: Coil to 50A.
Thursday, October 18, 2018, 17:47: Closing Neon valve.
Thursday, October 18, 2018, 17:57: Closing Argon valve.
Thursday, October 18, 2018, 19:51: Assuming 720 nA entering the source (from Brad). Efficiency measurement = 0.44%
Thursday, October 18, 2018, 19:52: Opening valves.
Thursday, October 18, 2018, 19:54: Vaccum ok @ 5.46e-7T
FM
Friday, October 19, 2018, 08:27: Manually tapping 1 A to have TBHT=360.
Friday, October 19, 2018, 08:39: FC6 is stable. Closing Neon Valve.
Friday, October 19, 2018, 08:44: FC6 is stable. Closing Argon Valve.
Friday, October 19, 2018, 09:13: TBHT@360A, AV=150V. Efficiency measurement = 0.41%
Friday, October 19, 2018, 09:16: Opening the valves.
Friday, October 19, 2018, 09:40: FC6 stable. Carefully increasing AV (anode voltage) to 200V keeping an eye on the AC (anode current). |
Tuesday, October 02, 2018, 13:39, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps w/ stoppage
|
Silver bolts used on Coil, TGHT, & TBHT.
End caps in target
Tuesday, October 02, 2018, 13:36: Roughing.
Tuesday, October 02, 2018, 13:37: Doors sealed.
Tuesday, October 02, 2018, 14:10: Turbos on.
Due to potential power & cooling loss. Shutdown vac.
Wednesday, October 03, 2018, 07:34: Chamber Turbos off.
Wednesday, October 03, 2018, 10:58: Beam line Turbos off. Closed both PV1 & PV2 & turned off both roughing pumps.
Thursday, October 11, 2018, 10:37: RGA on. Strip tools re-opened.
Thursday, October 11, 2018, 10:43: Waterlines opened. No response on RGA. Vacuum stable @ 3.40e-07T.
Thursday, October 11, 2018, 10:48: Power on.
Thursday, October 11, 2018, 10:49: Opened manual valve in gas control to operate small pump. Vacuum spike into Xe-05T range.
Thursday, October 11, 2018, 10:51: Very gradual opening on source gas control. Pump ineffective.
Thursday, October 11, 2018, 10:52: SV5 not opened yet. Open SV2. Vacuum spike noted.
Thursday, October 11, 2018, 10:53: SV5 opened/closed very quickly. Allow stabilization. Alternate between SV5 & SV2 until stable.
Thursday, October 11, 2018, 10:58: SV5 closed. Open SV4. Vacuum spike noted up to 3.3e-05T.
Thursday, October 11, 2018, 11:30: All Gas lines opened.
Thursday, October 11, 2018, 11:36: Sources on.
Thursday, October 11, 2018, 11:43: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Thursday, October 11, 2018, 11:46: IV4 opened. Error / closed / red. Fix. IV4 re-opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.9 |
3.96 |
TBHT |
21.7 |
3.09 |
COIL + EE |
22.0 |
5.15 |
TGHT |
22.2 |
5.83 |
Thursday, October 11, 2018, 12:08: Auto-ramping TGHT / TBHT to 300 / 200 A @ 2A per min
Friday, October 12, 2018, 08:07: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Friday, October 12, 2018, 08:13: Optics reset.Can Diagnostics re-cfg.
Friday, October 12, 2018, 10:49: Anode @ 200 V.
Friday, October 12, 2018, 10:50: Coil @ 10 A. Vacuum @ 6.25e-07T
Friday, October 12, 2018, 10:53: Coil @ 20 A. Vacuum @ 6.27e-07T
Friday, October 12, 2018, 10:56: Coil @ 30 A. Vacuum @ 6.27e-07T
Friday, October 12, 2018, 10:58: Coil @ 40 A. Vacuum @ 6.34e-07T
Friday, October 12, 2018, 11:00: Coil @ 50 A. Vacuum @ 6.34e-07T
Friday, October 12, 2018, 11:01: Auto-ramping TBHT to 300 A @ 2A per min.
Friday, October 12, 2018, 11:06: TBHT @ 300 A.
Friday, October 12, 2018, 11:51: Nothing found on Mass or wire scans?
Friday, October 12, 2018, 11:52: Anode set to 0 V.
Friday, October 12, 2018, 11:54: Still nothing found on wire scans.
Fernando:
Friday, October 12, 2018, 12:56: Anode leakage current is 6.105 mA on the readback with AV@200V Coil@0A TGHT@580A TBHT@310
Friday, October 12, 2018, 12:59 : This is very low anode lakage current. It should be on the bulk of 100 mA.
Friday, October 12, 2018, 12:59: Ramping up TBHT to 320 A @ 2A per min while keeping the AV@200 V. STOP
Aaron: Anode / Cathode BIAS PS polarity requires a reversal. John Chow notified. To be reversed Monday after 11am.
Friday, October 12, 2018, 13:24: Continue auto-ramping TBHT to 320 A @ 2A per min.
Friday, October 12, 2018, 13:30: TBHT 320 A / Read back @ 313.1 A.
Friday, October 12, 2018, 13:34: Wire & mass scans
Friday, October 12, 2018, 13:54: Anode to 0 V. Coil to 50 A.
Monday, October 15, 2018, 07:14: Auto-cooling. Coil to 0 A.
Monday, October 15, 2018, 11:54: Sources/power off. IV4 closed |
Friday, September 21, 2018, 11:41, Aaron Schmidt, UC#26, LP-IG-LIS, ITE, TM4, , 42132-1, In progress, Conditioning Heat Shield for UC#26
|
Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41: Doors sealed for roughing.
Friday, September 21, 2018, 14:02: Turbos on.
Monday, September 24, 2018, 08:05: Waterlines opened. No response on RGA. Vacuum ok @ 4.23-e07T
Monday, September 24, 2018, 08:12: Power / sources on.
Monday, September 24, 2018, 08:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.3 |
3.92 |
TBHT |
24.2 |
3.11 |
COIL + EE |
24.1 |
5.15 |
TGHT |
24.3 |
5.80 |
Monday, September 24, 2018, 13:45: Vacuum ok @ 6.47e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
24.9 |
3.11 |
COIL + EE |
24.7 |
5.18 |
TGHT |
27.0 |
5.83 |
Friday, September 28, 2018, 09:59: Auto-cooling @ 2A per min.
Tuesday, October 02, 2018, 08:32: Power / Sources off.
Tuesday, October 02, 2018, 08:37: Purge waterlines & empty DI bucket.
Tuesday, October 02, 2018, 08:38: RGA off. Ion gauge, turbo pumps off. |
Monday, September 17, 2018, 11:52, Aaron Schmidt, UC#25, LP-SIS, ITW, TM2, , 42752-9, In progress, Conditioning Heat Shield for UC#25
|
Monday, September 17, 2018, 11:47: Roughing*. Doors not sealing, help acq'd
Monday, September 17, 2018, 11:51: Roughing. Doors sealed
Monday, September 17, 2018, 12:30: Turbo pumps started.
Monday, September 17, 2018, 14:09: RGA on.
Tuesday, September 18, 2018, 09:01: Waterlines opened. No response on RGA. Vacuum ok @ 5.92e-07T.
Tuesday, September 18, 2018, 09:02: Power on
Tuesday, September 18, 2018, 09:05: Sources on.
Tuesday, September 18, 2018, 09:08: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.8 |
4.02 |
TBHT |
24.4 |
3.11 |
COIL + EE |
24.6 |
5.15 |
TGHT |
24.6 |
5.79 |
Wednesday, September 19, 2018, 08:14: Vacuum @ 7.73e-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.8 |
4.02 |
TBHT |
24.7 |
3.10 |
COIL + EE |
24.9 |
5.13 |
TGHT |
26.8 |
5.77 |
Wednesday, September 19, 2018, 14:30: Auto-cooling @ 2A per min.
Friday, September 21, 2018, 07:52: Power / Sources off.
Friday, September 21, 2018, 07:53: RGA off. Ion Gauge off. Turbo pumps off.
Friday, September 21, 2018, 07:56: Waterlines purged. TS locked out.
|
Wednesday, September 12, 2018, 11:19, Aaron Schmidt, Ta#57, LP-SIS, ITE, TM4, 41177-3, 42752-6, In progress, Conditioning Ta#57 9x
|
Wednesday, September 12, 2018, 11:06: Roughing. Help req'd. Doors wouldn't seal.
Wednesday, September 12, 2018, 11:52: Turbo pumps started.
Wednesday, September 12, 2018, 12:40: Ion gauge on.
Thursday, September 13, 2018, 07:30: Waterlines opened. No response on RGA. Vacuum ok @ 5.5e-07T
Thursday, September 13, 2018, 07:33: Power/sources on.
Thursday, September 13, 2018, 07:37: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min
Thursday, September 13, 2018, 07:42: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Thursday, September 13, 2018, 07:43: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.6 |
4.02 |
TBHT |
24.4 |
3.10 |
COIL + EE |
24.4 |
5.13 |
TGHT |
24.6 |
5.77 |
Thursday, September 13, 2018, 07:44: Optics set.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
24.6 |
3.13 |
COIL + EE |
24.4 |
5.16 |
TGHT |
26.5 |
5.82 |
Thursday, September 13, 2018, 13:56: Vacuum @ 9.97e-07T.
Friday, September 14, 2018, 09:55:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
24.6 |
3.13 |
COIL + EE |
24.4 |
5.16 |
TGHT |
26.5 |
5.82 |
Friday, September 14, 2018, 09:55:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
3.99 |
TBHT |
24.6 |
3.11 |
COIL + EE |
24.6 |
5.12 |
TGHT |
26.5 |
5.83 |
Friday, September 14, 2018, 14:41: Auto-cooling @ 2 A per min.
Monday, September 17, 2018, 09:15: HV to 0. RGA off, IV4 closed & reset
Monday, September 17, 2018, 09:20: Sources off. Turbo pumps & Ion gauge off. Power off.
Monday, September 17, 2018, 09:23: Waterlines purged.
|
Friday, August 31, 2018, 12:27, Aaron Schmidt, nSiC#1, LP-SIS, ITW, TM2, 43044-1, 42752-4, In progress, Conditioning nSiC#1 15x
|
Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo pumps started.
Wednesday, September 05, 2018, 11:03: RGA on.
***NOTE***
P (kW) = A*V
TGHT at 475/7.84V, temp at 1550 C (3.72 kW - Max operating target heating power)
Note: To condition the nanoSiC, it is better to keep TBHT at 0A and ramp up TGHT to 475A while monitoring the vacuum. Then step up TBHT; any increase in vacuum would indicate a local evaporation of nanoSiC close to the ionizer.
Settings as per John Wongs instructions and found in https://elog.triumf.ca/TIS/Evaporator_2/414
DO NOT EXCEED 400A
Thursday, September 06, 2018, 07:23: Waterlines opened. No response on RGA. Vacuum ok @ 5.5e-07T
Thursday, September 06, 2018, 07:25: Power/sources on.
Thursday, September 06, 2018, 07:30: Auto-ramping TGHT to 250 A @ 2A per min
Thursday, September 06, 2018, 07:38: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Thursday, September 06, 2018, 07:39: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.6 |
3.85 |
TBHT |
26.8 |
3.12 |
COIL + EE |
25.4 |
4.99 |
TGHT |
25.5 |
5.64 |
Thursday, September 06, 2018, 07:43: Optics set.
Thursday, September 06, 2018, 08:25: Vacuum @ 1.05e-06T. TGHT @ 105 A. Rate increments based on Vacuum. Minor out gassing.
Thursday, September 06, 2018, 08:51: Vacuum @ 9.13e-07T. TGHT @ 150 A. Rate increments back to 2A.
Thursday, September 06, 2018, 10:13: Vacuum @ 6.62e-07T. TGHT @ 250 A / 2.171 V.
Thursday, September 06, 2018, 11:11: Auto-ramping TGHT to 400 A @ 2A per min.
Thursday, September 06, 2018, 11:51: Vacuum @ 1.05e-06T. TGHT @ 315 A. Rate increments based on Vacuum. Minor out gassing.
Thursday, September 06, 2018, 13:44: Auto-ramping TGHT to 450 A @ 2A per min. Vacuum @ 1.05e-06T. TGHT @ 358 A. Rate increments based on Vacuum. Out gassing.
Thursday, September 06, 2018, 14:34: Auto-ramping TGHT to 400 A @ 2A per min. Vacuum @ 1.05e-06T. TGHT @ 383 A. Rate increments based on Vacuum. Out gassing.
Friday, September 07, 2018, 06:24: Auto-ramping TGHT to 450 A @ 2A per min. TGHT VOL @ 4.200 V
Friday, September 07, 2018, 06:50: TGHT @ 450 A. Vacuum @ 9.13e-07T. TGHT VOL @ 4.933 V
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.6 |
3.85 |
TBHT |
26.8 |
3.12 |
COIL + EE |
25.5 |
4.99 |
TGHT |
27.0 |
5.64 |
Friday, September 07, 2018, 06:55: Auto-ramping TBHT to 150 A @ 2A per min.
Friday, September 07, 2018, 08:12: TBHT @ 150 A. Vacuum @ 9.57e-07T. TGHT VOL @ 1.470 V
Friday, September 07, 2018, 08:15: Auto-ramping TBHT to 230 A @ 2A per min.
Friday, September 07, 2018, 09:55: TBHT @ 230 A. Vacuum @ 9.97e-07T. TGHT VOL @ 1.520 V
Friday, September 07, 2018, 11:00: EZL to 13.5 kV
Friday, September 07, 2018, 15:12: Auto-cooling @ 2 A per min.
Monday, September 10, 2018, 08:15: RGA off.
Monday, September 10, 2018, 08:20:BIAS / EZL / EE @ 0. Sources off.
Monday, September 10, 2018, 08:23: IV4 closed / reset. Ion gauge off. Turbo pumps off. |
Friday, August 31, 2018, 10:16, Aaron Schmidt, , , , , , , Problems/Solutions, RGA connection loss.
|
Friday, August 31, 2018, 10:10: The RGA will not re-connect to the computer. Manually turned it off while under vacuum to protect the filament before shutting down the turbo pumps.
Friday, August 31, 2018, 10:15: Ion gauge & turbo pumps off.
Wednesday, September 05, 2018, 10:00: Communications chip replaced by RH (Travis C.)
Wednesday, September 05, 2018, 10:40: Computer restarted to reconnect/reboot.
Wednesday, September 05, 2018, 11:05: RGA started |
Wednesday, August 29, 2018, 11:36, Aaron Schmidt, , , , , , , , Epics / putty crash.
|
Wednesday, August 29, 2018, 11:35: EPIC's crashed.... epically.
Unable to restart Putty or TS controls.
|
Wednesday, August 22, 2018, 15:20, Aaron Schmidt, , LP-SIS, , , 41177-3, , , Voltage Tests (Ta Target)
|
Wires reconfigured / set
Wednesday, August 22, 2018, 13:10: Roughing.
Wednesday, August 22, 2018, 15:18: Turbo Pumps on.
Thursday, August 23, 2018, 08:16: RGA On.
Thursday, August 23, 2018, 08:39: Power on. Waterlines opened. No response on RGA, Vacuum ok @7.25e-06T
Monday, August 27, 2018, 09:50: Venting.
Monday, August 27, 2018, 10:59: Ta foil removed from one end plate. Roughing.
Monday, August 27, 2018, 11:29: Turbo pumps started.
Monday, August 27, 2018, 11:36: Ion gauge on. Both Turbo pumps at speed.
Tuesday, August 28, 2018, 08:27: Power on
Tuesday, August 28, 2018, 08:30: Waterlines opened. Vacuum ok @ 9.31e-07T. No response on RGA.
Wednesday, August 29, 2018, 11:34: Epics crashed. See added elog.
Friday, August 31, 2018, 10:07: Voltage tests are complete. Results to be uploaded later.
RGA crashed. Unable to re-connect. Manually turned it off.
Friday, August 31, 2018, 10:14: Ion gauge & turbo pumps off.
Friday, August 31, 2018, 11:27: Venting.
|
Tuesday, August 21, 2018, 12:54, Anders Mjos, , , , , , , Problems/Solutions, 9-pin connection configuration
|
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
|
Tuesday, August 14, 2018, 11:03, Aaron Schmidt, , LP-SIS, , , 41177-3, 42752-6, , Voltage Tests (Ta target)
|
Tuesday, August 14, 2018, 10:55: Auto ramping TGHT @ 6 A per min to 40 A.
Tuesday, August 14, 2018, 11:03: TGHT @ 40 A. Display @ 0.198 V. PS @ 0.18 V. Multimeter @ 033 mV.
Tuesday, August 14, 2018, 11:09: Auto ramping TGHT @ 6 A per min to 80 A.
Tuesday, August 14, 2018, 11:16: TGHT @ 80.1 A. Display @ 0.405 V. PS @ 0.38 V. Multimeter @ 084 mV.
Tuesday, August 14, 2018, 11:18: Auto ramping TGHT @ 6 A per min to 120 A.
Tuesday, August 14, 2018, 11:28: TGHT @ 120.1 A. Display @ 0.718 V. PS @ 0.69 V. Multimeter @ 187 mV.
Tuesday, August 14, 2018, 11:35: TGHT @ 120.1 A. Display @ 0.745 V. PS @ 0.72 V. Multimeter @ 201 mV.
Tuesday, August 14, 2018, 11:36: Auto ramping TGHT @ 6 A per min to 160 A.
Tuesday, August 14, 2018, 11:44: TGHT @ 160.3 A. Display @ 1.131 V. PS @ 1.11 V. Multimeter @ 340 mV.
Tuesday, August 14, 2018, 11:54 TGHT @ 160.3 A. Display @ 1.148 V. PS @ 1.12 V. Multimeter @ 347 mV.
Tuesday, August 14, 2018, 11:54: Auto ramping TGHT @ 6 A per min to 200 A.
Tuesday, August 14, 2018, 12:01: TGHT @ 200.4 A. Display @ 1.565 V. PS @ 1.54 V. Multimeter @ 502 mV.
Tuesday, August 14, 2018, 12:47 TGHT @ 200.4 A. Display @ 1.582 V. PS @ 1.56 V. Multimeter @ 508 mV.
Tuesday, August 14, 2018, 12:47: Auto ramping TGHT @ 6 A per min to 230A.
Tuesday, August 14, 2018, 12:54: TGHT @ 230.6 A. Display @ 1.924 V. PS @ 1.89 V. Multimeter @ 635 mV.
Tuesday, August 14, 2018, 13:00: TGHT @ 230.6 A. Display @ 1.929 V. PS @ 1.90 V. Multimeter @ 638 mV.
Tuesday, August 14, 2018, 13:01: Auto ramping TGHT @ 6 A per min to 240A.
Tuesday, August 14, 2018, 13:05: TGHT @ 240.6 A. Display @ 2.046 V. PS @ 2.02 V. Multimeter @ 682 mV.
Tuesday, August 14, 2018, 13:10: TGHT @ 240.6 A. Display @ 2.049 V. PS @ 2.02 V. Multimeter @ 683 mV.
Tuesday, August 14, 2018, 13:11 Auto ramping TGHT @ 6 A per min to 280A.
Tuesday, August 14, 2018, 13:19: TGHT @ 280.7 A. Display @ 2.537 V. PS @ 2.51 V. Multimeter @ 869 mV.
Tuesday, August 14, 2018, 13:24: TGHT @ 280.7 A. Display @ 2.540 V. PS @ 2.51 V. Multimeter @ 871 mV.
Tuesday, August 14, 2018, 13:25 Auto ramping TGHT @ 6 A per min to 300A.
Tuesday, August 14, 2018, 13:30: TGHT @ 300.8 A. Display @ 2.794 V. PS @ 2.76 V. Multimeter @ 968 mV.
Tuesday, August 14, 2018, 13:34: TGHT @ 300.8 A. Display @ 2.796 V. PS @ 2.77 V. Multimeter @ 970 mV.
Tuesday, August 14, 2018, 13:36: Auto ramping TGHT @ 6 A per min to 354A.
Tuesday, August 14, 2018, 13:46: TGHT @ 354.9 A. Display @ 3.509 V. PS @ 3.48 V. Multimeter @ 1248 mV.
Tuesday, August 14, 2018, 13:51: TGHT @ 354.9 A. Display @ 3.512 V. PS @ 3.48 V. Multimeter @ 1249 mV.
Tuesday, August 14, 2018, 13:52 Auto ramping TGHT @ 6 A per min to 360A.
Tuesday, August 14, 2018, 13:55: TGHT @ 360.9 A. Display @ 3.592 V. PS @ 3.56 V. Multimeter @ 1281 mV.
Tuesday, August 14, 2018, 13:56 Auto ramping TGHT @ 6 A per min to 370A.
Tuesday, August 14, 2018, 14:00 TGHT @ 370.8 A. Display @ 3.729 V. PS @ 3.70 V. Multimeter @ 1336 mV.
Tuesday, August 14, 2018, 14:03: Auto ramping TGHT @ 6 A per min to 400A.
Tuesday, August 14, 2018, 14:10 TGHT @ 401.0 A. Display @ 4.149 V. PS @ 4.12 V. Multimeter @ 1501 mV.
Tuesday, August 14, 2018, 14:15: Auto ramping TGHT @ 6 A per min to 410A.
Tuesday, August 14, 2018, 14:19: TGHT @ 411.0 A. Display @ 4.291 V. PS @ 4.26 V. Multimeter @ 1558 mV.
Tuesday, August 14, 2018, 14:23: Auto ramping TGHT @ 6 A per min to 427A.
Tuesday, August 14, 2018, 14:28: TGHT @ 428.0 A. Display @ 4.537 V. PS @ 4.51 V. Multimeter @ 1657 mV.
Tuesday, August 14, 2018, 14:32: Auto ramping TGHT @ 6 A per min to 451A.
Tuesday, August 14, 2018, 14:38: TGHT @ 452.2 A. Display @ 4.891 V. PS @ 4.86 V. Multimeter @ 1805 mV.
Tuesday, August 14, 2018, 14:42: Auto ramping TGHT @ 6 A per min to 460A.
Tuesday, August 14, 2018, 14:47: TGHT @ 461.2 A. Display @ 5.026 V. PS @ 4.99 V. Multimeter @ 1862 mV.
Tuesday, August 14, 2018, 14:52: Auto ramping TGHT @ 6 A per min to 475A.
Tuesday, August 14, 2018, 14:55: TGHT @ 476.3 A. Display @ 5.250 V. PS @ 5.22 V. Multimeter @ 1962 mV.
Tuesday, August 14, 2018, 14:58: Auto ramping TGHT @ 6 A per min to 500A.
Tuesday, August 14, 2018, 15:04: TGHT @ 501.4 A. Display @ 5.629 V. PS @ 5.60 V. Multimeter @ 2130 mV.
Tuesday, August 14, 2018, 15:08: Auto ramping TGHT @ 6 A per min to 510A.
Tuesday, August 14, 2018, 15:11: TGHT @ 511.5 A. Display @ 5.783 V. PS @ 5.75 V. Multimeter @ 2190 mV.
Tuesday, August 14, 2018, 15:13: Auto ramping TGHT @ 6 A per min to 520A.
Tuesday, August 14, 2018, 15:17: TGHT @ 521.5 A. Display @ 5.937 V. PS @ 5.91 V. Multimeter @ 2260 mV.
Wednesday, August 15, 2018, 09:29: TGHT @ 521.5 A. Display @ 5.956 V. PS @ 5.92 V. Multimeter @ 2260 mV.
Wednesday, August 15, 2018, 09:34: Auto ramping TGHT @ 6 A per min to 550A.
Wednesday, August 15, 2018, 09:39: TGHT @ 551.5 A. Display @ 6.422 V. PS @ 6.39 V. Multimeter @ 2480 mV.
Wednesday, August 15, 2018, 09:42: Auto ramping TGHT @ 6 A per min to 560A.
Wednesday, August 15, 2018, 09:44: TGHT @ 561.5 A. Display @ 6.579 V. PS @ 6.55 V. Multimeter @ 2550 mV.
Wednesday, August 15, 2018, 09:46: Auto ramping TGHT @ 6 A per min to 580A.
Wednesday, August 15, 2018, 09:53: TGHT @ 581.7 A. Display @ 6.896 V. PS @ 6.86 V. Multimeter @ 2680 mV.
Wednesday, August 15, 2018, 09:55: Auto ramping TGHT @ 6 A per min to 600A.
Wednesday, August 15, 2018, 09:59: TGHT @ 600.0 A. Display @ 7.214 V. PS @ 7.18 V. Multimeter @ 2820 mV.
Wednesday, August 15, 2018, 10:07: Auto cooling TGHT @ 6 A per min to 580A.
Wednesday, August 15, 2018, 10:10: TGHT @ 581.7 A. Display @ 6.896 V. PS @ 6.86 V. Multimeter @ 2680 mV.
Wednesday, August 15, 2018, 10:12: Auto cooling TGHT @ 6 A per min to 560A.
Wednesday, August 15, 2018, 10:17: TGHT @ 561.6 A. Display @ 6.584 V. PS @ 6.55 V. Multimeter @ 2550 mV.
Wednesday, August 15, 2018, 10:18: Auto cooling TGHT @ 6 A per min to 550A.
Wednesday, August 15, 2018, 10:23: TGHT @ 551.5 A. Display @ 6.427 V. PS @ 6.39 V. Multimeter @ 2480 mV.
Wednesday, August 15, 2018, 10:24: Auto cooling TGHT @ 6 A per min to 520A.
Wednesday, August 15, 2018, 10:33: TGHT @ 521.5 A. Display @ 5.963 V. PS @ 5.93 V. Multimeter @ 2290 mV.
Wednesday, August 15, 2018, 10:35 Auto cooling TGHT @ 6 A per min to 510A.
Wednesday, August 15, 2018, 10:39: TGHT @ 511.5 A. Display @ 5.814 V. PS @ 5.78 V. Multimeter @ 2200 mV.
Wednesday, August 15, 2018, 10:40: Auto cooling TGHT @ 6 A per min to 500A.
Wednesday, August 15, 2018, 10:45 TGHT @ 501.4 A. Display @ 5.665 V. PS @ 5.63 V. Multimeter @ 2140 mV.
Wednesday, August 15, 2018, 10:45: Auto cooling TGHT @ 6 A per min to 475A.
Wednesday, August 15, 2018, 10:52: TGHT @ 476.3 A. Display @ 5.292 V. PS @ 5.26 V. Multimeter @ 1997 mV.
Wednesday, August 15, 2018, 10:53: Auto cooling TGHT @ 6 A per min to 460A.
Wednesday, August 15, 2018, 10:59: TGHT @ 461.2 A. Display @ 5.070 V. PS @ 5.04 V. Multimeter @ 1879 mV.
Wednesday, August 15, 2018, 11:00: Auto cooling TGHT @ 6 A per min to 451A.
Wednesday, August 15, 2018, 11:05: TGHT @ 452.2 A. Display @ 4.935 V. PS @ 4.90 V. Multimeter @ 1821 mV.
Wednesday, August 15, 2018, 11:06: Auto cooling TGHT @ 6 A per min to 427A.
Wednesday, August 15, 2018, 11:15: TGHT @ 428.0 A. Display @ 4.584 V. PS @ 4.55 V. Multimeter @ 1674 mV.
Wednesday, August 15, 2018, 11:16: Auto cooling TGHT @ 6 A per min to 410A.
Wednesday, August 15, 2018, 11:20: TGHT @ 411.0 A. Display @ 4.337 V. PS @ 4.31 V. Multimeter @ 1576 mV.
Wednesday, August 15, 2018, 11:21: Auto cooling TGHT @ 6 A per min to 400A.
Wednesday, August 15, 2018, 11:25: TGHT @ 401.0 A. Display @ 4.195 V. PS @ 4.17 V. Multimeter @ 1519 mV.
Wednesday, August 15, 2018, 13:13: TGHT @ 401.0 A. Display @ 4.193 V. PS @ 4.16 V. Multimeter @ 1516 mV.
Wednesday, August 15, 2018, 13:14: Auto cooling TGHT @ 6 A per min to 370A.
Wednesday, August 15, 2018, 13:23: TGHT @ 370.8 A. Display @ 3.773 V. PS @ 3.74 V. Multimeter @ 1350 mV.
Wednesday, August 15, 2018, 13:24 Auto cooling TGHT @ 6 A per min to 360A.
Wednesday, August 15, 2018, 13:30: TGHT @ 360.9 A. Display @ 3.634 V. PS @ 3.61 V. Multimeter @ 1296 mV.
Wednesday, August 15, 2018, 13:31: Auto cooling TGHT @ 6 A per min to 354A.
Wednesday, August 15, 2018, 13:35: TGHT @ 354.9 A. Display @ 3.553 V. PS @ 3.52 V. Multimeter @ 1263 mV.
Wednesday, August 15, 2018, 13:36 Auto cooling TGHT @ 6 A per min to 300A.
Wednesday, August 15, 2018, 13:46: TGHT @ 300.8 A. Display @ 2.830 V. PS @ 2.80 V. Multimeter @ 0984 mV.
Wednesday, August 15, 2018, 13:51: TGHT @ 300.8 A. Display @ 2.828 V. PS @ 2.80 V. Multimeter @ 0981 mV.
Wednesday, August 15, 2018, 13:52: Auto cooling TGHT @ 6 A per min to 280A.
Wednesday, August 15, 2018, 13:58: TGHT @ 280.7 A. Display @ 2.569 V. PS @ 2.54 V. Multimeter @ 0882 mV.
Wednesday, August 15, 2018, 13:59: Auto cooling TGHT @ 6 A per min to 240A.
Wednesday, August 15, 2018, 14:07: TGHT @ 240.6 A. Display @ 2.073 V. PS @ 2.05 V. Multimeter @ 0685 mV.
Wednesday, August 15, 2018, 14:11: TGHT @ 240.6 A. Display @ 2.071 V. PS @ 2.04 V. Multimeter @ 0692 mV.
Wednesday, August 15, 2018, 14:12: Auto cooling TGHT @ 6 A per min to 230A.
Wednesday, August 15, 2018, 14:18: TGHT @ 230.6 A. Display @ 1.951 V. PS @ 1.92 V. Multimeter @ 0647 mV.
Wednesday, August 15, 2018, 14:19: Auto cooling TGHT @ 6 A per min to 200A.
Wednesday, August 15, 2018, 14:25: TGHT @ 200.4 A. Display @ 1.612 V. PS @ 1.59 V. Multimeter @ 0522 mV.
Wednesday, August 15, 2018, 14:31: TGHT @ 200.4 A. Display @ 1.604 V. PS @ 1.58 V. Multimeter @ 0517 mV.
Wednesday, August 15, 2018, 14:31: Auto cooling TGHT @ 6 A per min to 160A.
Wednesday, August 15, 2018, 14:39: TGHT @ 160.3 A. Display @ 1.179 V. PS @ 1.16 V. Multimeter @ 0364 mV.
Wednesday, August 15, 2018, 14:44: TGHT @ 160.3 A. Display @ 1.170 V. PS @ 1.14 V. Multimeter @ 0356 mV.
Wednesday, August 15, 2018, 14:44: Auto cooling TGHT @ 6 A per min to 120A.
Wednesday, August 15, 2018, 14:52: TGHT @ 120.1 A. Display @ 0.794 V. PS @ 0.77 V. Multimeter @ 0226 mV.
Wednesday, August 15, 2018, 14:56: TGHT @ 120.3 A. Display @ 0.779 V. PS @ 0.76 V. Multimeter @ 0218 mV.
Wednesday, August 15, 2018, 14:56: Auto cooling TGHT @ 6 A per min to 80A.
Wednesday, August 15, 2018, 15:04: TGHT @ 80.1 A. Display @ 0.466 V. PS @ 0.45 V. Multimeter @ 0117 mV.
Wednesday, August 15, 2018, 15:09: TGHT @ 80.1 A. Display @ 0.454 V. PS @ 0.43 V. Multimeter @ 0109 mV.
Wednesday, August 15, 2018, 15:13: TGHT @ 80.1 A. Display @ 0.447 V. PS @ 0.42 V. Multimeter @ 0105 mV.
Wednesday, August 15, 2018, 15:14: Auto cooling TGHT @ 6 A per min to 40A.
Wednesday, August 15, 2018, 15:22: TGHT @ 40.0 A. Display @ 0.217 V. PS @ 0.19 V. Multimeter @ 0041 mV.
Wednesday, August 15, 2018, 15:27: TGHT @ 40.0 A. Display @ 0.210 V. PS @ 0.19 V. Multimeter @ 0039 mV.
Wednesday, August 15, 2018, 15:28: Auto cooling TGHT @ 6 A per min to 0A.
------------------------------------
Thursday, August 16, 2018, 13:41: Auto ramping TGHT @ 6 A per min to 40A. Auto ramping TBHT @ 6 A per min to 40A.
Thursday, August 16, 2018, 13:52 TGHT @ 40.0 A. Display @ 0.200 V. PS @ 0.18 V. Multimeter @ 0116 mV. TBHT @ 38.4 A. Display @ 0.195 V. PS @ 0.18 V.
Thursday, August 16, 2018, 13:53 Auto ramping TGHT @ 6 A per min to 80A. Auto ramping TBHT @ 6 A per min to 80A.
Thursday, August 16, 2018, 14:02: TGHT @ 80.1 A. Display @ 0.405 V. PS @ 0.38 V. Multimeter @ 0279 mV. TBHT @ 78.5 A. Display @ 0.391 V. PS @ 0.38 V.
Thursday, August 16, 2018, 14:13: TGHT @ 80.1 A. Display @ 0.437 V. PS @ 0.41 V. Multimeter @ 0304 mV. TBHT @ 78.5 A. Display @ 0.410 V. PS @ 0.40 V.
Thursday, August 16, 2018, 14:22: TGHT @ 80.1 A. Display @ 0.444 V. PS @ 0.42 V. Multimeter @ 0313 mV. TBHT @ 78.5 A. Display @ 0.418 V. PS @ 0.40 V.
Thursday, August 16, 2018, 14:22: Auto ramping TGHT @ 6 A per min to 120A. Auto ramping TBHT @ 6 A per min to 120A.
Thursday, August 16, 2018, 14:31: TGHT @ 120.1 A. Display @ 0.735 V. PS @ 0.72 V. Multimeter @ 0610 mV. TBHT @ 118.5 A. Display @ 0.711 V. PS @ 0.71 V.
Thursday, August 16, 2018, 14:44: TGHT @ 120.1 A. Display @ 0.794 V. PS @ 0.77 V. Multimeter @ 0674 mV. TBHT @ 118.5 A. Display @ 0.767 V. PS @ 0.75 V.
Thursday, August 16, 2018, 14:45: Auto ramping TGHT @ 6 A per min to 160A. Auto ramping TBHT @ 6 A per min to 160A.
Thursday, August 16, 2018, 14:53: TGHT @ 160.3 A. Display @ 1.165 V. PS @ 1.15 V. Multimeter @ 0927 mV. TBHT @ 158.7 A. Display @ 1.197 V. PS @ 1.19 V.
Thursday, August 16, 2018, 15:01: TGHT @ 160.3 A. Display @ 1.197 V. PS @ 1.17 V. Multimeter @ 0946 mV. TBHT @ 158.7 A. Display @ 1.221 V. PS @ 1.21 V.
Thursday, August 16, 2018, 15:02: Auto ramping TGHT @ 6 A per min to 200A. Auto ramping TBHT @ 6 A per min to 200A.
Thursday, August 16, 2018, 15:10: TGHT @ 200.4 A. Display @ 1.617 V. PS @ 1.60 V. Multimeter @ 1382 mV. TBHT @ 198.8 A. Display @ 1.678 V. PS @ 1.68 V.
Thursday, August 16, 2018, 15:17: TGHT @ 200.4 A. Display @ 1.634 V. PS @ 1.61 V. Multimeter @ 1390 mV. TBHT @ 198.7 A. Display @ 1.690 V. PS @ 1.69 V.
Thursday, August 16, 2018, 15:18: Auto ramping TGHT @ 6 A per min to 230A. Auto ramping TBHT @ 6 A per min to 230A.
Thursday, August 16, 2018, 15:25: TGHT @ 230.5 A. Display @ 1.976 V. PS @ 1.95 V. Multimeter @ 1751 mV. TBHT @ 228.9 A. Display @ 2.071 V. PS @ 2.07 V.
Thursday, August 16, 2018, 15:34: TGHT @ 230.6 A. Display @ 1.985 V. PS @ 1.96 V. Multimeter @ 1754 mV. TBHT @ 228.9 A. Display @ 2.081 V. PS @ 2.08 V.
Thursday, August 16, 2018, 15:35: Auto ramping TGHT @ 6 A per min to 240A.
Thursday, August 16, 2018, 15:42: TGHT @ 240.6 A. Display @ 2.100 V. PS @ 2.07 V. Multimeter @ 1801 mV. TBHT @ 228.9 A. Display @ 2.083 V. PS @ 2.08 V.
Thursday, August 16, 2018, 15:44: Auto ramping TGHT @ 6 A per min to 280A.
Thursday, August 16, 2018, 15:52: TGHT @ 280.6 A. Display @ 2.581 V. PS @ 2.56 V. Multimeter @ 1996 mV. TBHT @ 228.9 A. Display @ 2.095 V. PS @ 2.09 V.
Thursday, August 16, 2018, 16:00: TGHT @ 280.7 A. Display @ 2.586 V. PS @ 2.56 V. Multimeter @ 1998 mV. TBHT @ 228.9 A. Display @ 2.098 V. PS @ 2.10 V.
Thursday, August 16, 2018, 16:01: Auto ramping TGHT @ 6 A per min to 300A.
Thursday, August 16, 2018, 16:06: TGHT @ 300.8 A. Display @ 2.835 V. PS @ 2.81 V. Multimeter @ 2090 mV. TBHT @ 228.9 A. Display @ 2.103 V. PS @ 2.10 V.
Thursday, August 16, 2018, 16:11: TGHT @ 300.8 A. Display @ 2.840 V. PS @ 2.81 V. Multimeter @ 2090 mV. TBHT @ 228.9 A. Display @ 2.105 V. PS @ 2.10 V.
Thursday, August 16, 2018, 16:11: Auto ramping TGHT @ 6 A per min to 354A.
Thursday, August 16, 2018, 16:22: TGHT @ 354.9 A. Display @ 3.546 V. PS @ 3.52 V. Multimeter @ 2390 mV. TBHT @ 228.9 A. Display @ 2.122 V. PS @ 2.12 V.
Thursday, August 16, 2018, 16:26: TGHT @ 354.9 A. Display @ 3.551 V. PS @ 3.52 V. Multimeter @ 2390 mV. TBHT @ 228.9 A. Display @ 2.125 V. PS @ 2.12 V.
Thursday, August 16, 2018, 16:26: Auto ramping TGHT @ 6 A per min to 360A.
Thursday, August 16, 2018, 16:32: TGHT @ 360.9 A. Display @ 3.634 V. PS @ 3.60 V. Multimeter @ 2420 mV. TBHT @ 228.9 A. Display @ 2.127 V. PS @ 2.12 V.
Thursday, August 16, 2018, 16:33: Auto ramping TGHT @ 6 A per min to 370A.
Thursday, August 16, 2018, 16:40: TGHT @ 370.8 A. Display @ 3.768 V. PS @ 3.74 V. Multimeter @ 2480 mV. TBHT @ 228.9 A. Display @ 2.129 V. PS @ 2.13 V.
Thursday, August 16, 2018, 16:41: Auto ramping TGHT @ 6 A per min to 400A.
Thursday, August 16, 2018, 16:47: TGHT @ 401.0 A. Display @ 4.183 V. PS @ 4.15 V. Multimeter @ 2650 mV. TBHT @ 228.9 A. Display @ 2.139 V. PS @ 2.14 V.
--------------------------------------------------------------
Friday, August 17, 2018, 09:12: TGHT @ 400.9 A. Display @ 4.190 V. PS @ 4.16 V. Multimeter @ 2650 mV. TBHT @ 228.9 A. Display @ 2.144 V. PS @ 2.14 V.
Friday, August 17, 2018, 09:13: Auto ramping TGHT @ 6 A per min to 410A.
Friday, August 17, 2018, 09:16: TGHT @ 410.8 A. Display @ 4.327 V. PS @ 4.30 V. Multimeter @ 2710 mV. TBHT @ 228.9 A. Display @ 2.147 V. PS @ 2.15 V.
Friday, August 17, 2018, 09:19: TGHT @ 410.8 A. Display @ 4.332 V. PS @ 4.30 V. Multimeter @ 2720 mV. TBHT @ 228.9 A. Display @ 2.149 V. PS @ 2.15 V.
Friday, August 17, 2018, 09:20: Auto ramping TGHT @ 6 A per min to 427A.
Friday, August 17, 2018, 09:24: TGHT @ 428.0 A. Display @ 4.571 V. PS @ 4.55 V. Multimeter @ 2820 mV. TBHT @ 228.9 A. Display @ 2.154 V. PS @ 2.15 V.
Friday, August 17, 2018, 09:28: TGHT @ 428.0 A. Display @ 4.574 V. PS @ 4.55 V. Multimeter @ 2820 mV. TBHT @ 228.9 A. Display @ 2.156 V. PS @ 2.15 V.
Friday, August 17, 2018, 09:29: Auto ramping TGHT @ 6 A per min to 451A.
Friday, August 17, 2018, 09:37: TGHT @ 452.0 A. Display @ 4.923 V. PS @ 4.89 V. Multimeter @ 2970 mV. TBHT @ 228.9 A. Display @ 2.166 V. PS @ 2.17 V.
Friday, August 17, 2018, 09:38: Auto ramping TGHT @ 6 A per min to 460A.
Friday, August 17, 2018, 09:44: TGHT @ 461.2 A. Display @ 5.057 V. PS @ 5.03 V. Multimeter @ 3020 mV. TBHT @ 228.9 A. Display @ 2.168 V. PS @ 2.17 V.
Friday, August 17, 2018, 09:45: Auto ramping TGHT @ 6 A per min to 475A.
Friday, August 17, 2018, 09:51: TGHT @ 476.2 A. Display @ 5.280 V. PS @ 5.25 V. Multimeter @ 3120 mV. TBHT @ 228.9 A. Display @ 2.176 V. PS @ 2.18 V.
Friday, August 17, 2018, 09:52: Auto ramping TGHT @ 6 A per min to 500A.
Friday, August 17, 2018, 10:01: TGHT @ 501.4 A. Display @ 5.656 V. PS @ 5.63 V. Multimeter @ 3280 mV. TBHT @ 228.9 A. Display @ 2.188 V. PS @ 2.19 V.
Friday, August 17, 2018, 10:02: Auto ramping TGHT @ 6 A per min to 510A.
Friday, August 17, 2018, 10:08: TGHT @ 511.4 A. Display @ 5.810 V. PS @ 5.78 V. Multimeter @ 3350 mV. TBHT @ 228.9 A. Display @ 2.193 V. PS @ 2.19 V.
Friday, August 17, 2018, 10:09: Auto ramping TGHT @ 6 A per min to 520A.
Friday, August 17, 2018, 10:14: TGHT @ 521.3 A. Display @ 5.961 V. PS @ 5.93 V. Multimeter @ 3420 mV. TBHT @ 228.9 A. Display @ 2.203 V. PS @ 2.20 V.
Friday, August 17, 2018, 10:16: Auto ramping TGHT @ 6 A per min to 550A.
Friday, August 17, 2018, 10:24: TGHT @ 551.5 A. Display @ 6.425 V. PS @ 6.39 V. Multimeter @ 3630 mV. TBHT @ 228.9 A. Display @ 2.217 V. PS @ 2.22 V.
Friday, August 17, 2018, 10:25: Auto ramping TGHT @ 6 A per min to 560A.
Friday, August 17, 2018, 10:32: TGHT @ 561.5 A. Display @ 6.584 V. PS @ 6.55 V. Multimeter @ 3690 mV. TBHT @ 228.9 A. Display @ 2.222 V. PS @ 2.22 V.
Friday, August 17, 2018, 10:32: Auto ramping TGHT @ 6 A per min to 580A.
Friday, August 17, 2018, 10:40: TGHT @ 581.7 A. Display @ 6.899 V. PS @ 6.87 V. Multimeter @ 3830 mV. TBHT @ 228.9 A. Display @ 2.232 V. PS @ 2.23 V.
Friday, August 17, 2018, 10:41: Auto ramping TGHT @ 6 A per min to 600A.
Friday, August 17, 2018, 10:47: TGHT @ 600.0 A. Display @ 7.214 V. PS @ 7.18 V. Multimeter @ 3970 mV. TBHT @ 228.9 A. Display @ 2.239 V. PS @ 2.24 V.
Friday, August 17, 2018, 10:56: TGHT @ 600.0 A. Display @ 7.214 V. PS @ 7.18 V. Multimeter @ 3970 mV. TBHT @ 228.9 A. Display @ 2.242 V. PS @ 2.24 V.
Friday, August 17, 2018, 10:58: Auto cooling TGHT @ 6 A per min to 580A.
Friday, August 17, 2018, 11:09: TGHT @ 581.7 A. Display @ 6.901 V. PS @ 6.87 V. Multimeter @ 3830 mV. TBHT @ 228.9 A. Display @ 2.234 V. PS @ 2.23 V.
Friday, August 17, 2018, 11:09: Auto cooling TGHT @ 6 A per min to 560A.
Friday, August 17, 2018, 11:19: TGHT @ 561.5 A. Display @ 6.586 V. PS @ 6.55 V. Multimeter @ 3700 mV. TBHT @ 228.9 A. Display @ 2.225 V. PS @ 2.22 V.
Friday, August 17, 2018, 11:20: Auto cooling TGHT @ 6 A per min to 550A.
Friday, August 17, 2018, 11:25: TGHT @ 551.5 A. Display @ 6.432 V. PS @ 6.40 V. Multimeter @ 3630 mV. TBHT @ 228.9 A. Display @ 2.220 V. PS @ 2.22 V.
Friday, August 17, 2018, 11:26: Auto cooling TGHT @ 6 A per min to 520A.
Friday, August 17, 2018, 11:35: TGHT @ 521.3 A. Display @ 5.976 V. PS @ 5.94 V. Multimeter @ 3430 mV. TBHT @ 228.9 A. Display @ 2.208 V. PS @ 2.21 V.
Friday, August 17, 2018, 11:36: Auto cooling TGHT @ 6 A per min to 510A.
Friday, August 17, 2018, 11:41: TGHT @ 511.4 A. Display @ 5.827 V. PS @ 5.80 V. Multimeter @ 3370 mV. TBHT @ 228.9 A. Display @ 2.203 V. PS @ 2.20 V.
Friday, August 17, 2018, 11:42: Auto cooling TGHT @ 6 A per min to 500A.
Friday, August 17, 2018, 11:48: TGHT @ 501.4 A. Display @ 5.678 V. PS @ 5.65 V. Multimeter @ 3300 mV. TBHT @ 228.9 A. Display @ 2.198 V. PS @ 2.20 V.
Friday, August 17, 2018, 11:49: Auto cooling TGHT @ 6 A per min to 475A.
Friday, August 17, 2018, 11:55: TGHT @ 476.2 A. Display @ 5.314 V. PS @ 5.28 V. Multimeter @ 3140 mV. TBHT @ 228.9 A. Display @ 2.190 V. PS @ 2.19 V.
Friday, August 17, 2018, 12:59: TGHT @ 476.2 A. Display @ 5.309 V. PS @ 5.28 V. Multimeter @ 3140 mV. TBHT @ 228.9 A. Display @ 2.188 V. PS @ 2.19 V.
Friday, August 17, 2018, 13:00: Auto cooling TGHT @ 6 A per min to 460A.
Friday, August 17, 2018, 13:08: TGHT @ 461.2 A. Display @ 5.092 V. PS @ 5.06 V. Multimeter @ 3050 mV. TBHT @ 228.9 A. Display @ 2.183 V. PS @ 2.18 V.
Friday, August 17, 2018, 13:09: Auto cooling TGHT @ 6 A per min to 451A.
Friday, August 17, 2018, 13:16: TGHT @ 452.2 A. Display @ 4.960 V. PS @ 4.93 V. Multimeter @ 2990 mV. TBHT @ 228.9 A. Display @ 2.173 V. PS @ 2.17 V.
Friday, August 17, 2018, 13:17: Auto cooling TGHT @ 6 A per min to 427A.
Friday, August 17, 2018, 13:26: TGHT @ 428.0 A. Display @ 4.608 V. PS @ 4.58 V. Multimeter @ 2830 mV. TBHT @ 228.9 A. Display @ 2.159 V. PS @ 2.16 V.
Friday, August 17, 2018, 13:27: Auto cooling TGHT @ 6 A per min to 410A.
Friday, August 17, 2018, 13:34: TGHT @ 411.0 A. Display @ 4.364 V. PS @ 4.33 V. Multimeter @ 2730 mV. TBHT @ 228.9 A. Display @ 2.151 V. PS @ 2.15 V.
Friday, August 17, 2018, 13:36: Auto cooling TGHT @ 6 A per min to 400A.
Friday, August 17, 2018, 13:41: TGHT @ 400.9 A. Display @ 4.220 V. PS @ 4.19 V. Multimeter @ 2670 mV. TBHT @ 228.9 A. Display @ 2.149 V. PS @ 2.15 V.
Friday, August 17, 2018, 13:42: Auto cooling TGHT @ 6 A per min to 370A.
Friday, August 17, 2018, 13:52: TGHT @ 370.8 A. Display @ 3.797 V. PS @ 3.77 V. Multimeter @ 2490 mV. TBHT @ 228.9 A. Display @ 2.137 V. PS @ 2.14 V.
Friday, August 17, 2018, 13:53: Auto cooling TGHT @ 6 A per min to 360A.
Friday, August 17, 2018, 14:01: TGHT @ 360.9 A. Display @ 3.661 V. PS @ 3.63 V. Multimeter @ 2430 mV. TBHT @ 228.9 A. Display @ 2.132 V. PS @ 2.13 V.
Friday, August 17, 2018, 14:02: Auto cooling TGHT @ 6 A per min to 354A.
Friday, August 17, 2018, 14:05: TGHT @ 354.9 A. Display @ 3.580 V. PS @ 3.55 V. Multimeter @ 2400 mV. TBHT @ 228.9 A. Display @ 2.129 V. PS @ 2.13 V.
Friday, August 17, 2018, 14:07: Auto cooling TGHT @ 6 A per min to 300A.
Friday, August 17, 2018, 14:17: TGHT @ 300.8 A. Display @ 2.869 V. PS @ 2.84 V. Multimeter @ 2110 mV. TBHT @ 228.9 A. Display @ 2.112 V. PS @ 2.11 V.
Friday, August 17, 2018, 14:22: TGHT @ 300.8 A. Display @ 2.862 V. PS @ 2.83 V. Multimeter @ 2100 mV. TBHT @ 228.9 A. Display @ 2.110 V. PS @ 2.11 V.
Friday, August 17, 2018, 14:22: Auto cooling TGHT @ 6 A per min to 280A.
Friday, August 17, 2018, 14:30: TGHT @ 280.7 A. Display @ 2.606 V. PS @ 2.58 V. Multimeter @ 2000 mV. TBHT @ 228.9 A. Display @ 2.103 V. PS @ 2.10 V
.Friday, August 17, 2018, 14:22: Auto cooling TGHT @ 6 A per min to 240A.
Friday, August 17, 2018, 14:56: TGHT @ 240.6 A. Display @ 2.081 V. PS @ 2.09 V. Multimeter @ 1798 mV. TBHT @ 228.9 A. Display @ 2.081 V. PS @ 2.08 V
Friday, August 17, 2018, 14:58: Auto cooling TGHT @ 6 A per min to 230A.
Friday, August 17, 2018, 15:05: TGHT @ 230.5 A. Display @ 1.998 V. PS @ 1.97 V. Multimeter @ 1750 mV. TBHT @ 228.9 A. Display @ 2.078 V. PS @ 2.08 V
------------------------------------------------------------------------------
Sunday, August 19, 2018, 12:44: TGHT @ 230.5 A. Display @ 1.998 V. PS @ 1.97 V. Multimeter @ 1748 mV. TBHT @ 228.9 A. Display @ 2.078 V. PS @ 2.08 V
Sunday, August 19, 2018, 12:45: Auto cooling TGHT @ 6 A per min to 200A.
Sunday, August 19, 2018, 12:51: TGHT @ 200.4 A. Display @ 1.661 V. PS @ 1.64 V. Multimeter @ 1617 mV. TBHT @ 228.9 A. Display @ 2.071 V. PS @ 2.07 V
Sunday, August 19, 2018, 12:56: TGHT @ 200.4 A. Display @ 1.658 V. PS @ 1.63 V. Multimeter @ 1614 mV. TBHT @ 228.9 A. Display @ 2.068 V. PS @ 2.07 V
Sunday, August 19, 2018, 12:59: Auto cooling TGHT @ 6 A per min to 160A.
Sunday, August 19, 2018, 13:06: TGHT @ 160.3 A. Display @ 1.245 V. PS @ 1.22 V. Multimeter @ 1452 mV. TBHT @ 228.9 A. Display @ 2.061 V. PS @ 2.06 V
Sunday, August 19, 2018, 13:11: TGHT @ 160.3 A. Display @ 1.236 V. PS @ 1.21 V. Multimeter @ 1449 mV. TBHT @ 228.9 A. Display @ 2.056 V. PS @ 2.06 V
Sunday, August 19, 2018, 13:11: Auto cooling TGHT @ 6 A per min to 120A.
Sunday, August 19, 2018, 13:20: TGHT @ 120.1 A. Display @ 0.867 V. PS @ 0.84 V. Multimeter @ 1311 mV. TBHT @ 228.9 A. Display @ 2.049 V. PS @ 2.05 V
Sunday, August 19, 2018, 13:24: TGHT @ 120.1 A. Display @ 0.857 V. PS @ 0.83 V. Multimeter @ 1306 mV. TBHT @ 228.9 A. Display @ 2.046 V. PS @ 2.05 V
Sunday, August 19, 2018, 13:25: Auto cooling TGHT @ 6 A per min to 80A.
Sunday, August 19, 2018, 13:33: TGHT @ 80.1 A. Display @ 0.540 V. PS @ 0.51 V. Multimeter @ 1193 mV. TBHT @ 228.9 A. Display @ 2.039 V. PS @ 2.04 V
Sunday, August 19, 2018, 13:37: TGHT @ 80.1 A. Display @ 0.535 V. PS @ 0.51 V. Multimeter @ 1190 mV. TBHT @ 228.9 A. Display @ 2.037 V. PS @ 2.04 V
Sunday, August 19, 2018, 13:38: Auto cooling TGHT @ 6 A per min to 40A.
Sunday, August 19, 2018, 13:53: TGHT @ 40.0 A. Display @ 0.259 V. PS @ 0.24 V. Multimeter @ 1100 mV. TBHT @ 228.9 A. Display @ 2.032 V. PS @ 2.03 V
Sunday, August 19, 2018, 13:53: Auto cooling TGHT @ 6 A per min to 0A.
Sunday, August 19, 2018, 14:02: TGHT @ 4.4 A. Display @ 0.042 V. PS @ 0.02 V. Multimeter @ 1033 mV. TBHT @ 228.9 A. Display @ 2.029 V. PS @ 2.03 V
Sunday, August 19, 2018, 14:02: Auto cooling TBHT @ 6 A per min to 200A.
Sunday, August 19, 2018, 14:12: TGHT @ 4.4 A. Display @ 0.042 V. PS @ 0.02 V. Multimeter @ 0807 mV. TBHT @ 198.8 A. Display @ 1.648 V. PS @ 1.65 V
Sunday, August 19, 2018, 14:15: Auto cooling TBHT @ 6 A per min to 160A.
Sunday, August 19, 2018, 14:27: TGHT @ 4.4 A. Display @ 0.042 V. PS @ 0.02 V. Multimeter @ 0531 mV. TBHT @ 158.7 A. Display @ 1.179 V. PS @ 1.17 V
Sunday, August 19, 2018, 14:28: Auto cooling TBHT @ 6 A per min to 120A.
Sunday, August 19, 2018, 14:50: TGHT @ 4.4 A. Display @ 0.042 V. PS @ 0.02 V. Multimeter @ 0419 mV. TBHT @ 118.5 A. Display @ 0.725 V. PS @ 0.72 V
Sunday, August 19, 2018, 14:50: Auto cooling TBHT @ 6 A per min to 80A.
Sunday, August 19, 2018, 15:02: TGHT @ 4.4 A. Display @ 0.042 V. PS @ 0.02 V. Multimeter @ 0208 mV. TBHT @ 79.0 A. Display @ 0.415 V. PS @ 0.40 V
Sunday, August 19, 2018, 15:02: Auto cooling TBHT @ 6 A per min to 40A.
Sunday, August 19, 2018, 15:20: TGHT @ 4.4 A. Display @ 0.042 V. PS @ 0.02 V. Multimeter @ 0083 mV. TBHT @ 38.4 A. Display @ 0.198 V. PS @ 0.19 V
Sunday, August 19, 2018, 15:21: Auto cooling TBHT @ 6 A per min to 0A.
Monday, August 20, 2018, 09:10: RGA off.
Monday, August 20, 2018, 09:14: Ion gauge, turbo pumps off.
Monday, August 20, 2018, 09:15: Power off.
Monday, August 20, 2018, 10:26: Venting. |
Friday, August 10, 2018, 10:56, Aaron Schmidt, , , , , , , Problems/Solutions, New PS installation and Cathode BIAS set
|
Friday, August 10, 2018, 10:25: Remove TBHT 500 PS and replace with TBHT 600 PS.
Friday, August 10, 2018, 10:50: Switch wiring in the high voltage cage from and Anode BIAS to Cathode BIAS setting.
Friday, August 10, 2018, 11:32: TBHT limit increased from 500A to 600A by Controls group.
Friday, August 10, 2018, 11:34: TBHT tested manually. Operation is satisfactory. |
Friday, July 27, 2018, 14:44, Aaron Schmidt, UC#24, LP-SIS, ITE, TM4, 41177-3, 42752-6, In progress, Conditioning Heat Shield for UC#24 & voltage test prep
|
4 Kapton wire routed into the 9-pin connector. Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing
Friday, July 27, 2018, 14:41: Turbo pumps on.
Friday, July 27, 2018, 15:53: RGA on.
Saturday, July 28, 2018, 07:03: Waterlines opened. No response on RGA. Vacuum steady @ 1.34e-06T
Friday, August 03, 2018, 10:30: Exposed 9-pin wires inside the cage insulated with electrical tape.
Friday, August 03, 2018, 10:35: Auto-ramping TGHT / TBHT to 580 / 225 A @ 2A per min.
Tuesday, August 07, 2018, 07:40: Small spikes but frequent noted in the RGA on Water, Nitrogen, and Oxygen. More than usual although the vacuum in reasonable at 7.0e-07T.
Tuesday, August 07, 2018, 07:49: Auto-cooling started @ 2A per min. |
Monday, July 23, 2018, 14:25, Aaron Schmidt, UC#23, LP-FEBIAD-CTL, ITE, TM2, , , In progress, Conditioning Heat Shield for UC#23
|
Monday, July 23, 2018, 14:20: Roughing.
Monday, July 23, 2018, 14:54: Turbo pumps on.
Tuesday, July 24, 2018, 06:40: Ion gauge on. Vacuum slowly decreasing
Tuesday, July 24, 2018, 07:20: RGA on.
Tuesday, July 24, 2018, 07:27: Waterlines opened. No response on RGA. Vacuum stable @ 2.24e-06T
Tuesday, July 24, 2018, 07:29: Power/sources on.
Tuesday, July 24, 2018, 07:34: Opening gas lines slowly.
Tuesday, July 24, 2018, 07:36: SV2 & SV5 Open.
Tuesday, July 24, 2018, 07:43: SV3 Open.
Tuesday, July 24, 2018, 07:47: SV4 Open.
Tuesday, July 24, 2018, 09:00: Turn off sources/power and check 9-pin in the back of the TS. OK
Tuesday, July 24, 2018, 09:20: Restart sources/power. Gases open.
Tuesday, July 24, 2018, 13:39: Auto-ramping TGHT / TBHT to 500 / 275 A @ 2A per min.
Tuesday, July 24, 2018, 13:45: BIAS / EZL / EE @ 30 / 13 / -1.5 kV.
Tuesday, July 24, 2018, 13:46: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.4 |
3.92 |
TBHT |
26.9 |
3.08 |
COIL + EE |
26.1 |
5.00 |
TGHT |
26.5 |
5.64 |
Tuesday, July 24, 2018, 13:48: Optics set.
Note* Approx 10 sparks noted during auto-ramping. All occurred between 12:30am - 4:00am today.
Wednesday, July 25, 2018, 06:35: Auto-ramping is ongoing since it was started yesterday. Auto-ramping TGHT / TBHT to 500 / 275 A @ Vacuum limited rate
TGHT / TBHT @ 310 / 275. Significant out gassing noted adjusting the ramping rate.
Wednesday, July 25, 2018, 06:40: Auto-ramp halted. Auto-ramping TGHT / TBHT to 580 / 285 (290 w/ direct readout) A @ Vacuum limited rate. Restart auto-ramp.
Wednesday, July 25, 2018, 11:25: Increased good ramping limit to 2E-6 Torr - AM
Wednesday, July 25, 2018, 11:28: ANODE voltage to 200 V, 11 mA current read back
Thursday, July 26, 2018, 08:08: RGA Restarted
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.6 |
3.86 |
TBHT |
26.8 |
3.06 |
COIL + EE |
26.5 |
5.03 |
TGHT |
28.6 |
5.65 |
Thursday, July 26, 2018, 08:13: EZL to 13.4 kV
Thursday, July 26, 2018, 08:19: Coil @ 20 A.
Thursday, July 26, 2018, 08:29: Coil @ 30 A. TBHT @ 300A.
Thursday, July 26, 2018, 08:35: Coil @ 40 A.
Thursday, July 26, 2018, 08:41: Coil @ 50 A.
Thursday, July 26, 2018, 14:33: auto-cooling @ 2 A per min
Thursday, July 26, 2018, 14:45: Coil @ 0 A.
Friday, July 27, 2018, 08:29: Gas lines closed
Friday, July 27, 2018, 08:32: Sources off.
Friday, July 27, 2018, 08:34: RGA off. IV4 closed
Friday, July 27, 2018, 08:36: Ion gauge & turbos off.
Friday, July 27, 2018, 08:39: Power off. Waterlines purged. |
Thursday, July 12, 2018, 10:11, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Coil Test #5
|
*** REVIEW Elog entry #673 Power outage & restart ***
Thursday, July 12, 2018, 10:10: Opened IV4
Thursday, July 12, 2018, 10:20: Attempt auto-ramp cancelled. Max increment values reached. Wait on Vacuum.
Thursday, July 12, 2018, 13:10: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2A per min.
Thursday, July 12, 2018, 13:16: BIAS/EZL/EE @ 30/13/1.5 kV.
Thursday, July 12, 2018, 13:19: Anode set to 200 V
Thursday, July 12, 2018, 13:23: Gas lines SV1, SV3, SV4 opened without issue.
Friday, July 13, 2018, 07:02: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
FM:
Friday, July 13, 2018, 09:26 Ramping up to TBHT=335A to get at least 20 mA on the anode current.
Friday, July 13, 2018, 09:52 Ramp up finished: TBHT=335A, TBHT RB=349.6A, TBHT PS=341A. Anode current=20.757mA@200V. Vaccum ok@8.86e-7Torr
Friday, July 13, 2018, 09:56 Closing Neon valve in order to only deliver Argon.
Friday, July 13, 2018, 13:32 When anode voltage=0V, there are four peaks on the mass scan on masses 23,38,41,83 u. This indicate surface ionized particles. Most likely Sodium (23) and Potassium (38,41) and not sure about 83.
Friday, July 13, 2018, 16:58 Cooling it down for the weekend: TBHT=250A, TGHT=450
Friday, July 13, 2018, 17:01 wow! accidentally, changed to those values immediatly. I hope this does not compromise the cathode - Fernando
Monday, July 16, 2018, 06:57: Odd RGA values. Restarting RGA.
Monday, July 16, 2018, 07:14: RGA only displays Water, Nitrogen, and Oxygen. Investigate.
Monday, July 16, 2018, 09:57 Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min from 449 / 209 A.
Monday, July 16, 2018, 10:00: Restarted the RGA with an older file loaded. RGA still only displays lines for Water, Nitrogen, and Oxygen. A table of values is still given for the other masses.
Monday, July 16, 2018, 11:08: TGHT / TBHT to 580 / 320 A. Anode to 200V
Monday, July 16, 2018, 11:19: Neon valve carefully opened. Vacuum stable @ 6.56e-07T. Neon response also showed up on the RGA.
Monday, July 16, 2018, 11:25: TBHT @ 340.0A (332A on PS)
FM
Monday, July 16, 2018, 11:55 TBHT@340A @ 354.7A (RB)@346A PS
Monday, July 16, 2018, 15:02 TBHT@345A @ 359.8A (RB)@351A PS
Monday, July 16, 2018, 15:18 Investigation the possible location of the surface ionized ions by sweeping the voltage in lower values <10V
Monday, July 16, 2018, 15:29 Values swept: 10,8,6,4,2,1 V. the same peak was observed at all cases
Monday, July 16, 2018, 15:52 Closing Neon Valve for efficiency measurement.
Monday, July 16, 2018, 15:58 Steady ion source current. closing Argon valve.
Monday, July 16, 2018, 17:00 Opening Argon Valve
Monday, July 16, 2018, 17:51 Argon valve closed. Neon Valve open. Measuring Mass=20
Monday, July 16, 2018, 18:13 Manually tapped TBHT down to 325A.
FM
Tuesday, July 17, 2018, 09:53 Ramping up TBHT to 345A
Tuesday, July 17, 2018, 10:13 Ramp up finish. TBHT@345A @ 359.7A (RB)@351A PS. Vacuum ok @ 7.43e-7 T
Tuesday, July 17, 2018, 10:14 Restarting quads that were off.
Tuesday, July 17, 2018, 10:18 Tuning
Tuesday, July 17, 2018, 11:01 Measurements will start for mass 20.
Tuesday, July 17, 2018, 11:59 Lunch break
Tuesday, July 17, 2018, 12:41 Coming back. TMSQ2 & TMSQ5 off. Turning them on.
Tuesday, July 17, 2018, 13:54 Retuning emittance scanner to default parameters. Cycle the emittance scanner PS.
Tuesday, July 17, 2018, 14:18 Increasing current limit for anode. From 51.282 mA to 51.400 mA
Tuesday, July 17, 2018, 14:34 Increasing current limin on anode to 52.00 mA
Tuesday, July 17, 2018, 14:35 Closing Neon Valve
Tuesday, July 17, 2018, 15:02 FC6 stable
Tuesday, July 17, 2018, 15:02 Opening "Argon" bottle
Tuesday, July 17, 2018, 15:21 Fc6 stable. The present current lies between the on/off Neon Valve.
Tuesday, July 17, 2018, 15:30 Opening Neon Valve
Tuesday, July 17, 2018, 15:51 Re-tuning. Taking a mass scan.
Tuesday, July 17, 2018, 15:55 Checking the RGA, I noticed that the maximum reading for Neon was 7.05e-8T, and for Argon, 6.15e-7T
Tuesday, July 17, 2018, 16:45 Increasing Anode current limit to 100mA. Increasing TBHT to 347A, 361.8 RB, 353 PS. Vaccum ok@7.87e-7T
Tuesday, July 17, 2018, 16:54 Finish for today.
FM
Wednesday, July 18, 2018, 09:27 Starting new round of measurements.
Wednesday, July 18, 2018, 09:31 TBHT@350A@364.5A (RB) @ 356 (PS). Vacuum ok at 6.71e-7T
Wednesday, July 18, 2018, 11:48 Finish mass scan sweeps. Leaving for lunch. Coming back at around 3pm due to science week
Wednesday, July 18, 2018, 15:29 Starting again.
Wednesday, July 18, 2018, 15:30 Mass scan at AB=0V
Wednesday, July 18, 2018, 15:56 Mass scan set to 38.5 (K).
Wednesday, July 18, 2018, 15:56 Measuring emittance.
Wednesday, July 18, 2018, 16:02 Closing Argon bottle.
Wednesday, July 18, 2018, 16:08 Closing Neon bottle.
Wednesday, July 18, 2018, 16:13 Measuring what it looks to be a potassium signal. Let's see if the signal decreases overnight.
Friday, July 20, 2018, 11:48: FC0 put in place & the gas lines closed. - Aaron S.
Friday, July 20, 2018, 11:50 : Auto cooling @ 2A per min.
Monday, July 23, 2018, 07:05: Sources off. Optics checked.
Monday, July 23, 2018, 07:13 : RGA error. Restart for proper shut off. IV4 closed.
Monday, July 23, 2018, 07:14 : Ion gauge, turbos off.
|
Thursday, July 12, 2018, 08:24, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Power outage / restart
|
Power outage (07/11/2018 @ approx 21:53) shut down the test stand.
Thursday, July 12, 2018, 08:17: Reset vacuum controls & IV4
Thursday, July 12, 2018, 08:19: Restart all the turbo pumps.
Thursday, July 12, 2018, 08:24: IG6 & IG1 restarted.
Thursday, July 12, 2018, 08:33: Power on.
Thursday, July 12, 2018, 08:36: Opened gas lines SV2 & SV5 for FEBIAD to pump down lines with the chamber.
Thursday, July 12, 2018, 08:56: Reset optics. Operation appears ok.
Thursday, July 12, 2018, 09:02: Sources except EE & BIAS are reset. BIAS requires EE and the EE won't restart / respond.
Thursday, July 12, 2018, 09:31: Cycle EE PS? No response.
Thursday, July 12, 2018, 10:08: Cycle PLC. EE is responsive / back. BIAS operates as well.
Thursday, July 12, 2018, 10:10: Opened IV4. |
Monday, July 09, 2018, 10:44, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Coil Test July
|
Monday, July 09, 2018, 10:43: Rouging.
Monday, July 09, 2018, 13:14: Turbo pumps on.
Tuesday, July 10, 2018, 07:45: Waterlines opened. Vacuum ok @ 6.93e-07T. No response on RGA.
Tuesday, July 10, 2018, 08:05: Opened gas lines TSH:SV3 & TSH:SV4. Vacuum spiked to 1.08e-06T. Response registered on RGA. Closed valves.
Tuesday, July 10, 2018, 08:22: Vacuum Holding at 1.08e-06T.
Tuesday, July 10, 2018, 08:24: Close valve to small gas line pump. Pump is running.
Tuesday, July 10, 2018, 09:02: Path to TSH:SV1 through SV2 & SV5 ok. Vacuum @ 5.55e-07T. Close and begin SV3 & SV4 purging.
Tuesday, July 10, 2018, 09:12: All gas lines opened.
Tuesday, July 10, 2018, 09:16: Power/sources on. Vacuum @ 7.26e-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.4 |
3.85 |
TBHT |
24.2 |
2.99 |
COIL + EE |
24.2 |
4.97 |
TGHT |
24.6 |
5.61 |
Tuesday, July 10, 2018, 09:18: Auto ramping TGHT / TBHT to 580 / 270 A @ 2A per min.
Tuesday, July 10, 2018, 09:20: IV4 opened. Optics on (already set).
Tuesday, July 10, 2018, 14:11: Abort auto-ramping. Increase TBHT ramping to 300A. Continue auto ramping TGHT / TBHT to 580 / 270 A @ 2A per min.
Tuesday, July 10, 2018, 13:56: BIAS/EZL/EE @ 30/13/1.5 kV. Anode set to 200 V
Tuesday, July 10, 2018, 14:12: Auto ramping complete.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.6 |
3.85 |
TBHT |
25.0 |
2.97 |
COIL + EE |
24.9 |
5.00 |
TGHT |
26.8 |
5.60 |
Tuesday, July 10, 2018, 14:17: TBHT set to 300 A. Read back reads 312 A
Wednesday, July 11, 2018, 06:52: Coil to 10A.
Wednesday, July 11, 2018, 07:00: Coil to 20A.
Wednesday, July 11, 2018, 07:05: Coil to 30A.
Wednesday, July 11, 2018, 07:10: Coil to 40A.
Wednesday, July 11, 2018, 07:20: Coil to 50A.
Fernando Maldonado
Wednesday, July 11, 2018, 09:59 Anode current=4.884 mA, Anode Voltage=200V. FC0=1.59e-9 . Source seems to be too cold. ramping up TBHT to 320 A (for a 330A readback). Vaccum=9.06e-7
Wednesday, July 11, 2018, 10:18 Ramp up compleete TBHT=320A Read Back=33.8A. Anode current=9.768mA. Anode voltage=200V. FC0=1.77e-8A. Vaccum=9.13e-7
Wednesday, July 11, 2018, 11:52 Mass scan performed for nominal values
Lunch
Steering
Adjusting Emittance parameter for more precise scan
Wednesday, July 11, 2018, 15:37 Cathode is still "cold" , at 325A and 250V the anode current is 15 mA. The way to obtained more current and to have better emittances readings is to increase the tbht current
Wednesday, July 11, 2018, 15:39 TBHT=325, TBHT RB =339.1A, TBHT PS=330A. Increasing TBHT to 335A. Where TBHT RB is the read back value. TBHT PS is the value display on the Power Supply
Wednesday, July 11, 2018, 15:46 tbht=335, tbht rb=349.7, tbht ps=341. With this the anode current is 24.42 at anode voltage=250V. *THIS WILL BE THE MAXIMUM VALUE"
Wednesday, July 11, 2018, 17:15 Mass Scan measurement seem to not vary with anode voltage
Wednesday, July 11, 2018, 17:45 Coil to 60 A to let out gass a bit more overnight. Vacuum ok at 9.6e-7
Thursday, July 12, 2018, 07:25: Power outage. (07/11/2018 @ 21:53 approx) The test stand was completely knocked out. Power & pumps were all shut down.
Thursday, July 12, 2018, 07:31: Power supplies turned off and all settings manually re-zeroed. |
Tuesday, July 03, 2018, 12:46, Aaron Schmidt, Ta#56, HP-SIS, ITE, TM4, 42218-9, 42752-3, In progress, Conditioning Ta#56 8x
|
Tuesday, July 03, 2018, 12:44: Roughing
Tuesday, July 03, 2018, 13:32: Turbo pumps started.
Tuesday, July 03, 2018, 13:38: Ion gauge on.
Wednesday, July 04, 2018, 06:57: Waterlines opened. Vacuum ok @ 1.08e-06T. No response on RGA.
Wednesday, July 04, 2018, 06:59: Power/sources on
Wednesday, July 04, 2018, 07:00: Vacuum not yet low enough to begin ramping.
Wednesday, July 04, 2018, 07:10: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Thursday, July 05, 2018, 06:29: Note* TMS:IG6 has higher than usual vacuum @ 9.22e-07T. Typically below 6.0e-07T.
Thursday, July 05, 2018, 06:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Thursday, July 05, 2018, 06:31: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.5 |
3.90 |
TBHT |
24.7 |
3.06 |
COIL + EE |
24.7 |
4.97 |
TGHT |
24.9 |
5.61 |
Thursday, July 05, 2018, 06:35: Optics set.
Thursday, July 05, 2018, 11:23: Auto ramping TBHT to 230 A @ 2A per min.
Thursday, July 05, 2018, 11:34: Auto ramp aborted on TBHT @ 221 A. Read back is at 230.3 A.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
32.9 |
3.82 |
TBHT |
28.0 |
3.13 |
COIL + EE |
24.7 |
4.97 |
TGHT |
24.9 |
5.61 |
Thursday, July 05, 2018, 14:32: RGA froze. Restart
Friday, July 06, 2018, 08:24: Spark noted. RGA restarted.
Friday, July 06, 2018, 14:05: Auto-cooling @ 2A/min
Monday, July 09, 2018, 07:50: Power/sources brought to 0. Turned off.
Monday, July 09, 2018, 07:52: RGA off. IV4 closed (reset).
Monday, July 09, 2018, 07:56: Ion gauge, Turbo pumps off.
Monday, July 09, 2018, 07:58: Waterlines purged.
Monday, July 09, 2018, 09:19: Venting. |
Thursday, June 21, 2018, 16:32, Anders Mjos, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Heating target
|
Thursday, June 21, 2018, 16:30: Short between ANODE and EE. Do not use until repaired.
Thursday, June 21, 2018, 16:32: Ramping TBHT/TGHT to 290 / 580 Aat 2 A/min
Friday, June 22, 2018, 07:49: Target at temperature. Vacuum at 1.0E-7 T
Monday, June 25, 2018, 09:10: Auto-cooling at 2A/min - AS.
Friday, June 29, 2018, 08:52: Turbos/PS/Sources/RGA/Ion gauge off.
Friday, June 29, 2018, 10:03: Venting.
Friday, June 29, 2018, 14:32: Roughing. Anode to EE short fixed. |
Tuesday, June 19, 2018, 10:30, Aaron Schmidt, , , , , , , Done, RGA repair
|
Monday, June 18, 2018, 10:00: RGA removed from ISAC TS. Handed to Travis C. Communications issues found
Communications chip replaced.
Tuesday, June 19, 2018, 08:36: Re-install RGA.
Tuesday, June 19, 2018, 10:29: RGA confirmed operational |
Tuesday, June 12, 2018, 11:38, Aaron Schmidt, , , , , , , In progress, Source Tray re-installation
|
Re-installation of the ISAC Test Stand Source tray. The TM2 ST was removed.
Tuesday, June 12, 2018, 10:15: Disconnect Optics Tray. Set blocks.
-Continue with removal of TM2 Tray
Tuesday, June 12, 2018, 10:56: TM2 Tray Removed.
-Continue with installation of ISAC Test Stand Source Tray. Optics reconnect.
Tuesday, June 12, 2018, 11:25: Open line FS#8. No visible leaks found.
Tuesday, June 12, 2018, 11:37: Connect Source tray, optics tray, gas line, etc. Complete.
Tuesday, June 12, 2018, 14:37: Roughing.
Wednesday, June 13, 2018, 06:32: Turbo pumps on.
Wednesday, June 13, 2018, 06:37; Ion Gauge on.
He Leak TEST #1:
Cold Lab Leak detector. RGA unavailable.
Monday, June 18, 2018, 11:00 Vacuum @ 2.15e-06T
LD Base line before opening valve to turbo pumps: 0.0 to 5.6 e-11 atm-cc/sec
LD baseline after opening valve to turbo pumps: 8.e-10 atm-cc/sec
Full open base after five minutes:
Vacuum @ 2.18e-06T.
LD: 8.2e-09 atm-cc/sec
Monday, June 18, 2018, 11:05: Open line FS#2 . Pressurize to 30 PSI. Record after 5 minutes
Vacuum @ 2.15e-06T .
LD: 6.6e-09 atm-cc/sec. Purge and close FS#2.
Monday, June 18, 2018, 11:10: Open line FS#3 . Pressurize to 30 PSI.
Drop followed by Major SPIKE into e-04 vacuum.
Vacuum @ 1.5e-05T.
LD: 1.6e-04 atm-cc/sec. Confirmed leak on FS#3
Monday, June 18, 2018, 11:26: Continued Vacuum instability.
Halt leak test!
Monday, June 18, 2018, 11:30: Close port to LD.
Monday, June 18, 2018, 11:34: Vent and shut down LD. Ion gauge and turbos off.
Tuesday, June 19, 2018, 06:40: Venting.
C-seals replaced with O-rings on line FS#3 (E)(G)
Tuesday, June 19, 2018, 08:36: Re-install RGA
Continue C-Seal replacement. (F)(H)(K).
Tuesday, June 19, 2018, 09:00: Roughing.
Tuesday, June 19, 2018, 10:15: Turbo pumps on.
Tuesday, June 19, 2018, 10:19: Ion gauge on.
Tuesday, June 19, 2018, 10:28: RGA operational.
Thursday, June 21, 2018, 14:28 Vacuum @ 4.95e-07T
LD Base line before opening valve to turbo pumps: 0.0 e-11 atm-cc/sec
LD baseline after opening valve to turbo pumps: 3.3e-10 atm-cc/sec
Full open base after five minutes:
Vacuum @ 4.95e-07T. RGA ok
LD: 3.3e-08 atm-cc/sec
Thursday, June 21, 2018, 14:33 : Open line FS#4 . Pressurize to 30 PSI. Record after 5 minutes
Vacuum @ 4.76e-07T . RGA ok
LD: 3.3e-08 atm-cc/sec. Purge and close FS#4.
Thursday, June 21, 2018, 14:38: Open line FS#5 . Pressurize to 30 PSI.
Vacuum @ 4.76e-07T. RGA ok
LD: 3.6e-08 atm-cc/sec.
Thursday, June 21, 2018, 14:43: Open line FS#3 . Pressurize to 30 PSI. Record after 5 minutes
Vacuum @ 4.95e-07T . RGA ok
LD: 3.7e-08 atm-cc/sec.
Purge and close FS#3.
Thursday, June 21, 2018, 14:48: Open line all lines . Pressurize to 30 PSI. Record after 5 minutes
Vacuum @ 4.95e-07T . RGA ok
LD: 4.0e-08 atm-cc/sec.
Thursday, June 21, 2018, 14:53: Close port to LD.
Vent and shut down LD.
Purge He, Open with water.
Thursday, June 21, 2018, 14:58: Vacuum @ 5.04e-07T . RGA ok.
Thursday, June 21, 2018, 15:00: Power/sources on. Vacuum @ 5.04e-07T . RGA ok.
See Target Heating - TS Elog 670.*
Monday, June 25, 2018, 09:10: Auto-cooling at 2A/min - AS. |
Thursday, June 07, 2018, 09:21, Aaron Schmidt, , , , , , , Problems/Solutions, Pump down empty chamber. Anode check
|
TM2 Source tray still in.
Thursday, June 07, 2018, 09:20: Roughing.
Thursday, June 07, 2018, 12:42: Turbo pumps started.
Friday, June 08, 2018, 08:00: Anode run to 15 A. Short still apparent.
Friday, June 08, 2018, 08:12: Ion gauge, Turbos off.
Friday, June 08, 2018, 08:55: Venting.
Friday, June 08, 2018, 09:45: Anode connection investigated. Short found on the bracket once the anode wire was disconnected from the back screw (Picture)
Friday, June 08, 2018, 10:00: Removed 9-pin bracket. (Top connector left connected to TS. (Picture)
New Anode 9-pin connection/wire to be installed on the bracket. Test in the cold lab.
Friday, June 08, 2018, 10:12: Roughing.
Friday, June 08, 2018, 11:14: Turbo pumps started.
Friday, June 08, 2018, 12:31: Ion gauge on.
Tuesday, June 12, 2018, 06:18: Ion gauge & Turbo pumps off.
Tuesday, June 12, 2018, 07:40: Venting. |
Wednesday, June 06, 2018, 14:01, Aaron Schmidt, , , , , , , Problems/Solutions, Emittance scanner (E-rig) communication issues.
|
Wednesday, June 06, 2018, 13:50:
It was noted yesterday during the TM2 Source HV tests that the E-rig was not running accordingly through the beam.
Upon turning on the PS, there a 45 second or so delay before the needle drops to the right at +500V and the PS no longer responds. (similar issue in August 2016)
Wednesday, June 06, 2018, 14:20: Soft reboot on Emittance rig communication. (Reboot IOC - Kyle LeBlanc)
Wednesday, June 06, 2018, 14:30: Calibrate
test scan & park
Reference parameters. Dac in bottom right corner to control PS.
Enter: 100 on Dac -- Reads 100 - On PS
Enter: 200 on Dac -- Reads 200 - On PS
Enter: 0 on Dac -- Reads 0 - On PS
Enter: -200 on Dac -- Reads -200 - On PS
The reboot fixed the erig/scanner. |
Monday, June 04, 2018, 16:02, Anders Mjos, , , , , , , Problems/Solutions, MB1 timeout
|
Mass separator magnet timed out. Tried reconfigure. Called Kyle from controls who power cycled the CANbus card. This resolved the issue
(From the Source tray swap out.) - AS
Tuesday, June 05, 2018, 11:25: BIAS / EZL / EE @ 52 / 24 / 2.8 kV. SPARK *knocked out optics, magnet & Turbo TMS:TP6. IV4 closed/opened/reset. TP6/optics restarted. Magnet still off.
Complete failure of the communications with the magnet.
Wednesday, June 06, 2018, 13:40: Canbus contoller was swapped by Kyle L from Controls group. The old card was dead and replaced with a new one. The magnet is back and running. |
Monday, May 28, 2018, 08:46, Aaron Schmidt, , LP-FEBIAD, , TM2, 41790-9, 42752-5, In progress, New TM source tray swap out.
|
Monday, May 28, 2018, 08:45: Venting. Prep For removal.
Close FS#8. Clean up water
Adjust
Tuesday, May 29, 2018, 08:30: Test Stand source tray & Optics tray removed
Clean EZL on optics tray.
Tuesday, May 29, 2018, 11:30: New Source tray installed w/ Original TS optics tray. Connect.
Tuesday, May 29, 2018, 13:30: Roughing.
Tuesday, May 29, 2018, 14:38: Turbos on
Tuesday, May 29, 2018, 14:47: Ion gauge on.
Tuesday, May 29, 2018, 14:49: Exterior line FS# 8 opened.
Wednesday, May 30, 2018, 06:29: RGA on. Vacuum @ 3.38e-06T
He Leak TEST #1:
Vacuum Group Leak detector LD#2.
Friday, June 01, 2018, 08:30: Vacuum @ 9.15e-07T
LD Base line before opening valve to turbo pumps: 3.5e-10 atm-cc/sec
Friday, June 01, 2018, 08:40: LD baseline after opening valve to turbo pumps: 3.7e-10 atm-cc/sec
Full open base:
Vacuum @ 3.24e-07T. RGA status:
Water @ 7.76e-007
He: -2.31e-009
LD: 2.6e-09 atm-cc/sec
Friday, June 01, 2018, 10:30: Open line FS#2 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.24e-07T . RGA status:
Water @ 7.91e-007
He:-1.87e-009
LD: 2.8e-09 atm-cc/sec. Purge and close FS#2.
Friday, June 01, 2018, 10:45: Open line FS#3 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.24e-07T. RGA status:
Water @ 7.97e-007
He:-1.92e-009
LD: 3.0e-09 atm-cc/sec. Purge and close FS#3.
Friday, June 01, 2018, 11:00: Open line FS#4 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.21e-07T. RGA status:
Water @ 7.92e-007
He:-1.85e-009
LD: 4.7e-09 atm-cc/sec. Purge and close FS#4.
Friday, June 01, 2018, 11:15: Open line FS#5 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.24e-07T. RGA status:
Water @ 7.919e-007
He:-1.81e-009
LD: 4.0e-09 atm-cc/sec. Purge and close FS#5
Friday, June 01, 2018, 11:30: Depressurize lines. Connect HPA & Purge all lines.
After 5 minutes: Vacuum @ 9.24e-07T . RGA status:
Water @ 7.87e-007
He:-1.86-009
LD: 4.6e-09 atm-cc/sec
Close Valve & disconnect LD. HE LEAK TEST COMPLETE
Friday, June 01, 2018, 11:41: Open water supply and return mainlines. Vacuum @ 9.15e-07T.
Friday, June 01, 2018, 11:45: Open line FS#2. Vacuum ok. RGA ok
Friday, June 01, 2018, 11:46: Open line FS#3. Vacuum ok. RGA ok
Friday, June 01, 2018, 11:47: Open line FS#4. Vacuum ok. RGA ok
Friday, June 01, 2018, 11:48: Open line FS#5. Vacuum ok. RGA ok.
Friday, June 01, 2018, 12:05: Power/sources switched on.
Friday, June 01, 2018, 12:11: Auto ramping TGHT / TBHT to 300 / 150 A @ 2A per min.
Friday, June 01, 2018, 12:53: Power bump. Lights flickered, however TS ok.
Friday, June 01, 2018, 12:58: Monitored for 5 minutes. ok.
Friday, June 01, 2018, 15:08: Auto ramping TGHT to 350 A @ 2A per min.
Monday, June 04, 2018, 07:27: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Monday, June 04, 2018, 07:28: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Monday, June 04, 2018, 07:30: Optics reset / Switched on. IV4 opened.
Monday, June 04, 2018, 10:00: FC0 GAIN on 1 uA = 1.65e-09. Wire scans no reading. Adjust steering.
Monday, June 04, 2018, 10:34: Anode @ 200V. Coil @ 10A.
Monday, June 04, 2018, 13:30: Optics tune changed with EZL off. Brad. S.
Monday, June 04, 2018, 13:45: Resetting tunes. COIL @ 50 A. Auto ramping TBHT to 300 A @ 2A per min. (310 A on read back)
Monday, June 04, 2018, 13:51: EZL / EE @ 13 / -1.5 kV.
Monday, June 04, 2018, 13:54: Optics reset to EZL on.
Tuesday, June 05, 2018, 08:00: RGA off.
Tuesday, June 05, 2018, 08:10: Auto ramping TBHT to 310 A @ 2A per min. (320 A on read back)
E-rig issue. Not scanning. Proceed with HV testing.
Tuesday, June 05, 2018, 09:00: BIAS / EZL / EE @ 35 / 15 / 1.75 kV.
Tuesday, June 05, 2018, 09:06: BIAS / EZL / EE @ 40 / 17.5 / 2 kV.
Tuesday, June 05, 2018, 09:13: Small spark knocked out optics & TMS:TP6
Tuesday, June 05, 2018, 09:21: IV4 closed/opened/reset. TP6 restarted.
Tuesday, June 05, 2018, 09:30: Spark*. Knocked out optics. Reset.
Tuesday, June 05, 2018, 10:37: BIAS / EZL / EE @ 45 / 19.5 / 2.25 kV.
Tuesday, June 05, 2018, 10:44: BIAS / EZL / EE @ 50 / 22 / 2.5 kV.
Tuesday, June 05, 2018, 10:47: Spark. Optics & CBC reset.
Tuesday, June 05, 2018, 11:25: BIAS / EZL / EE @ 52 / 24 / 2.8 kV. SPARK *knocked out optics, magnet & Turbo TMS:TP6. IV4 closed/opened/reset. TP6/optics restarted. Magnet still off.
Tuesday, June 05, 2018, 11:35: BIAS / EZL / EE @ 55 / 24 / 2.8 kV. SPARK* knocked out optics, magnet & Turbos TMS:TP6 & TP1B. IV4 closed/opened/reset. Turbos/optics restarted. Magnet still off.
Tuesday, June 05, 2018, 12:46: BIAS / EZL / EE @ 55 / 24 / 2.8 kV. SPARK* knocked out optics, magnet & Turbos TMS:TP6 & TP1B. IV4 closed/opened/reset. Turbos/optics restarted. Magnet still off.
Tuesday, June 05, 2018, 13:06: BIAS / EZL / EE @ 55 / 24 / 2.8 kV. SPARK* knocked out optics, magnet & Turbos TMS:TP6. IV4 closed/opened/reset. Turbo/optics restarted. Magnet still off. Anode @ 200V (reads 9V, shorted)
Tuesday, June 05, 2018, 13:16: TBHT brought down to 300A. Anode brought to 0V.
Tuesday, June 05, 2018, 13:20: Attempted to bring up to 30V. (30 input) Actual: 8V & 50.061 mA. Possible short, post spark*
Tuesday, June 05, 2018, 13:47: Auto-cooling @ 2A/min
Tuesday, June 05, 2018, 13:56: BIAS / EZL / EE @ 50 / 22 / 2.5 kV. Continue down to 30 kV settings.
Tuesday, June 05, 2018, 14:04: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Wednesday, June 06, 2018, 06:49: Anode still unresponsive cold. Short*
Wednesday, June 06, 2018, 11:09: Vacuum @ 4.30e-07T ok. Test EZL
Wednesday, June 06, 2018, 11:16: BIAS / EZL / EE @ 30 / 20 / 1.5 kV.
Wednesday, June 06, 2018, 11:20: BIAS / EZL / EE @ 30 / 25 / 1.5 kV.
Wednesday, June 06, 2018, 11:24: BIAS / EZL / EE @ 30 / 30 / 1.5 kV.
Wednesday, June 06, 2018, 11:30: Coil @ 0A.
Wednesday, June 06, 2018, 12:51: No sparks* BIAS / EZL / EE @ 30 / 30 / 1.5 kV.
Wednesday, June 06, 2018, 12:53: Move Steerers to zero.
TSG:CB1: 0V
TSG:VCB1: 0V
TSG:CBC(2): 0V
Increase each one to 1000V individually. Hold 5 minutes and bump back to zero on each.
Wednesday, June 06, 2018, 12:55: TSG:CB1: 0 - 1000V. Hold for 5 minutes. Zero Sparks. Back to 0V.
Wednesday, June 06, 2018, 13:01: TSG:VCB1: 0 - 1000V. Goes red @ 1000V, stays blue @ 999V Hold for 5 minutes. Zero Sparks. Back to 0V.
Wednesday, June 06, 2018, 13:06: TSG:CBC(2): 0 - 1000V. Hold for 5 minutes. Zero Sparks. Back to 0V.
Wednesday, June 06, 2018, 13:40: Canbus contoller was swapped. The magnet is back.
Wednesday, June 06, 2018, 13:50: Sources to 0V.
Wednesday, June 06, 2018, 14:05: IV4 closed. Turbo pumps off. Ion gauge off.
Wednesday, June 06, 2018, 14:08: Power to the sources off.
Thursday, June 07, 2018, 06:35: Venting & waterlines purged. |
Thursday, May 24, 2018, 15:28, Anders Mjos, , , , , , , Problems/Solutions, Reconfigured FEBIAD coil for testing new source tray
|
Thursday, May 24, 2018: Configured coil to be (-) E&F, (+) G&H. Water should be supplied to both terminals in either configuration. |
Thursday, May 24, 2018, 08:38, Anders Mjos, , , , , , , Problems/Solutions, Venting beamline for IG6 replacement
|
Thursday, May 24, 2018, 08:38: TPs stopped
Thursday, May 24, 2018, 09:18: Venting
Thursday, May 24, 2018, 14:30: IG6 replaced (second attempt) by Anthony. System pumping down |
Tuesday, May 22, 2018, 08:48, Anders Mjos, , , , , , , Problems/Solutions, TSG:TP1A not running
|
Pump found off on Tuesday morning.
Tuesday, May 22, 2018, 08:40: Starting TP1A
Tuesday, May 22, 2018, 08:47: TP1A at speed
Tuesday, May 22, 2018, 16:33: Source and optics off
Wednesday, May 23, 2018, 08:30: Stopped TP
Wednesday, May 23, 2018, 14:10: Water purged |
Tuesday, May 08, 2018, 10:36, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, C-seal Test
|
2 C-Seals installed with SS springs on water blocks. The SS springs are also used in the module.
Long pkg seal (A):
T: 0.098" x 0.429" Diameter.
Installed on line FS#5 , Block L, Heat shield cooling block. (Top seal, bottom seal of 2 is still the rubber O-ring)
Short pkg seal (B):
T: 0.095" x 0.424" Diameter.
Installed on line FS#3 , Block G, Coil cooling block.
All the waterlines are purged and shut. Open individually and monitor for leaks.
Tuesday, May 08, 2018, 10:27: Roughing
Tuesday, May 08, 2018, 10:31: Both BV1A & BV1B are open.
Tuesday, May 08, 2018, 10:57: Turbo Pumps started.
Tuesday, May 08, 2018, 11:03: Ion gauge on.
Tuesday, May 08, 2018, 11:15: RGA started.
Tuesday, May 08, 2018, 13:30: Vacuum @ 3.14e-06T
Wednesday, May 09, 2018, 06:48: Vacuum 5.13E-07T. RGA ok.
Wednesday, May 09, 2018, 06:50: Hook up Leak Detector. Leak detector # 5 (DRY) from Vacuum Group. Startup
Baseline Reading:
TP pressure 0.0e-04
Leak rate: Below 0.0e-09 atm-cc/sec
Valve to chamber opened. LD connection clear.
LD: 1.3e-08 atm-cc/sec
He TEST:
Wednesday, May 09, 2018, 07:00: Purge both lines with He. Do not pressurize.
Vacuum @ 5.13e-07T. RGA status:
Water @ 3.22e-007
He:-1.93e-009
LD: 1.3e-08 atm-cc/sec
Wednesday, May 09, 2018, 07:15: Open line FS#5 to heat shield. Pressurize to 30 PSI.
Wednesday, May 09, 2018, 07:40: Vacuum @ 5.02e-07T. RGA status:
Water @ 3.13e-007
He:-1.67e-009
LD: 9.3e-08 atm-cc/sec. Purge and close FS#5.
Wednesday, May 09, 2018, 07:45: Open line FS#3 to Coil block. Pressurize to 30 PSI.
08:10: Vacuum @ 4.9e-07T. RGA status:
Water @ 3.08e-007
He:-1.61e-009
LD: 1.5e-07 atm-cc/sec
Wednesday, May 09, 2018, 08:15: Depressurize lines. Connect HPA.
Wednesday, May 09, 2018, 08:20: Vacuum @ 4.76e-07T. RGA status:
Water @ 3.05e-007
He:-1.68e-009
LD: 1.7e-07 atm-cc/sec
08:25: LD: 1.7e-07 atm-cc/sec. Close Valve & disconnect LD
Water & Cycling TEST:
Wednesday, May 09, 2018, 08:45: Vacuum @ 4.67e-07T. RGA status:
Water: 3.02e-007
Open lines FS#2 and FS#4
Wednesday, May 09, 2018, 08:55: Vacuum @ 4.65e-07T. RGA status: Water @ 2.97e-007
Close lines FS#2 and FS#4. Water filled.
Open line FS#5 to heat shield. Vacuum and RGA ok.
09:00: Begin C-Seal (A) shock cycling. 20 cycles @ 5 min apart.
Close Supply/Return, Open Supply/Return to 'Shock'
TIME |
Vacuum (T) |
RGA (water) |
TIME |
Vacuum (T) |
RGA (Water) |
09:00 |
4.65e-07 |
2.94e-007 |
09:50 |
4.58e-07 |
2.87e-007 |
09:05 |
4.58e-07 |
2.93e-007 |
09:55 |
4.58e-07 |
2.88e-007 |
09:10 |
4.58e-07 |
2.93e-007 |
10:00 |
4.58e-07 |
2.87e-007 |
09:15 |
4.65e-07 |
2.92e-007 |
10:05 |
4.56e-07 |
2.87e-007 |
09:20 |
4.65e-07 |
2.92e-007 |
10:10 |
4.56e-07 |
2.85e-007 |
09:25 |
4.65e-07 |
2.90e-007 |
10:15 |
4.56e-07 |
2.86e-007 |
09:30 |
4.65e-07 |
2.89e-007 |
10:20 |
4.49e-07 |
2.83e-007 |
09:35 |
4.56e-07 |
2.89e-007 |
10:25 |
4.49e-07 |
2.84e-007 |
09:40 |
4.65e-07 |
2.89e-007 |
10:30 |
4.49e-07 |
2.84e-007 |
09:45 |
4.58e-07 |
2.89e-007 |
10:35 |
4.47e-07 |
2.83e-007 |
Wednesday, May 09, 2018, 10:40: Close line FS#5. Vacuum @ 4.49e-07T. RGA status: Water @ 2.84e-007
Open line FS#3 to Coil block. Vacuum and RGA ok
10:45: Begin C-Seal (B) shock cycling. 20 cycles @ 5 min apart
Close Supply/Return, Open Supply/Return to 'Shock'
TIME |
Vacuum (T) |
RGA (water) |
TIME |
Vacuum (T) |
RGA (Water) |
10:45 |
4.47e-07 |
2.80e-007 |
11:35 |
4.32e-07 |
2.77e-007 |
10:50 |
4.47e-07 |
2.80e-007 |
11:40 |
4.38e-07 |
2.75e-007 |
10:55 |
4.47e-07 |
2.81e-007 |
11:45 |
4.38e-07 |
2.75e-007 |
11:00 |
4.38e-07 |
2.80e-007 |
11:50 |
4.38e-07 |
2.75e-007 |
11:05 |
4.38e-07 |
2.78e-007 |
11:55 |
4.38e-07 |
2.75e-007 |
11:10 |
4.40-e07 |
2.79e-007 |
12:00 |
4.40e-07 |
2.75e-007 |
11:15 |
4.38e-07 |
2.77e-007 |
12:05 |
4.38e-07 |
2.73e-007 |
11:20 |
4.47e-07 |
2.77e-007 |
12:10 |
4.40e-07 |
2.73e-007 |
11:25 |
4.40e-07 |
2.78e-007 |
12:15 |
4.30e-07 |
2.71e-007 |
11:30 |
4.38e-07 |
2.76e-007 |
12:20 |
4.32e-07 |
2.73e-007 |
12:25: Open FS#5 and leave FS#3 open. Status Vacuum @ 4.32e-07T . RGA status: Water @ 2.70e-007
13:00: Status Vacuum @ 4.30e-07T . RGA status: Water @ 2.67e-007
Wednesday, May 09, 2018, 14:24: Status Vacuum @ 4.21e-07T . RGA status: Water @ 2.52e-007
Thursday, May 10, 2018, 07:41: Status Vacuum @ 3.24e-07T . RGA status: Water @ 1.76e-007.
Purge all water from lines. Prep for He.
Hook up Leak Detector. Leak detector # 5 (DRY) from Vacuum Group. Startup
Thursday, May 10, 2018, 08:00: Baseline Reading:
TP pressure 0.0e-04
Leak rate: Below 0.0e-09 atm-cc/sec
Vacuum @ 3.15e-07T . RGA status: Water @ 1.65e-007.
Valve to chamber opened. LD connection clear.
Leak rate: 1.6e-08 atm-cc/sec
He TEST #2:
Thursday, May 10, 2018, 08:13: Purge both lines with He. Do not pressurize.
Vacuum @ 3.15e-07T. RGA status:
Water @ 1.76e-007
He: -1.51e-009
LD: 1.5e-08 atm-cc/sec
Thursday, May 10, 2018, 08:15: Open line FS#3 to Coil Block. Pressurize to 30 PSI.
Thursday, May 10, 2018, 08:40: Vacuum @ 3.22e-07T . RGA status:
Water @ 1.80e-007
He:-1.98e-009
LD: 7.1e-08 atm-cc/sec. Purge and close FS#3.
Thursday, May 10, 2018, 08:45: Open line FS#5 to Heat Shield. Pressurize to 30 PSI.
Thursday, May 10, 2018, 09:10: Vacuum @ 3.22e-07T. RGA status:
Water @ 1.79e-007
He:-1.39e-009
LD: 1.5e-07 atm-cc/sec
09:15: Depressurize lines. Connect HPA.
09:30: Vacuum @ 3.22e-07T . RGA status:
Water @ 1.78e-007
He:-1.56-009
LD: 1.7e-07 atm-cc/sec
Thursday, May 10, 2018, 09:32: Close Valve & disconnect LD
Thursday, May 10, 2018, 09:35: Opened all waterlines completely. Vacuum stable @3.22e-07T and no response on the RGA.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.8 |
2.83 |
TBHT |
24.7 |
3.09 |
COIL + EE |
24.7 |
5.08 |
TGHT |
24.9 |
5.77 |
Tuesday, May 15, 2018, 06:06: Auto ramping TGHT / TBHT to 580 / 270 A @ 2A per min.
Tuesday, May 15, 2018, 06:13: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, May 15, 2018, 06:17: Optics set. IV4 opened.
Tuesday, May 15, 2018, 08:35: RGA Restarted. Spikes noticed on BIAS current. Vacuum @ 2.57E-06T
Wednesday, May 16, 2018, 06:40: TMS:IG6 (between 3-4pm yesterday) and the RGA were both knocked out. Restarting both.
Wednesday, May 16, 2018, 06:48: Repeated attempts to reset/restart IG6 have failed. Closing IV4
Friday, May 18, 2018, 10:55: Auto-cooling @ 1A per min. IG6 still non-responsive. |
Monday, April 30, 2018, 12:07, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test ready
|
Ready for C-seals or FEBIAD work
Monday, April 30, 2018, 12:05: Roughing.
Monday, April 30, 2018, 13:11: Turbo pumps on.
Monday, May 07, 2018, 15:02: RGA, ion gauge, and turbo pumps off. |
Wednesday, April 25, 2018, 09:50, Aaron Schmidt, Ta (test), LP-SIS, , , 41177-3, , In progress, Ta test and window change
|
Window changed on view port. Ta target prepared for Aurelia's tests.
***Note*** No Ta window foils on the end plates. Initial ramping to on the TGHT to 300 A. Follow up in increments of 50 A and check the right door window temperature.
Wednesday, April 25, 2018, 09:47: Roughing both the Evap/box end and beam end.
Wednesday, April 25, 2018, 10:27: All 4 turbo pumps started.
Wednesday, April 25, 2018, 10:49: Both Ion gauges on.
Wednesday, April 25, 2018, 14:56: RGA on.
Thursday, April 26, 2018, 06:54: Water lines opened. No response on RGA. Vacuum stable @ 4.23e-07T
Thursday, April 26, 2018, 06:56: Power/sources on.
Thursday, April 26, 2018, 07:00: Auto ramping TGHT to 300 @ 2A per min.
Thursday, April 26, 2018, 07:05: IV4 opened.
Thursday, April 26, 2018, 08:50: Door temp @ 25 C @ left window.
Thursday, April 26, 2018, 09:30: 300A reached. Door temp @ 26 C @ left window.
Thursday, April 26, 2018, 13:01: 550A Reached. Door temp @ 29 C @ left window.
Monday, April 30, 2018, 07:05: IV4 closed, RGA off.
Monday, April 30, 2018, 07:10: Ion gauge off. Turbo pumps off.
Monday, April 30, 2018, 11:00: Venting. Purging water lines. |
Friday, April 20, 2018, 13:20, Carla Babcock, , , , , , , Done, BIAS* fan sounds like it is dying
|
The fan in the EZL power supply is making a terrible noise - keep an eye on it, it sounds like it might give up soon.
Monday, April 23, 2018, 10:47: The back panel was opened. Original entry stated EZL power supply issue. Corrected to BIAS PS. High voltage group notified. Fan replacement required.
Monday, May 14, 2018, 13:20: BIAS fans, external an internal were replaced. Re-installed @ TS.
Monday, May 14, 2018, 13:26: BIAS ramped up to 10 kV. Response ok on epics and locally on the PS. No odd noise on the fans either. The issue appears to be fixed. |
Thursday, April 19, 2018, 12:55, Fernando Maldonado, , , , , , , Done, Re-wiring Anode PS
|
Thursday, April 19, 2018, 12:52: Pin J1 was reconnected into the anode power supply. All jumpers were put back to remote control.
NOTE: the cable EXTLKT is still not connected. I will ask Carla about this one.
Thursday, April 19, 2018, 18:00: Cable EXTLKT connected.
Thursday, April 19, 2018, 18:12 When turning the transformer on, the Anode PS was not turned on. Neither the TGHT.
Thursday, April 19, 2018, 18:30: I turned off everything. Will check tomorrow with someone.
Friday, April 20, 2018, 11:01 : Issue fixed. I've attached a picture of the jumpers connection for future references
|
Tuesday, April 17, 2018, 11:02, Aaron Schmidt, , , , , , , Done, Roughing pump issue.
|
Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.
TSG:CG1A @ 1.515T
TSG:CG1B @ 1.529T.
Tuesday, April 17, 2018, 11:02: TSG:PV1 Closed. Roughing pump off.
Vacuum group notified.
Wednesday, April 18, 2018: Replace pump & adapters. Clean.
Wednesday, April 18, 2018, 08:45: Start TSG:RP1 and open PV1, BV1A & BV1B
Wednesday, April 18, 2018, 08:55: exhaust pipe/mesh cleared out back
Wednesday, April 18, 2018, 08:57: Turbo pumps on.
RP status ok.
Thursday, April 19, 2018, 08:30: waterlines opened. No response on RGA. Vacuum @ 3.42e-07T |
Tuesday, April 17, 2018, 09:59, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, , , Test FEBIAD
|
New assembly & target. Same silver bolts.
Tuesday, April 17, 2018, 09:56: Roughing.
Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.
See* elog entry for roughing pump issue 04/17/2018
Wednesday, April 18, 2018, 08:57: Turbo pumps on.
Friday, April 20, 2018, 13:45: Power/sources on. RGA restarted
Friday, April 20, 2018, 13:46: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.1 |
3.61 |
TBHT |
24.2 |
2.80 |
COIL + EE |
23.9 |
5.06 |
TGHT |
24.1 |
5.72 |
Friday, April 20, 2018, 13:50: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Friday, April 20, 2018, 13:56: BIAS / EZL / EE @ 30 / 13 / 1.5 kV . Spark @ Bias 28 kV knocked out RGA.
Friday, April 20, 2018, 13:59: RGA restarted.
Friday, April 20, 2018, 14:03: Optics on. Set
Friday, April 20, 2018, 14:40: Auto cooling TGHT / TBHT from 97 A @ 4A per min. Odd noise on (BIAS*) PS
Friday, April 20, 2018, 14:44: BIAS / EZL / EE @ 0 / 0 / 0 kV . Sources being turned off except TBHT and TGHT.
Monday, April 23, 2018, 10:46: FEBIAD TEST halted. See BIAS PS issue.
Tuesday, April 24, 2018, 10:46: Power off.
Tuesday, April 24, 2018, 10:48: RGA off.
Tuesday, April 24, 2018, 10:49: Ion gauge TSG:IG1 & Evap side turbos off,
Tuesday, April 24, 2018, 10:50: Ion gauge TMS:IG6 & beam side turbos off.
Tuesday, April 24, 2018, 10:54: Waterlines purged.
|
Wednesday, April 11, 2018, 10:19, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Wednesday, April 11, 2018, 10:19: Roughing |
Thursday, March 29, 2018, 10:58, Carla Babcock, , , , , , , , 6x
|
Started with Anode at 25V and coil at 0A, bias at 30kV. (attachment 1)
Ramped coil to 60A (0.4V) (attachment 2)
Ramped bias to 51kV, but then TP6 turned off and there was a momentary 0.2A decrease in the TGHT current. No spike in BIAS current seen, maybe TP6 is turning off for another reason? (attachment 3)
At 57kV, a small spark, heard outside the vacuum, sounding like it comes somewhere near the blue racks which hold the power supplies. It has sounded like that to me before. Did not turn anything off but bias current spiked from 110uA to 280uA. (attachment 4)
At 57.5kV another spark, taking down TP1B and TP6, as well as the CB1 steerers and TPS:Q1/2. TGHT current dropped momentarily from 581A to 240A, or so says EPICS. Maybe just a communications effect? Voltage for TBHT also dropped but nothing seen on TBHT. Coil current and voltage also showed small effects. (attachment 5)
After 10mins at 60kV, spike in bias current with slight spike in EE current but no other effects.
After 20mins everything has been stable, will turn the bias back to 30kV. As I turn the bias voltage down, the EE current ramps up. No change to EE voltage... (attachment 6) |
Wednesday, March 21, 2018, 14:11, Fernando Maldonado, , LP-FEBIAD, , , 395530-3, 42752-2, In progress, Test FEBIAD 10x
|
Tests on coil, temperature and the use of silver bolts.
(3) Vented silver bolts on the TBHT and (2) Full silver bolts on the coil
Wednesday, March 21, 2018, 14:10: Roughing.
Wednesday, March 21, 2018, 14:30: Turbo pumps on.
Wednesday, March 21, 2018, 14:35: Ion gauge on.
Wednesday, March 21, 2018, 14:42: RGA on.
Thursday, March 22, 2018, 06:52: Waterlines opened: Vacuum stable @ 3.04e-07T
Thursday, March 22, 2018, 06:53: Power/sources on.
Thursday, March 22, 2018, 06:56: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.9 |
3.61 |
TBHT |
21.6 |
2.80 |
COIL + EE |
21.7 |
4.59 |
TGHT |
22.0 |
5.23 |
Thursday, March 22, 2018, 07:00: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Thursday, March 22, 2018, 07:04 : BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Thursday, March 22, 2018, 07:05: Optics on.
Thursday, March 22, 2018, 11:32: Out gassing noted. TBHT @ 200 A . TGHT @ 472 A. Ramping rate slowed automatically. Vacuum @ 3.03e-06T.
Thursday, March 22, 2018, 14:42: Out gassing continued. TGHT @ 570A. Auto ramping TGHT / TBHT to 580 / 250 A @ undefined rate according to vacuum. Vacuum @ 3.03e-06T
Friday, March 23, 2018, 08:11: Auto ramping TBHT from 250 A to 290 A @ 2A per min. TGHT @ 580 A.
Friday, March 23, 2018, 10:20: Anode @ 100V & 8.5mA.
Friday, March 23, 2018, 10:28: Coil @ 50 A
Friday, March 23, 2018, 10:34: Anode @ 200V & 11 mA.
Friday, March 23, 2018, 13:08: RGA froze. Restart RGA
Sunday, March 25, 2018, 20:34 Vacuum stable @ 4.3e-07T .
Sunday, March 25, 2018, 20:34: TBHT @ 290 A. TGHT @ 580 A.
Sunday, March 25, 2018, 20:34 : Coil @ 50 A ^ 0.5 V
Sunday, March 25, 2018, 20:34 : Increasing Coil to 60 A
Sunday, March 25, 2018, 20:43: Vacuum seemed to increase to 4.4e-07T.
Monday, March 26, 2018, 06:45: Optics on. Vacuum stable @ 4.38e-07T
Fernando
Wednesday, March 28, 2018, 08:31: Optics on. Vacuum stable @ 3.57e-7T
Wednesday, March 28, 2018, 16:2: After increasing the coil current to to 75, A the coil voltage started to show an oscillating behaviour. (see image ttached)
When increased to 80 A the oscillatory behaviour increases. Reducing the current to 65A and then increasing it to 70 A showed a steady behaviour
Thursday, March 29, 2018, 15:51: Ramping down EZL, BIAS, and TGHT for the long weekend
Tuesday, April 03, 2018, 09:14: Vaccum at 1.77e-7T
Tuesday, April 03, 2018, 09:14 : Auto ramping TGHT / TBHT to 550/ 250A @ 2A per min.
Tuesday, April 03, 2018, 09:18 : BIAS / EZL / EE @ 30 / 13 / 1.5 kV
Tuesday, April 03, 2018, 09:23 : Optics on
Wednesday, April 04, 2018, 08:39: Ramping TBHT to 290A @ 2A per min. TGHT remains @ 550 A
Friday, April 6, 2018, afternoon: Due to inconsistencies on EPICS, Carla and I Change the Anode power supply to local in order to monitor the leakage current with a multimeter.
Monday, April 9, 2018, afternoon: TBHT@350A and TGHT@550A
PS went current limited at AnodeBias=300V and show 3A on the PS Screen, the multimeter read the same.
Ramp down to 0 V 0A on PS. PS shows 0.01V
PS goes to limited current even at 2V.
Tuesday, April 10, 2018, 09:10: Problem persists even at lower TBHG (330A).
The output cable was removed and the power power supply seemed to behave better. This could mean that there is a short inside the unit, in the past the anode cable had melted into the cup.
Planning to ramp down the TBHT and see if the behaviour remains. If it does, I would ask to remove the unit for inspection.
Tuesday, April 10, 2018, 09:32 : Ramping down TBHTH to 250A
Tuesday, April 10, 2018, 13:07 : Same behaviour. Cooling procedure started to see if the issue is still present, anf if it does remove unit for inspection
Wednesday, April 11, 2018, 06:44: RGA, power/sources confirmed off. IV4 closed. Ion gauge & turbos off.
Wednesday, April 18, 2018, 13:00: Post use comparison of the coil - A.S
1) Used coil from this FEBIAD = 1.999mΩ ***
2) Unused coil A = 2.421mΩ
3) unused coil B = 2.451mΩ |
Tuesday, March 20, 2018, 09:14, Aaron Schmidt, , , , , , , Problems/Solutions, Optics issue
|
Tuesday, March 20, 2018, 09:11: TMS:Q5 & TMS:Q2 controllers require repair. Unable to hold a negative voltage.
+ @ 680V
- @ 0V (Should be 680V as well)
Kyle L. & Rod N notified.
Tuesday, March 20, 2018, 12:58: The controller was fixed. |
Friday, March 16, 2018, 08:15, Aaron Schmidt, Nb#8, HP-SIS, ITW, TM2, 38817-2, 42738-12, In progress, Conditioning Nb#08 6x
|
Friday, March 16, 2018, 08:42: Roughing.
Friday, March 16, 2018, 10:34: Turbo pumps started.
Friday, March 16, 2018, 10:40: Ion gauge on.
Friday, March 16, 2018, 10:45: RGA on.
Friday, March 16, 2018, 13:10: Check. Vacuum @ 7.37e-7T
Monday, March 19, 2018, 06:44: Waterlines opened: Vacuum stable @ 2.16e-07T
Monday, March 19, 2018, 06:46: Power/sources on.
Monday, March 19, 2018, 06:49: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.6 |
3.68 |
TBHT |
22.2 |
2.97 |
COIL + EE |
21.4 |
4.73 |
TGHT |
21.5 |
5.39 |
Monday, March 19, 2018, 06:51: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Monday, March 19, 2018, 06:57: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Monday, March 19, 2018, 07:02: Optics on & reset.
Monday, March 19, 2018, 10:53: Drops in BIAS voltage from 30kV to below 22.5 kV and spikes to the BIAS current (282 uA) observed. Unstable.
Monday, March 19, 2018, 12:56: Communications issue noted with the mass separator magnet. Increase in Amp achieves no change in Gauss. Kyle L notified.
TMS:HALLMB1:RDFIELD Communication error.
Monday, March 19, 2018, 14:00: MB1 Communication error fixed. However the negative voltage on Q2 & Q5 in unavailable.
Monday, March 19, 2018, 15:07: Auto cooling TGHT / TBHT to 500 / 150 A @ 6A/4A per min.
Monday, March 19, 2018, 15:17: Auto cooling halted. TGHT / TBHT @ 501 / 152 A. Manually put to 500 / 150 A.
Controller for TMS:Q5 & TMS:Q2 off for repair.
Tuesday, March 20, 2018, 09:09: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, March 20, 2018, 12:58: The controller was fixed. Nb#08 conditioning continues with tests.
Wednesday, March 21, 2018, 06:24: Auto-cooling @ 2A per min.
Wednesday, March 21, 2018, 11:23: Sources at 0. Off.
Wednesday, March 21, 2018, 11:29: Power off. Waterlines purged.
Wednesday, March 21, 2018, 11:32: RGA off. IV4 closed/reset.
Wednesday, March 21, 2018, 11:33: Ion gauge off. Turbos off.
Wednesday, March 21, 2018, 13:15: Venting. |
Tuesday, March 13, 2018, 06:00, Aaron Schmidt, UC#22, LP-SIS, ITE, TM4, , , In progress, Conditioning Heat Shield for UC#22
|
Tuesday, March 13, 2018, 08:50: Roughing.
Tuesday, March 13, 2018, 09:10: Turbo Pumps started.
Tuesday, March 13, 2018, 09:15: Ion gauge on.
Tuesday, March 13, 2018, 10:17: RGA started.
Tuesday, March 13, 2018, 13:15: Check Vacuum @ 6.56e-07T
Wednesday, March 14, 2018, 07:27: Waterlines opened. No response on RGA. Vacuum ok @ 2.69e-07T
Wednesday, March 14, 2018, 07:30: Power/sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.7 |
3.61 |
TBHT |
21.4 |
2.82 |
COIL + EE |
21.5 |
4.64 |
TGHT |
21.7 |
5.23 |
Wednesday, March 14, 2018, 07:35: Auto ramping TGHT to 580 A @ 2A per min.
Wednesday, March 14, 2018, 13:18: Vacuum ok @ 5.48e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
32.6 |
3.72 |
TBHT |
22.5 |
2.86 |
COIL + EE |
22.6 |
4.75 |
TGHT |
24.9 |
5.08 |
Wednesday, March 14, 2018, 13:29: BIAS/EZL/EE to 30 / 13.5 / 1.5 kV.
BIAS current: 40uA
EZL current: 49uA
EE current: 518uA
Thursday, March 15, 2018, 08:00: Check, Vacuum @ 4.76e-07T
Thursday, March 15, 2018, 13:19: Check, Vacuum @ 4.65e-07T
Thursday, March 15, 2018, 15:13: Started cool down. Vacuum at 4.76e-7 by AM
Friday, March 16, 2018, 06:24: Power/sources off.
Friday, March 16, 2018, 06:27: Waterlines purged
Friday, March 16, 2018, 06:28: RGA, ion gauge, and turbos off.
Friday, March 16, 2018, 07:57: Venting.
|
Monday, March 12, 2018, 10:44, Carla Babcock, , , , , , , , Bringing up HV with gas on 8x
|
Pressure:
Previous HV tests done at 2e-7 pressure.
Current pressure 1.1e-6 (see previous entry for RGA stats) - first attachment shows source gas setup. Argon, neon and He leaks all on.
Ramping up:
- Second attachment - bias at 50kV
- Third attachment - bias at 60kV
- Fourth attachment - bias at 65kV
Pressure has been slowly falling since we started this test - now down to 8.7e-7
Spark after 10 mins, see attachment 5. Very slight vacuum jump (8.5e-7 -> 1.2e-6) and bias current jump (36uA -> 113uA). Tripped TP6 and the steerers, as usual. Bias current read back more erratic afterwards (see sixth attachment).
System has been stable for 20mins, though current on bias is still more erratic than before the spark. Increasing He leak rate from 7 to 7.06 to bring vacuum back up to 2e-6 (see attachment 7). No effect from increased pressure.
Tuesday, March 13, 2018, 05:52: Power off.
Tuesday, March 13, 2018, 05:56: Waterlines purged
Tuesday, March 13, 2018, 05:57: Ion gauge, Turbos off. |
Monday, March 12, 2018, 10:07, Aaron Schmidt, , , , , , , , HV Test w-gas
|
Monday, March 12, 2018, 09:45: Gas lines opened. Leak rate set. Vacuum @ 1.16e-06T
Monday, March 12, 2018, 10:00: RGA on
Monday, March 12, 2018, 10:07: RGA off. Manually shut off power as well |
Friday, March 09, 2018, 08:57, Carla Babcock, , , , , , , , HV test with electronics moved to rack
|
First attachment: BIAS/EE/EZL = 63.25/-1.5/31 So far no issues.
Second attachment: BIAS/EE/EZL = 64.25/-1.5/32 Slight spark - bias current jumped from 40uA to 88uA and vacuum jumped from 2e-7 to 2e-6... Steerers went off.
Third attachment: BIAS/EE/EZL = 65/-1.5/32 Some small signs of instability in the bias power supply
Fourth attachment : BIAS/EE/EZL = 65/-1.5/32 Been running for 20 mins now. More variation on the bias current output than at lower voltages but not too bad |
Thursday, March 08, 2018, 17:47, Carla Babcock, , , , , , , , Change of electronics on target and tube power supplies
|
The resistor/varistor combinations across the target + / -, tube + / - and target- / tube + have been remade and moved to the back of the power supplies to limit the corona discharges at higher voltages. Pictures attached. |
Tuesday, March 06, 2018, 10:55, Carla Babcock, , , , , , , , Trying HV without electronics
|
I have removed the resistor/varistor combinations that go between the poles of the target and tube heaters, and between those two supplies. I tested all the components to make sure they were still working after the sparks - for the record the varistors clamp at 23V, not 33V as implied by the schematic.
Tuesday, March 06, 2018, 10:48 BIAS/EE/EZL = 59.5/-1000/29.5 There was some kind of spark, the current on the bias supply went up to 400uA ( normally at 40 +/- 5 ) and the vacuum jumped a bit ( but still in the 10e-7 range ) but I didn't hear anything. It took out TP6 again. See first attachment.
Tuesday, March 06, 2018, 10:54 BIAS/EE/EZL = 60/-1/30
...
Problems
...
Tuesday, March 06, 2018, 12:00 BIAS/EE/EZL = 60/-1.5/29
Tuesday, March 06, 2018, 12:37 BIAS/EE/EZL = 62/-1.5/30
Tuesday, March 06, 2018, 14:11 BIAS/EE/EZL = 64/-1.5/31 No sparks but occasional ticking sounds from either the EZL or behind where the EE is... see second screenshot
Tuesday, March 06, 2018, 14:40 BIAS/EE/EZL = 65/-1.5/33
Test stand has been sitting at 65kV for about an hour now. Some small increases in bias power supply current but nothing significant (40uA). Some small sparks on the way to this voltage, and I ramped up very slowly. The corona discharges seen before seem to be related to the resistor/varistor combos since there are none now that I have removed them. Will redesign and reinstall. |
Thursday, March 01, 2018, 10:05, Carla Babcock, , , , , , , , HV tests with corona discharge problems solved
|
Turning up bias, no corona discharge at 60kV but a spark at 61.5kV bias, 31kV EZL, -800V EE
Thursday, March 01, 2018, 10:26: BIAS / EZL / EE @ 65 / 32.5 / 3.2 kV
Thursday, March 01, 2018, 10:32: Spark* Knocked out turbo pump TMS : TP6 (Restarted) Communications restarted. RPM0A restarted.
Thursday, March 01, 2018, 10:44: BIAS / EZL / EE @ 61 / 30.5 / 3.1 kV |
Wednesday, February 28, 2018, 11:50, Aaron Schmidt, , , , , , , , HV Test Np
|
New parts installed. Corona Shield, brackets, and board/spark gap orientation.
Wednesday, February 28, 2018, 11:48: Power on. Ready to test
Wednesday, February 28, 2018, 14:00: BIAS / EZL / EE @ 30 / 13 / 1.5 kV
Wednesday, February 28, 2018, 14:06: BIAS / EZL / EE @ 40 / 17 / 2.0 kV
Wednesday, February 28, 2018, 14:11: BIAS / EZL / EE @ 55 / 24 / 2.8 kV
Wednesday, February 28, 2018, 14:16: BIAS / EZL / EE @ 60 / 28 / 3.1 kV
Wednesday, February 28, 2018, 14:18: BIAS / EZL / EE @ 62 / 30 / 3.2 kV
Wednesday, February 28, 2018, 14:21: BIAS / EZL / EE @ 63 / 31 / 3.2 kV
Wednesday, February 28, 2018, 14:26: BIAS / EZL / EE @ 65 / 32.5 / 3.2 kV
Wednesday, February 28, 2018, 14:32: BIAS / EZL / EE @ 66 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:35: BIAS / EZL / EE @ 66.5 / 33.5 / 3.3 kV ***2 sparks***
Wednesday, February 28, 2018, 14:37: BIAS / EZL / EE @ 66 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:41: BIAS / EZL / EE @ 66.5 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:44: BIAS / EZL / EE @ 67 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:47: BIAS / EZL / EE @ 68 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:49: BIAS / EZL / EE @ 68.75 / 33 / 3.3 kV ***Spark***
Wednesday, February 28, 2018, 14:51: BIAS / EZL / EE @ 68 / 33 / 3.3 kV
Wednesday, February 28, 2018, 14:57: *** 2 sparks ***
The BIAS was pushed to 69 kV however the resulting sparks shut down the communications with the test stand computer.
RPM0B was put into a continuous running cycle and had to be shut off manually.
The voltage was brought back down remotely via a separate computer. Turbo pump TMS : TP2 was also restarted. |
Monday, February 26, 2018, 09:13, Carla Babcock, , , , , , , , Running list of changes to the ISAC test stand for >60kV operation 6x
|
1. Al corona shield installed over end of the HV duct to suppress discharges from the sharp edge of the duct.
2. Some moving and shortening of cables to keep them from running close to different voltages.
3. Changed the angle bracket on the 3M bias-EE resistor chain to a plate, same position.
4. Moved the 164K EE resistor chain to sit flat against feedthrough K.
5. Moved the bias-EE spark gap to sit flat against the back of feedthrough K, required tapping a hole in the back of the copper clamp.
6. Cap and top of rack vacuumed.
7. Piece of shielding removed from top of HV rack |
Friday, February 23, 2018, 08:50, Aaron Schmidt, , , , , , , , New Al Corona
|
Friday, February 23, 2018, 08:50
Friday, February 23, 2018, 08:53: BIAS / EZL / EE @ 62.5 / 29 / -1 kV
Friday, February 23, 2018, 08:56: Spark* Turbo pump TMS:TP6 restarted,
Friday, February 23, 2018, 09:13: Bias sitting at 61kV for about 15mins now. Still corona discharges from the area of the EE, but the area of the duct seems fine. |
Tuesday, February 20, 2018, 09:04, Carla Babcock, , , , , , , , Trying HV with rubber corona shield
|
Tuesday, February 20, 2018, 09:01: Sparks at 62.5kV after a couple minutes. Sounds like they were in the EE spark gap but don't appear on the EE read current. Ozone smell around 61kV, so there are still some discharges.
Turned back up to 62.5kV but no sparks. Put it up to 63.5kV and there was a spark, but not in the EE spark gap as expected. Took down TP1B but everything is back up and seems fine. |
Monday, February 19, 2018, 14:01, Carla Babcock, , , , , , , , Attempts to get to higher voltages, summarized.
|
The test stand holds up to 63kV, however at voltages over 54kV there are small discharges, rising to a continuous level around 60kV. The best guess right now is that these are coronal discharges coming from the end of the HV duct to the faraday cage. The only way to fix this would be to round out the edges of the duct, or to move the duct farther away. Since I have heard small discharges in other places, we may need to make a variety of modifications. Things that have had no effect:
1. Changing the EZL/EE voltages - break down is happening only between HV bias and ground
2. Cleaning the faraday cage
3. Locating sparks with a thermal camera
4. Conditioning - break down always happens at the same point |
Monday, February 19, 2018, 08:30, Carla Babcock, , , , , , , , TMSTP6 off
|
Found TMSTP6 off, restarted it, seems fine now (drawing 0.8A) |
Friday, February 16, 2018, 15:21, Carla Babcock, , , , , , , , Cleaned HV cage - trying bias again
|
I vacuumed inside the HV cage, though it has many small areas that are difficult to access so I am not sure how great a job I did.
Turned the bias up and again at 55kV I hear small sparks near the end of the HV duct that brings the cables from the rack. Cannot see anything. If it is really sparking where it sounds like sparking, it must be from the edge of the duct to the faraday cage.
Changing the EZL voltage and the EE voltage has no effect on where it starts sparking. |
Tuesday, February 13, 2018, 16:47, Carla Babcock, , , , , , , , Ramping to 63kV - some sparks
|
Sparks at 62kV on the bias.
Turned it down, turned it back up and got a spark at 60kV.
Now up to 63kV, no sparks so far (5 mins). Left EE @ -3100V and EZL @ 28.5kV
There is the sound of a low level continuous discharge, like HV power lines, and a very strong ozone smell coming from the HV duct that sticks into the cage and carries the cables from the HV rack. Also seems to be present near the EE insulating standoff. Can't see anything though. Maybe just moisture in the air? Starts at 55kV on the bias, does not change with EE voltage.
Turned EZL up to 29kV, bias stable at 63kV for 11mins.
Sparks at 63.6kV in the EE spark gap, EE @ -3.1kV. |
Tuesday, February 13, 2018, 12:17, Carla Babcock, , , , , , , , Ramping up bias to 60kV with conditioning station supply
|
Ramped up to 60kV with the new power supply, same as what we did last time with the standard test stand bias supply (see entry #627 ). Much more instability on the bias current readout (see attached screen shot), develops around 54kV. As well, the old supply read out 37uA at 60kV while the new supply reads out ~85uA. This could just be an EPICS read back issue though. |
Friday, February 09, 2018, 08:57, Carla Babcock, , , , , , , , TSGBIASSAFETY ok interlock
|
Friday, February 09, 2018, 08:25 Disconnected the AC power chain from the old bias supply but now cannot turn on the new bias supply in EPICS because the "TSGBIASSAFETY ok" interlock is tripped. No idea what this means - maybe it checks for AC power?
Friday, February 09, 2018, 08:48 Reconnected power to old bias supply, does not fix problem. Talked to Mike, he thinks it is PLC related, so will call Gelo later.
Friday, February 09, 2018, 11:38 TSGBIASSAFETY ok interlock problem seems to have solved itself, it now appears to be working fine. Will turn off power for now and continue tests on Tuesday. (note: turns out Mike told Dave about the problem and he solved it. No one knows what this interlock is for, but it used to be reset using the Global Reset button and now the RST button for the power supply should also reset it.) |
Thursday, February 08, 2018, 16:54, Carla Babcock, , , , , , , , EZL strange behaviour
|
Thursday, February 08, 2018, 16:54
Testing the HV bias I found that the einzel lens was behaving strangely. When I tried to put it higher than 1kV, the current would start spiking from 12uA to > 100uA. The voltage would jump around quite a bit as well (+/- 100V). Everything seems the way it was before, except the EZL power supply is still connected in parallel with the old bias power supply, which is no longer powered. Maybe one of the transorbs connecting line and neutral on the bias side is fried? I will unhook the connection to the old PSU and try again.
|
Thursday, February 08, 2018, 14:44, Carla Babcock, , , , , , , Done, Conditioning station power supply integrated into EPICS
|
The 75kV power supply is now in EPICS under the usual TSG:BIAS controls. The upper limit has been set to 70kV to protect the transformer. |
Wednesday, February 07, 2018, 08:46, Aaron Schmidt, , , , , , , , BIAS Power supply installation
|
Wednesday, February 07, 2018, 08:40: A 75 kV Glassman power supply was installed in the rack for use in further HV testing.
-The 75kV power supply is linked into the keyed interlock system. The key & switch labelled BIAS/EZL will unlock it.
-The PS is currently not connected to the epics controls and can only be adjusted manually.
-The old Glassman supply is disconnected and removed from the cage. |
Monday, February 05, 2018, 09:17, Aaron Schmidt, , , , , , , Problems/Solutions, Epics loss
|
Monday, February 05, 2018, 09:10: the epics program was in 'White-out'. Turbo pumps tripped.
Unplug, re-plug PLC.
Monday, February 05, 2018, 09:16: Restart Turbo pumps on chamber & beamline.
Monday, February 05, 2018, 09:21: Ion gauges on.
Tuesday, February 06, 2018, 09:00: TSG:CB1 noted to be red. Attempts to restart/reconfigure failed. Alive displays red MAJOR. Fault submitted. |
Wednesday, January 31, 2018, 12:58, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, HV test 4
|
Wednesday, January 31, 2018, 12:53: Power/sources on.
Wednesday, January 31, 2018, 12:58: BIAS / EZL / EE @ 40 / 17 / 2
Wednesday, January 31, 2018, 13:02: BIAS / EZL / EE @ 40 / 17 / 2
Wednesday, January 31, 2018, 13:05: BIAS / EZL / EE @ 50 / 22 / 2.5
Wednesday, January 31, 2018, 13:08: BIAS / EZL / EE @ 55 / 24 / 2.8
Wednesday, January 31, 2018, 13:10: BIAS / EZL / EE @ 57.5 / 27 / 3.0
Wednesday, January 31, 2018, 13:14: BIAS / EZL / EE @ 60 / 28 / 3.1
Wednesday, January 31, 2018, 13:34: No Sparks.
Wednesday, January 31, 2018, 14:14: No sparks after one hour.
Wednesday, January 31, 2018, 14:44: Spark free at 1-1/2 hours.
Wednesday, January 31, 2018, 14:45: Bringing down voltage.
Wednesday, January 31, 2018, 14:56: BIAS / EZL / EE @ 0
Wednesday, January 31, 2018, 14:57: Sources off. |
Wednesday, January 31, 2018, 09:53, Aaron Schmidt, , , , , (Blank), 42752-3, Done, Wire moved.
|
Wednesday, January 31, 2018, 09:50: A wire (B - F) was too close (Almost touching) to the EZL and had visible sparks during HV tests 1 & 2. The wire was adjusted to sit higher. and away from the EZL |
Tuesday, January 30, 2018, 06:51, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, HV test 3
|
Tuesday, January 30, 2018, 06:50: BIAS / EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, January 30, 2018, 06:58: Optics on / set
Tuesday, January 30, 2018, 06:59: IV4 opened.
RGA switched completely off and unplugged.
Tuesday, January 30, 2018, 13:15: BIAS / EZL / EE @ 40 / 17 / 2
Tuesday, January 30, 2018, 13:20: BIAS / EZL / EE @ 50 / 21.8 / 2.5
Tuesday, January 30, 2018, 13:50: Half hour wait. Ok. No sparks.
Tuesday, January 30, 2018, 13:55: BIAS / EZL / EE @ 55 / 24 / 2.8
15 minute wait. No sparks.
Tuesday, January 30, 2018, 14:10: BIAS / EZL / EE @ 57.5 / 27 / 3.1
Tuesday, January 30, 2018, 14:23: BIAS / EZL / EE @ 60 / 28 / 3.1
Tuesday, January 30, 2018, 14:35: No sparks.
Tuesday, January 30, 2018, 15:05: BIAS / EZL / EE @ 0
Tuesday, January 30, 2018, 15:06: Auto-cooling started.
Wednesday, January 31, 2018, 06:59: Power/sources off.
|
Monday, January 29, 2018, 10:07, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Power outage / HV test 2
|
HV test 2 cancelled. 9:38: BIAS/EZL/EE @ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly) Power went out completely
Monday, January 29, 2018, 10:00: Power up TS
Monday, January 29, 2018, 10:07:Turbos on.
Monday, January 29, 2018, 10:11: Ion gauge on Vacuum @ 3.3e-06T
Monday, January 29, 2018, 11:47; Power cycled. PLC and Canbus reset/cfg.
Monday, January 29, 2018, 11:54: Optics & Sources ok/reset.
Monday, January 29, 2018, 13:27: BIAS/EZL/EE @ 30 / 13 / 1.5 kV.
Monday, January 29, 2018, 13:30: BIAS/EZL/EE @ 40 / 17 / 2 kV.
Monday, January 29, 2018, 13:33: BIAS/EZL/EE @ 45 / 19.5 / 2.25 kV.
Monday, January 29, 2018, 13:36: BIAS/EZL/EE @ 50 / 21.5 / 2.5 kV.
Monday, January 29, 2018, 13:40: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.
Monday, January 29, 2018, 13:43: BIAS/EZL/EE @ 60 / 26 / 3 kV.
SPARKS*
Monday, January 29, 2018, 13:48: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.
Monday, January 29, 2018, 13:51: BIAS/EZL/EE @ 57.5 / 26 / 2.9 kV.
Sparks
Monday, January 29, 2018, 13:57: BIAS/EZL/EE @ 58 / 27 / 2.95 kV.
Monday, January 29, 2018, 14:03: Holding.
Monday, January 29, 2018, 14:07: BIAS/EZL/EE @ 59 / 28 / 3.1 kV.
Monday, January 29, 2018, 14:14: Spark*
Monday, January 29, 2018, 14:45: Holding
Monday, January 29, 2018, 14:56: BIAS/EZL/EE @ 0. Test Complete |
Friday, January 26, 2018, 13:59, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, HV test 1
|
Friday, January 26, 2018, 14:00: BIAS/EZL/EE ramp up.
Friday, January 26, 2018, 14:06: BIAS/EZL/EE @ 30/13/1.5 kV.
Friday, January 26, 2018, 14:09: BIAS/EZL/EE @ 35/13/1.5 kV.
Spark at BIAS 30 kV and 40kV
Friday, January 26, 2018, 14:12: BIAS/EZL/EE @ 40/13/1.5 kV.
Friday, January 26, 2018, 14:15: BIAS/EZL/EE @ 45/13/1.5 kV.
Audible sparks, but none showing on the strip tool.
Friday, January 26, 2018, 14:19: BIAS/EZL/EE @ 45/19/1.5 kV.
Friday, January 26, 2018, 14:22: BIAS/EZL/EE @ 47/22/1.5 kV. Sparks @ 47000 to 47250 V.
Sparks observed on EE feed through in cage.
Friday, January 26, 2018, 14:27: BIAS/EZL/EE @ 50/22/1.7 kV.
Friday, January 26, 2018, 14:39: BIAS/EZL/EE @ 55/23.5/1.8 kV.
Bias controls 55 kV Actual @ 50 kV.
Friday, January 26, 2018, 14:44: Spark free 5 min.
Friday, January 26, 2018, 14:49: Spark free 10 min. |
Friday, January 26, 2018, 11:10, Aaron Schmidt, , , , , , , Done, Helium tank replacement
|
Friday, January 26, 2018, 11:08: New Helium tank installed inside the Test Stand.
-The 'Full' tag remains. The He tank was not opened.
-The old tank was placed beside the Test Stand beneath/beside the power switch. |
Monday, January 22, 2018, 09:04, Aaron Schmidt, , , , , , , Done, Power outage & Controller replacement.
|
Computer, TS, epics, restarted. Power checks
Monday, January 22, 2018, 09:00: ISAC PLC TLCIOC Restarted.
Turbo pumps restarted.
Monday, January 22, 2018, 09:26: New controller for TSG:TP1B brought in.
(Connect) Global reset. Resart Turbo pumps.
Monday, January 22, 2018, 09:40: Both turbo pumps @ speed.
Vacuum controls ok
Sources ok
Optics - Issues. Some restart, others do not.
|
Tuesday, January 02, 2018, 09:18, Anders Mjos, , , , , , , Problems/Solutions, Starting system
|
Tuesday, January 02, 2018
Cycled power for TCSIOC and PLCIOC
TP2 and TP6 started
TP1B does not start. TP1B controller does not start up correctly - controller will have to be replaced. E-fault submitted (10739).
Controller for PS for Q1,6 was switching constantly. Unplugged and plugged back in resolved the problem
TP1A started
(Aaron Schmidt)
Wednesday, January 03, 2018, 08:15: TSG:TP1B Still non-responsive.
Wednesday, January 03, 2018, 08:20: Power/sources on. Add Voltage/Amp and check power supplies.
BIAS - 300V Reads 290V - OK
EE - 300V Reads 298V - OK
EZL - 300V Reads 293 V - OK
CB1 - 10V Reads 10V - OK
VCB1 - 10V Reads 10V - OK
CBC (both) - 10V Reads 9V - OK
TBHT - 10A Reads 9.9A (009 direct off PS) - OK
TGHT - 10A Reads 9.8A (007 direct off PS) - OK
Optics Check:
Magnet ok - Some optics start, some do not respond. Submit fault report for communications issues.
Fault Report submitted - 10742
Thursday, January 04, 2018, 14:38:
Kyle and Dave were able to get all the canbus optics for ISAC test stand re-configured except one device: TMS:Q2
"We investigated and it looks like the controller board for the TMS:Q2 supply is toast. Unfortunately these boards are a very old style so we don't have a surplus of replacements on hand. Our electronics shop did have some spares but the spares are not ready for use and need to have a few components soldered on. " - Kyle
The repaired controller board should be ready for next week.
Wednesday, January 10, 2018, 13:22: TS optics all fixed. Turbo pump TP1B is still out.
|
Thursday, December 21, 2017, 15:12, Anders Mjos, , , , , , , , Powered down devices
|
Powered down vacuum gauge and turbo pump controllers |
Wednesday, December 20, 2017, 09:11, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Holiday Shut Down
|
Power/sources already off. The water cooling is currently left on.
Wednesday, December 20, 2017, 09:07: RGA off.
Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off.
Wednesday, December 20, 2017, 11:21: Valves closed. Roughing pumps off.
Wednesday, December 20, 2017, 11:22: RGA shut off completely. |
Tuesday, December 12, 2017, 08:32, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Pump down w/ possible outgas
|
Check achievable vacuum. Watch for spikes on RGA. Silver bolts removed from the chamber. Vented steel screws in.
Tuesday, December 12, 2017, 08:23: Doors open from previous test. (Open for 7 minutes)
Tuesday, December 12, 2017, 08:30: Doors closed. Roughing.
Tuesday, December 12, 2017, 08:50: Turbo pumps on.
Tuesday, December 12, 2017, 08:56: Ion gauge on.
Wednesday, December 13, 2017, 06:46: Check. Vacuum @ 5.44e-07T. RGA Error.
Wednesday, December 13, 2017, 06:49: RGA restarted.
Wednesday, December 13, 2017, 06:52: Water lines opened. Vacuum @ 5.44e-07T
Wednesday, December 13, 2017, 06:54: Power on.
Wednesday, December 13, 2017, 06:56: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Friday, December 15, 2017, 13:37: Auto-cooling @ 2A per min
Monday, December 18, 2017, 08:15: Power/source off.
Wednesday, December 20, 2017, 09:07: RGA off.
Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off. |
Monday, December 04, 2017, 08:29, Aaron Schmidt, , , , , , , Problems/Solutions, Power outage
|
Power outage over the weekend. Reboot PLC and systems.
Monday, December 04, 2017, 08:22: Turbo pumps TMS:TP6 & TP2 Restarted.
Monday, December 04, 2017, 08:28: Time out on turbo pump TP1B.
Monday, December 04, 2017, 09:25: Turn off/restart TSG:TP1B Maincontrol.
Monday, December 04, 2017, 09:26: TMS:IG6 Restarted.
Monday, December 04, 2017, 14:24: Multi gauge controller to TSG:IG1 burned out. Replaced. Vacuum @ 4.45e-06T. Monitor. |
Friday, December 01, 2017, 14:31, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, Silver plated bolts test / Outgas TS
|
Chamber 'open state, no turbos' 2 weeks. Testing Silver plated 3/8"-16x1" (SCR, SHC, 18-8, AG) bolt on the TBHT.
Friday, December 01, 2017, 14:26: Roughing. BV1B open.
Friday, December 01, 2017, 14:27: BV1A open
Friday, December 01, 2017, 14:47: Turbo pumps on.
Friday, December 01, 2017, 14:53: Ion gauge on (Vacuum @ 1.44 e-04T)
Friday, December 01, 2017, 14:57: Turbos @ speed. RGA on.
Monday, December 04, 2017, 09:27: System rebooted after weekend power outage.
Tuesday, December 05, 2017, 08:10: RGA on.
Tuesday, December 05, 2017, 08:17: Waterlines opened. Vacuum ok @ 1.56e-06T
Tuesday, December 05, 2017, 08:20: Power on. (Power supplies in off position) Turn power off
Open back. switch power supplies to on.
Tuesday, December 05, 2017, 08:35: Power on
Tuesday, December 05, 2017, 08:37: Auto ramping TGHT / TBHT to 150 / 75 A @ 2A per min.
Tuesday, December 05, 2017, 09:55: Auto ramping TGHT / TBHT to 200 / 75 A @ 2A per min.
Tuesday, December 05, 2017, 10:28: Auto ramping TGHT / TBHT to 400 / 150 A @ 2A per min. Vacuum @ 1.56e-06T.
Tuesday, December 05, 2017, 12:50: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 3.03e-06T.
Tuesday, December 05, 2017, 12:58: Auto ramping halted. Vacuum @ 3.12e-06T. Allow vacuum to improve.
Wednesday, December 06, 2017, 08:03: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 2.65e-06T. Added note*** The Silver bolts are NOT vented ***.
Wednesday, December 06, 2017, 08:30: TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.03e-06T and holding. Auto-ramping continued. No halt.
Wednesday, December 06, 2017, 10:45: Check. TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.36e-06T and holding. Auto-ramping on wait.
Wednesday, December 06, 2017, 14:37: Check. TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.21e-06T and holding. Auto-ramping halted. Allow Vacuum to improve.
Thursday, December 07, 2017, 07:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 2.33e-06T.
Thursday, December 07, 2017, 09:00: Check. TGHT / TBHT @ 571 / 200 A. Vacuum @ 3.19e-06T. Auto-ramping halted. Allow Vacuum to improve.
Friday, December 08, 2017, 07:52: Auto ramping TGHT to 580 A from 571 A @ 2A per min. Vacuum @ 2.04e-06T.
Monday, December 11, 2017, 08:00: Auto cooling @ 2A per min.
Monday, December 11, 2017, 13:45: Sources/power off. Water cooling off.
Tuesday, December 12, 2017, 06:35: RGA, Ion gauge, turbo pumps off.
Tuesday, December 12, 2017, 07:45: Venting.
Tuesday, December 12, 2017, 08:23: Doors open. |
Wednesday, November 15, 2017, 10:56, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:TP6 replacement
|
Turbo pump TP6 requires replacement.
Wednesday, November 15, 2017, 09:55: Turbo (TP2) off. Ion gauge off.
Wednesday, November 15, 2017, 10:55: Venting |
Monday, October 30, 2017, 08:54, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP6 shut down due to high noise
|
The turbo pump will need replacement. |
Tuesday, October 24, 2017, 11:38, Anders Mjos, , , , , , , , FEBIAD coil magnetic field measurment
|
with Fernando
Tuesday, October 24, 2017: Testing setup with triple coil
Wednesday, October 25, 2017: Field mapping at 70 A and current/field measurements on triple coil. |
Monday, October 16, 2017, 11:46, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber Test EE
|
Monday, October 16, 2017, 11:45: Roughing.
Monday, October 16, 2017, 12:05: Turbo pumps started.
Monday, October 16, 2017, 12:10; Ion gauge on.
Tuesday, October 17, 2017, 10:43: Waterlines opened. RGA not on. Vacuum ok @ 1.53e-07T. Power/sources on.
Tuesday, October 17, 2017, 10:45: RGA on.
Tuesday, October 17, 2017, 10:50: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, October 17, 2017, 14:44: EE Current Stable.
Tuesday, October 17, 2017, 14:52: Power/sources off.
Tuesday, October 17, 2017, 14:54: Waterlines purged.
|
Friday, October 13, 2017, 15:53, Aaron Schmidt, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, 41751-4, In progress, Conditioning SiC#37 (ii) 10x
|
Previous short fixed. Grid clamp removed. Grid tack welded.
Friday, October 13, 2017, 15:49: Roughing.
By Anders
Friday, October 13, 2017, 16:10: TPs started
Friday, October 13, 2017, 16:20: Vacuum at 2.7E-7 T
Saturday, October 14, 2017, 06:37: Opened water supply to HS. 95/10 psi. Vacuum stable at 5.7E-7 T
Saturday, October 14, 2017, 06:42: Opened gas lines.
Saturday, October 14, 2017, 06:43: Started heater ramping to 580 / 290 A
Saturday, October 14, 2017, 06:45: BIAS/EZL/EE to 30 / 13.5 / 1.5 kV. EE current somewhat unstable around 500 uA - seems related to elevated BIAS current. Improving as BIAS current is gradually coming down.
Saturday, October 14, 2017, 15:19: TBHT to 310 A. Local readback 316 A
Sunday, October 15, 2017, 17:36 : Ramping down heaters.
Monday, October 16, 2017, 09:10: Sources off.
Monday, October 16, 2017, 09:13; IV4 Closed & Reset. FEBIAD Gas lines closed.
Monday, October 16, 2017, 09:15: RGA, Ion gauge, turbos off.
Monday, October 16, 2017, 10:40: Power off. Waterlines purged.
Monday, October 16, 2017, 10:43: Venting. |
Tuesday, October 10, 2017, 14:56, Aaron Schmidt, , , , , , , In progress, FEBIAD Anode bias configuration
|
Unable to hold Anode voltage after power supply change out.
Tuesday, October 10, 2017, 14:55: The Test Stand has been configured for Anode bias and the electrical connections have been wired according to ISK4523D REV 6.
At this current point in time John Chow has removed the power supply (PS). Will update once polarity is switched (if required) and is re-installed to the test stand.
Wednesday, October 11, 2017, 10:25: Polarity was switched and PS is installed on the test stand. Sources/power switched on. |
Tuesday, October 10, 2017, 13:10, Aaron Schmidt, , , , , , , , Gas bottles
|
Tuesday, October 10, 2017, 09:30: Install/swap gas bottles. Elog.
Removed smallest Neon leak. Neon Bottle Serial #11231. Leak rate calibrated @ 1.59e-07 atm*CC/sec (02/09/2016)
In use:
Neon Bottle Serial #09572. Leak rate calibrated @ 1.82e-06 atm*CC/sec (02/09/2016)
Argon Bottle Serial #09937. Leak rate calibrated @ 1.35 x10-6 Atm-CC/sec (08/06/2003)
Tuesday, October 10, 2017, 10:12: Gas bottles opened. Pump not on? Vacuum spiked into e-04T. All closed. Await vacuum stabilization.
Tuesday, October 10, 2017, 10:36: Power on. Pump on Gas bottles opened. Await vacuum stabilization.
pump off. |
Friday, October 06, 2017, 12:14, Aaron Schmidt, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, 41751-4, In progress, Conditioning SiC#37 9x
|
NOTE* : The right coil terminal terminates into the heat shield. DO NOT TURN ON COIL.
Friday, October 06, 2017, 12:12: Roughing. * Note on installation. Middle TBHT prong 'stuck' to insulator slightly and was moved to fit. Fit ok in Jig.
Friday, October 06, 2017, 13:53: Turbo pumps on.
Friday, October 06, 2017, 14:00: Ion gauge, RGA on.
Tuesday, October 10, 2017, 07:45: Waterlines opened. No response on RGA. Vacuum ok @ 1.35e-07T.
Tuesday, October 10, 2017, 07:49: RGA Fatal communications error. Restart RGA.
Tuesday, October 10, 2017, 07:57: Power/sources on.
Tuesday, October 10, 2017, 08:17: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, October 10, 2017, 08:57: BIAS / EZL / EE @ 0 kV. Power/sources off. Locked out*
Tuesday, October 10, 2017, 09:30: Install/swap gas bottles. Elog.
Tuesday, October 10, 2017, 10:36: Power on. Gas bottles opened. Await vacuum stabilization.
Tuesday, October 10, 2017, 10:40: Sources on.
Tuesday, October 10, 2017, 10:50: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Unable to bring Anode to voltage. Power supply was changed and does not 'Float'. Test TGHT & TBHT. Then switch from Cathode Negative Bias to Anode positive*.
Tuesday, October 10, 2017, 11:37: Auto ramping TGHT / TBHT to 20 / 20 A @ 4A per min. (TEST then cool)
Tuesday, October 10, 2017, 11:45: Auto-cooling
Tuesday, October 10, 2017, 11:57: Sources off / BIAS / EZL / EE @ 0 kV.
Wednesday, October 11, 2017, 10:25: Anode & PS switched*. Power/Sources on.
Wednesday, October 11, 2017, 10:38: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Wednesday, October 11, 2017, 10:40: Coil @ 0 A. Anode 200 V / 7.326mA.
Wednesday, October 11, 2017, 10:45: Gas bottles opened. Await vacuum stabilization.
Wednesday, October 11, 2017, 10:47: IV4 Opened. Vacuum @ 2.43e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.6 |
3.78 |
TBHT |
24.6 |
2.75 |
COIL + EE |
24.4 |
4.84 |
TGHT |
24.6 |
5.44 |
Wednesday, October 11, 2017, 10:50: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Wednesday, October 11, 2017, 14:21: Check. Vacuum @ 2.99e-06T. Outgassing.
Wednesday, October 11, 2017, 14:42: Note* Slight discrepancy on the TBHT. Direct read out off the PS @ 296A. Source page: TBHT set to 290.0A, shows 302.2A
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
31.4 |
3.84 |
TBHT |
25.4 |
2.98 |
COIL + EE |
25.0 |
4.86 |
TGHT |
27.1 |
5.45 |
Thursday, October 12, 2017, 09:00. Mass scans ok. Spark @ 8:57.
Thursday, October 12, 2017, 10:48: Auto ramping TBHT to 310 A @ 2A per min.
Friday, October 13, 2017, 07:15: Anode short determined. Plotted. Occurred around 18:00 (6pm) yesterday.
Friday, October 13, 2017, 07:20: Auto-cooling @ 4A per min
Friday, October 13, 2017, 10:03: Sources off. Gas lines closed.
Friday, October 13, 2017, 10:06: RGA off. IV4 Closed. Reset IV4
Friday, October 13, 2017, 10:08: Ion gauge off. Turbos off.
Friday, October 13, 2017, 11:10: Venting.
Friday, October 13, 2017, 11:45: power off. Waterlines purged.
Friday, October 13, 2017, 11:49: Doors open, |
Monday, September 25, 2017, 14:10, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Monday, September 25, 2017, 14:10: Roughing.
Wednesday, September 27, 2017, 08:23: Turbo pumps on
Friday, October 06, 2017, 09:04: Ion gauge off. Turbos off.
Friday, October 06, 2017, 11:17: Venting. |
Wednesday, September 20, 2017, 14:11, Aaron Schmidt, Ta#54, HP-SIS, ITW, TM2, 42218-10, , In progress, Conditioning Ta#54 6x
|
Wednesday, September 20, 2017, 14:08: Roughing.
Wednesday, September 20, 2017, 14:28: Turbos on.
Wednesday, September 20, 2017, 14:33: Ion gauge on.
Wednesday, September 20, 2017, 14:39: RGA on.
Thursday, September 21, 2017, 08:43: Waterlines opened. No response on RGA. Vacuum ok @ 1.7e-07T
Thursday, September 21, 2017, 08:49: Power/sources on.
Thursday, September 21, 2017, 09:03: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Thursday, September 21, 2017, 09:04: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.1 |
3.85 |
TBHT |
25.4 |
3.04 |
COIL + EE |
24.9 |
4.94 |
TGHT |
25.1 |
5.59 |
Thursday, September 21, 2017, 09:08: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Friday, September 22, 2017, 13:42: Bias / EZL increased to 40 / 17.3 kV. Tune accordingly.
Mass scan ok
Friday, September 22, 2017, 14:33: Bias / EZL decreased to 30 / 13 kV. Tune accordingly.
Friday, September 22, 2017, 14:39: Auto-cooling @ 2A / min
Monday, September 25, 2017, 10:20: BIAS / EZL / EE @ 0 V.
Monday, September 25, 2017, 10:21:Power/sources off.
Monday, September 25, 2017, 10:32: RGA off. IV4 closed
Monday, September 25, 2017, 10:33: Ion gauge, turbos off.
Monday, September 25, 2017, 10:37: Waterlines purged.
Monday, September 25, 2017, 13:19: Venting. |
Thursday, August 17, 2017, 12:45, Anders Mjos, , , , , , , Problems/Solutions, TBHT power supply removed
|
The Xantrex 10V 600 A power supply for the TBHT has been moved to ITE to replace the failed TGHT power supply |
Monday, August 21, 2017, 16:20, Anders Mjos, , , , , , , Problems/Solutions, TBHT power supply removed
|
Anders Mjos wrote: |
The Xantrex 10V 600 A power supply for the TBHT has been moved to ITE to replace the failed TGHT power supply
|
A spare EMI-EMS 10 V - 500 A power supply was installed last Friday by John Chow. Dave Morris has connected the controls today and updated EPICS. The local voltage readback on the power supply does not work. |
Tuesday, August 15, 2017, 08:41, Aaron Schmidt, Ta#55, LP-SIS, , , 42218-11, 42738-2, In progress, TBHT sight in test
|
Heat TGHT to 580 A & TGHT to 200 A for view port test.
Tuesday, August 15, 2017, 08:40: Roughing.
Tuesday, August 15, 2017, 08:59: Both Turbo pumps started.
Tuesday, August 15, 2017, 09:05: Ion gauge on. TP1B @ speed 42 KRPM.
Tuesday, August 15, 2017, 09:07: TP1A @ speed 38 KRPM.
Tuesday, August 15, 2017, 09:10: RGA on. Vacuum @ 9.14e-06T
Tuesday, August 15, 2017, 11:40: Check. Vacuum @ 6.76e-07T
Tuesday, August 15, 2017, 11:41: Waterlines opened. No response on RGA. Vacuum @ 6.49e-07T
Tuesday, August 15, 2017, 11:43: Power/sources on.
Tuesday, August 15, 2017, 13:57: Check. Vacuum @ 3.88e-07T.
Tuesday, August 15, 2017, 14:33: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Wednesday, August 16, 2017, 10:33: Auto-cooling TBHT to 100 A @ 4A per min.
Thursday, August 17, 2017, 07:05: TGHT / TBHT off. FC0 closed. IV4 Closed.
Thursday, August 17, 2017, 07:11: IV4 reset.
Thursday, August 17, 2017, 07:13: Power off
Thursday, August 17, 2017, 07:15 Waterlines purged
Thursday, August 24, 2017, 13:03: Waterlines ok (open). Power/source on.
Thursday, August 24, 2017, 13:10: Auto ramping TGHT to 580 A @ 2A per min.
Friday, August 25, 2017, 07:59: Open IV4. Open TMS : FC0.
Friday, September 08, 2017, 06:51: Auto ramping TGHT to 580 A @ 2A per min.
Monday, September 11, 2017, 10:55: Close TMS : FC0. Close IV4
Monday, September 11, 2017, 11:58: power/sources off
Monday, September 11, 2017, 11:00: RGA off
Monday, September 11, 2017, 11:01: Ion gauge, turbos off.
Monday, September 11, 2017, 11:59: Venting.
Monday, September 11, 2017, 13:17: Roughing.
Monday, September 11, 2017, 13:34: Turbo pumps on
Monday, September 11, 2017, 13:40: Ion gauge on.
Tuesday, September 12, 2017, 07:24: RGA, power, & sources on.
Tuesday, September 12, 2017, 07:25: Auto ramping TGHT to 580 A @ 2A per min.
Tuesday, September 12, 2017, 07:26: Open IV4. Open TMS : FC0.
Monday, September 18, 2017, 10:53: Close TMS : FC0. Close IV4
Monday, September 18, 2017, 10:57: Power/sources off.
Wednesday, September 20, 2017, 10:25: RGA, Ion gauge, Turbo pumps off. Waterlines purged.
Wednesday, September 20, 2017, 12:49: Venting. |
Thursday, August 03, 2017, 17:00, Anders Mjos, , , , , , , Problems/Solutions, Vacuum system tripped on power interruption
|
Thursday, August 03, 2017, 17:00: Restarted TPs |
Wednesday, July 19, 2017, 09:13, Aaron Schmidt, Ta Targets, , , , , , Done, Ion Peaks
|
Attached is a recent list of Ta targets with their extracted ions peaks. |
Monday, July 17, 2017, 10:04, Aaron Schmidt, , HP-SIS, , , 42218-10, 42738-1, , Target cleaning test HP-SIS Full Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 42738-1: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-10: Full Clean. Crystal Clear, Acetone, & Methanol used.
Thursday, July 27, 2017, 09:49: HS removed from test stand. Exchange target.
Thursday, July 27, 2017, 10:07: Target # 42218-10 placed into test stand. Door open for 20 minutes.
Thursday, July 27, 2017, 10:10: Roughing.
Thursday, July 27, 2017, 10:10: Doors sealed for roughing.
Thursday, July 27, 2017, 10:13 BV1B OPEN. Opened @ 230T.
Thursday, July 27, 2017, 10:29: Both Turbo pumps started.
Thursday, July 27, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Thursday, July 27, 2017, 10:37: TP1A @ speed 38 KRPM.
Thursday, July 27, 2017, 10:40: RGA on. Vacuum @ 1.42T.
Thursday, July 27, 2017,15:00: Check. Vacuum @ 5.51e-07T.
Thursday, July 27, 2017, 15:02: Waterlines opened. No response on RGA. Vacuum @ 5.42e-07T
Thursday, July 27, 2017, 15:05: Power on.
Friday, July 28, 2017, 08:30: Ramping started
Monday, July 31, 2017, 07:56: Ramping down
Monday, July 31, 2017, 14:25: Power supplies off. RGA off.
Tuesday, August 15, 2017, 06:48: Ion gauge, Turbo pumps off.
Tuesday, August 15, 2017, 06:50: power off. Waterlines purged.
Tuesday, August 15, 2017, 07:55: Venting. |
Monday, July 17, 2017, 09:58, Aaron Schmidt, , HP-SIS, , , 42218-8, 42738-1, , Target cleaning test (Long) HP-SIS CC Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 42738-1: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-8: Crystal Clean only.
Monday, July 24, 2017, 09:46: HS removed from test stand. Exchange target.
Monday, July 24, 2017, 10:08: Target # 42218-8 placed into test stand. Door open for 22 minutes.
Monday, July 24, 2017, 10:10: Roughing.
Monday, July 24, 2017, 10:10: Doors sealed for roughing.
Monday, July 24, 2017, 10:11: BV1B OPEN. Opened @ 306T.
Monday, July 24, 2017, 10:29: Both Turbo pumps started.
Monday, July 24, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, July 24, 2017, 10:38: TP1A @ speed 38 KRPM.
Monday, July 24, 2017, 10:40: RGA on. Vacuum @ 1.51E-05T.
Monday, July 24, 2017, 15:03: Vacuum @ 6.14e-07T
Tuesday, July 25, 2017, 08:02: Water lines opened. No response on RGA. Vacuum stable @ 1.97E-07T.
Tuesday, July 25, 2017, 08:05: Power/Sources on.
Tuesday, July 25, 2017, 08:23: Anode increased to 5, 10, 25, 50 V. Ok @ 0.000mA
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.3 |
3.77 |
TBHT |
27.3 |
3.02 |
COIL + EE |
27.1 |
4.91 |
TGHT |
27.3 |
5.53 |
Tuesday, July 25, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, July 25, 2017, 09:00: Open back power supply panel. Using multimeter, 9-pin ground connection verified. Panel closed.
10:45: Check. Vacuum @ 2E-06T.
11:45: Check. Vacuum @ 3.33E-07T.
13:30: Check. Vacuum @ 2.78E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
3.78 |
TBHT |
28.1 |
3.03 |
COIL + EE |
27.2 |
4.92 |
TGHT |
29.4
|
4.48 |
Tuesday, July 25, 2017, 14:27: Open back power supply panel. Using multimeter, 9-pin ground connection verified. Panel closed
Wednesday, July 26, 2017, 08:15: Check. Vacuum @ 2.60E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
3.78 |
TBHT |
27.6 |
2.99 |
COIL + EE |
27.2 |
4.06 |
TGHT |
29.4
|
5.52 |
Wednesday, July 26, 2017, 15:00: Auto-Cooling @ 2A per min. Check. Vacuum @ @2.43e-07T
Thursday, July 27, 2017, 07:20: Check. Vacuum @ 1.44e-07T
Thursday, July 27, 2017, 07:22: Power/sources off.
Thursday, July 27, 2017, 07:24: Waterlines purged.
Thursday, July 27, 2017, 07:26: RGA off.
Thursday, July 27, 2017, 07:27: Ion gauge, Turbos off
Thursday, July 27, 2017, 09:13: Venting. |
Monday, July 17, 2017, 09:55, Aaron Schmidt, , , , , 41882-4, 42738-1, In progress, Out Gas HS for Target Cleaning Test
|
-No EE. Insulators, gripper arms, and blank EE plate included
-New grounded 9 pins included in brackets
-TGHT included to out gas Heat shield
Monday, July 17, 2017, 10:48: Roughing.
Monday, July 17, 2017, 11:08: Turbo pumps on.
Monday, July 17, 2017, 11:17: Ion gauge & RGA on.
Tuesday, July 18, 2017, 08:17: Water lines opened. No response on RGA. Vacuum stable @ 1.79e-07T.
Tuesday, July 18, 2017, 08:20: Power/sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.1 |
3.78 |
TBHT |
26.9 |
2.97 |
COIL + EE |
26.9 |
4.94 |
TGHT |
26.9 |
5.48 |
Tuesday, July 18, 2017, 08:25: Auto-ramping TGHT to 580A @ 2A per min. Vacuum @ 1.44e-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
36.4 |
3.78 |
TBHT |
27.1 |
2.97 |
COIL + EE |
27.4 |
4.84 |
TGHT |
29.5 |
5.48 |
Wednesday, July 19, 2017, 08:00: Auto cooling TGHT.
Monday, July 24, 2017, 07:38: Power/sources off.
Monday, July 24, 2017, 07:40: Waterlines purged
Monday, July 24, 2017, 07:42: RGA off. Ion gauge off. Turbos off.
Monday, July 24, 2017, 09:10: Venting. |
Monday, July 10, 2017, 13:27, Aaron Schmidt, Ta#53, HP-SIS, ITW, TM2, 42218-6, 41751-6, In progress, Conditioning Ta#53 7x
|
Monday, July 10, 2017, 14:03: Roughing.
Monday, July 10, 2017, 14:27: Turbo pumps started.
Monday, July 10, 2017, 14:33: Ion gauge on.
Monday, July 10, 2017, 14:36: RGA on.
Tuesday, July 11, 2017, 06:52: Waterlines opened. No response on RGA. Vacuum ok @ 2.18e-07T
Tuesday, July 11, 2017, 06:56: Power/sources on.
Tuesday, July 11, 2017, 07:03: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, July 11, 2017, 07:04: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.1 |
3.78 |
TBHT |
27.0 |
2.95 |
COIL + EE |
26.9 |
4.87 |
TGHT |
27.1 |
5.48 |
Tuesday, July 11, 2017, 07:10: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, July 11, 2017, 10:10: RGA error (Spark?). Restarted.
Tuesday, July 11, 2017, 15:08: Anode brought up to 5, 10 15, and 50 V using FEBIAD controls. No Current detected.
Wednesday, July 12, 2017, 08:23:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.2 |
3.85 |
TBHT |
27.5 |
2.98 |
COIL + EE |
27.2 |
4.87 |
TGHT |
29.5 |
5.48 |
Wednesday, July 12, 2017, 14:42: Auto-cooling.
Friday, July 14, 2017, 12:13: Sources off. IV4 Closed (Reset)
Monday, July 17, 2017, 07:55: Power off.
Monday, July 17, 2017, 07:57: Waterlines purged.
Monday, July 17, 2017, 07:59: RGA off. Ion gauge & Turbos off.
Monday, July 17, 2017, 09:43: Venting. |
Thursday, July 06, 2017, 13:16, Aaron Schmidt, Ta#55, LP-SIS, , , 42218-11, 42738-2, In progress, Conditioning Ta spare for Ta#52 10x
|
Thursday, July 06, 2017, 13:56: Roughing.
Thursday, July 06, 2017, 14:25: Turbo pumps started.
Thursday, July 06, 2017, 14:30: Ion gauge on. RGA Started
Friday, July 07, 2017, 07:29: Waterlines opened. No response on RGA. Vacuum ok @ 1.97e-07T
Friday, July 07, 2017, 07:33: Power/sources on.
Friday, July 07, 2017, 07:39: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Friday, July 07, 2017, 07:40: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.0 |
3.78 |
TBHT |
26.5 |
3.02 |
COIL + EE |
25.8 |
4.86 |
TGHT |
26.0 |
5.47 |
Friday, July 07, 2017, 07:42: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Friday, July 07, 2017, 07:45: Optics reset.
Friday, July 07, 2017, 14:28: Anode brought up to 5, 10 15, and 50 V using FEBIAD controls. No Current detected.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
36.5 |
3.75 |
TBHT |
27.6 |
3.04 |
COIL + EE |
26.5 |
4.87 |
TGHT |
28.7 |
5.54 |
Saturday, July 08, 2017, 08:58: Ramping down heaters
Monday, July 10, 2017, 08:15: Power/Sources off. *BIAS 30 to 0 kV due to shut off. EE & EZL Brought to 0.
Monday, July 10, 2017, 08:23: Water lines purged. IV4 Closed
Monday, July 10, 2017, 08:27: IV4 reset.
Monday, July 10, 2017, 09:40: RGA off. Ion Gauge off. Turbos off.
Monday, July 10, 2017, 11:02: Venting.
|
Friday, June 30, 2017, 13:31, Aaron Schmidt, Ta#53, HP-SIS, ITW, TM2, 42218-6, 41751-6, In progress, Conditioning Ta#53
|
Friday, June 30, 2017, 13:48: Roughing.
Friday, June 30, 2017, 14:26: Turbo pumps on.
Friday, June 30, 2017, 14:31: Ion gauge on.
Tuesday, July 04, 2017, 07:47: Waterlines opened. No response on RGA. Vacuum @1.35e-07T.
Tuesday, July 04, 2017, 07:51: Power/sources on.
Tuesday, July 04, 2017, 08:01: BIAS / EZL / EE @ 20 / 13 / 1.5 kV .
Tuesday, July 04, 2017, 08:02: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.2 |
3.78 |
TBHT |
26.1 |
2.99 |
COIL + EE |
25.8 |
4.87 |
TGHT |
26.0 |
5.48 |
***Halted to bring in spare target for Ta#52.***
Thursday, July 06, 2017, 09:20: Power/sources off
Thursday, July 06, 2017, 09:24: IV4 closed. Timeout error. Fixed. RGA off
Thursday, July 06, 2017, 09:27: Waterlines purged.
Thursday, July 06, 2017, 09:29: Ion gauge off. Turbos off.
Thursday, July 06, 2017, 13:14: Venting.
***Halted to bring in spare target for Ta#52.*** |
Friday, June 16, 2017, 11:23, Aaron Schmidt, , , , , , , , Pump down empty chamber.
|
Friday, June 16, 2017, 11:22: roughing.
Friday, June 16, 2017, 14:28: Turbo pumps on
Friday, June 30, 2017, 10:37: Ion gauge, turbos off.
Friday, June 30, 2017, 13:01: Venting. |
Friday, June 09, 2017, 13:28, Aaron Schmidt, Ta#52, LP-SIS, ITE, TM4, 42218-14, 41751-8, In progress, Conditioning Ta#52 8x
|
Friday, June 09, 2017, 13:27: Roughing.
Friday, June 09, 2017, 14:09: Turbo pumps on.
Friday, June 09, 2017, 14:16: Ion gauge on.
Monday, June 12, 2017, 07:20: Waterlines opened. No response on RGA. Vacuum @1.52e-07T.
Monday, June 12, 2017, 07:23: Power/Sources on.
Monday, June 12, 2017, 08:15: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Monday, June 12, 2017, 08:16: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.0 |
3.78 |
TBHT |
27.3 |
3.03 |
COIL + EE |
25.8 |
4.91 |
TGHT |
26.0 |
5.46 |
Monday, June 12, 2017, 08:18: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Monday, June 12, 2017, 11:33: Spark around 10:30 tripped RGA. Restarting RGA.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.9 |
3.78 |
TBHT |
26.6 |
2.95 |
COIL + EE |
26.1 |
4.89 |
TGHT |
28.4 |
5.46 |
Tuesday, June 13, 2017, 14:50: Auto-cooling @ 2A per min
Wednesday, June 14, 2017, 07:41: Sources/power off. IV4 closed
Friday, June 16, 2017, 07:16: RGA off
Friday, June 16, 2017, 07:18: Ion gauge & turbo pumps off.
Friday, June 16, 2017, 07:20: Water lines purged.
Monday, June 19, 2017, 13:35: While writing report, it was noticed a step was skipped on the mass correlations. The MassCorr data was not saved. - AS |
Wednesday, June 07, 2017, 12:49, Aaron Schmidt, , , , , , , , Gas bottles
|
Gas bottles for FEBIAD testing were exchanged yesterday around 1:30. One Neon & one Argon bottle were removed.
Two Neon bottles were added. |
Tuesday, June 06, 2017, 09:22, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Tuesday, June 06, 2017, 09:21: roughing.
Friday, June 09, 2017, 08:50: Ion gauge off. Turbo pumps off.
Friday, June 09, 2017, 10:46: Venting. |
Wednesday, May 24, 2017, 11:12, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD Anode bias configuration
|
The Test Stand has been configured for Anode bias. John Chow changed the power supply and the electrical connections have been wired according to ISK4523D REV 6.
Wednesday, May 24, 2017, 17:37: Anode current reduce to 285 A. Anode drain current limited to a maximum of 300 A. This will be left overnight to see if there is an increase in anode drain current. as was seen today. |
Saturday, June 03, 2017, 09:34, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD Cathode bias configuration
|
Anders Mjos wrote: |
The Test Stand has been configured for Anode bias. John Chow changed the power supply and the electrical connections have been wired according to ISK4523D REV 6.
Wednesday, May 24, 2017, 17:37: Anode current reduce to 285 A. Anode drain current limited to a maximum of 300 A. This will be left overnight to see if there is an increase in anode drain current. as was seen today.
|
The Test Stand has been configured for Cathode bias. John Chow changed the power supply and the electrical connections have been wired according to ISK4563 REV 5. |
Friday, June 02, 2017, 15:57, Aaron Schmidt, SiC#36, HP-FEBIAD-CTL, ITW, TM2, 41369-10, 42132-6/9, , Conditioning SiC#36 9x
|
Friday, June 02, 2017, 15:20: Coil loose (Remove lid, Tighten and place lid again)
Friday, June 02, 2017, 15:52: Roughing
Friday, June 02, 2017, 16:13: Turbo pumps on.
Friday, June 02, 2017, 16:18: Ion gauge on
Friday, June 02, 2017, 16:23: RGA on
By Anders
Saturday, June 03, 2017, 09:07: Opened HS water supply. In/out 95 / 10 psi. 3.8 lpm. Vacuum stable at 3.3E-7 Torr
Saturday, June 03, 2017, 09:08: Open IV4
Saturday, June 03, 2017, 09:32: Opening gas bottles. Source on. Reconfigured in Cathode bias
Saturday, June 03, 2017, 09:41: Started autoramping to 580 / 250 A at 2 A/min
Saturday, June 03, 2017, 09:42: COIL at 70 A, ANODE at 200 V
Saturday, June 03, 2017, 09:42: BIAS / EL / EE at 30 / 13 / 1.5 kV
Saturday, June 03, 2017, 09:47
Daqpro time 9:33
Device |
Flow [lpm] |
Temp [C] |
HS + MSP |
3.8 |
26 |
TBHT |
3.1 |
27 |
COIL + EE |
4.9 |
26 |
TGHT |
5.5 |
26 |
Sunday, June 04, 2017, 06:52 : Source at TGHT / TBHT 580 / 290 A over night and outgassing while measuring mass 20. Both anode current andFC6 current increased whie vacuum decreased. Ramped TBHT up to 300 A. Anode current now 68 mA, FC6 0.2 nA, FC0 3 uA
Monday, June 05, 2017, 16:04: Starting cool down
Monday, June 05, 2017, 22:04: Source off. Stopped turbo pumps.
Tuesday, June 06, 2017, 07:28: RGA off.
Tuesday, June 06, 2017, 07:30: Venting |
Monday, May 22, 2017, 09:43, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , , Tri-Coil CTL-FEBIAD test IV
|
Monday, May 22, 2017, 09:41: Roughing.
Monday, May 22, 2017, 10:00: Turbo pumps started.
Tuesday, May 23, 2017, 07:45: Power/sources on.
Tuesday, May 23, 2017, 07:58: BIAS / EZL / EE @ 35 / 13 / 1.5 kV .
Tuesday, May 23, 2017, 08:19: Coil @ 50 A . Anode @ 200 V
Tuesday, May 23, 2017, 08:20: Auto ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.
Tuesday, May 23, 2017, 10:22: IV4 opened.
Tuesday, May 23, 2017, 10:57: Increased ramping rate for TGHT to 4 A/min - AM
Tuesday, May 23, 2017, 19:05: Cooling down target for change to Anode bias tomorrow. - AM
Tuesday, May 23, 2017, 21:04: BIAS/EZL/EE off
Wednesday, May 24, 2017, 07:16: IV4 Closed.
Wednesday, May 24, 2017, 07:18: Power/Sources off.
Changed to Anode Bias.
Wednesday, May 24, 2017, 11:00: Coil @ 50 A . Anode @ 200 V
Wednesday, May 24, 2017, 11:02: Auto ramping TGHT / TBHT to 580 / 270 A @ 4 / 2 A per min.
Wednesday, May 24, 2017, 11:09: BIAS / EZL / EE @ 35 / 13 / 1.5 kV .
Tuesday, May 30, 2017, 07:02: Auto Cooling @ 2A/min
Thursday, June 01, 2017, 14:08: IV4 Closed. RGA off.
Thursday, June 01, 2017, 14:10: Ion gauge off. Turbos off.
Thursday, June 01, 2017, 16:51: Venting
Thursday, June 01, 2017, 21:16: Roughing. |
Wednesday, May 17, 2017, 10:17, Anders Mjos, , HP-FEBIAD-CTL, , , , , Problems/Solutions, Sparking between new coil line and ground electrode
|
Wednesday, May 17, 2017, 10:17: Sparking around 20 kV. Will need to vent to increase gap between water lines.
Turbos stopped.
Wednesday, May 17, 2017, 10:50: Reset IV4.
Wednesday, May 17, 2017, 10:59: Venting.
Wednesday, May 17, 2017, 11:42: Increased clearance to GND electrode.
Wednesday, May 17, 2017, 11:42: Roughing
Wednesday, May 17, 2017, 12:01: Turbos started
|
Tuesday, May 16, 2017, 14:25, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , , Tri-Coil CTL-FEBIAD test III 8x
|
Coil loose (Remove lid, Tighten and place lid again)
Tuesday, May 16, 2017, 14:24: Roughing.
Tuesday, May 16, 2017, 14:45: Turbo pumps on.
Wednesday, May 17, 2017, 06:53: RGA on. Vacuum @ 7.40e-07T
Wednesday, May 17, 2017, 08:04: Open waterline FS#5. OK. Vacuum @ 6.93e-07T
Wednesday, May 17, 2017, 08:05: Open waterline FS#4. OK.
Wednesday, May 17, 2017, 08:06: Open waterline FS#2. OK.
Wednesday, May 17, 2017, 08:07: Open waterline FS#3. OK.
Wednesday, May 17, 2017, 08:10: Vacuum @ 6.93e-07T. No response on RGA
Wednesday, May 17, 2017, 08:26: RGA Error out. Restart RGA.
Wednesday, May 17, 2017, 08:35: Vacuum ok @ 6.87e-07T. RGA ok.
Sparking issues
Wednesday, May 17, 2017, 13:00:
BIAS / EZL / EE @ 35 / 13 / 1.5 kV .
Coil @ 50 A . Anode @ 200 V
RGA Fatal errors. unable to restart. Reboot in morning.
Wednesday, May 17, 2017, 14:25: Auto ramping TGHT / TBHT to 300 / 150 A @ 2/1 A per min.
Wednesday, May 17, 2017, 15:05: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Thursday, May 18, 2017, 08:27: Auto ramping TGHT / TBHT to 400 / 200 A @ 2/1 A per min.
Thursday, May 18, 2017, 08:33: RGA on.
Thursday, May 18, 2017, 08:37: IV4 opened
Thursday, May 18, 2017, 08:42: Optics on/set
Monday, May 22, 2017, 07:55: RGA, Power/Sources off.
Monday, May 22, 2017, 07:59: Turbo pumps, Ion gauge off.
Monday, May 22, 2017, 09:03: Venting
Monday, May 22, 2017, 09:40: 6 block screws tightened. |
Wednesday, May 10, 2017, 15:07, Aaron Schmidt, , , , , , , , Pump down empty chamber. (FS#3 out)
|
FS#3 lines blanked off.
Wednesday, May 10, 2017, 14:40: Roughing
Wednesday, May 10, 2017, 15:05: Turbos on.
Wednesday, May 10, 2017, 15:10: Ion gauge on.
Disconnect Leak detector. Connect He to FS#3 (G) line.
Thursday, May 11, 2017, 07:44: RGA on.
Thursday, May 11, 2017, 08:23: Vacuum @ 1.85e-06T. He line pressurized to 50 PSI. Monitor RGA.
Thursday, May 11, 2017, 09:07: No response on RGA. Vacuum @ 1.85e-06T. Purge Helium.
Hook up dry system leak detector to leak check valve behind turbo.
Leak rate: 0.0e-09 atm-cc/sec on detector. T.P: 0.0e-04T.
Thursday, May 11, 2017, 09:18: Open check valve. Vacuum ok @ 1.76e-06T
Base leak rate: 2.5e-09 atm-cc/sec.
Thursday, May 11, 2017, 09:25: Open He & Pressurize to 50 PSI.
Thursday, May 11, 2017, 09:30: Base leak rate dropping slowly: 2.0e-09 atm-cc/sec. No leak detected. No response on RGA.
Thursday, May 11, 2017, 09:35: Base leak rate dropping slowly: 1.7e-09 atm-cc/sec. No leak detected. No response on RGA.
Thursday, May 11, 2017, 09:45: Base leak rate Ok: 1.7e-09 atm-cc/sec. No leak detected. No response on RGA. Close check valve. Purge line. Vent detector.
Leak detector on. Leak rate: 0.0e-09 atm-cc/sec on detector. T.P: 0.0e-04T.
Thursday, May 11, 2017, 13:24: Open check valve. Vacuum @ 1.41e-06T
Base leak rate: @.2.0e-09 atm-cc/sec.
Thursday, May 11, 2017, 13:30: Open He & Pressurize to 50 PSI.
Thursday, May 11, 2017, 13:37: Base leak rate dropping slowly: 1.0e-09 atm-cc/sec. No leak detected. No response on RGA.
Thursday, May 11, 2017, 13:40: Base leak rate Ok: 0.1e-09 atm-cc/sec. No leak detected. No response on RGA. Vent He.
Connect spray nozzle to He. Vacuum issue noticed on RGA: N & O. Check for leak on Chamber
Tuesday, May 16, 2017, 08:45: RGA off. Ion gauge off. Turbos off
Tuesday, May 16, 2017, 09:50: Venting |
Friday, May 05, 2017, 14:28, Aaron Schmidt, UC#20, LP-IG-LIS, , , , , , Conditioning Heat shield for UC#20 (2)
|
New O-rings installed on FS#3.
Friday, May 05, 2017, 14:24: Roughing.
Friday, May 05, 2017, 14:34: Waterlines reconnected to air lines. He likely still in lines. May show in RGA if there's an issue prior to opening the waterlines.
Friday, May 05, 2017, 14:47: Turbos started.
Friday, May 05, 2017, 17:59: Water leak still present on FS#3
Monday, May 08, 2017, 08:54: Line re-route on FS#3. Return line on (F) re-routed to Return line on (K). (EE)
Monday, May 08, 2017, 09:00: Open water into line FS#3 wait 10 minutes. Vacuum @ 4.52e-07T.
Monday, May 08, 2017, 09:12: Vacuum @ 4.52e-07T. Lines purged. No response on Vacuum or RGA.
Monday, May 08, 2017, 09:20: Line re-route on FS#3 through (K) supply to (G) & return on (E)
Monday, May 08, 2017, 09:28: Vacuum increased to 6.41e-07T. Response noticed on RGA. FS#3 purged & closed.
Monday, May 08, 2017, 09:30: Slow Vacuum increase to 6.67e-07T & climbing.
Monday, May 08, 2017, 10:13: Vacuum has decreased.
Monday, May 08, 2017, 10:26: Line re-route on FS#3 through (K) supply to (H) & return on (F).
Monday, May 08, 2017, 10:20: Open water into line FS#3 wait 10 minutes. Vacuum @ 4.69e-07T.
Monday, May 08, 2017, 10:30: Vacuum @ 4.60e-07T. Lines purged. No response on Vacuum or RGA.
Monday, May 08, 2017, 10:39: Spike on RGA while tightening (G)
Monday, May 08, 2017, 12:02: RGA off. Ion gauge & turbos off
Monday, May 08, 2017, 14:14: Vented. Lines adapted to leak detector on line (G) of FS#3. Line (E) blanked off. Check for leaks.
Monday, May 08, 2017, 14:49: Roughing.
Further purging of the lines required. Leak detector unable to achieve vacuum in the lines. Adapters removed. Line re-route on FS#3 through (K) supply to (G) & return on (E) for purge.
Tuesday, May 09, 2017, 07:30: Venting & Purging. Purge for a minimum of 20 mins.
Attach adapters. Hook up leak detector
Tuesday, May 09, 2017, 09:24: Leak found @ (G) line block
The (G) block line was disconnected and 'Blanked' off. The (G) line, block to feed through, was re-tested. No leak was found on blank off.
O-ring area cleaned. O-ring replaced. Blank removed. Block to Coil end reconnected. Leak highest when He sprayed directly on block.
Masking tape and/or 'putty' added block to block & confirm solder joint ok.
(E)(G) line removed. Block to block leak/sealing issue confirmed. (G) block leaks on the seat. (E) block ok. Tested externally. Achieves 1.0e-09 leak rate.
Wednesday, May 10, 2017, 09:22: Test stand (G) line from block to feed through has a separate leak. Cannot achieve below e-04 leak rate. Does not fully seal.
Removed heat shield to condition in evaporator 2. |
Thursday, May 04, 2017, 13:49, Aaron Schmidt, UC#20, LP-IG-LIS, , , , , , Conditioning Heat shield for UC#20 (1)
|
Thursday, May 04, 2017, 13:48: Roughing.
Thursday, May 04, 2017, 14:09: Turbos on.
Friday, May 05, 2017, 07:35: RGA on. Vacuum @ 1.56e-06T
Friday, May 05, 2017, 07:37: Waterlines opened gradually. Vacuum increased to 1.64e-06T. Response noted on RGA.
Friday, May 05, 2017, 07:45: Vacuum Increase into e-05T range. All waterlines turned off & purged.
Friday, May 05, 2017, 08:00: Vacuum decreased to 1.85e-06T.
Friday, May 05, 2017, 08:22: Open lines one by one & monitor. Vacuum @ 1.76e-06T.
Friday, May 05, 2017, 08:26: FS#4 TBHT cooling: Ok, No response.
Friday, May 05, 2017, 08:27: FS#2 TGHT cooling: Ok, No response.
Friday, May 05, 2017, 08:28: FS#5 HS cooling: Ok, No response.
Friday, May 05, 2017, 08:30: FS#3 EE cooling: Ok, No response.
Friday, May 05, 2017, 08:35: No immediate response.
Friday, May 05, 2017, 08:37: Vacuum spike into e-05T range.
Open lines one by one @ 10 minute intervals & monitor. Vacuum @ 1.56e-06T.
Friday, May 05, 2017, 09:30: FS#4 TBHT cooling: Ok @ 10 minutes. No RGA Response. Vacuum @ 1.56e-06T.
Friday, May 05, 2017, 09:40: FS#2 TGHT cooling: Ok @ 10 minutes. No RGA Response. Vacuum @ 1.56e-06T.
Friday, May 05, 2017, 09:50: FS#5 HS cooling: Ok @ 10 minutes. No RGA Response. Vacuum @ 1.56e-06T.
Friday, May 05, 2017, 10:00: FS#3 EE cooling
Friday, May 05, 2017, 10:01: No response @ 1 minute. Vacuum @ 1.56e-06T.
Friday, May 05, 2017, 10:02: No response @ 2 minutes. Vacuum @ 1.56e-06T.
Friday, May 05, 2017, 10:05: No response @ 5 minutes. Vacuum @ 1.56e-06T. Ok @ 6 min. ok @ 7 min.
Friday, May 05, 2017, 10:10: No response @ 5 minutes. Vacuum @ 1.56e-06T.
Friday, May 05, 2017, 10:11:39: Vacuum Increasing.
Friday, May 05, 2017, 10:12: Supply/Return closed. All lines purged.
Friday, May 05, 2017, 10:13: Vacuum @ 3.82e-06T and increasing.
Friday, May 05, 2017, 10:20: Vacuum @ 1.25e-05T. Line FS#3 closed.
Friday, May 05, 2017, 11:04: RGA off. Vacuum @ 1.56e-06T.
Friday, May 05, 2017, 11:05: Ion gauge. Turbos off.
Friday, May 05, 2017, 12:03: He lined into cooling. Venting. |
Tuesday, May 02, 2017, 14:03, Aaron Schmidt, , , , , , , , Pump down empty chamber. (FS#3 out)
|
Check to fit lines FS#3
Tuesday, May 02, 2017, 14:00: Rouging.
Wednesday, May 03, 2017, 07:07: Venting.
Check final fit. Mark up FS#3.
Wednesday, May 03, 2017, 08:11: Roughing.
Wednesday, May 03, 2017, 12:42: Venting.
Thursday, May 04, 2017, 13:35: FS#3 re-installed.
Thursday, May 04, 2017, 13:47: Roughing w/ UC#20 IG-LIS heat shield. |
Tuesday, April 18, 2017, 07:46, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1B & TSG:BV1B tripped
|
Tuesday, April 18, 2017, 07:30: TSG : TP1B Tripped on Saturday.
Tuesday, April 18, 2017, 07:40: TSG : BV1B opened. TSG : TP1B restarted.
Tuesday, April 18, 2017, 07:48: TSG : TP1B failed to restart.Turn off.
Tuesday, April 18, 2017, 07:59: TSG : BV1B opened. TSG : TP1B restart attempt. No audible response detected.
Tuesday, April 18, 2017, 08:01: The turbo pump is off and BV1B closed. Fault report entered #9815.
Tuesday, April 18, 2017, 09:40: Ion gauge, remaining turbo pump off.
Tuesday, April 18, 2017, 13:00: Vacuum Group arrival to change TSG : TP1B.
Once the turbo pump cooling line was loosened slightly, a slight water leak occurred. Line snapped. Water leak. Valves to all turbo pump cooling closed.
***NOTE*** - From Thursday, November 24, 2016, 08:05: TMS:TP2
Friday, November 25, 2016, 14:45: Turbos at speed. Vacuum at 1.9E-5 T
*** Note *** : One of the copper cooling lines was leaking. The line was fixed. Monitor. <---- Due to this recurring issue, the decision was made to air cool the turbo pumps.
Tuesday, April 18, 2017, 14:10: Air cooling to replace water cooling. TSG : TP1A already has air cooling. Replace the cooling on the other 3 of 4 turbo pumps.
Tuesday, April 18, 2017, 15:27: All turbo pump cooling replaced with air cooling. TSG : TP1B successfully replaced.
Wednesday, April 19, 2017, 07:57: Roughing.
Wednesday, April 19, 2017, 09:01: Turbo pumps on. Bypass made on water flow (Still air cooled overall)
Wednesday, April 19, 2017, 09:15: TSG :TP1A accidentally tripped. Restarted.
Wednesday, April 19, 2017, 09:42: Both turbo pumps off. Unable to achieve proper vacuum.
Wednesday, April 19, 2017, 11:04: Roughing.
Wednesday, April 19, 2017, 11:44: TSG :TP1A on.
Wednesday, April 19, 2017, 11:51: TSG :TP1B on.
|
Wednesday, April 12, 2017, 16:04, Anders Mjos, , , , , , , Problems/Solutions, Leak on FS#3 COIL and EE
|
A water to vacuum leak has been found on FS#3. The leak is not detected on the leak detector, but can be seen as an increase in vacuum and on partial water pressure on the RGA
Wednesday, April 12, 2017, 17:11: The leak is on circuit EG (Coil +). Confirmed with water pressure
Wednesday, April 12, 2017, 17:21: RGA off. Turbos stopped.
Wednesday, April 19, 2017, 13:00: Leak detector hooked up to TS. (Check Turbo)
Wednesday, April 19, 2017, 14:00: He to FS#3.
Wednesday, April 19, 2017, 14:31: Minimal response on leak detector. No response on RGA.
Wednesday, April 19, 2017, 14:36: Manual valve closed. Leak detector off. RGA off.
Wednesday, April 19, 2017, 14:37: FS#3 purged.
Wednesday, April 19, 2017, 14:39: Ion gauge off. Turbos off.
Wednesday, April 19, 2017, 14:44: Leak detector disconnected.
Thursday, April 20, 2017, 07:35: Venting
Thursday, April 20, 2017, 09:10: TRI-COIL CTL-FEBIAD removed.
Thursday, April 20, 2017, 09:23: Water lines (E) (G) removed w/ block.
Thursday, April 20, 2017, 09:30: Roughing.
Thursday, April 20, 2017, 10:04: Turbos on.
Thursday, April 20, 2017, 13:15: Leak detector attached & turned on.
Thursday, April 20, 2017, 13:25: Water lines FS#5 opened to create loop. Pressurized @ 30 PSI.
Thursday, April 20, 2017, 13:45: RGA on.
Thursday, April 20, 2017, 13:58: All lines opened, purged, and re-pressurized @ 30 PSI with He.
Thursday, April 20, 2017, 14:15: Minimal response on Leak detector. No response on RGA.
Friday, April 21, 2017, 07:26: Vacuum @ 4.87E-07T. No He response on RGA. Lines still pressurized @ 30 PSI of Helium.
Friday, April 21, 2017, 10:19: Vacuum level close, but not optimal after 24 hrs. 2e-07T range is optimal.
Friday, April 21, 2017, 10:22: Adjustment of Turbo (TSG:TP1B) flanges. Stud Flange to Chamber (loose nuts found). brief vacuum spike noted.
Friday, April 21, 2017, 10:27: Turbo pump flange to Stud Flange tightened. No change on vacuum.
Friday, April 21, 2017, 10:41: Test Stand Exhaust cleaned. Clog noticed. Monitor Vacuum
Monday, April 24, 2017, 10:24: Three leaks found on FS#3. Two on the soldered ends of the VCRS (Mid-line) and one on the block. Requires repair/replacement.
Tuesday, May 02, 2017, 08:32 : RGA off.
Tuesday, May 02, 2017, 08:33: Ion gauge & Turbos off.
Tuesday, May 02, 2017, 12:55: Venting
|
Monday, April 10, 2017, 15:12, Anders Mjos, , , , , , , Problems/Solutions, Vacuum leak on front door
|
The vacuum behaved erratic over night with excursion up into the mid 10^-6 Torr range. To investigate the chamber was vented. With the doors open, the o-rings and sealing surfaces were cleaned. When pumping down again a vacuum leak could be heard at the front door by the lock. The chamber was vented again twice, finally the two o-rings were swapped. This removed the large leak. The door is prevented from contacting the box at the lock, which is likely the source of the leak. |
Thursday, April 06, 2017, 12:06, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , In progress, Tri-Coil CTL-FEBIAD test
|
Thursday, April 06, 2017, 12:06: Roughing.
Thursday, April 06, 2017, 13:07: Turbo pumps on.
Thursday, April 06, 2017, 13:18: Ion gauge on.
Thursday, April 06, 2017, 13:25: RGA filament error FL5. RESET RGA.
Thursday, April 06, 2017, 13:34: RGA on.
Friday, April 07, 2017, 08:35: Waterlines opened. No response on RGA. Vacuum @ 3.24e-07T
Monday, April 10, 2017, 11:51: Vacuum unstable. Venting to investigate.
Monday, April 10, 2017, 11:52: Turbos stopped.
Monday, April 10, 2017, 14:57: Roughing.
Monday, April 10, 2017, 15:18: Turbos started.
Monday, April 10, 2017, 15:23: TP1 at speed. Opened gases.
Monday, April 10, 2017, 15:26: Turbos at speed. Vacuum at 2.0E-5 T
Tuesday, April 11, 2017, 16:55 : Stopped turbos.
Tuesday, April 11, 2017, 17:01: Venting through turbos to replace seals on HS
Tuesday, April 11, 2017, 17:48: Turbos started
Thursday, April 20, 2017, 09:10: Assembly removed from test stand. |
Tuesday, April 04, 2017, 14:33, Aaron Schmidt, , , , , , , , Power supply failure to E-rig
|
Wednesday, March 29, 2017, 15:15: DAC power supply appears to have failed. Pop sound and electrical smoke/smell noticed.
Tuesday, April 04, 2017, 14:15: Kepco BOP 500M power supply replaced with back up Kepco BOP 500M.
Tuesday, April 04, 2017, 14:32: No response from new power supply. All connections in OK. Further inquiry required.
It has been determined, due to the damage shown in the uploaded pictures, that theis power supply will need replacing. |
Friday, March 24, 2017, 14:43, Aaron Schmidt, Ta#51, LP-SIS, ITW, TM2, 41790-4, 41751-5, In progress, Conditioning Ta#51 9x
|
Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo pumps on.
Friday, March 24, 2017, 16:04: Ion gauge on.
Friday, March 24, 2017, 16:07: RGA on. Turbo pumps @ speed.
Monday, March 27, 2017, 09:07: Water lines opened. No response on RGA. Vacuum @ 1.81e-07T
Monday, March 27, 2017, 09:10: Power on.
Monday, March 27, 2017, 09:50: Troubleshooting: Sources/Optics non-responsive. Controls group notified.
Monday, March 27, 2017, 11:16: Optics all green minus the magnet TMS : MB1. PLC issue reported.
Monday, March 27, 2017, 11:30: PLC reboot. Brief whiteout on screens. Screen function returned. TMS : MB1 still interlocked.
Monday, March 27, 2017, 14:30: TMS : MB1 no longer interlocked. Optics non-responsive to 'P/S On'. Voltages can be adjust while optics are 'in black'
Tuesday, March 28, 2017, 09:30: Optics still have error but can be run.
Tuesday, March 28, 2017, 09:43: BIAS / EZL / EE @ 30 / 13 / 1.5 kV . Spark noted while bring up BIAS.
Tuesday, March 28, 2017, 09:45: IV4 opened.
Tuesday, March 28, 2017, 11:13: RGA Fatal error. Restarted 11:15.
Tuesday, March 28, 2017, 12:57: Optics ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.5 |
3.89 |
TBHT |
27.3 |
3.00 |
COIL + EE |
27.1 |
4.94 |
TGHT |
27.1 |
5.59 |
Tuesday, March 28, 2017, 13:01: Auto ramping TGHT / TBHT to 300 / 100 A @ 2A per min.
Tuesday, March 28, 2017, 15:52: TGHT / TBHT @ 300 / 100. Vacuum @ 2.16e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.5 |
3.85 |
TBHT |
26.7 |
3.12 |
COIL + EE |
25.8 |
4.92 |
TGHT |
26.5 |
5.59 |
Wednesday, March 29, 2017, 08:25: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Wednesday, March 29, 2017, 11:23: TMS : MB1 set from 'Reverse' to 'Normal' manually. Interlock Reset. (Mass Scan ok).
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
36.9 |
3.82 |
TBHT |
27.2 |
3.07 |
COIL + EE |
27.4 |
4.97 |
TGHT |
29.4 |
5.58 |
Wednesday, March 29, 2017, 13:09: Auto ramping TBHT to 220 A @ 2A per min.
Wednesday, March 29, 2017, 13:20: Source page @ 218.9A - Read back on power supply @ 219A. Fatal Error on RGA.
Wednesday, March 29, 2017, 13:27: Manually ramp TBHT to 230 A @ 2A per min (approx).
Wednesday, March 29, 2017, 15:15: DAC power supply appears to have failed. Pop sound and electrical smoke/smell noticed.
Wednesday, March 29, 2017, 15:28: Auto cooling TBHT to 220 A @ 2A per min.
Thursday, March 30, 2017, 08:42: Auto-cooling @ 2A per min.
Friday, March 31, 2017, 08:35: IV4 closed.
Friday, March 31, 2017, 08:44: Power/sources off.
Friday, March 31, 2017, 08:46: Ion gauge, Turbos off. Waterlines purged.
Thursday, April 06, 2017, 10:40: Venting |
Wednesday, March 22, 2017, 09:37, Anders Mjos, , , , , , , , Pump down empty chamber
|
Wednesday, March 22, 2017, 09:3: Roughing
Wednesday, March 22, 2017, 10:05: Turbos started
Friday, March 24, 2017, 11:01: Turbos off. Ion gauge off.
Friday, March 24, 2017, 14:42: Venting. |
Friday, March 10, 2017, 15:42, Aaron Schmidt, UC#19, , , , 41882-4, 41751-2, In progress, Conditioning Heat shield for UC#19
|
Friday, March 10, 2017, 15:40: Roughing.
Friday, March 10, 2017, 15:58: Turbo pumps started.
Friday, March 10, 2017, 16:19: Ion gauge on.
Friday, March 10, 2017, 16:22: RGA on.
Monday, March 13, 2017, 09:20: Water lines opened. No response on RGA. Vacuum @ 1.99e-07T
Monday, March 13, 2017, 09:38: Power/sources on
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.6 |
3.84 |
TBHT |
24.4 |
3.00 |
COIL + EE |
24.4 |
4.89 |
TGHT |
24.6 |
5.56 |
Monday, March 13, 2017, 09:42: Auto ramping TGHT to 580A @ 2A per min.
Monday, March 13, 2017, 11:58: Water: 95 PSI on Supply. 10 PSI on Return.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.1 |
3.82 |
TBHT |
26.3 |
3.20 |
COIL + EE |
24.7 |
4.95 |
TGHT |
25.4 |
5.56 |
Tuesday, March 14, 2017, 08:55: Vacuum @ 3.26e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.0 |
3.85 |
TBHT |
25.9 |
3.11 |
COIL + EE |
24.9 |
4.98 |
TGHT |
26.8 |
5.57 |
Tuesday, March 14, 2017, 15:54:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.1 |
3.82 |
TBHT |
25.2 |
3.07 |
COIL + EE |
25.0 |
4.94 |
TGHT |
27.1 |
5.58 |
Tuesday, March 14, 2017, 15:55: Auto-cooling started @ 2A per min
Tuesday, March 21, 2017, 09:30: Power/Sources off.
Tuesday, March 21, 2017, 14:11: RGA off
Tuesday, March 21, 2017, 14:13: Ion gauge & Turbo pumps off.
by Anders
Wednesday, March 22, 2017, 08:47: Venting
Wednesday, March 22, 2017, 09:3: HS removed |
Tuesday, February 21, 2017, 10:35, Aaron Schmidt, , , , , 42218-11, 41751-6, Problems/Solutions, Water leak (E)(G)
|
Water leak found on water block lines (E) & (G) on FS #3.
Both lines were removed at the water blocks and the coil connection at the heat shield. They ends were blanked off.
Tuesday, February 21, 2017, 10:32: Roughing
Tuesday, February 21, 2017, 10:34: BV1B opened.
Tuesday, February 21, 2017, 10:51: Turbo pumps started.
Tuesday, February 21, 2017, 11:23: Ion gauge & RGA started. Vacuum @ 7.60E-06T.
Wednesday, February 22, 2017, 10:30: The test stand was pressurized with Air (HPA). The loop was completed through the heat shield line FS #5.
Pressurized @ 80 PSI w/ HPA. Monitor. No response on RGA or Vacuum.
Wednesday, February 22, 2017, 10:42: The test stand was pressurized with Helium. The loop was completed through the heat shield line FS #5. The air was purged from the lines using the Helium.
Pressurized @ 30 PSI w/ Helium. Monitor.
Wednesday, February 22, 2017, 11:57: De-pressurize the lines. No response on RGA.
Wednesday, February 22, 2017, 13:47: Pressurize line (G) @ 40 PSI w/ Helium directly.
Wednesday, February 22, 2017, 14:00: No response on RGA or Vacuum. Disconnect.
Wednesday, February 22, 2017, 14:03: Pressurize line (E) @ 38 PSI w/ Helium directly.
Wednesday, February 22, 2017, 14:30: No response on RGA or Vacuum. Disconnect.
Thursday, February 23, 2017, 08:11: RGA, Ion gauge, & Turbo pumps off.
Thursday, February 23, 2017, 10:21: Venting.
Thursday, February 23, 2017, 11:45 Lines (G)(E) reinstalled w/ new seals
Thursday, February 23, 2017, 11:58: Roughing.
Thursday, February 23, 2017, 13:00: Turbos on.
Thursday, February 23, 2017, 13:05: Ion Gauge on.
Thursday, February 23, 2017, 13:10: RGA on.
Friday, February 24, 2017, 08:15: Waterlines opened on FS #3.
Friday, February 24, 2017, 08:18: RGA froze.
Friday, February 24, 2017, 08:20: Restarted RGA.
Friday, February 24, 2017, 08:48: FS #2, #4, #5 all opened.
Friday, February 24, 2017, 10:20: Vacuum & Leak appear to be stable. Vacuum @ 2.54E-07T
Friday, February 24, 2017, 10:25: Cage re-installed on top of vacuum Chamber
Friday, February 24, 2017, 10:28: Power/sources on
Friday, February 24, 2017, 10:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 4A per min. Heat check.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.4 |
4.06 |
TBHT |
22.2 |
3.28 |
COIL + EE |
21.2 |
5.16 |
TGHT |
21.4 |
5.82 |
Friday, February 24, 2017, 10:37: RGA froze (Fatal communication error message).
Friday, February 24, 2017, 10:40: RGA restarted.
Friday, February 24, 2017, 13:30: No major sign of leak detected. Standard response on Vacuum and RGA to heating.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
32.1 |
4.06 |
TBHT |
24.5 |
3.28 |
COIL + EE |
23.0 |
5.17 |
TGHT |
24.9 |
5.80 |
Friday, February 24, 2017, 13:55: Vacuum and water appear leveled off with no indication of a major leak.
Friday, February 24, 2017, 14:00: Auto-cooling started @ 4A per min.
Monday, February 27, 2017, 08:12: Power/sources off. The likely cause for the leak was one of the seals within lines (G)(E). Either one of the O-rings or VCR's. Once the seals were changed, no further leaks were detected.
Wednesday, March 08, 2017, 08:40: RGA timed out. RGA off. No leak detected.
Friday, March 10, 2017, 10:05: Water lines purged.
Friday, March 10, 2017, 10:09: Ion gauge & Turbos off.
Friday, March 10, 2017, 14:24: Venting. |
Wednesday, February 15, 2017, 13:42, Aaron Schmidt, , , , , 42218-11, 41751-6, Problems/Solutions, Vacuum Check (Water leak)
|
*Vacuum from previous test still active, minus turbo pumps. Same target, & heat shield as well.*
Wednesday, February 15, 2017, 13:38: Both Turbo pumps started.
Wednesday, February 15, 2017, 13:43: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, February 15, 2017, 13:51: RGA on. Vacuum @4.79E-05T.
Monitor water & vacuum with the RGA.
Thursday, February 16, 2017, 09:05: Main water supply & return shut off to the test stand. Purged. Vacuum @ 7.13E-07T.
Thursday, February 16, 2017, 09:16: Vacuum @ 3.59E-07T. Confirms water leak
Thursday, February 16, 2017, 09:17: RGA stopped.
Thursday, February 16, 2017, 09:20: RGA restarted.
Thursday, February 16, 2017, 09:30: Open main supply & return water supply. Individual valves are closed.
Thursday, February 16, 2017, 09:35: Open supply and return to FS #2. Vacuum @ 3.24E-07T. No response on RGA
Thursday, February 16, 2017, 09:40: Open supply and return to FS #3. Vacuum @ 6.76E-07T. Response on RGA. (Leak detected)
Thursday, February 16, 2017, 09:42: Close main Supply & Return. Purge & close FS #2 & FS #3 . Allow vacuum to stabilize.
Thursday, February 16, 2017, 09:50: Open main supply & return water supply. Open supply and return to FS #3. Vacuum @ 6.76E-07T. Response on RGA. (Leak confirmed)
Thursday, February 16, 2017, 09:53: Close main Supply & Return. Purge & close FS #3 . Allow vacuum to stabilize.
Thursday, February 16, 2017, 09:55: Open main supply & return. All valves are closed. Vacuum @ 3.51E-07T
Thursday, February 16, 2017, 10:00: Open supply and return to FS #4. Vacuum @3.26E-07T. No response on RGA.
Water leak confirmed in FS #3
Thursday, February 16, 2017, 10:05: Close main Supply & Return. Purge & close FS #4 . Allow vacuum to stabilize.
Thursday, February 16, 2017, 10:37: RGA off.
Thursday, February 16, 2017, 10:38: Ion gauge. Turbos off
Thursday, February 16, 2017, 11:58: Venting
Friday, February 17, 2017, 14:10: Roughing.
Friday, February 17, 2017, 14:30: Both Turbo pumps started.
Friday, February 17, 2017, 14:36: Ion gauge on.
Friday, February 17, 2017, 14:44: RGA on. Vacuum @ 2.32E-05T. Note* Waterlines FS #3 currently pressurized with 38 PSI Helium.
Monday, February 20, 2017, 08:26: Vacuum @ 2.60E-07T
Leak is apparent on RGA via Helium. He @ 20 PSI
Monday, February 20, 2017, 09:55: He in line brought up to 40 PSI. Monitor on RGA.
Monday, February 20, 2017, 10:00: No response on RGA. Connectivity gaps?.
Monday, February 20, 2017, 10:05: RGA restarted.
Monday, February 20, 2017, 10:39: Top cage removed from test stand. Waterlines purged of Helium. Immediate drop in RGA Helium reading.
Monday, February 20, 2017, 11:23: FS #3 (K) re-routed with return from (F). EE (K) pressurized with He @ 20-30 PSI. No significant response on RGA. Purge He
Monday, February 20, 2017, 11:36: FS #3 (K) returned back to (G). Return connected through (E). Pressurized to 20-30 PSI. No significant response on RGA. Purge He
Monday, February 20, 2017, 11:46: FS #3 (K) routed through to (H). (F) return to return. Pressurized to 20-30 PSI. Left pressurized for one hour
Monday, February 20, 2017, 12:51: No response on RGA. He Purged.
Monday, February 20, 2017, 12:55: Re-pressurize all of FS #3 with He @ 30 PSI.
Monday, February 20, 2017, 13:00: Purge Helium. Switch to water.
Monday, February 20, 2017, 13:12: Water supply/return on. No response on RGA.
Monday, February 20, 2017, 13:22: Slow response noted on RGA. Slow climb on water observed.
Monday, February 20, 2017, 13:30: Slight increase from 2.52E-07T to 3.26E-07T noted on Vacuum. Purge water lines. Reconnect/route lines & Test.
Monday, February 20, 2017, 13:40: FS #3 (K) re-routed with return from (F). EE (K). Open waterlines & observe.
Monday, February 20, 2017, 13:57: No response on RGA or Vacuum. Purge water & Re-route lines.
Monday, February 20, 2017, 14:05: FS #3 (K) returned back to (G). Return connected through (E). Open waterlines & observe.
Monday, February 20, 2017, 14:10: The water leak is apparent on (G) & (E) route. Vacuum climbed from 2.80E-07T to 3.33E-07T. RGA shows increase on water.
Monday, February 20, 2017, 14:14: Purge water lines.
Monday, February 20, 2017, 14:21: FS #3 (K) routed through to (H). (F) return to return. Waterlines opened to rule out (F) & (H) route.
Monday, February 20, 2017, 14:30: No response on RGA. Vacuum Stable. Purge water & Re-connect lines back to standard.
Monday, February 20, 2017, 15:22: Intermittent purging. Flow meter paddles pick up speed with air if purged for too long.
Tuesday, February 21, 2017, 08:34: RGA off, Ion gauge off, Turbos off.
Tuesday, February 21, 2017, 09:32: Venting. |
Monday, February 06, 2017, 09:14, Aaron Schmidt, , , , , , , Problems/Solutions, Power outage.
|
Weekend power outage. All turbos were tripped. Epics white out. Control group notified.
Monday, February 06, 2017, 09:07: Turbo pumps TMS : TP2 & TMS : TP6 restarted.
Monday, February 06, 2017, 09:12: TMS: IG6 ion gauge restarted.
Monday, February 06, 2017, 10:14: Turbo pumps TSG : TP1A & TSG : TP1B restarted.
Monday, February 06, 2017, 10:19: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, February 06, 2017, 10:22: TP1A @ speed 38 KRPM. |
Wednesday, January 25, 2017, 14:57, Aaron Schmidt, , , , , 42218-11, 41751-6, Done, Target cleaning test LP-SIS Full Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-11: Full Clean. Crystal Clear, Acetone, & Methanol used.
Thursday, February 09, 2017, 09:44: HS removed from test stand. Exchange target.
Thursday, February 09, 2017, 10:04: Target # 42218-11 placed into test stand. Door open for 20 minutes.
Thursday, February 09, 2017, 10:10: Roughing.
Thursday, February 09, 2017, 10:10: Doors sealed for roughing.
Thursday, February 09, 2017, 10:11: BV1B OPEN. Opened @ 428T.
Thursday, February 09, 2017, 10:29: Both Turbo pumps started.
Thursday, February 09, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Thursday, February 09, 2017, 10:37: TP1A @ speed 38 KRPM.
Thursday, February 09, 2017, 10:40: RGA on. Vacuum @ 1.45E-05T.
Thursday, February 09, 2017, 10:47: Strip tool Vacuum.Current restarted.
Thursday, February 09, 2017, 15:34: Check. Vacuum @ 3.97E-07T.
***NOTE: Small water anomaly on RGA affecting Vacuum***
***NOTE: Small water anomaly on RGA affecting Vacuum*** Continues. Monitor through heating.
Friday, February 10, 2017, 08:06: Water lines opened. No response on RGA. Vacuum stable @ 3.24E-07T.
Friday, February 10, 2017, 08:08: Power/Sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.4 |
4.02 |
TBHT |
24.2 |
3.22 |
COIL + EE |
24.2 |
5.26 |
TGHT |
24.4 |
5.90 |
08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
10:00: Check. Vacuum @ 3.68-4.87E-07T. (Anomaly variant)
11:40: Check. Vacuum @ XE-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.6 |
4.12 |
TBHT |
25.5 |
3.21 |
COIL + EE |
25.5 |
5.29 |
TGHT |
27.3
|
5.88 |
Check. Vacuum @ 4.41E-07T.
Auto-cooling started @ 2A per min. Vacuum @ 4.25E-07T.
Tuesday, February 14, 2017, 08:22: Power/sources off.
Tuesday, February 14, 2017, 08:23: Water lines purged.
Tuesday, February 14, 2017, 08:26: RGA off. Ion Gauge off. Turbo pumps off. |
Wednesday, January 25, 2017, 14:56, Aaron Schmidt, , , , , 42218-14, 41751-6, Done, Target cleaning test LP-SIS CC Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
LP-SIS Target # 42218-14: Crystal Clean only.
Tuesday, February 07, 2017, 09:48: HS removed from test stand. Exchange target.
Tuesday, February 07, 2017, 10:07: Target # 42218-14 placed into test stand. Door open for 19 minutes.
Tuesday, February 07, 2017, 10:10: Roughing.
Tuesday, February 07, 2017, 10:10: Doors sealed for roughing.
Tuesday, February 07, 2017, 10:11: BV1B OPEN. Opened @ 430T.
Tuesday, February 07, 2017, 10:29: Both Turbo pumps started.
Tuesday, February 07, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Tuesday, February 07, 2017, 10:37: TP1A @ speed 38 KRPM.
Tuesday, February 07, 2017, 10:39: RGA on. Vacuum @ 1.49E-05T.
Tuesday, February 07, 2017, 15:30: Check. Vacuum @ 3.26E-07T.
Wednesday, February 08, 2017, 08:12: Water lines opened. No response on RGA. Vacuum stable @ 1.29E-07T.
Wednesday, February 08, 2017, 08:14 : Power/Sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
20.8 |
4.06 |
TBHT |
20.5 |
3.17 |
COIL + EE |
20.6 |
5.27 |
TGHT |
20.7 |
5.88 |
Wednesday, February 08, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Wednesday, February 08, 2017, 10:00: Check. Vacuum @ 3.33E-07T.
Wednesday, February 08, 2017, 11:40: Check. Vacuum @ 1.70E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
30.2 |
4.06 |
TBHT |
21.0 |
3.17 |
COIL + EE |
21.1 |
5.22 |
TGHT |
21.3
|
5.82 |
Wednesday, February 08, 2017, 13:30: Check. Vacuum @ 3.53E-07T.
Wednesday, February 08, 2017, 15:30: Auto-cooling started @ 2A per min. Vacuum @ 3.88E-07T.
***NOTE: Small water anomaly on RGA affecting Vacuum***
***NOTE: Small water anomaly on RGA affecting Vacuum continues***
Thursday, February 09, 2017, 08:08: Sources/power off.
Thursday, February 09, 2017, 08:10: Water lines purged.
Thursday, February 09, 2017, 08:11: RGA off.
Thursday, February 09, 2017, 09:00: Venting |
Wednesday, January 25, 2017, 14:55, Aaron Schmidt, , , , , 42218-6, 41751-6, Done, Target cleaning test (Long) HP-SIS Full Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-6: Full Clean. Crystal Clear, Acetone, & Methanol used.
Wednesday, February 01, 2017, 09:47: HS removed from test stand. Exchange target.
Wednesday, February 01, 2017, 10:04: Target # 42218-6 placed into test stand. Door open for 17 minutes.
Wednesday, February 01, 2017, 10:10: Roughing.
Wednesday, February 01, 2017, 10:10: Doors sealed for roughing.
Wednesday, February 01, 2017, 10:11 BV1B OPEN. Opened @ 431T.
Wednesday, February 01, 2017, 10:29: Both Turbo pumps started.
Wednesday, February 01, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, February 01, 2017, 10:37: TP1A @ speed 38 KRPM.
Wednesday, February 01, 2017, 10:40: RGA on. Vacuum @ 6.79E-05T.
Wednesday, February 01, 2017, 15:30: Check. Vacuum @ 3.18E-7T.
Thursday, February 02, 2017, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.29E-07T.
Thursday, February 02, 2017, 08:18: Power/Sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.7 |
3.92 |
TBHT |
22.5 |
3.08 |
COIL + EE |
22.5 |
5.10 |
TGHT |
22.7 |
5.66 |
Thursday, February 02, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Thursday, February 02, 2017, 10:00: Check. Vacuum @ 6.76E-07T.
Thursday, February 02, 2017, 11:41: Check. Vacuum @ 3.26E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
29.1 |
3.99 |
TBHT |
23.9 |
3.16 |
COIL + EE |
23.8 |
5.19 |
TGHT |
25.5 |
5.80 |
Thursday, February 02, 2017, 13:30: Check. Vacuum @ 1.97E-07T.
Thursday, February 02, 2017, 15:30: Check. Vacuum @ 1.88E-07T.
Friday, February 03, 2017, 08:45: Check. Vacuum @ 1.62E-07T
Friday, February 03, 2017, 08:50: RGA restarted.
Friday, February 03, 2017, 10:50: Auto-cooling started @ 2A per min.
Monday, February 06, 2017, 08:18: Multiple attempts made to restart epics. Strip tools are not available. Vacuum data not available (White out screen). (see power outage eLog)
Monday, February 06, 2017, 08:20: RGA confirmed shut down.
Monday, February 06, 2017, 08:23: Sources/power off.
Monday, February 06, 2017, 08:25: Water lines purged.
Monday, February 06, 2017, 10:14: Turbo pumps restarted.
Monday, February 06, 2017, 10:19: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, February 06, 2017, 10:22: TP1A @ speed 38 KRPM.
Tuesday, February 07, 2017, 08:13: Turbos off.
Tuesday, February 07, 2017, 09:10: Venting. |
Wednesday, January 25, 2017, 14:54, Aaron Schmidt, , , , , 42218-9, 41751-6, Done, Target cleaning test HP-SIS CC Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-9: Crystal Clean only.
Monday, January 30, 2017, 09:44: HS removed from test stand. Exchange target.
Monday, January 30, 2017, 10:01: Target # 42218-9 placed into test stand. Door open for 17 minutes.
Monday, January 30, 2017, 10:10: Roughing.
Monday, January 30, 2017, 10:10: Doors sealed for roughing.
Monday, January 30, 2017, 10:11: BV1B OPEN. Opened @ 350T.
Monday, January 30, 2017, 10:29: Both Turbo pumps started.
Monday, January 30, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, January 30, 2017, 10:37: TP1A @ speed 38 KRPM.
Monday, January 30, 2017, 10:40: RGA on. Vacuum @1.24E-05T.
Monday, January 30, 2017, 15:30: Vacuum @ 4.49E-07T.
Tuesday, January 31, 2017, 08:14: Water lines opened. No response on RGA. Vacuum stable @ 1.44E-07T.
Tuesday, January 31, 2017, 08:19: Power/Sources on.
Tuesday, January 31, 2017, 08:20: DAQPro loose. re-connected.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
20.9 |
3.95 |
TBHT |
20.7 |
3.08 |
COIL + EE |
20.9 |
5.13 |
TGHT |
21.1 |
5.72 |
Tuesday, January 31, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, January 31, 2017, 10:00: Check. Vacuum @ 7.73E-07T.
Tuesday, January 31, 2017, 11:40: Check. Vacuum @ 3.42E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.92 |
TBHT |
27.0 |
3.45 |
COIL + EE |
23.0 |
5.02 |
TGHT |
24.9 |
5.61 |
Tuesday, January 31, 2017, 13:30: Check. Vacuum @ 2.34E-07T
Tuesday, January 31, 2017, 15:30: Auto-cooling started @ 2A per min.
Wednesday, February 01, 2017, 08:10: Power/sources off.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.2 |
3.95 |
TBHT |
22.2 |
3.06 |
COIL + EE |
22.0 |
5.02 |
TGHT |
22.2 |
5.67 |
Wednesday, February 01, 2017, 08:14: Waterlines purged.
Wednesday, February 01, 2017, 08:15: RGA, Ion gauge, turbo pumps off.
Wednesday, February 01, 2017, 09:15: Venting. |
Wednesday, January 25, 2017, 09:48, Aaron Schmidt, , , , , 41882-4, 41751-6, Done, Out gas Heat Shield for Target cleaning test 7x
|
No EE. Insulators, gripper arms, and blank EE plate included
-New grounded 9 pins included in brackets
-TGHT included to out gas Heat shield
Wednesday, January 25, 2017, 09:45: Roughing
Wednesday, January 25, 2017, 10:04: Turbo pumps started.
Wednesday, January 25, 2017, 11:26: Ion gauge & RGA on.
Thursday, January 26, 2017, 08:25: RGA restarted. (Fatal communication error)
Thursday, January 26, 2017, 08:32: Water lines opened. No response on RGA. Vacuum stable @ 1.44e-07T.
Thursday, January 26, 2017, 08:35: Power/sources on.
Thursday, January 26, 2017, 08:37: Auto-ramping TGHT to 580A @ 2A per min. Vacuum @ 1.44e-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.5 |
4.02 |
TBHT |
23.3 |
3.13 |
COIL + EE |
23.3 |
5.18 |
TGHT |
23.4 |
5.78 |
Thursday, January 26, 2017, 13:11: RGA restarted. (Fatal communication error)
Thursday, January 26, 2017, 15:20: RGA restarted. (Fatal communication error)
Thursday, January 26, 2017, 15:26: RGA being shut down. (Fatal communication error)
Thursday, January 26, 2017, 15:31: RGA Restarted.
Friday, January 27, 2017, 08:06: RGA running ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
30.2 |
4.06 |
TBHT |
21.2 |
3.14 |
COIL + EE |
21.4 |
5.11 |
TGHT |
23.3 |
5.78 |
Friday, January 27, 2017, 15:23: Auto-cooling started @ 2A per min.
Monday, January 30, 2017, 08:02: RGA off. Ion Gauge off. Turbo pumps off.
Monday, January 30, 2017, 08:05: Power/sources off. Water lines purged.
Monday, January 30, 2017, 09:09: Venting. |
Tuesday, January 24, 2017, 14:14, Aaron Schmidt, , , , , , , , Calibrated leak tanks removed
|
Tuesday, January 24, 2017, 13:30: Calibrated leak tanks of Argon & Neon removed. Both old Neon tanks were re-installed in their place. |
Monday, January 23, 2017, 15:30, Aaron Schmidt, , , , , , , , Pump down empty chamber.
|
Monday, January 23, 2017, 15:30: Roughing
Wednesday, January 25, 2017, 09:05: Venting |
Friday, January 20, 2017, 08:45, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1A & TSG:BV1A tripped
|
Friday, January 20, 2017, 08:25: TSG : TP1A and TSG : BV1A were noticed to be tripped around 6am.
Friday, January 20, 2017, 08:42: Bypass to restart TSG : TP1A and TSG : BV1A. TP1A is at speed.
------
Continue to monitor. |
Tuesday, November 29, 2016, 11:20, Anders Mjos, , , , , , , Problems/Solutions, TSH:UHV1 remvoed
|
The variable leak rate valve will be used for TM3 HV spark tests in TCS |
Thursday, January 19, 2017, 13:23, Anders Mjos, , , , , , , Problems/Solutions, TSH:UHV1 remvoed
|
Anders Mjos wrote: |
The variable leak rate valve will be used for TM3 HV spark tests in TCS
|
Variable leak valve returned yesterday (2017-01-18). New calibrated leaks installed. Ar and Ne. System leak checked OK after. |
Wednesday, January 18, 2017, 09:23, Aaron Schmidt, Ta Test, LP-FEBIAD, , , 39530-3, , In progress, Tri-Coil FEBIAD for testing 12x
|
Wednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41: Turbo pumps started.
Wednesday, January 18, 2017, 11:01: Ion gauge on.
Thursday, January 19, 2017, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.70e-07T.
Thursday, January 19, 2017, 08:55: Power/Sources on. BIAS/EZL/EE @ 30/15/1.5 kV . Coil @ 50 A . Anode @ 200 V.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.9 |
3.99 |
TBHT |
24.8 |
3.15 |
COIL + EE |
24.7 |
5.16 |
TGHT |
24.7 |
5.05 |
Thursday, January 19, 2017, 08:59: IV4 opened. Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Friday, January 20, 2017, 08:25: TSG : TP1A and TSG : BV1A were noticed to be tripped around 6am.
Friday, January 20, 2017, 08:42: Bypass to restart TSG : TP1A and TSG : BV1A. TP1A is at speed.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.1 |
3.99 |
TBHT |
25.0 |
3.19 |
COIL + EE |
24.7 |
5.19 |
TGHT |
26.5 |
5.05 |
Friday, January 20, 2017, 11:48: Auto ramping TBHT to 320 A @ 2A per min.
Friday, January 20, 2017, 15:51: Coil @ 100A
Saturday, January 21, 2017, 11:00: Increased TB HT voltage limit to 2.75 V. TBHT current went back up from 313 to 319 A. -AM
Monday, January 23, 2017, 10:08: Argon Valve closed.
Monday, January 23, 2017, 10:33: Neon Valve closed.
Monday, January 23, 2017, 11:00: Auto-cooling @ 4A per min. Coil reduced from 100 A to 50 A
Monday, January 23, 2017, 13:32: Power/sources off.
Monday, January 23, 2017, 13:35: RGA off. IV4 closed. Ion gauge off. Turbo pumps off.
Monday, January 23, 2017, 14:45: Venting |
Tuesday, January 03, 2017, 08:27, Aaron Schmidt, , , , , , , , Pump down empty chamber. (Restart. Post holidays)
|
Tuesday, January 03, 2017, 08:26: TSG : RP1 & TMS : RP2 restarted.
Wednesday, January 04, 2017, 11:18: TSG : PV1 & TMS : PV2 opened.
Wednesday, January 04, 2017, 11:19: TSG : BV1A & TSG : BV1B opened. TMS : BV2 & TMS : BV6 open.
Wednesday, January 04, 2017, 11:25: Turbo pumps TSG : TP1A & TP1B on. Monitor startup.
Wednesday, January 04, 2017, 11:31: TSG : IG1 on. TP1B @ speed.
Wednesday, January 04, 2017, 11:34: TSG : TP1A @ speed
Wednesday, January 04, 2017, 11:35: Turbo pumps TMS : TP2 & TP6 on. Monitor Startup.
Wednesday, January 04, 2017, 11:40: Both Turbo pumps @ speed. TMS : IG6 on.
Friday, January 13, 2017, 08:49: Ion gauge off, Turbos off.
Wednesday, January 18, 2017, 08:28: Venting. |
Wednesday, November 30, 2016, 10:16, Aaron Schmidt, , , , , , , , Pump down empty chamber. (Close off for holidays)
|
Wednesday, November 30, 2016, 10:16: Roughing
Wednesday, November 30, 2016, 11:05: Turbo pumps on.
Wednesday, November 30, 2016, 11:13: Ion gauge on.
Thursday, December 15, 2016, 09:19: TMS : IG6 off. TSG : IG1 off.
Thursday, December 15, 2016, 09:20: TMS : BV6 & BV2 off. TSG : BV1A, & BV1B off. Turbo pumps TMS : TP6 & TP2 off. TSG : TP1B & TP1A off.
Friday, December 16, 2016, 07:59: Roughing pumps shut down. Test stand closed for the holidays. |
Wednesday, November 30, 2016, 07:25, Aaron Schmidt, , , , , , , , Camera Container test 3.
|
Wednesday, November 30, 2016, 07:23: Venting
Wednesday, November 30, 2016, 08:35: Roughing.
Wednesday, November 30, 2016, 09:01: RGA on. Turbos @ speed. Ion gauge on.
Wednesday, November 30, 2016, 09:35: RGA off. Ion gauge off. Turbo pumps off.
Wednesday, November 30, 2016, 09:47: Turbo pumps were internally vented. Venting continued. |
Monday, November 28, 2016, 15:39, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber/Check Exhaust
|
Monday, November 28, 2016, 15:35: Begin roughing. Monitor exhaust mesh cover.
*Cover was found on the ground earlier today and re-attached*
Monday, November 28, 2016, 15:55: Exhaust mesh OK. Roughing continued.
Tuesday, November 29, 2016, 14:55: Test partially vented. @ around 550 T. Roughing restarted. Test delayed until tomorrow.
Wednesday, November 30, 2016, 07:23: Venting |
Friday, November 25, 2016, 14:28, Anders Mjos, , , , , , , , Camera Container test 2
|
Friday, November 25, 2016, 14:28: Roughing
Friday, November 25, 2016, 14:47: Turbos started
Friday, November 25, 2016, 14:56: Turbos at speed. Vacuum at 6.4E-6 T. RGA on
Monday, November 28, 2016, 08:45: Ion gauge & Turbo pumps off.
Monday, November 28, 2016, 15:02: Venting.
Monday, November 28, 2016, 15:32: Camera removed & bagged. |
Thursday, November 24, 2016, 10:39, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:TP2
|
Thursday, November 24, 2016, 08:05: Whining sound (high pitch) heard from TMS:TP2
Thursday, November 24, 2016, 10:37: Sound fades in and out roughly every 3-5 minutes. Vacuum group notified. Monitor.
Thursday, November 24, 2016, 15:21: Vent tomorrow AM as per Vacuum group. Edi.
Thursday, November 24, 2016, 15:38: Turbo pumps TMS:TP6 & TMS:TP2 were turned of. Backing valves closed. Ion gauge IG6 also off.
Thursday, November 24, 2016, 16:34: Two short vent bursts. - AM
Friday, November 25, 2016, 10:21: Venting -AM
Friday, November 25, 2016, 11:00: Pump being replaced
Friday, November 25, 2016, 14:01: Roughing
Friday, November 25, 2016, 14:40: Turbos started.
Friday, November 25, 2016, 14:45: Turbos at speed. Vacuum at 1.9E-5 T
*** Note *** : One of the copper cooling lines was leaking. The line was fixed. Monitor.
Monday, November 28, 2016, 08:47: Turbo pump operating well. No leaks detected on cooling lines. |
Thursday, November 24, 2016, 10:36, Aaron Schmidt, , , , , , , , Camera Container test 1.
|
Thursday, November 24, 2016, 10:15: Discuss w/ Aurelia. Camera container filled with Argon. Place under Vacuum, monitor w/ RGA.
Thursday, November 24, 2016, 11:43:Pump down started. Camera and case placed near RGA.
Thursday, November 24, 2016, 12:42: Turbo pumps started
Thursday, November 24, 2016, 12:51: Turbo pumps at speed. RGA on
*Note: Nitrogen Anomaly noted on RGA and in report.*
Friday, November 25, 2016, 10:11 : Stopped turbos. RGA off. -AM
Friday, November 25, 2016, 11:10: Venting -AM |
Wednesday, November 16, 2016, 10:50, Aaron Schmidt, , , , , , , , Pump down empty chamber.
|
Wednesday, November 16, 2016, 10:50: Begin roughing.
Wednesday, November 16, 2016, 11:52: Turbo pumps on.
*Note* Unusual sound noticed right at the start up of TSG : TP1B. It was first noticed prior to venting UC#18. The sound only lasts 10-15 seconds within a minute of starting the pump. An odd whine with tapping sound. Operation is otherwise normal, but will continue to monitor the pump.
Wednesday, November 16, 2016, 11:57: Ion gauge on.
Wednesday, November 16, 2016, 12:03: Both pumps are at speed
Thursday, November 24, 2016, 10:08: Ion gauge & Turbo pumps off.
Thursday, November 24, 2016, 11:07: Venting. |
Thursday, October 27, 2016, 13:37, Aaron Schmidt, UC#18, LP-SIS, ITW, TM2, , 41751-3, In progress, Conditioning Heat shield for UC#18
|
Thursday, October 27, 2016, 13:36: Roughing.
Thursday, October 27, 2016, 14:27: Turbo pumps started.
Thursday, October 27, 2016, 14:33: Ion gauge on.
Thursday, October 27, 2016, 14:35: Both Turbo pumps at speed.
Thursday, October 27, 2016, 16:00: RGA on.
Friday, October 28, 2016, 07:57: Water lines opened. No response on RGA. Vacuum stable @ 2.80e-07T.
Monday, October 31, 2016, 09:42: Power/sources on.
Monday, October 31, 2016, 09:43: Auto-ramping TGHT to 500 A @ 2A per min.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.3 |
3.88 |
TBHT |
26.1 |
3.10 |
COIL + EE |
26.0 |
5.03 |
TGHT |
26.0 |
5.67 |
Monday, October 31, 2016, 14:46: TGHT @ 500 A, looks ok. Auto-ramping TGHT to 580 A @ 2A per min.
Monday, October 31, 2016, 15:28: TGHT @ 580 A.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.3 |
3.96 |
TBHT |
26.1 |
3.08 |
COIL + EE |
26.1 |
5.05 |
TGHT |
28.2 |
5.67 |
Wednesday, November 02, 2016, 08:23: Auto-cooling TGHT @ 2A per min.
Wednesday, November 02, 2016, 13:15: Auto-cooling complete.
Thursday, November 03, 2016, 08:40: Sources/power off.
Thursday, November 03, 2016, 08:42: Water lines purged.
Monday, November 07, 2016, 08:08: RGA off. Ion gauge off. Turbo pumps off.
Tuesday, November 08, 2016, 08:07: Turbo pumps restarted. Removal not yet required.
Tuesday, November 08, 2016, 08:13: Ion gauge switched on.
Wednesday, November 16, 2016, 08:05: Ion Gauge off. Turbo pumps off.
Wednesday, November 16, 2016, 09:45: Venting. |
Monday, October 24, 2016, 16:02, Aaron Schmidt, , , , , , , Problems/Solutions, Pump down empty chamber/Clean Exhaust/Test
|
Monday, October 24, 2016, 15:45: Remove metal mesh covering roughing pump exhaust.
Clean out mesh (3/4"-5/8" thick w/ layers of dust/material).
Monday, October 24, 2016, 15:52: Roughing 710.0 T.
Monday, October 24, 2016, 15:54: BV1B opened.
Monday, October 24, 2016, 16:00: Rouging 2.0 T.
Monday, October 24, 2016, 16:10: Turbo pumps available.
Tuesday, October 25, 2016, 08:08: Venting.
Tuesday, October 25, 2016, 08:40: Doors open.
Tuesday, October 25, 2016, 08:50: Roughing.
Tuesday, October 25, 2016, 08:51: Doors sealed for roughing.
Tuesday, October 25, 2016, 08:52: BV1B opened.
Tuesday, October 25, 2016, 09:10: Turbo pumps available & started.
Tuesday, October 25, 2016, 09:20: Ion gauge on.
Thursday, October 27, 2016, 08:35: Ion Gauge & Turbo pumps off.
Thursday, October 27, 2016, 11:44: Venting. |
Tuesday, October 18, 2016, 13:29, Aaron Schmidt, Ta#50, LP-SIS, ITE, TM4, 41790-5, 41751-1, In progress, Conditioning Ta#50 9x
|
Tuesday, October 18, 2016, 13:22: Roughing.
Tuesday, October 18, 2016, 13:46: Turbo pumps started.
Tuesday, October 18, 2016, 13:52: Ion gauge on.
Tuesday, October 18, 2016, 13:54: Both turbo pumps at speed.
Tuesday, October 18, 2016, 15:05: RGA on.
Wednesday, October 19, 2016, 08:46: Power/Sources on
Wednesday, October 19, 2016, 08:49: Waterline opened. No response on RGA. Vacuum stable @4.40E-7T
Wednesday, October 19, 2016, 08:57: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Wednesday, October 19, 2016, 08:58 : IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.9 |
3.90 |
TBHT |
27.7 |
3.06 |
COIL + EE |
27.6 |
5.08 |
TGHT |
27.7 |
5.70 |
Wednesday, October 19, 2016, 09:01: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Wednesday, October 19, 2016, 11:50: TMS:FC0 moved out & TMS:RPM0B began scanning continuously on their own. Monitor.
Wednesday, October 19, 2016, 14:45: RGA Restarted.
Wednesday, October 19, 2016, 15:25: RGA Restarted (Unable to save 14:45 Startup)
Friday, October 21, 2016, 13:27: Auto Cooling @ 2A per min
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
37.3 |
3.92 |
TBHT |
28.2 |
3.07 |
COIL + EE |
27.9 |
5.07 |
TGHT |
29.8 |
5.62 |
Friday, October 21, 2016, 15:39: IV4 Closed
Monday, October 24, 2016, 09:10:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.1 |
3.95 |
TBHT |
28.2 |
3.10 |
COIL + EE |
27.7 |
5.04 |
TGHT |
27.7 |
5.70 |
Monday, October 24, 2016, 09:10: Power/Sources off.
Monday, October 24, 2016, 09:20: Water lines purged.
Monday, October 24, 2016, 09:21: RGA off.
Monday, October 24, 2016, 09:23: Ion gauge & Turbo pumps off
Monday, October 24, 2016, 12:54: Venting. |
Friday, October 14, 2016, 13:17, Anders Mjos, , , , , , , Problems/Solutions, Powerbump tripped off turbos
|
Friday, October 14, 2016, 13:17: Restarted pumps
Friday, October 14, 2016, 13:4: Another trip: restarted pumps
Tuesday, October 18, 2016, 12:12: Venting. |
Tuesday, October 11, 2016, 14:55, Anders Mjos, , , , , , , In progress, Empty
|
Breaker tripped during roughing. Removed exhaust line during first 2 min.
Tuesday, October 11, 2016, 14:55: Turbos at speed. Vacuum at 1.0E-6 T
Wednesday, October 12, 2016, 12:09: Ion gauge & Turbo pumps off.
Wednesday, October 12, 2016, 13:52: Venting |
Friday, September 30, 2016, 11:14, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:RP1 Replacement
|
Friday, September 30, 2016, 10:01: Roughing pump RP1 failed during roughing. Breaker was tripped to RP1 & RP2.
Friday, September 30, 2016, 10:30: Roughing pump RP1 replaced and tested. |
Friday, September 30, 2016, 11:11, Aaron Schmidt, SiC#35, HP-FEBIAD, ITW, TM2, 39530-9, 41120-8, Done, Conditioning SiC#35 6x
|
Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01: Roughing stopped. RP1 failure. Breaker tripped.
Friday, September 30, 2016, 11:49: Roughing continued.
Friday, September 30, 2016, 12:37: Turbos started -AM
Monday, October 03, 2016, 09:00: RGA on.
Monday, October 03, 2016, 09:05: Waterline opened. No response on RGA. Vacuum stable @1.70E-7T.
Monday, October 03, 2016, 09:20: Power/Sources on. Gas sources opened/closed.
Monday, October 03, 2016, 09:39: Optics switched on. Monitor TMS:SX2
Monday, October 03, 2016, 09:47: Anode on @ 200 V
Monday, October 03, 2016, 09:49: Coil on @ 50A
Monday, October 03, 2016, 09:50: IV4 opened.
Monday, October 03, 2016, 09:58: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Monday, October 03, 2016, 10:08: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Monday, October 03, 2016, 10:12
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.0 |
3.99 |
TBHT |
27.5 |
3.21 |
COIL + EE |
26.8 |
5.26 |
TGHT |
26.9 |
5.78 |
Monday, October 03, 2016, 11:09: TMS:SX2 Fixed. No optics or sources affected.
Monday, October 03, 2016, 11:38: BIAS @ 30 kV. (Was actually set to 20 kV before). Ramping progress ok.
Monday, October 03, 2016, 15:56: TGHT / TBHT @ 580 / 290 A. RGA restarted.
Wednesday, October 05, 2016, 08:29: Optics found to be tripped : TMS:OCT4 , TMS:Q4 ,TMS:OCT3 ,TMS:SX3 ,TMS:Q3 ,TMS:SX2. Restarted
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.3 |
3.99 |
TBHT |
29.9 |
3.14 |
COIL + EE |
28.8 |
5.07 |
TGHT |
30.8 |
5.72 |
Wednesday, October 05, 2016, 09:20: Wire scanners reset. Emittance rig not reading properly.
Wednesday, October 05, 2016, 09:22: Auto ramping TBHT to 300 A @ 2A per min.
Thursday, October 06, 2016, 15:58: Auto-cooling TGHT / TBHT @ 2A per min.
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.4 |
3.95 |
TBHT |
29.4 |
3.09 |
COIL + EE |
28.8 |
5.05 |
TGHT |
30.8 |
5.70 |
Friday, October 07, 2016, 08:12: Source off - AM
Tuesday, October 11, 2016, 08:28: Turbos off. RGA off -AM
Tuesday, October 11, 2016, 13:38: Venting -AM |
Wednesday, September 07, 2016, 15:50, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:RP1 running uneven
|
Fault report was submitted.
Anders informed Anthony on Tuesday, Sept 6, 2016.
Fault report # 9233. |
Tuesday, September 13, 2016, 14:38, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 replaced
|
Aaron Schmidt wrote: |
Fault report was submitted.
Anders informed Anthony on Tuesday, Sept 6, 2016.
Fault report # 9233.
|
Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi |
Wednesday, September 14, 2016, 13:58, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 latched breaker
|
Anders Mjos wrote: |
Aaron Schmidt wrote: |
Fault report was submitted.
Anders informed Anthony on Tuesday, Sept 6, 2016.
Fault report # 9233.
|
Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi
|
Wednesday, September 14, 2016, 13:57: The pump does not run properly. Attempting to contact vacuum group
Found that the exhaust pipe needed to be disconnected from the pump. Asked plant group (Curtis) to investigate exhaust pipe on the outside of the building, to check if it is restricted again.
Thursday, September 15, 2016, 11:03: Starting turbos
Thursday, September 29, 2016, 11:16: Turbos stopped.
Friday, September 30, 2016, 08:24: Venting. |
Thursday, September 08, 2016, 09:12, Anders Mjos, , , , , , , Problems/Solutions, Filament change on IG6
|
Thursday, September 08, 2016, 08:20: Vacuum group changed to the other filament to investigate vacuum spikes on IG6
Spikes In Green.
Spikes in Grey.
|
Wednesday, September 07, 2016, 15:51, Aaron Schmidt, , , , , , , , Flexible waterlines test.
|
Wednesday, September 07, 2016, 15:35: Roughing
Thursday, September 08, 2016, 08:33: Turbo pumps started.
Thursday, September 08, 2016, 08:38: Ion gauge on. TP1B @ speed 42 KRPM.
Thursday, September 08, 2016, 08:41: TP1A @ speed 38 KRPM.
Thursday, September 08, 2016, 08:47: RGA on.
Thursday, September 08, 2016, 11:00: Checked and screenshots taken. Vacuum @ 1.38E-6T
DaqPro Logger HS+MSP flow checked. Connections disconnect and re-connect.
Thursday, September 08, 2016, 11:45: Waterlines opened. No response on RGA. Vacuum ok @ 1.21 E-6T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.78 |
TBHT |
28.6 |
2.96 |
COIL + EE |
28.2 |
4.89 |
TGHT |
28.4 |
5.49 |
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.6 |
3.68 |
TBHT |
28.6 |
3.02 |
COIL + EE |
28.2 |
4.91 |
TGHT |
28.2 |
5.51 |
Friday, September 09, 2016, 08:51: Vacuum ok @ 3.68E-7T
Friday, September 09, 2016, 15:35: Vacuum ok @ 3.35E-7T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.7 |
3.71 |
TBHT |
28.8 |
3.06 |
COIL + EE |
28.2 |
4.94 |
TGHT |
28.4 |
5.56 |
Monday, September 12, 2016, 08:05: Vacuum ok @ 1.97E-7T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.68 |
TBHT |
29.0 |
3.09 |
COIL + EE |
28.2 |
4.95 |
TGHT |
28.4 |
5.48 |
Monday, September 12, 2016, 15:09: Vacuum ok @ 1.97E-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.72 |
TBHT |
29.1 |
3.06 |
COIL + EE |
28.2 |
4.87 |
TGHT |
28.4 |
5.51 |
Tuesday, September 13, 2016, 08:17: Vacuum ok @ 1.79E-7T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.68 |
TBHT |
28.7 |
3.07 |
COIL + EE |
28.0 |
4.91 |
TGHT |
28.2 |
5.51 |
Tuesday, September 13, 2016, 08:19: RGA off. Ion Gauge off. Turbo pumps off.
Tuesday, September 13, 2016, 08:24: Waterlines purged.
Wednesday, September 14, 2016, 11:33: Venting -AM |
Friday, September 02, 2016, 15:47, Aaron Schmidt, SiC#34, LP-IG-LIS, ITE, TM4, 39814-V2-1, 41751-9, , Conditioning SiC# 34
|
Friday, September 02, 2016, 15:47: Roughing.
Friday, September 02, 2016, 16:18: Turbos started -AM
Friday, September 02, 2016, 16:28: Turbos at speed. Vacuum at 2.0E-5 T.
Tuesday, September 06, 2016, 08:13: RGA on.
Tuesday, September 06, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.62E-7T
Tuesday, September 06, 2016, 08:19: Power/sources on.
Tuesday, September 06, 2016, 08:30: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, September 06, 2016, 08:34: IV4 open. Auto ramping TGHT / TBHT to 580 / 250 A @ 2A per min.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.78 |
TBHT |
28.3 |
2.96 |
COIL + EE |
28.0 |
4.89 |
TGHT |
29.6 |
5.50 |
Tuesday, September 06, 2016, 13:56: Auto ramping TBHT to 270A @ 2A per min
Tuesday, September 06, 2016, 14:05: Turbo pump TP1A found off. Restarted.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
38.4 |
0.07 |
TBHT |
28.5 |
2.98 |
COIL + EE |
28.0 |
4.92 |
TGHT |
30.0 |
5.54 |
Tuesday, September 06, 2016, 20:49: Ramping down TGHT / TBHT at 2 / 1 A/min
Wednesday, September 07, 2016, 08:46: Sources off. RGA error out. RGA off
Wednesday, September 07, 2016, 08:53: IV4 closed. Ion gauge off.
Wednesday, September 07, 2016, 08:54: Turbo pumps off.
Wednesday, September 07, 2016, 09:06: Power off. Water lines purged.
Wednesday, September 07, 2016, 09:54: Venting. |
Monday, August 29, 2016, 10:08, Aaron Schmidt, , , , , , , , Pump down empty chamber.
|
Monday, August 29, 2016, 10:07: Roughing.
Friday, September 02, 2016, 14:33: Venting |
Wednesday, August 24, 2016, 09:16, Aaron Schmidt, , , , , 41882-4, 41751-6, , HS Test OR Clean 7x
|
Heat Shield Test (OR only).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-6 . OR only.
No insulators, bracket, or gripper arms. Blank/Plate (new one, old plate was too warped). No source cup.
Wednesday, August 24, 2016, 09:46 : 41751-3 removed from test stand. Exchange target & End plates to 41751-6
Wednesday, August 24, 2016, 10:08: 41751-6 placed into test stand. Door open for 22 minutes.
Wednesday, August 24, 2016, 10:10: Roughing.
Wednesday, August 24, 2016, 10:10: Doors sealed for roughing.
Wednesday, August 24, 2016, 10:18: BV1B OPEN. Opened @ 79T.
Wednesday, August 24, 2016, 10:41: Both Turbo pumps started.
Wednesday, August 24, 2016, 10:46: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, August 24, 2016, 10:49: TP1A @ speed 38 KRPM.
Wednesday, August 24, 2016, 11:45: RGA on. Vacuum @ 3.38E-6T.
Thursday, August 25, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 2.36E-7T
Thursday, August 25, 2016, 08:20: Power/sources on.
Thursday, August 25, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum @ 2.36E-7T.
Thursday, August 25, 2016, 11:21: Screen shots and check made @ 340-344A.
Thursday, August 25, 2016, 13:20: TGHT @ 580A. Vacuum @3.70E-7T.
Friday, August 26, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.53E-7T
Friday, August 26, 2016, 13:20: Cooling Complete. Vacuum @ 1.97E-7T
Monday, August 29, 2016, 08:19: RGA off. Ion gauge and Turbos off.
Monday, August 29, 2016, 09:28: Venting.
Monday, August 29, 2016, 09:35: Power/sources off. Waterlines purged. |
Monday, August 22, 2016, 08:20, Aaron Schmidt, , , , , 41882-4, 41751-3, , HS Test Full Clean
|
Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-3 . OR, Acetone, Methanol. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate (Warped from 41751-5). No source cup.
Monday, August 22, 2016, 09:50: 41751-5 removed from test stand. Exchange target & End plates to 41751-3
Monday, August 22, 2016, 10:15: 41751-3 placed into test stand. Door open for 25 minutes.
Monday, August 22, 2016, 10:18: Roughing.
Monday, August 22, 2016, 10:19: Doors sealed for roughing.
Monday, August 22, 2016, 10:25: BV1B OPEN. Opened @ 151T.
Monday, August 22, 2016, 10:50: Both Turbo pumps started.
Monday, August 22, 2016, 10:54: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, August 22, 2016, 10:58: TP1A @ speed 38 KRPM.
Monday, August 22, 2016, 11:50: RGA on. Vacuum @ 3.91E-6T.
Tuesday, August 23, 2016, 08:16: Water lines opened. No response on RGA. Vacuum stable @ 2.45E-7T
Tuesday, August 23, 2016, 08:19: Power/sources on.
Tuesday, August 23, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum @ 2.45E-7T.
Tuesday, August 23, 2016, 13:20: TGHT @ 580A. Vacuum @3.79E-7T.
Tuesday, August 23, 2016, 16:06: Auto-cooling started @ 2A/min. Vacuum @ 3.96E-7T.
Wednesday, August 24, 2016, 08:08: RGA off. Ion gauge and Turbos off.
Wednesday, August 24, 2016, 08:14; Power/sources off.
Wednesday, August 24, 2016, 08:25: Waterlines purged.
Wednesday, August 24, 2016, 09:14: Venting. |
Wednesday, August 17, 2016, 08:19, Aaron Schmidt, , , , , 41882-4, 41751-5, , HS Test OR Clean
|
Heat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-5 . OR only. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Wednesday, August 17, 2016, 09:45: 41751-4 removed from test stand. Exchange target & End plates to 41751-5
Wednesday, August 17, 2016, 10:08: 41751-5 placed into test stand. Door open for 22 minutes.
Wednesday, August 17, 2016, 10:10: Roughing.
Wednesday, August 17, 2016, 10:10: Doors sealed for roughing.
Wednesday, August 17, 2016, 10:18: BV1B OPEN. Opened @ 136T.
Wednesday, August 17, 2016, 10:41: Both Turbo pumps started.
Wednesday, August 17, 2016, 10:46: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, August 17, 2016, 10:50: TP1A @ speed 38 KRPM.
Wednesday, August 17, 2016, 11:47: RGA on. Vacuum @ 3.65E-6T.
Thursday, August 18, 2016, 08:19: Water lines opened. No response on RGA. Vacuum stable @ 2.53E-7T.
Thursday, August 18, 2016, 08:22: Power/sources on.
Thursday, August 18, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.45E-7T.
Thursday, August 18, 2016, 11:39: Screen shots and check made @ 380-381A.
Thursday, August 18, 2016, 13:20: TGHT @ 580A. Vacuum @4.21E-7T.
Friday, August 19, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.88E-7T
Friday, August 19, 2016, 13:20: Cooling Complete. Vacuum @ 2.25E-7T.
Friday, August 19, 2016, 13:42: Water lines purged. Power/sources off.
Monday, August 22, 2016, 08:17: Vacuum @ 1.37E-7T. RGA off. Ion gauge off. Turbos off.
Monday, August 22, 2016, 09:16: Venting.
Flat Head screw on bottom end plate stripped. Warping found on cup Blank/plate. Discoloration noted on heat shield |
Monday, August 15, 2016, 08:09, Aaron Schmidt, , , , , 41882-4, 41751-4, , HS Test OR Clean
|
Heat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-4 . OR only. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Monday, August 15, 2016, 09:45: 41751-2 removed from test stand. Exchange target & End plates to 41751-2
Monday, August 15, 2016, 10:07: 41751-4 placed into test stand. Door open for 22 minutes.
Monday, August 15, 2016, 10:10: Roughing.
Monday, August 15, 2016, 10:12: Doors sealed for roughing.
Monday, August 15, 2016, 10:21: BV1B OPEN. Opened @ 104T.
Monday, August 15, 2016, 10:44: Both Turbo pumps started.
Monday, August 15, 2016, 10:50: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, August 15, 2016, 10:52: TP1A @ speed 38 KRPM.
Monday, August 15, 2016, 11:45: RGA on. Vacuum @ 4.20E-6T.
Tuesday, August 16, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 2.43E-7T
Tuesday, August 16, 2016, 08:20: Power/sources on
Tuesday, August 16, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.45E-7T
Tuesday, August 16, 2016, 11:15: Screen shots and check made @ 329-330A.
Tuesday, August 16, 2016, 13:20: TGHT @ 580A. Vacuum @4.16E-7T.
Tuesday, August 16, 2016, 16:00: Auto-cooling started @ 2A/min. Vacuum @ 4.25E-7T
Wednesday, August 17, 2016, 08:11: Vacuum @ 1.90E-7T. RGA off. Ion gauge off. Turbos off.
Wednesday, August 17, 2016, 08:16: Water lines purged. Power/sources off.
Wednesday, August 17, 2016, 09:09: Venting. |
Friday, August 12, 2016, 14:40, Aaron Schmidt, , , , , , , Problems/Solutions, Emittance scanner communications
|
Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05
Emittance rig communications affected.
Enter 100 on Dac -- Reads: -500
Enter -100 on Dac -- Reads: -500. No response
@ 10V
Friday, August 12, 2016, 15:53: Soft reboot on Emittance rig communications
Calibrate
test scan & park
Enter: 100 on Dac -- Reads 100
Enter: 200 on Dac -- Reads 200
Enter: 0 on Dac -- Reads 0
Enter: -200 on Dac -- Reads -200
Fixed |
Wednesday, August 10, 2016, 08:09, Aaron Schmidt, , , , , 41882-4, 41751-2, , HS Test Full Clean
|
Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-2 . OR, Acetone, Methanol. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Wednesday, August 10, 2016, 09:47: 41751-1 removed from test stand. Exchange target & End plates to 41751-2
Wednesday, August 10, 2016, 10:07: 41751-2 placed into test stand. Door open for 20 minutes.
Wednesday, August 10, 2016, 10:10: Roughing.
Wednesday, August 10, 2016, 10:13: Doors finally sealed for roughing.
Wednesday, August 10, 2016, 10:23: BV1B OPEN. Opened @ 59T.
Wednesday, August 10, 2016, 10:45: Both Turbo pumps started.
Wednesday, August 10, 2016, 10:50: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, August 10, 2016, 10:53: TP1A @ speed 38 KRPM
Wednesday, August 10, 2016, 11:45: RGA on. Vacuum @ 3.56E-6T
Thursday, August 11, 2016, 08:16: Water lines opened. No response on RGA. Vacuum stable @ 2.34E-7T
Thursday, August 11, 2016, 08:19: Power/sources on
Thursday, August 11, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.36E-7T
Thursday, August 11, 2016, 11:15: Screen shots and check made @ 329-330A.
Thursday, August 11, 2016, 13:25: TGHT @ 580A. Vacuum @4.16E-7T
Thursday, August 11, 2016, 15:54: Screen shots and check made @ 580A. Vacuum @4.43E-7T and increasing. Cool in Am.
Friday, August 12, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.88E-7T
Friday, August 12, 2016, 13:20: Cooling Complete. Vacuum @ 2.16E-7T.
Friday, August 12, 2016, 13:33: Water lines purged. Power/sources off.
Monday, August 15, 2016, 08:07: Turbo pumps, Ion gauge, and RGA off.
Monday, August 15, 2016, 09:14: Venting. |
Monday, August 08, 2016, 09:48, Aaron Schmidt, , , , , 41882-4, 41751-1, , HS Test Full Clean
|
Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-1 . OR, Acetone, Methanol. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Monday, August 08, 2016, 09:58: Ta#49 removed from test stand.
Monday, August 08, 2016, 10:07: 41751-1 placed into test stand. Door open for 9 minutes.
Monday, August 08, 2016, 10:10: Roughing.
Monday, August 08, 2016, 10:18: BV1B OPEN. Opened @ 88T.
Monday, August 08, 2016, 10:40: Both Turbo pumps started.
Monday, August 08, 2016, 10:45: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, August 08, 2016, 10:48: TP1A @ speed 38 KRPM.
Monday, August 08, 2016, 11:45: RGA on. Vacuum @ 2.02E-6T
Tuesday, August 09, 2016, 08:14: Water lines opened. No response on RGA. Vacuum stable @ 1.99E-7T
Tuesday, August 09, 2016, 08:19: Power/sources on.
Tuesday, August 09, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 1.99E-7T
Tuesday, August 09, 2016, 11:15: Screen shots and check made @ 329-330A
Tuesday, August 09, 2016, 13:20: TGHT @ 580A. Vacuum @4.23E-7T
Tuesday, August 09, 2016, 16:00: Auto-cooling @ 2A/min. Vacuum @ 3.77E-7T
Wednesday, August 10, 2016, 08:00: Vacuum @ 1.70E-7T. RGA off. Ion gauge off. Turbos off.
Wednesday, August 10, 2016, 09:14: Venting. |
Wednesday, August 03, 2016, 13:47, Aaron Schmidt, Ta#49, HP-SIS, ITW, TM2, , 41751-10, , Conditioning Ta#49 7x
|
Wednesday, August 03, 2016, 13:47: Roughing
Wednesday, August 03, 2016, 14:17: Turbo pumps started.
Wednesday, August 03, 2016, 14:22: Ion gauge on.
Thursday, August 04, 2016, 08:17: Water lines opened. No response on RGA. Vacuum stable @ 2.96E-7T
Thursday, August 04, 2016, 08:20: Power/Sources on.
Thursday, August 04, 2016, 08:30: BIAS/EZL/EE @ 30/ 13/ 1.5 kV .
Thursday, August 04, 2016, 08:35: IV4 open. Auto ramping TGHT/TBHT to 580/200 A @ 2A/1A per min.
Thursday, August 04, 2016, 15:06:
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.3 |
3.85 |
TBHT |
28.8 |
3.00 |
COIL + EE |
27.6 |
4.89 |
TGHT |
29.6 |
5.50 |
Friday, August 05, 2016, 10:12: RGA lost connection. Restarting.
Friday, August 05, 2016, 13:25: Graham Waters contacted. Constant voltage on emittance rig power supply. 10V? Spark from a while ago? Unable to scan.
Friday, August 05, 2016, 14:13: Auto cooling TGHT/TBHT @ 2A/1A per min.
Friday, August 05, 2016, 16:02: BIAS/ EZL/ EE @ 0/ 0/ 0 kV. Cooling continued.
Monday, August 08, 2016, 08:22 : RGA off. IV4 Closed.
Monday, August 08, 2016, 08:23: Turbo pumps off.
Monday, August 08, 2016, 08:26: Waterlines purged. Power off.
Monday, August 08, 2016, 09:27: Venting.
|
Thursday, July 28, 2016, 11:12, Aaron Schmidt, , , , , , , , Pump down empty chamber.
|
Thursday, July 28, 2016, 10:00 Roughing. |
Thursday, July 28, 2016, 08:21, Anders Mjos, , , , , , , Problems/Solutions, TMS:MB1 time out
|
Fault report submitted. 9156
Thursday, July 28, 2016, 09:55: Controls group resolved the issue by cycling the power on the canbus controller |
Thursday, July 21, 2016, 09:51, Aaron Schmidt, , LP-FEBIAD, , , , , , Febiad Test - NEW COIL - No PE
|
Thursday, July 21, 2016, 08:55: Roughing.
Thursday, July 21, 2016, 09:50: Turbo pumps started.
Thursday, July 21, 2016, 09:54: Ion Gauge on.
Thursday, July 21, 2016, 11:12: RGA on.
Thursday, July 21, 2016, 15:12: Water lines opened. No response on RGA. Vacuum stable @ 5.7E-7 T
Friday, July 22, 2016, 08:40: Opening gas lines.
Friday, July 22, 2016, 09:09: Power/Sources on. BIAS/EZL/EE @ 30/13/1.5 kV . Coil @ 50 A . Anode @ 200 V.
Friday, July 22, 2016, 09:13: IV4 open. Auto ramping TGHT/TBHT to 580/270 A @ 2A/per min.
Friday, July 22, 2016, 09:18: Heat shield flow rate @ 3.82 lpm
Friday, July 22, 2016, 12:10: TBHT ramped to 300 A -AM
Friday, July 22, 2016, 14:08: TBHT ramped to 310 A -AM
Monday, July 25, 2016, 09:39:
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
38.0 |
3.82 |
TBHT |
27.9 |
2.96 |
COIL + EE |
27.7 |
4.94 |
TGHT |
29.7 |
5.51 |
Monday, July 25, 2016, 16:29: Changed the tune to improve mass resolution.
Wednesday, July 27, 2016, 14:37: Spark tripped off IG6
Wednesday, July 27, 2016, 14:38: BIAS / EZL / EE to 40 / 17.5 / 2 kV
Wednesday, July 27, 2016, 14:51: BIAS / EZL / EE to 45 / 19 / 2.5 kV
Wednesday, July 27, 2016, 15:00: BIAS / EZL / EE to 50 / 21.6 / 2.5 kV
Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05 knocked out magnet (RED)
Wednesday, July 27, 2016, 17:0: BIAS / EZL / EE to 30 / 13 / 1.5 kV. Ramping down target
Thursday, July 28, 2016, 08:03 : Turn off sources. Close IV4. Turn off Ion gauge. Turbos off.
Thursday, July 28, 2016, 09:09: Source gas control off. Venting.
|
Tuesday, July 19, 2016, 15:15, Aaron Schmidt, , , , , , 41751-7, , Tube only - No EE - With PE
|
Tuesday, July 19, 2016, 15:14: Roughing.
Tuesday, July 19, 2016, 15:48: Turbo pumps started.
Tuesday, July 19, 2016, 15:55: Ion Gauge on.
Wednesday, July 20, 2016, 08:15: RGA On.
Wednesday, July 20, 2016, 08:25: Power/water on. No response on RGA. Vacuum stable @ 2.7E-7 T
Wednesday, July 20, 2016, 08:28: Sources on BIAS/EZL/EE @ 30/13/0 Kv
Wednesday, July 20, 2016, 08:31: Auto-ramping TBHT @ 2A/min.
Wednesday, July 20, 2016, 13:01: Auto-Cooling TBHT @ 3A/min.
Wednesday, July 20, 2016, 14:45: Sources off.
Wednesday, July 20, 2016, 14:47: RGA off. IV4 Closed.
Wednesday, July 20, 2016, 14:49: Turbos off.
Wednesday, July 20, 2016, 14:53: Power off. Water line purged.
Thursday, July 21, 2016, 07:52: Venting |
Monday, July 18, 2016, 12:20, Aaron Schmidt, , , , , , 41751-7, , Tube only - No EE - No PE
|
Monday, July 18, 2016, 12:19: Roughing.
Monday, July 18, 2016, 13:13: Turbo pumps on.
Monday, July 18, 2016, 13:18: Ion gauge on.
Tuesday, July 19, 2016, 08:28: Power/Water on. No response on RGA. Vacuum stable @ 2.63E-7 T.
Tuesday, July 19, 2016, 08:43: Optics on. BIAS/EZL/EE on 30/13/0 kV. Auto-ramp TBHT to 110A @ 2 A/min.
Tuesday, July 19, 2016, 10:15: Auto-ramp TBHT to 130A @ 2 A/min.
Tuesday, July 19, 2016, 13:325: Auto-ramp down TBHT @ 2 A/min - AM
Tuesday, July 19, 2016, 13:36: Optics and BIAS / EZL / EE off -AM.
Tuesday, July 19, 2016, 14:28: Turbos off/Turbo vent.
Tuesday, July 19, 2016, 14:33: Venting.
|
Thursday, July 14, 2016, 13:22, Aaron Schmidt, , , , , , 41751-7, , Tube only - NEW EE w/insulators - No PE
|
Thursday, July 14, 2016, 14:41: Roughing started.
Thursday, July 14, 2016, 15:41: Turbo pumps started.
Thursday, July 14, 2016, 15:58: Ion gauge & RGA on.
Friday, July 15, 2016, 08:15: Water, power/sources on. Vacuum stable at 3.9E-7 T. No response on RGA.
Friday, July 15, 2016, 08:25: Optics on. BIAS/EZL/EE to 30/13/1.5kV
Friday, July 15, 2016, 08:30: Auto-ramp TBHT to 110A @ 2A/min
Friday, July 15, 2016, 11:19; Auto-ramp TBHT to 130A @ 2A/min
Friday, July 15, 2016, 11:21: IV4 opened
Monday, July 18, 2016, 09:03: TBHT cooling started @ 2A/min
Monday, July 18, 2016, 09:04: RGA disconnected/Filament off.
Monday, July 18, 2016, 10:16: Sources off. IV4 closed. Turbo pumps off.
Monday, July 18, 2016, 11:17: Venting. Note* Global reset used each time VV1 was opened and closed. VV1 becomes non-responsive otherwise.
Monday, July 18, 2016, 11:25: Water purged. Power off/lockout. |
Monday, July 11, 2016, 13:51, Aaron Schmidt, , , , , , 41751-7, , Tube only - NEW EE w/insulators
|
Monday, July 11, 2016, 13:49: Begin roughing.
10 µL: K & Rb added
5 µL: Cs added
Monday, July 11, 2016, 14:59 : Turbo pumps started.
Monday, July 11, 2016, 15:33 : Ion gauge on.
Tuesday, July 12, 2016, 08:13 : RGA on.
Tuesday, July 12, 2016, 08:18 : Water, power/sources on. Vacuum stable at 3.2E-7 T. No response on RGA.
Tuesday, July 12, 2016, 08:35: Auto-ramping TBHT only @ 1A/min to 110A. EZL/EE/BIAS to 13/1.5/30 kV.
Wednesday, July 13, 2016, 08:17: Reduced TBHT to 100 A -AM
Wednesday, July 13, 2016, 18:15: Auto-cool @ 1.5A/min
Thursday, July 14, 2016, 08:20: Sources/power off
Thursday, July 14, 2016, 08:27: RGA off, IV4 closed, Ion gauge off. Turbo pumps off. Water lines closed.
Thursday, July 14, 2016, 12:57: Venting
|
Wednesday, July 06, 2016, 10:42, Anders Mjos, , , , , , , Problems/Solutions, Emittance scanner check/repair.
|
Dave Morris increased the current from ~ 1 A to ~2.5 A. This seem to solve the problem with the in/out drive of the emittance meter |
Wednesday, June 29, 2016, 16:28, Aaron Schmidt, , , , , , , , Pump down empty chamber.
|
Wednesday, June 29, 2016, 16:28 : Roughing
Thursday, June 30, 2016, 08:44: Turbo pumps on.
Thursday, July 07, 2016, 13:11: Turbo pumps off. Ion gauge off.
Monday, July 11, 2016, 12:50: Venting. ERROR on PuTTY.
Monday, July 11, 2016, 13:05: IOC WHITEOUT?
Monday, July 11, 2016, 13:25 All returned to normal. |
Monday, June 27, 2016, 13:11, Aaron Schmidt, SiC#33, HP-SIS, ITW, TM2, , 41120-7, , Conditioning SiC#33 8x
|
Monday, June 27, 2016, 12:05: Roughing.
Monday, June 27, 2016, 13:08: Turbo pumps on.
Monday, June 27, 2016, 13:15: Ion Gauge on.
Monday, June 27, 2016, 13:27: RGA on.
Tuesday, June 28, 2016, 08:20: Water, power/sources on. Vacuum stable at 2.2E-7 T. No response on RGA.
Tuesday, June 28, 2016, 08:33: Auto ramping TGHT/TBHT @ 2A/1A min to 580A/200A.
Tuesday, June 28, 2016, 08:35: Turned on optics. BIAS/EZL/EE to 30/13/1.5kV
Tuesday, June 28, 2016, 08:47:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.8 |
3.82 |
TBHT |
28.8 |
3.06 |
COIL + EE |
27.1 |
4.90 |
TGHT |
27.3 |
5.50 |
Tuesday, June 28, 2016, 11:17: Restarted RGA program (after crash) -AM
Tuesday, June 28, 2016, 15:46:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.8 |
3.82 |
TBHT |
29.1 |
2.98 |
COIL + EE |
28.8 |
4.84 |
TGHT |
30.8 |
5.48 |
Wednesday, June 29, 2016, 08:21: Restarted RGA (crashed).
Wednesday, June 29, 2016, 08:22:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.8 |
3.82 |
TBHT |
29.9 |
3.05 |
COIL + EE |
28.7 |
4.84 |
TGHT |
30.6 |
5.48 |
Wednesday, June 29, 2016, 09:5: Ramping TBHT to 220 A
Wednesday, June 29, 2016, 11:06: EE to 2.0kV
Wednesday, June 29, 2016, 11:16: Auto cooling TGHT/TBHT @ 3A/1.5A min.
Wednesday, June 29, 2016, 13:45: Sources BIAS/EZL/EE off. TBHT @ 0A & TGHT @ 134.5A
Wednesday, June 29, 2016, 15:31:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
29.0 |
3.85 |
TBHT |
29.7 |
3.04 |
COIL + EE |
28.8 |
4.86 |
TGHT |
28.9 |
5.42 |
Wednesday, June 29, 2016, 15:39: Water lines purged. |
Friday, June 24, 2016, 08:07, Aaron Schmidt, , , , , , , , Emittance scanner check/repair.
|
Friday, June 24, 2016, 08:06: Ion gauge IG6 OFF. Turbo pumps TP6 and TP2 off.
Friday, June 24, 2016, 09:58: Venting.
Friday, June 24, 2016, 10:17: Remove emittance scanner for inspection.
Friday, June 24, 2016, 10:20: Roughing.
Disassemble, inspect.
Move bearing along screw. Acetone to break down old grease. Wiped clean. Move bearing back and forth, use pick to remove dirt. Re-grease.
Clean, and reassemble.
Test emittance scanner (outside of vacuum) . Draw in OK. Draw out OK.
Friday, June 24, 2016, 13:35: Venting.
Install emittance scanner.
Friday, June 24, 2016, 14:10: Roughing.
Test. Draws in fine. Draw out fails 3/4 of the way back up.
Friday, June 24, 2016, 14:32: Turbo pumps started.
Friday, June 24, 2016, 14:37: Ion gauge on.
Work to continue when more information is found on emittance scanner motor & history. |
Monday, June 20, 2016, 14:36, Aaron Schmidt, , , , , , , , Pump down empty chamber.
|
Monday, June 20, 2016, 12:50: roughing down
Monday, June 20, 2016, 14:30: Turbo pumps on. Ion gauge on.
Monday, June 27, 2016, 09:00: Ion gauge off. Turbo pumps off. |
Thursday, June 16, 2016, 14:34, Aaron Schmidt, , LP-SIS, , , , , , TUBE ONLY (3)
|
Thursday, June 16, 2016, 14:33: Roughing. Plasma Electrode re-attached. Salts replaced.
Thursday, June 16, 2016, 15:12: Turbo pumps started.
Thursday, June 16, 2016, 15:22: Ion gauge on.
Friday, June 17, 2016, 08:32: Water opened. RGA ok. Vacuum stable @ 2.4E-7T. Power/sources on.
Saturday, June 18, 2016, 09:31: Cool down started.
Monday, June 20, 2016, 09:48: Sources/power/voltages off.
Monday, June 20, 2016, 10:06: IV4 reset. Water lines purged.
Monday, June 20, 2016, 10:11: RGA off. Ion gauge off. Turbos off.
Monday, June 20, 2016, 11:50: Venting |
Tuesday, June 14, 2016, 10:46, Aaron Schmidt, , LP-SIS, , , , , , TUBE ONLY - NO PLASMA ELECTRODE
|
Tuesday, June 14, 2016, 10:46: Begin roughing.
Tuesday, June 14, 2016, 11:16: Turbo pumps started.
Tuesday, June 14, 2016, 11:23: Ion gauge on.
Wednesday, June 15, 2016, 07:45: Water opened. RGA ok. Vacuum stable @ 1.9E-7T. Power/sources on.
Wednesday, June 15, 2016, 08:24: BIAS / EZL / EE to 30 / 13 / 1.5 kV
Wednesday, June 15, 2016, 08:24: Ramping TBHT to 120 A at 1 A/min
Wednesday, June 15, 2016, 10:23: EZL P/S was not on. Switched on and set to 13 kV
Wednesday, June 15, 2016, 15:05: Ramping down.
Thursday, June 16, 2016, 08:57: IV4 reset. RGA off. Ion gauge off. Turbo pumps off.
Thursday, June 16, 2016, 13:22: Water lines purged. Power/sources off. Venting. |
Friday, June 10, 2016, 12:42, Anders Mjos, , , , , , , Problems/Solutions, FC0 BIAS probelm
|
Graham Waters is looking into this problem. The IOC has been rebooted a couple of times. |
Thursday, June 09, 2016, 14:56, Aaron Schmidt, , LP-SIS, , , , , , TUBE ONLY
|
Thursday, June 09, 2016, 14:50: Begin roughing.
Thursday, June 09, 2016, 15:34: Turbo pumps started.
Thursday, June 09, 2016, 15:42: Ion gauge on.
Friday, June 10, 2016, 08:27: RGA on.
Friday, June 10, 2016, 08:35: Water opened. RGA ok. Vacuum stable @ 1.9E-7T
Friday, June 10, 2016, 08:50: BIAS/EZL/EE to 30/13/1.5kV.
Friday, June 10, 2016, 08:52: Auto ramping TBHT only @ 2A min to 50A.
Friday, June 10, 2016, 10:02: Auto ramping TBHT only @ 1A min to 100A.
Friday, June 10, 2016, 11:14: Continue ramping to 150 A -AM
Friday, June 10, 2016, 11:28: Stopped ramping ag 110 A -AM
Monday, June 13, 2016, 08:12: Auto ramping TBHT only @ 1A min to 150A.
Monday, June 13, 2016, 09:59: Ramping to 150 A - AM
Monday, June 13, 2016, 15:51: Ramping down.
Tuesday, June 14, 2016, 07:47: IV4 Reset. Ion gauge off. Turbos off.
Tuesday, June 14, 2016, 07:52: Power/sources off. Water purged.
Tuesday, June 14, 2016, 09:20: Venting. |
Friday, June 03, 2016, 14:50, Aaron Schmidt, , , , , , , , Pumping down empty chamber.
|
Friday, June 03, 2016, 14:50: Turbo pumps started.
Friday, June 03, 2016, 15:22: RGA on.
Monday, June 06, 2016, 15:40: RGA still connected. OK. Screen shot saved. Vacuum @ 8.5E-07T
Wednesday, June 08, 2016, 15:26: RGA off
Wednesday, June 08, 2016, 15:29: Ion gauge off. Turbo pumps off.
Thursday, June 09, 2016, 12:44: Venting -AM |
Wednesday, June 01, 2016, 10:02, Aaron Schmidt, UC#16, LP-IG-LIS, ITE, TM4, 39814-V2-1, , , Conditioning Heat shield for UC#16
|
Wednesday, June 01, 2016, 10:02: Begin roughing.
Wednesday, June 01, 2016, 10:44: Turbo pumps started.
Wednesday, June 01, 2016, 10:47: Ion Gauge IG1 ON.
Wednesday, June 01, 2016, 10:50; Turbos at speed. Vacuum at 1.24-5T.
Thursday, June 02, 2016, 08:54: Sources and power supply on. RGA on. Open water. Vacuum stable at 2.1E-07T. Heat shield water flow at 4.0 lpm.
Thursday, June 02, 2016, 09:05: Auto ramping TGHT/TBHT @ 2A min to 580A/250A
Thursday, June 02, 2016, 09:10: BIAS/EZL/EE to 30/13/1.5kV. IV4 opened
Thursday, June 02, 2016, 11:54: Stopped auto ramping for lunch break. - AM
Thursday, June 02, 2016, 13:01 : Auto ramping resumed. -AM
Thursday, June 02, 2016, 15:03: TGHT/TBHT @ 580A/250A
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
36.1 |
3.99 |
TBHT |
27.2 |
3.14 |
COIL + EE |
27.1 |
5.18 |
TGHT |
29.2 |
5.78 |
Thursday, June 02, 2016, 20:43: ramping down TGHT/TBHT at 2 / 1 A/min - AM
Friday, June 03, 2016, 08:06: Source off. Turbo pumps off. Ion gauge off. IV4 closed.
Friday, June 03, 2016, 08:21: Supply water pressure: 103 PSI. Return pressure: 10 PSI.
Friday, June 03, 2016, 09:27: Venting. |
Thursday, May 12, 2016, 13:32, Aaron Schmidt, SiC, LP-SIS, , , 41077-3, , , EE new insulator Test, No PE , Dirty EE.
|
Thursday, May 12, 2016, 13:00: Begin Roughing.
Thursday, May 12, 2016, 13:40: Turbo Pumps started
Thursday, May 12, 2016, 13:46: Ion gauge switched on.
Friday, May 13, 2016, 08:33: Opened water supply for heat shield. Vacuum stable at 3.70E-7 T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.9 |
4.06 |
TBHT |
29.0 |
3.20 |
COIL + EE |
28.5 |
5.24 |
TGHT |
28.5 |
5.72 |
Friday, May 13, 2016, 10:01: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.
Friday, May 13, 2016, 13:55
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
3.95 |
TBHT |
29.8 |
3.16 |
COIL + EE |
29.0 |
5.17 |
TGHT |
30.0 |
5.72 |
Monday, May 16, 2016, 11:29:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
29.4 |
3.18 |
COIL + EE |
28.7 |
5.18 |
TGHT |
29.8 |
5.77 |
Monday, May 16, 2016, 15:59:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.9 |
3.20 |
COIL + EE |
29.1 |
5.21 |
TGHT |
30.1 |
5.77 |
Note: RGA misread.
Tuesday, May 17, 2016, 15:15:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
30.6 |
3.29 |
COIL + EE |
29.0 |
5.16 |
TGHT |
30.1 |
5.74 |
Note: RGA Misread.
Wednesday, May 18, 2016, 14:30: IV4 open. FC0 open
Wednesday, May 18, 2016, 14:58: FC0 closed.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.3 |
3.15 |
COIL + EE |
29.0 |
5.14 |
TGHT |
30.0 |
5.72 |
Thursday, May 19, 2016, 16:26:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.06 |
TBHT |
29.3 |
3.15 |
COIL + EE |
28.8 |
5.17 |
TGHT |
30.0 |
5.77 |
Friday, May 20, 2016, 14:59:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.6 |
3.20 |
COIL + EE |
28.8 |
5.14 |
TGHT |
30.0 |
5.79 |
Tuesday, May 24, 2016, 15:31:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.9 |
3.18 |
COIL + EE |
29.0 |
5.15 |
TGHT |
30.1 |
5.72 |
Thursday, May 26, 2016, 15:18:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.0 |
4.02 |
TBHT |
30.6 |
3.28 |
COIL + EE |
29.0 |
5.14 |
TGHT |
30.0 |
5.75 |
Friday, May 27, 2016, 15:27: IV4 Closed
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
32.2 |
3.42 |
COIL + EE |
28.7 |
5.22 |
TGHT |
29.7 |
5.77 |
Monday, May 30, 2016, 08:35:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.05 |
TBHT |
29.9 |
3.25 |
COIL + EE |
28.7 |
5.18 |
TGHT |
29.7 |
5.78 |
Monday, May 30, 2016, 08:54: Auto ramp down TGHT/TBHT @ 2A/1A per min to 0A.
Tuesday, May 31, 2016, 08:25: Ion gauge off. Turbo pumps off.
Wednesday, June 01, 2016, 09:10: Venting
Wednesday, June 01, 2016, 9:45: Water lines purged, power off. |
Friday, May 06, 2016, 10:18, Aaron Schmidt, SiC, LP-SIS, , , 41077-3, , , EE new insulator Test (2) No PE
|
Friday, May 06, 2016, 10:18: Begin roughing
Venting: VCR on HS not closed
Friday, May 06, 2016, 12:58: Roughing
Friday, May 06, 2016, 13:22: Started turbos
Friday, May 06, 2016, 15:32: Vacuum at 1.2E-5 T
Monday, May 09, 2016, 09:07: Opened water supply for heat shield. Vacuum stable at 2.78E-7 T.
Monday, May 09, 2016, 09:16:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.9 |
4.06 |
TBHT |
30.8 |
3.33 |
COIL + EE |
28.5 |
5.24 |
TGHT |
28.7 |
5.80 |
Monday, May 09, 2016, 09:35: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.
Monday, May 09, 2016, 13:26:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
31.8 |
3.40
|
COIL + EE |
28.8 |
5.19 |
TGHT |
30.0 |
5.82 |
Tuesday, May 10, 2016, 08:18:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
30.3 |
3.27
|
COIL + EE |
28.8 |
5.19 |
TGHT |
29.8 |
5.77 |
Tuesday, May 10, 2016, 12:36:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.06 |
TBHT |
29.9 |
3.20
|
COIL + EE |
28.8 |
5.18 |
TGHT |
29.8 |
5.82 |
Tuesday, May 10, 2016, 15:21:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.02 |
TBHT |
29.4 |
3.15
|
COIL + EE |
28.8 |
5.16 |
TGHT |
30.0 |
5.73 |
Wednesday, May 11, 2016, 08:45:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
29.3 |
3.16
|
COIL + EE |
28.8 |
5.13 |
TGHT |
30.0 |
5.77 |
Wednesday, May 11, 2016, 14:13:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.06 |
TBHT |
29.6 |
3.16
|
COIL + EE |
29.0 |
5.19 |
TGHT |
30.0 |
5.78 |
Wednesday, May 11, 2016, 17:39: Ramping down TGHT/TBHT -AM
Thursday, May 12, 2016, 08:04: Ion gauge off. Turbo pumps off.
Thursday, May 12, 2016, 11:08: Water lines off/purged. Venting.
Thursday, May 12, 2016, 11:32: Source off, lock on. |
Monday, May 02, 2016, 16:03, Aaron Schmidt, SiC, LP-SIS, , , 41077-3, , , EE new insulator Test
|
Monday, May 02, 2016, 16:01: Roughing.
Monday, May 02, 2016, 16:35: Turbos started -AM
Monday, May 02, 2016, 16:43: Turbos at speed. Vacuum at 1.6E-5 T - AM
Tuesday, May 03, 2016, 08:15: Opened water supply for heat shield. Vacuum stable at 2.5E-7 T. No response on RGA.
Tuesday, May 03, 2016, 08:33: Sources on
Tuesday, May 03, 2016, 08:37: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min
Tuesday, May 03, 2016, 08:44: Sources off Except TGHT/TBHT
Tuesday, May 03, 2016, 08:47:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.9 |
3.99 |
TBHT |
29.6 |
3.24 |
COIL + EE |
28.5 |
5.15 |
TGHT |
28.7 |
5.77 |
Tuesday, May 03, 2016, 12:42:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.06 |
TBHT |
29.6 |
3.17 |
COIL + EE |
28.7 |
5.16 |
TGHT |
29.8 |
5.78 |
Tuesday, May 03, 2016, 15:29;
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.02 |
TBHT |
30.4 |
3.26 |
COIL + EE |
29.0 |
5.16 |
TGHT |
30.0 |
5.77
|
Wednesday, May 04, 2016, 08:00:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
3.99 |
TBHT |
29.5 |
3.22 |
COIL + EE |
28.7 |
5.16 |
TGHT |
29.6 |
5.74
|
Wednesday, May 04, 2016, 12:53:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.06 |
TBHT |
29.6 |
3.19
|
COIL + EE |
28.7 |
5.19 |
TGHT |
29.6 |
5.72
|
Wednesday, May 04, 2016, 14:56: TSHWSW-1: 8 Psi , Gauge below: 106 Psi
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
29.8 |
3.19
|
COIL + EE |
28.8 |
5.21 |
TGHT |
29.8 |
5.80
|
Wednesday, May 04, 2016, 15:01: Begin auto-cooling @ 2A/min.
Thursday, May 05, 2016, 08:33: TBHT/TGHT off. Ion gauge off. Turbo pumps off.
Friday, May 06, 2016, 08:10: Water lines purged. Power supply off. Venting. |
Thursday, April 21, 2016, 14:26, Aaron Schmidt, Ta#48, HP-SIS, ITW, TM2, 41369-5, 41120-5, In progress, Conditioning Ta#48
|
Thursday, April 21, 2016, 14:25: Begin pumping down.
Thursday, April 21, 2016, 15:02: Turbo pumps started.
Thursday, April 21, 2016, 15:34: Ion gauge on.
Thursday, April 21, 2016, 15:43: RGA on
Friday, April 22, 2016, 08:30: Opened water supply for heat shield. Vacuum stable at 2.4E-7 T. No response on RGA.
Friday, April 22, 2016, 08:44: Anode breaker switched on. While off, a charge was measured via TSH:ANODE:RDCUR.
Monday, April 25, 2016, 08:08: Noticed Turbo pump 1 shut down around roughly 4 pm Sunday afternoon. Will attempt restart.
Monday, April 25, 2016, 08:15: Interlocks bypassed for TP1, Pump Restarted.
Monday, April 25, 2016, 08:23: TP1 @ speed. Vacuum recovered to 1.9E-7 T
Monday, April 25, 2016, 08:41: IV4 opened. Auto ramping TGHT/TBHT to 400A/150A @ 2A/min.
Monday, April 25, 2016, 08:42: Turned on optics. BIAS/EZL/EE to 30/13/1.5kV
Monday, April 25, 2016, 13:40: Mass scan (test)
Monday, April 25, 2016, 14:04: Ramp down TGHT to 350A @ 2A/min.
Tuesday, April 26, 2016, 08:10: Auto ramping TGHT/TBHT to 580A/220A @ 2A/min.
Tuesday, April 26, 2016, 14:10: Auto ramping TBHT to 230A @ 2A/min.
Tuesday, April 26, 2016, 14:10: Ramp Down TBHT to 220A @ 2A/min.
Wednesday, April 27, 2016, 07:55: Auto ramp down TGHT/TBHT @ 2A/min to 0A.
Wednesday, April 27, 2016, 12:56: Ramp down Complete. Sources and optics off. IV4 Closed
Thursday, April 28, 2016, 08:52
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.9 |
4.02 |
TBHT |
28.6 |
3.16 |
COIL + EE |
28.3 |
5.22 |
TGHT |
28.7 |
5.75 |
Monday, May 02, 2016, 13:32: Ion gauge off. Turbo pumps off.
Monday, May 02, 2016, 15:03: Water supply closed.
Monday, May 02, 2016, 15:11: Venting |
Friday, April 15, 2016, 16:07, Anders Mjos, , , , , , , Problems/Solutions, ANODE polarity switched to positive
|
to test the effect of extraction when biasing of the target. |
Wednesday, April 20, 2016, 08:27, Anders Mjos, , , , , , , Problems/Solutions, ANODE polarity switched to negative
|
Anders Mjos wrote: |
to test the effect of extraction when biasing of the target.
|
Testing finished. Switched back to negative polarity. |
Wednesday, April 13, 2016, 13:03, Aaron Schmidt, , LP-SIS, , , 41790-2, 39956-8, , Testing restraint insulator prototype (2)
|
Wednesday, April 13, 2016, 13:03: Begin roughing. (Plasma electrode in. Salts in)
Wednesday, April 13, 2016, 13:34: Turbo pumps started.
Wednesday, April 13, 2016, 13:39: Ion Gauge on.
Thursday, April 14, 2016, 08:13: Open water to heat shield. Vacuum stable at 3.3E-7T.
Thursday, April 14, 2016, 08:19: Isolation valve opened. Auto ramping TGHT/TBHT to 300A/200A @ 2A/min.
Thursday, April 14, 2016, 08:33: Turned on optics. BIAS/EZL/EE to 30/13/1.5kV.
Thursday, April 14, 2016, 15:20: Ramping down TGHT from 300A to 250A @ 2A/min.
Friday, April 15, 2016, 8:23: Slow ramping TGHT to 300A/ @ 1/2A/min.
Friday, April 15, 2016, 10:30: Begin ramping down TGHT/TBHT. @3A/2A per min.
Friday, April 15, 2016, 12:54: Sources off.
Friday, April 15, 2016, 13:09 :Water lines purged & power down.
Monday, April 18, 2016, 08:23: Opened water. Auto ramping TGHT/TBHT to 300A/200A @ 3A/2A per min. BIAS/EZL/EE to 30/13/1.5kV
Monday, April 18, 2016, 09:58: Ramping TBHT to 230A @ 2A/min
Monday, April 18, 2016, 12:54: Sources off. Ramping down @ 2A/min.
Tuesday, April 19, 2016, 09:37 : BIAS and EE off - AM
Tuesday, April 19, 2016, 15:30: Water, Ion gauge and Turbos off.
Thursday, April 21, 2016, 13:41: Venting - AM |
Monday, April 04, 2016, 11:33, Aaron Schmidt, , LP-SIS, , , 41790-2, 39956-8, In progress, Testing restraint insulator prototype
|
Monday, April 04, 2016, 11:31: Begin roughing. (No plasma electrode)
Monday, April 04, 2016, 12:47: Started Turbos and Ion gauge
Tuesday, April 05, 2016, 09:09: Open water, Vacuum increased from 3.7E-07 to 2.2E-06 (roughly). Leak detected, Confirmed via RGA, Water increased from 7.0E-7T to 5.8E-6T.
Tuesday, April 05, 2016, 09:17: Turbo Pumps stopped. Ion gauge shut off. RGA off.
Tuesday, April 05, 2016, 10:28: Venting for inspection.
Tuesday, April 05, 2016, 11:31: Inspect, re-tighten with new seals.. Begin roughing.
Tuesday, April 05, 2016, 11:54: Turbo pumps started.
Tuesday, April 05, 2016, 11:59: Ion gauge turned on.
Tuesday, April 05, 2016, 15:45: Opened water for heat shield. Vacuum stable @ 6.4E-7T - 6.8E-7T.
Tuesday, April 05, 2016, 16:07: Vacuum stable @6.4E-7T.
Wednesday, April 06, 2016, 09:09: Started auto ramping up to 500A and 200A at 2A/min BIAS/EZL/EE to 30/13/1.5 KV
Wednesday, April 06, 2016, 09:22: Opened IV4. Switched on optics.
Wednesday, April 06, 2016, 14:29: Continue auto ramp up to 580A and 230A at 2A/min.
Thursday, April 07, 2016, 13:30: Most of the salts have evaporated FC0: at 3E-10A
Thursday, April 07, 2016, 14:10: Ramp down 2A/min.
Friday, April 08, 2016, 08:57: Ramp up 2A/min to 100A and 50A. ANODE to 200V.
Friday, April 08, 2016, 13:50: Ramp up 2A/min to 500A and 200A.
Monday, April 11, 2016, 08:29: Ramp up 2A/min to 580A and 230A. Vacuum stable @ 2.9E-7T
Monday, April 11, 2016, 09:44: ANODE current increased from 0 to 16 mA during the ramp up. -AM
Monday, April 11, 2016, 11:36: Increased TGHT voltage limit to 7.35 V. ANODE current now at 18 mA -AM
Monday, April 11, 2016, 16:00: BIAS / EZL / EE to 30 / 13 / 1.5 kV -AM
Tuesday, April 12, 2016, 08:47: Ramp Down 2A/min 230A to 200A TBHT only.
Tuesday, April 12, 2016, 09:31: Ramp Down 2A/min 580A to 500A TGHT only.
Tuesday, April 12, 2016, 13:55: Ramp up 2A/min 500A to 580A TGHT only.
Tuesday, April 12, 2016, 15:43: Ramp up 2A/min 580A to 590A, Voltage limit increased to 7.50 TGHT only.
Tuesday, April 12, 2016, 15:59: Ramp down 2A/min and 1A/min.
Wednesday, April 13, 2016, 08:04 : RGA off.
Wednesday, April 13, 2016, 08:20: Source off. IV4 closed. Turbo pumps off.
Wednesday, April 13, 2016, 09:38: Venting.
Wednesday, April 13, 2016, 10:59: Venting paused.
Wednesday, April 13, 2016, 11:03: Venting Continued.
Wednesday, April 13, 2016, 11:24: Venting complete. RP#1 removed. (No plasma electrode). |
Wednesday, March 30, 2016, 16:32, Aaron Schmidt, Ta#47, LP-SIS, ITE, TM4, 41790-1, 41120-05, In progress, Conditioning Ta#47
|
Wednesday, March 30, 2016, 16:31: Roughing.
Wednesday, March 30, 2016, 17:34 : Turbos started -AM
Wednesday, March 30, 2016, 18:50: Turbos at speed. Vacuum at 1.8E-6 T -AM
Thursday, March 31, 2016, 08:39: Opened water supply for heat shield. Vacuum stable at 3.2E-7 T. No response on RGA.
Thursday, March 31, 2016, 08:48: Started heating Target. TGHT to 500A, TBHT to 170A @ 2/1 A/min.
Thursday, March 31, 2016, 09:07: Opened IV4. BIAS/EZL/EE to 30/13/1.5 kV
Friday, April 01, 2016, 17:53: Ramping down TGHT/TBHT -AM
Monday, April 04, 2016, 08:32: Source off. Closed IV4. Stopped the Turbo pumps.
Monday, April 04, 2016, 09:49: Venting. |
Tuesday, March 29, 2016, 14:44, Aaron Schmidt, , , , , , , , Pumping down empty chamber.
|
Tuesday, March 29, 2016, 14:43: Roughing.
Wednesday, March 30, 2016, 14:33: Venting -AM |
Wednesday, March 16, 2016, 09:59, Anders Mjos, Target tube only, , , TM1, 39459-2, 40898-2, In progress, Conditiong Heat Shield for UC#15
|
Back up heat shield for UC#15
Wednesday, March 16, 2016, 09:58: Roughing
Wednesday, March 16, 2016, 12:54: Started Turbo pumps
Wednesday, March 16, 2016, 13:02: Turbos at speed, Vacuum at 7.16E-06T
Thursday, March 17, 2016, 08:30: Opened water on heat shield circuit. Vacuum stable at 3.0E-07T. No response on RGA.
Thursday, March 17, 2016, 08:37: Auto-Ramping started. TGHT to 500A @ 2A/min. EE to 1500V.
Thursday, March 17, 2016, 15:40 @ 500A and 6.76E-07T
Friday, March 18, 2016, 08:35: Auto-cooling. Vacuum @5.87E-07T.
Friday, March 18, 2016, 14:13: Source off. Stopped turbo pumps.
Tuesday, March 29, 2016, 13:22: venting |
Friday, March 11, 2016, 15:46, Anders Mjos, , , , , , , In progress, Testing end cap leak tightness
|
Two Ta-tubes sealed with 2 end caps each placed in the vacuum chamber.
Friday, March 11, 2016, 15:03: Rouging
Monday, March 14, 2016, 09:43: Caps still on the tube. Vacuum on CG1 5 mT
Wednesday, March 16, 2016, 08:37: Venting |
Friday, March 04, 2016, 14:23, Anders Mjos, Target tube only, LP-SIS, ITW, TM2, 39459-2, 41120-10, In progress, Conditiong Heat Shield for UC#15
|
Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos started
Friday, March 04, 2016, 15:11: Turbos at speed. Vacuum at 3.5E-5 T.
Monday, March 07, 2016, 08:34: Opened water. Vacuum stable at 6.7E-7 T. No response on RGA
Monday, March 07, 2016, 08:46: Started auto-ramping TGHT to 420 A at 2 A/min. EE to 1500 V
Tuesday, March 08, 2016, 08:26: Continued auto-ramping TGHT to 500 A.
Wednesday, March 09, 2016, 09:25: TGHT voltage limited at 488 A. Increased voltage limit from 6 to 6.5 V. Resumed auto-ramping to 500 A
Thursday, March 10, 2016, 08:19: Begin cool down @ 2 A/min ; Vacuum @ 7.1E-7 T
Thursday, March 10, 2016, 13:20: TGHT to 0 A. Switched off RGA.
Thursday, March 10, 2016, 14:04 : Source off. Stopped Turbo pumps.
Friday, March 11, 2016, 08:15: Begin venting.
Friday, March 11, 2016, 08:28: Heat shield water circuit has been purged.
|
Wednesday, March 02, 2016, 12:08, Anders Mjos, , , , , , , Problems/Solutions, TGHT insulator broken
|
The insulator for the TGHT terminals cracked during an attempt to remove a seized bolt.The right TGHT block was removed with the target and the bolt cut to remove the target. The single stand-off insulator on the target assembly cracked in the process.
Friday, March 04, 2016
Re-installed the TGHT terminal with new Keensert. |
Tuesday, February 23, 2016, 10:43, Anders Mjos, SiC, LP-SIS, , , 41077-3, , , EE coating test - no Plasma Electrode
|
Cleaned up EE and around target tube. Removed PE
Tuesday, February 23, 2016, 10:40: Roughing
Tuesday, February 23, 2016, 11:09: Starting turbos
Tuesday, February 23, 2016, 11:47: Turbos at speed. Vacuum at 7.5E-6 T
Tuesday, February 23, 2016, 13:43: EE to 1500 V. 518 uA
Tuesday, February 23, 2016, 15:07: RGA on
Wednesday, February 24, 2016, 08:48: Opened cooling water supply for HS circuit. Vacuum stable at 3.6E-7 T. No response on RGA
Wednesday, February 24, 2016, 08:51: IV4 opened
Wednesday, February 24, 2016, 08:56: BIAS/EZL/EE to 30 / 13 / 1.5 kV. Started auto-ramping to 420 / 220 A at 2 A/min.
Tuesday, March 01, 2016, 06:30: EE went into current limiting.
Tuesday, March 01, 2016, 08:30: Lowered EE voltage to 200 V
Tuesday, March 01, 2016, 09:41: Started cool down of target.
Tuesday, March 01, 2016, 09:50: RGA off
Tuesday, March 01, 2016, 13:27: BIAS / EZL / EE off. Stopped turbo pumps
Wednesday, March 02, 2016, 08:20: Venting |
Friday, January 22, 2016, 15:34, Anders Mjos, SiC, LP-SIS, , , 41077-3, , In progress, EE coating test
|
Friday, January 22, 2016, 15:30: Turbos started
Friday, January 22, 2016, 16:14: RGA ON
Monday, January 25, 2016, 10:30: Opened water. No response on vacuum.
BIAS / EZL / EE to 30 / 15 / 1.5 kV
Started auto-ramping to 300 / 200 A at 2 A/min.
Monday, January 25, 2016, 15:34: Aborted auto-ramping and stepped down to 180 A on TGHT / TBHT to conserve salts. Vacuum at 1.2 E-6 T
Tuesday, January 26, 2016, 08:30: Continue auto-ramping.
Tuesday, January 26, 2016, 09:15: Tuning by Alex
Wednesday, January 27, 2016, 08:24: Increased good/bad vacuum to 4/6 E-6T
Wednesday, January 27, 2016, 08:58: Continue ramping to TGHt 400 A
Thursday, January 28, 2016, 13:28: Continue ramping to TGHT / TBHT 420 / 220 A
Monday, February 01, 2016, 08:31: Ramp down started
Monday, February 01, 2016, 10:40: Isolation valve closed
Monday, February 01, 2016, 10:42: RGA off.
Tuesday, February 23, 2016, 09:07 Monday, February 01, 2016, 16:35: BIAS / EZL / EE off. Stopped turbos.
Tuesday, February 02, 2016, 09:28: Venting through turbo pump (air).
Wednesday, February 03, 2016, 08:35: Roughing
Wednesday, February 03, 2016, 09:06: Starting TP1B only.
Wednesday, February 03, 2016, 09:17: Force on TSG:IG1 for high vacuum test
Wednesday, February 03, 2016, 09:27 : EE current limiting around 1500 V with IG1 at 4E-5 T. EE can no longer hold more than some hundred volts before current limiting.
Wednesday, February 03, 2016, 10:01: Stopped turbo. Will vent and inspect insulator.
Wednesday, February 03, 2016, 10:06: Force removed from IG1.
Wednesday, February 03, 2016, 12:11: Venting
TEST 2
Cleaned PE and EE with acetone.
Friday, February 05, 2016, 15:05: Roughing
Friday, February 05, 2016, 15:48: Turbos started.
Friday, February 05, 2016, 15:56 : Turbos at speed. Vacuum at 3.7E-5 T
Tuesday, February 09, 2016, 08:55: Opened water to HS circuit. Vacuum stable at 6.2E-7 T. No response on RGA
Tuesday, February 09, 2016, 08:59: Started auto-ramping heaters.
Tuesday, February 09, 2016, 09:12: Opened IV4
Wednesday, February 10, 2016, 14:15: Increased voltage limit on TB HT
EE voltage limited over the weekend on Feb 14th. See attached.
Observed EE opening with telescope. Could not see any material buildup. Nice round shape visible.
Monday, February 15, 2016, 11:55: Starting ramp down of heaters.
Tuesday, February 16, 2016, 08:32: BIAS/EZL/EE off. Stopped turbos.
Tuesday, February 16, 2016, 08:37: RGA off.
Tuesday, February 23, 2016, 09:08: Venting |
Monday, January 18, 2016, 08:41, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today |
Monday, January 18, 2016, 15:38, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping. |
Tuesday, January 19, 2016, 18:34, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway. |
Wednesday, January 20, 2016, 14:26, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A. |
Wednesday, January 20, 2016, 19:11, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF. |
Thursday, January 21, 2016, 13:04, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK. |
Friday, January 22, 2016, 13:35, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing
|
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK.
|
Temperature measurements ended on Thursday, January 21, followed by cool down over night. |
Friday, January 22, 2016, 11:07, Anders Mjos, , , , , , , In progress, Venting
|
Friday, January 22, 2016, 11:07: Stopped turbos |
Monday, January 11, 2016, 09:02, Anders Mjos, , , , , , , , Venting
|
Monday, January 11, 2016, 09:02: Turbos stopped.
Monday, January 11, 2016, 12:58: Venting
Roughed down yesterday due to change of plans.
Tuesday, January 12, 2016, 09:58: Turbos started.
Thursday, January 14, 2016, 11:44: Turbos stopped. |
Wednesday, January 06, 2016, 09:28, Anders Mjos, , , , , , , Problems/Solutions, Water leak fixed on flow sensor for HS circuit
|
The Swagelok fitting on the return side of the flow sensor for the HS circuit was tightened to stop the leak. See e-fault 8650 |
Friday, December 18, 2015, 11:44, Anders Mjos, , , , , , , Problems/Solutions, IG6 not reading correctly
|
The new controller (XGS-600) installed for IG6 use a different voltage to pressure conversion than the previous models. This causes a discrepancy between values in EPICS and the value displayed on the controller. An e-fault has been submitted.
Friday, December 18, 2015, 14:40: EPICS updated and restarted. |
Wednesday, December 02, 2015, 15:30, Anders Mjos, , LP-SIS, , , , , , New centre block test
|
New 2x 9-pin connector grounding tool with gripper installed.
Wednesday, December 02, 2015, 15:30: Roughing
Wednesday, December 02, 2015, 17:14: Starting turbos
Wednesday, December 02, 2015, 17:32: Turbos at speed.
Thursday, December 03, 2015, 14:51: Opened water supply for HS circuit. Vacuum stable at 2.3E-7 T. No response on RGA
Monday, December 07, 2015, 08:45: Auto-ramping TBHT to 100 A at 2A/min. RGA on. Vacuum at 1.7E-7 T
Monday, December 07, 2015, 09:55: IV4 opened.
Target at TGHT / TBHT 100 A / 200 A over night.
Tuesday, December 08, 2015, 08:48: Ramping TGHT to 200 A at 4 A/min
Friday, December 11, 2015, 09:24: Ramping down target
Friday, December 11, 2015, 15:5: IV closed.
Tuesday, December 22, 2015, 15:11: RGA off |
Wednesday, December 02, 2015, 14:50, Anders Mjos, , , , , , , Problems/Solutions, Nitrogen supply for venting temporarely from bottle
|
No supply of N through the piping due to work on the N tanks. Confirmed with Geoff Hodgson. ISIS supply is shut off. Using a bottle until the supply is returned.
Monday, January 11, 2016
Nitrogen supply from ISIS restored and reconnected. |
Tuesday, November 17, 2015, 11:27, Anders Mjos, , , , , , , Problems/Solutions, Ran RP2 with gas ballast for 15 min
|
To recover performance |
Monday, November 16, 2015, 14:52, Anders Mjos, , , , , , , In progress, Current measurement
|
Installed Cu-shunts on TGHT and TBHT terminals. HS water looped.
Monday, November 16, 2015, 14:43: Roughing
Monday, November 16, 2015, 15:21: Turbos started.
Monday, November 16, 2015, 15:30: turbos at speed. Vacuum at 1.7E-5 T
Tuesday, November 17, 2015, 11:27: finished high current test.
Wednesday, December 02, 2015, 09:47: Turbos stopped.
Wednesday, December 02, 2015, 13:49: Venting |
Friday, October 16, 2015, 12:26, Anders Mjos, Target tube only, , , , , 41120-4, In progress, Conditioning HS for UC#14
|
Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06: Started turbos.
Friday, October 16, 2015, 13:25: Turbos at speed. Vacuum at 3.2E-5 T
IG1 filament beeing replaced.
Thursday, October 22, 2015, 13:56: Leak on water lines (pressurized all lines except HS line with helium)
Thursday, October 22, 2015, 13:57: Stopping turbos. RGA off.
Thursday, October 22, 2015, 15:02: Venting
Re-tightened all newly installed fittings.
Thursday, October 22, 2015, 15:41: Roughing
Thursday, October 22, 2015, 16:12: Turbos started.
Thursday, October 22, 2015, 16:22: Turbos at speed. Vacuum at 1.2 E-5 T. RGA on
Monday, October 26, 2015, 08:42: Stopped turbos. Water leak still present. RGA off.
Tuesday, October 27, 2015, 08:57: Venting
Tuesday, October 27, 2015, 14:25: roughing
Tuesday, October 27, 2015, 15:03: Turbos started.
Water can still be seen on the RGA when the TGHT cooling lines are pressurized.
Thursday, October 29, 2015, 14:00: Stopped turbos. RGA off.
Monday, November 02, 2015, 08:30: Venting |
Tuesday, November 03, 2015, 09:00, Anders Mjos, Target tube only, , , , , 41120-4, In progress, Conditioning HS for UC#14
|
Tuesday, November 03, 2015, 08:59: Starting TGHT ramping to 580 A at 1 A/min
Thursday, November 05, 2015, 16:39 : Ramping down
Monday, November 09, 2015, 08:13: Turbos stopped
Monday, November 16, 2015, 10:24: Venting |
Monday, November 02, 2015, 12:47, Anders Mjos, , , , , , , Problems/Solutions, Removed Swagelok T from rioght TGHT water lines
|
Mico replaced the T's with copper tube and leak checked.
Monday, November 02, 2015, 12:46: Roughing
Monday, November 02, 2015, 13:19: Starting turbos
Monday, November 02, 2015, 13:27: Turbos at speed. Vacuum at 2.6E-5 T. RGA on
Tuesday, November 03, 2015, 08:23: Pressurized TGHT line with 70 psi He. No response on vacuum or RGA.
Tuesday, November 03, 2015, 08:38: Opened water supply all lines. Vacuum stable at 6.8E-7 T. No response on RGA |
Wednesday, October 14, 2015, 16:13, Anders Mjos, , , , , , , Problems/Solutions, TMS:RP2 replaced
|
by vacuum group. The pump was making more noise than usual. |
Monday, October 19, 2015, 15:39, Anders Mjos, , , , , , , Problems/Solutions, Exhaust came off the new RP2
|
Anders Mjos wrote: |
by vacuum group. The pump was making more noise than usual.
|
It seems the exhaust line is blocked which caused pressure to build up and eventually forced the exhaust tube off RP2 as RP1 was roughing down the vacuum chamber.
Vacuum group has been notified and will ask plant group to investigate.
Plant group has removed the blockage. Exhaust lines are reconnected to the roughing pumps. |
Monday, October 19, 2015, 09:45, Anders Mjos, , , , , , , Problems/Solutions, IG1 filament dead
|
Will went chamber to replace the filament.
See e-fault 8501
Monday, October 19, 2015, 09:43: turbos stopped
Monday, October 19, 2015, 10:19: Venting
Monday, October 19, 2015, 15:36: Gauge replaced by Anthony.
Monday, October 19, 2015, 15:36: Roughing
Monday, October 19, 2015, 16:05: Turbos started
Monday, October 19, 2015, 16:13: Turbos at speed. Vacuum does not display correct value (1E-11 T)
Tuesday, October 20, 2015, 08:14: Switched on controller. Gauge seem to operate fine. |
Thursday, October 15, 2015, 11:19, Anders Mjos, , , , , , , Problems/Solutions, Right side TGHT connector block removed
|
The keensert has been worn out and will be replaced.
The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged). |
Wednesday, October 07, 2015, 11:16, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32
|
Wednesday, October 07, 2015, 11:15: roughing
Wednesday, October 07, 2015, 12:09 Turbos started
Wednesday, October 07, 2015, 12:18: Turbos at speed. Vacuum at 1.7E-5 T
Thursday, October 08, 2015, 08:55: Pumping down gas lines.
Thursday, October 08, 2015, 09:09: Opened gas line
Thursday, October 08, 2015, 09:24: Opened HS water line. Vacuum stable at 3.3E-7 T. No response on RGA
Thursday, October 08, 2015, 09:32: PS on. Starting autoramping to 580/300 A at 2/1 A/min good/bad vacuum at 1E-6 and $E-6
Thursday, October 08, 2015, 09:41: BIAS/EZL/EE to 30/15/1.5 kV
Thursday, October 08, 2015, 09:42: COIL to 50 A ANODE to 200 V
ANODE developed a short Thursday evening. Target was cooled down and will be inspected.
Friday, October 09, 2015, 12:36: Stopped turbos.
Friday, October 09, 2015, 13:26: Venting |
Tuesday, October 13, 2015, 07:47, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32
|
Target was pumped down on Friday.
Tuesday, October 13, 2015, 07:47: Opened water for HS. No response on RGA. Vacuum stable at 2.2E-7 T
Tuesday, October 13, 2015, 07:59: Gas lines open.
Tuesday, October 13, 2015, 08:00: IV4 opened
Tuesday, October 13, 2015, 08:04: BIAS/EZL/EE to 30 / 15 1.5 kV
Tuesday, October 13, 2015, 08:04: ANODE 200 V, COIL 50 A
Tuesday, October 13, 2015, 08:04: Ramping up heaters
Short on ANODE/CATHODE again. Ramping down.
Tuesday, October 13, 2015, 15:22: Turbos stopped.
Tuesday, October 13, 2015, 16:05: Venting |
Tuesday, October 13, 2015, 17:23, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32
|
Tuesday, October 13, 2015, 17:22: Roughing
Tuesday, October 13, 2015, 18:07: Started turbos.
Tuesday, October 13, 2015, 18:15: Turbos at speed. Vacuum at 1.9E-5 T
Wednesday, October 14, 2015, 07:55: Vacuum at 4.0E-7 T. Pumping on gas lines.
Wednesday, October 14, 2015, 08:00: Opened HS water. No response on vacuum or RGA.
Wednesday, October 14, 2015, 08:03: Ramping heaters to 580 / 300 A
Wednesday, October 14, 2015, 08:10: Opening gas lines.
Wednesday, October 14, 2015, 08:14: IV4 opened.
Wednesday, October 14, 2015, 16:00: RP2 replaced. See separate e-log entry.
Wednesday, October 14, 2015, 16:32: TBHT 305 A
Wednesday, October 14, 2015, 17:02: Opened He. - 5.6
Wednesday, October 14, 2015, 19:15: Started cool down of target.
Wednesday, October 14, 2015, 19:16 : Closed gas valves.
Thursday, October 15, 2015, 06:22: Source off. Stopped turbos. RGA off.
Thursday, October 15, 2015, 07:46: Venting
The bolt on the right side TGHT leg was difficult to remove. Se separate e-log entry |
Tuesday, October 13, 2015, 16:04, Anders Mjos, , , , , , , Problems/Solutions, IV4 timed out
|
Contacted Graham W. (controls) to have a look. It turned out to be a limit switch problem. Removed and reinstalled limit switch solved the time out issue. |
Friday, October 02, 2015, 08:35, Anders Mjos, , , , , , , Problems/Solutions, Venting beam line for TP exchange
|
Friday, October 02, 2015, 08:35: Turbo stopped |
Wednesday, September 30, 2015, 16:28, Anders Mjos, Test Target wrapped with heat shields, LP-SIS, , , , , In progress, New centre block test
|
T1 |
Probe Inside Target Left |
T2 |
|
T3 |
Probe Inside Target Right (touching tube) |
T4 |
|
Wednesday, September 30, 2015, 16:28: Roughing
Wednesday, September 30, 2015, 17:01: Turbos started
Wednesday, September 30, 2015, 17:09 : Turbos at speed. Vacuum at 3.4E-5 T
Thursday, October 01, 2015, 08:51: Opened HS water. No response on RGA. Vacuum stable at 7.2E-7 T
Thursday, October 01, 2015, 08:53: Atutoramping started to 580 / 230 A
Thursday, October 01, 2015, 09:49: Changed polarity on T3
Tuesday, October 06, 2015, 08:03: Turbos stopped
Tuesday, October 06, 2015, 09:54: Venting
|
Friday, September 18, 2015, 11:35, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP6 nor working
|
found in fault state this morning. Edi consulted and fault report submitted. |
Thursday, September 17, 2015, 14:05, Anders Mjos, Test Target, LP-SIS, , , , , In progress, New centre block test
|
T1 |
Probe Inside Target Left |
T2 |
Centre block attached outside |
T3 |
Probe on table below |
T4 |
not used |
Thursday, September 17, 2015, 14:04: Roughing
Thursday, September 17, 2015, 14:59: Turbos started
Friday, September 18, 2015, 08:56: Opened HS water . Vacuum stable at 3.3E-7 T. No response on RGA
Friday, September 18, 2015, 09:11: Starting heating
Monday, September 21, 2015, 07:49: Starting heating to 100 / 50 A
Switched/corrected T/C polarity for T2 and T3
Monday, September 21, 2015, 08:47: Continue heating to 580 / 200 A
Monday, September 21, 2015, 13:08: Continue heating TBHT to 230 A
Monday, September 21, 2015, 15:48: Starting cool down
Monday, September 21, 2015, 16:14: RGA off
Tuesday, September 29, 2015, 16:30: Turbos stopped
Wednesday, September 30, 2015, 13:07 : Venting |
Monday, September 14, 2015, 08:38, Anders Mjos, , , , , , , Problems/Solutions, RP2 increased pressure
|
e-fault submitted and vacuum group (Edi) notified.
Monday, September 14, 2015, 09:33: RP2 replaced by vacuum group |
Friday, September 11, 2015, 11:43, Anders Mjos, Ta#46, HP-SIS, ITE, TM4, , , Done, Ta#46 conditioning
|
EE is ST-200 material (AlN)
Friday, September 11, 2015, 11:0: Roughing
Friday, September 11, 2015, 12:12: Turbos started.
Friday, September 11, 2015, 12:22: Turbos at speed. Vacuum at 2.2E-5 T
Friday, September 11, 2015, 14:02: RGA on.
Monday, September 14, 2015, 08:05: Opened water for HS circuit. Vacuum stable at 2.3E-7 T. No response on RGA.
Monday, September 14, 2015, 08:08: Opened IV4
Monday, September 14, 2015, 08:11: Starting Target Heat. TGHT/TBHT 580 / 200 A at 2 / 1 A/min. Good/bad vacuum 4E-6 / 6E-6 T
Monday, September 14, 2015, 08:12: Interlock for BIAS does not clear although EE is on. Interlock cleared when beam line elements were turned on
Monday, September 14, 2015, 08:20: BIAS/EZL/EE at 30 / 15 / 1.5 kV
Monday, September 14, 2015, 08:25: Returned MB1 to remote control
Monday, September 14, 2015, 13:28: Target at temperature
Monday, September 14, 2015, 15:06: Heating TBHT to 230 A
Tuesday, September 15, 2015, 15:03: EE to 2 kV
Tuesday, September 15, 2015, 16:39: EE to 1.5 kV
Tuesday, September 15, 2015, 17:01: Starting target cool down
Wednesday, September 16, 2015, 09:01: HV and source off. Closed IV4. Turbos off
Wednesday, September 16, 2015, 12:52: RGA off. Venting |
Wednesday, September 09, 2015, 08:54, Anders Mjos, , , , , , , In progress, Venting
|
Wednesday, September 09, 2015, 08:53: Turbos stopped
Friday, September 11, 2015: Vented |
Saturday, August 29, 2015, 14:33, Anders Mjos, , , , , , , Problems/Solutions, Restarted IOC after power outage
|
Saturday, August 29, 2015, 15:50: Turbos started |
Monday, August 10, 2015, 18:01, Anders Mjos, , LP-SIS, , , , , In progress, Testing new center block target
|
Installed thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint
T3: Centre block top, outside
Monday, August 10, 2015, 18:01: Turbos started
Monday, August 10, 2015, 18:11 : Turbos at speed. Vacuum at 1.5E-5 T
Tuesday, August 11, 2015, 09:04: Opened water for HS. Vacuum stable at 5.2E-7 T. No response on RGA
Tuesday, August 11, 2015, 09:09 : Started auto-ramping to 250/100 A at 2/1 A/min.
Tuesday, August 11, 2015, 11:45: T1 857 C, T3 206 C (T2 no signal)
Tuesday, August 11, 2015, 11:45: Continue auto-ramping to 580/200 A.
Tuesday, August 11, 2015, 15:30: T1 1467, T3 816 at 580/230 A
Tuesday, August 11, 2015, 15:40: Starting cool down.
Wednesday, August 12, 2015, 09:40: Stopped turbos.
Wednesday, August 12, 2015, 13:20: Venting
The Centre block t/c was touching the TBHT terminal. Bent the t/c away from the TBHT terminal
Wednesday, August 12, 2015, 14:05: roughing
Wednesday, August 12, 2015, 14:48: Started turbos
Thursday, August 13, 2015, 09:06: Opened water for HS. Vacuum stable at 3.8E-7 T. No response on RGA
Thursday, August 13, 2015, 09:06: Started auto-ramping to 250/100 A at 2/1 A/min.
Thursday, August 13, 2015, 10:09: Aborting auto-ramping. Starting cool down. T/C shorts centre block to HS and may affect TGHT/TBHT current.
Thursday, August 13, 2015, 11:17: Turbos stopped. |
Tuesday, August 04, 2015, 13:37, Anders Mjos, , , , , , , Problems/Solutions, Equipment for outgassing measurements removed
|
|
Monday, July 13, 2015, 17:19, Anders Mjos, , LP-SIS, , , , , In progress, SIS Cup insulator clamping test
|
Monday, July 13, 2015, 17:09: Roughing
Monday, July 13, 2015, 17:51: Turbos started
Monday, July 13, 2015, 18:01: Turbos at speed. Vacuum at 3.7E-5 T
Tuesday, July 14, 2015, 09:05: Opened HS water. No response on IG or RGA.
Tuesday, July 14, 2015, 09:12: Started auto-ramping to 300 / 150 A
Tuesday, July 14, 2015, 14:46: TGHT at 400 A, TBHT at 150 A. HS 27 C, SIS cup 76 C
Wednesday, July 15, 2015, 13:57: TGHT 580, TBHT 200. HS 20, SIS cup 120 C
Wednesday, July 15, 2015, 15:08: TBHT 220 A. HS 20, SIS Cup 133 C
Wednesday, July 15, 2015, 15:08: Started ramping down heaters.
Thursday, July 16, 2015, 08:52: Turbos stopped.
Thursday, July 16, 2015, 10:24: Venting
Reconfigured target to no clamping (standard SIS Cup configuration)
Thursday, July 16, 2015, 11:41: Roughing
Thursday, July 16, 2015, 13:40: Turbos started.
Friday, July 17, 2015, 08:47: Opened S water. No response on IG or RGA.
Friday, July 17, 2015, 08:51 : Started auto-ramping to 580 / 220 A
Friday, July 17, 2015, 13:30: TGHT at 560 A, TBHT at 220 A. HS 25 C, SIS cup 514 C
Friday, July 17, 2015, 14:10: TGHT at 580 A, TBHT at 220 A. HS 23 C, SIS cup 530 C
Friday, July 17, 2015, 15:56: Starting cool-down
Monday, August 10, 2015, 08:43: Turbos stopped. Vacuum at 2.9E-7 T
Monday, August 10, 2015, 14:42: Venting |
Monday, July 06, 2015, 14:26, Anders Mjos, , , , , , , , Pumping down empty chamber
|
Monday, July 06, 2015, 14:26: Roughing
Wednesday, July 08, 2015, 09:26: Venting
Thursday, July 09, 2015, 11:42: Roughing
Thursday, July 09, 2015, 13:16: Turbos started.
Friday, July 10, 2015, 08:54 : Stopped turbos
Friday, July 10, 2015, 11:29 : Venting
Friday, July 10, 2015, 16:56: Roughing |
Monday, July 06, 2015, 09:29, Anders Mjos, , , , , , , Problems/Solutions, Replaced out gassing gauge on the backing line
|
|
Tuesday, June 30, 2015, 14:51, Anders Mjos, ZrC#7, LP-SIS, , TM2, 41177-2, , In progress, ZrC#7 Conditioning 2
|
Tuesday, June 30, 2015, 14:51: Roughing
Tuesday, June 30, 2015, 16:14: Started turbos. CG1 at 0.075 T
Tuesday, June 30, 2015, 16:23 : Turbos at speed. Vacuum at 1.4E-5 T
Thursday, July 02, 2015, 09:05: RGA on. Opened water for HS line. Vacuum stable at 4.6E-7 T. No response on RGA
Thursday, July 02, 2015, 09:06: IV4 opened
Thursday, July 02, 2015, 09:08: Staring auto-ramping heaters to TGHT / TBHT 300 A / 100 A at 2 / 1 A/min
Thursday, July 02, 2015, 11:22 : BIAS/EZL/EE to 20 / 10 1.5 kV
Thursday, July 02, 2015, 11:46: Continue heating to 400 / 150 A
Thursday, July 02, 2015, 13:48 : BIAS/EZL to 30 / 13 kV. Heating continued from 13:05.
Thursday, July 02, 2015, 15:55: EE held at 2 kV for 10 min. Current stable at 684 uA
Thursday, July 02, 2015, 15:55: EE back to 1.5 kV at 510 uA
Thursday, July 02, 2015, 20:06 : Starting cool down
Friday, July 03, 2015, 08:31: Closed IV4
Friday, July 03, 2015, 08:33: HV and source off
Monday, July 06, 2015, 11:04: Turbos stopped
Monday, July 06, 2015, 14:01: Venting |
Monday, June 29, 2015, 16:51, Friedhelm Ames, , , , , , , Problems/Solutions, TSG:BV1B closed
|
found TSG:TP1B tripped off. Closed TSG:BV1B as pressure at TSG:iG1 was rising. Pressure is coming down again.
Tuesday, June 30, 2015 by AM
Found the control cable not completely inserted. Inserted cable, which tripped TP1A. Started both turbo pumps again.
Tuesday, June 30, 2015, 09:54: Both turbos at speed.
Tuesday, June 30, 2015, 09:56: Stopped turobs. BV1B does not close when TP1B is switched off. Requested Dave Morris to look into it. All remaining BVs close when TP is swithced off in TMS and TSG sections. |
Thursday, June 25, 2015, 09:00, Anders Mjos, , LP-FEBIAD, , TM2, , , , TM2 FEBIAD Test
|
Thursday, June 25, 2015, 09:00: Water on HS. No vacuum response.
Thursday, June 25, 2015, 11:48: Started auto ramping heaters.
Thursday, June 25, 2015, 17:14: Target at 580/275 A. BIAS/EZL/EE at 30 / 13.5 / 1.5 kV
Friday, June 26, 2015, 08:04: Stopped TP1B for outgasing measurements
Friday, June 26, 2015, 10:25: Performing outgasing measurements
Friday, June 26, 2015, 10:35: Starting TP1B.
Friday, June 26, 2015, 10:39: TP1B at speed.
Friday, June 26, 2015, 11:12: Started cool-down.
Friday, June 26, 2015, 11:47: BIAS/EZL/EE/COIL/ANODE off
Friday, June 26, 2015, 11:47: Closed IV4
Tuesday, June 30, 2015, 13:32: Venting |
Monday, June 22, 2015, 15:49, Anders Mjos, , , , , , , In progress, Installed new 9-pin feed through
|
No wires connected yet.
Monday, June 22, 2015, 15:48: Roughing
Tuesday, June 23, 2015, 09:05: Roughing vacuum does not go below 0.9 T. Venting to investigate.
Tuesday, June 23, 2015, 10:16: Turbos started at 0.9 T
Tuesday, June 23, 2015, 10:276: Turbos at speed. Vacuum at 7.5E-4 T
Tuesday, June 23, 2015, 10:32: Stopped turbos
Tuesday, June 23, 2015, 11:01: Venting
Tuesday, June 23, 2015, 11:22: Roughing
Tuesday, June 23, 2015, 13:37: Venting
Tuesday, June 23, 2015, 16:48: Leak found on the newly installed f/t.
Wednesday, June 24, 2015, 09:29: Venting
Replaced f/t with a blank off.Installed TM2 FEBIAD test target
Wednesday, June 24, 2015, 10:31: Roughing
Wednesday, June 24, 2015, 11:07: Started turbos.
Wednesday, June 24, 2015, 11:17: Turbos at speed. Vacuum at 3.3E-5 T
Thursday, July 09, 2015
Installed the fixed f/t. |
Monday, June 15, 2015, 14:09, Anders Mjos, ZrC#7, LP-SIS, , TM2, 41177-1, , In progress, ZrC#7 Conditioning
|
Monday, June 15, 2015, 14:05 Roughing
Monday, June 15, 2015, 14:39: Turbos started.
Monday, June 15, 2015, 14:49: Turbos at speed. Vacuum at 5.3E-5 T
Tuesday, June 16, 2015, 10:14: Water lines leak checked and water opened.
TBHT p/s did not come on yesterday after PLC upgrade. Solved this morning by Dave M.
Wednesday, June 17, 2015, 09:56: BIAS/EZL/EE to 20 / 10 / 1 kV
Wednesday, June 17, 2015, 09:58: Atuo-ramping to 500 / 170 A at 2/1 A/min. Good/Bad Vac 4E-6 / 6E-6 T
Wednesday, June 17, 2015, 23:11 : Stopped auto-ramping at 342 / 170 A. Vacuum at 4E-6 T
Thursday, June 18, 2015, 08:59: Resuming auto-ramping. Vacuum at 3.3E-6 T
Thursday, June 18, 2015, 11:25: Good/Bad Vac 6E-6 / 8E-6 T.
Thursday, June 18, 2015, 14:59: TBHT to 180 A. BIAS/EZL/EE to 30 / 14 / 1.5 kV
Friday, June 19, 2015, 08:21: Ramping TBHT to 200 A
Friday, June 19, 2015, 08:40: EZL 13.4 kV
Friday, June 19, 2015, 11:30: Atuo-ramping to 580 A
Friday, June 19, 2015, 11:48: Stopped auto-ramping at 540 A. 8.4 V
Friday, June 19, 2015, 13:30: TGHT / TBHT at 580 / 220 A
Friday, June 19, 2015, 16:12: Cool down started. at 4 / 2 A/min
Friday, June 19, 2015, 17:57: BIAS / EZL / EE off
Friday, June 19, 2015, 17:57: Closed IV4. Timed out.
Monday, June 22, 2015, 08:57 : Stopped turbos
Monday, June 22, 2015, 13:02: Venting. Had to bypass interlocks as IV4 is timed out. |
Monday, June 15, 2015, 14:07, Anders Mjos, , , , , , , Problems/Solutions, Test Stand Source Tray installed
|
Monday, June 15, 2015
Remaining items to do
- ANODE wire not yet attached
- FEBIAD COILS not yet reconfigured
Tuesday, June 16, 2015:
Coils reconfigured. See attached photo.
|
Wednesday, June 03, 2015, 09:35, Anders Mjos, , , , , , , Problems/Solutions, PLC upgrade
|
Wednesday, June 03, 2015, 09:35: TP6 and TP2 off
Wednesday, June 03, 2015, 10:15: Upgrade in progress. |
Wednesday, May 27, 2015, 14:19, Anders Mjos, , LP-FEBIAD, , TM2, , , In progress, Re-testing new TM2 Source Tray
|
Wednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos started
Wednesday, May 27, 2015, 15:00: Turbos at speed. Vacuum at 1.6e-5 T
Thursday, May 28, 2015, 08:13: Water opened on HS line. Vacuum stable at 4.3E-7 T. No response on RGA
Thursday, May 28, 2015, 08:17: Pumping on gas line.
Thursday, May 28, 2015, 08:37: Open gas lines.
Thursday, May 28, 2015, 08:50: Started auto-ramping to 500 / 250 A at 4/2 A/min.
Thursday, May 28, 2015, 08:55: ANODE 200 V, COIL 50 A
Thursday, May 28, 2015, 08:52: Opened IV4
Thursday, May 28, 2015, 09:01: BIAS/EZL/EE to 30 / 15 / 1.5 kV
Thursday, May 28, 2015, 10:56: Continue auto-ramping to 580/290 A at 2/2 A/min
Thursday, May 28, 2015, 13:01: Ramping TBHT to 300 A
Friday, May 29, 2015, 08:23: ANODE current limited. Increased limit to 125 uA
Friday, May 29, 2015, 08:25: TPS:Q1 and Q4 found to be off. Switched back on
Friday, May 29, 2015, 14:38: Starting cool down of source.
Friday, May 29, 2015, 15:34: Close IV4
Friday, May 29, 2015, 15:36: BIAS/EZL/EE, COIL and ANODE off
Monday, June 01, 2015, 08:23: Vacuum at 2.8E-7 T. BIAS/EZL to 30 / 15 kV
Monday, June 01, 2015, 08:37: BIAS/EZL to 40 / 20 kV
Monday, June 01, 2015, 09:05: BIAS/EZL to 50 / 25 kV
Monday, June 01, 2015, 09:17: BIAS/EZL to 40 / 20 kV (target hand over to RH)
Monday, June 01, 2015, 09:50: BIAS/EZL to 50 / 25 kV
Monday, June 01, 2015, 10:08: BIAS/EZL to 55 / 25 kV. No sparks so far.
Monday, June 01, 2015, 10:28: EZL to 30 kV
Monday, June 01, 2015, 11:03: 2 sparks last 30 min
Monday, June 01, 2015, 11:48: 5 BIAS sparks last 80 min
Monday, June 01, 2015, 11:49: BIAS /EZL/ EE off
Monday, June 01, 2015, 15:38: Stopped TP1B for out-gassing measurement tomorrow.
Tuesday, June 02, 2015, 10:28: Stopped TP1A.
Tuesday, June 02, 2015, 13:57: Water lines purged. GE line closed (not purged).
Wednesday, June 03, 2015, 08:25: Venting |
Monday, May 25, 2015, 14:40, Anders Mjos, SiC#31, HP-SIS, ITW, TM4, 38817-7, , In progress, SiC#31 Conditioning
|
Monday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos started.
Monday, May 25, 2015, 15:15: Turbos at speed. Vacuum at 2.4E-5 T
Tuesday, May 26, 2015, 07:45: Opened water circuit for HS line. Vacuum stable at 6.3E-7 T. No response on RGA
Tuesday, May 26, 2015, 07:50: Autoramping to 500/200 A at 2/1 A/min. Good vacuum 2E-6, bad vacuum 4E-6 T
Tuesday, May 26, 2015, 07:52: IV4 open
Tuesday, May 26, 2015, 13:15: Continue auto-ramping to 580 A
Tuesday, May 26, 2015, 13:48: BIAS/EZL/EE 30 / 15 / 1.5 kV
Tuesday, May 26, 2015, 17:29: ~6 sparks/hour
Wednesday, May 27, 2015, 08:14: A couple of sparks over night.
Wednesday, May 27, 2015, 09:23: Autoramping TBHT to 220 A
Wednesday, May 27, 2015, 09:41: Found FC0 and FC6 bias to be off
Wednesday, May 27, 2015, 09:42: Autoramping TBHT to 230 A
Wednesday, May 27, 2015, 10:30: EE to 2 kV
Wednesday, May 27, 2015, 10:37: Starting cool down at 4/2 A/min
Wednesday, May 27, 2015, 10:40: EE to 1.5 kV
Wednesday, May 27, 2015, 12:37 : BIAS/EZL/EE OFF
Wednesday, May 27, 2015, 12:37 : IV4 closed
Wednesday, May 27, 2015, 13:02: Stopped turbos
Wednesday, May 27, 2015, 13:41: Venting |
Thursday, May 21, 2015, 17:38, Anders Mjos, , , , , , , Problems/Solutions, Installed equipment for measuring outgassing rate
|
A gauge and a valve was installed on the roughing line to the large turbo pump |
Thursday, May 21, 2015, 17:26, Anders Mjos, , LP-FEBIAD, , TM2, , , In progress, Re-testing new TM2 Source Tray
|
Thursday, May 21, 2015, 17:26: Roughing
Thursday, May 21, 2015, 18:02: Turbos started
Thursday, May 21, 2015, 18:12: Turbos at speed. Vacuum at 4.7E-5 T
Friday, May 22, 2015, 08:00: Opened water. Vacuum stable at 3.4E-6 T. No response on RGA
Friday, May 22, 2015, 08:10: Pumping on gas line
Friday, May 22, 2015, 08:21: Opened gas line.
Friday, May 22, 2015, 08:30: Auto-ramping to 500 / 250 A at 4/2 A/min. Good/bad vacuum 4E-6 and 5E-6 T
Friday, May 22, 2015, 08:35: BIAS/EZL/EE to 10 / 10 / 1.5 kV. COIL 50 A, ANODE 200 V
Friday, May 22, 2015, 12:16: Opened IV4
Friday, May 22, 2015, 14:59: BIAS/EZL/EE to 30 / 15 / 1.5 kV
Friday, May 22, 2015, 15:29 : Auto-ramping to 580 / 270 A at 2/1 A/min.
Saturday May 23 15:10 TGHT: 7.51 V 580 A, TBHT: 2.23 V 270 A, ANODE 200 V 13.4 mA, FC0 1.5e-8 A, IG1 1.9e-6 T, COIL 0 V 0 A not responding, some bias sparking over last 7 hours
Monday, May 25, 2015, 09:07: EE current limiting. Started auto-cool down at 4/2 A/min. Vacuum 1.2E-6 T
Monday, May 25, 2015, 09:37: BIAS and EZL to 0
Monday, May 25, 2015, 10:34 : Closed IV4
Monday, May 25, 2015, 11:56 : Cool down complete. Stopped turbos.
Monday, May 25, 2015, 13:17: Venting
Monday, May 25, 2015, 13:25: HS cooling circuit purged.
Monday, May 25, 2015, 14:25: The EE water line was found to be touching the COIL lines on the source tray. |
Thursday, May 21, 2015, 16:40, Anders Mjos, , , , , , , Problems/Solutions, Reconfigured service cap coil connections
|
The service cap has been reconfigured (colling and electric) to be compatible with the TM2 Source tray. Coil- is E & F , Coil+ is G & H. |
Tuesday, May 19, 2015, 19:10, Anders Mjos, , , , , , , Problems/Solutions, EPICS white out
|
Likely caused by the PLC. e-fault 8139
Wednesday, May 20, 2015
Dave Morris re-established contact with controls. (PLC IOC was down). |
Wednesday, May 13, 2015, 13:27, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Re-testing new TM2 Source Tray
|
NOTE: COIL PS is a 100 A supply, thus actual COIL current is 0.5x COIL set point.
Changed the FEBIAD connector blocks to have copper tubes exit below the block. Extended ANODE wire to allow it to be wrapped around Cu-tubes and keep it further away from the GE lines.
Wednesday, May 13, 2015, 13:45: Roughing
Wednesday, May 13, 2015, 14:13: Starting turbos
Wednesday, May 13, 2015, 14:23: Turbos at speed. Vacuum at 4.6E-5 T
Thursday, May 14, 2015, 09:27: He pressure tested waterlines to 70 psi He. No response on the RGA. Vacuum 3.3E-6 T
Thursday, May 14, 2015, 09:39: Opened water supply. No increase on the RGA or IG
Thursday, May 14, 2015, 10:04: Tested COIL to 50 A set point (= 25 A). Returned to 0 A.
Thursday, May 14, 2015, 10:09: Auto-ramping to 400 / 200 A at 4 / 2 A/min. Good/Bad vacuum 4E-6 / 5E-6 T
Thursday, May 14, 2015, 13:59: COIL at 50 A
Thursday, May 14, 2015, 21:57 : Starting cool down.
Friday, May 15, 2015, 06:25: Stopped turbos
Friday, May 15, 2015, 07:42 : Venting
C-seals installed.
Friday, May 15, 2015, 13:56: Roughing
Friday, May 15, 2015, 14:28 : Staring turbos
Friday, May 15, 2015, 14:38: Turbos ate speed. Vacuum at 3.9E-5 T
Tuesday, May 19, 2015, 07:31: Vacuum at 7.1E-7 T. Pumping on gas lines
Tuesday, May 19, 2015, 07:35: Water lines opened. Vacuum stable at 7.1E-7 T. No response on RGA
Tuesday, May 19, 2015, 07:43: Opened gas lines (SV5)
Tuesday, May 19, 2015, 07:47: Auto-ramping to 400 / 200 A at 4 / 2 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Tuesday, May 19, 2015, 08:46: ANODE and COIL to 200 V and 50 A
Tuesday, May 19, 2015, 09:39: Auto-ramping to 500 / 250 A at 2 / 1 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Tuesday, May 19, 2015, 10:54: Opened IV4
Tuesday, May 19, 2015, 11:14: Atuo-ramping to 270 A. BIAS/EZL/EE at 30 / 15 / 1.5 kV
Tuesday, May 19, 2015, 11:42: BIAS/EZL/EE to 20 / 10 / 1.5 kV
Wednesday, May 20, 2015, 09:55: Auto-ramping to 500 / 250 A at 4 / 2 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Wednesday, May 20, 2015, 09:57: BIAS/EZL/EE at 30 / 15 / 1.5 kV
Wednesday, May 20, 2015, 11:57: Auto-ramping to 580 / 290 A at 2 / 1 A/min.
Wednesday, May 20, 2015, 12:55: Vacuum excursion during beam tuning. Stopped turbos.
A leak was observed on the left coil conductor again. After inspecting the service cap, it was found that there was no water flow going through the left coil line due to differences in routing between the TM2 and the Test Stand source tray. A new coil line will be made and the water and electrical connections on the service cap will be reconfigured. |
Friday, May 08, 2015, 09:07, Anders Mjos, , , , , , , Problems/Solutions, EPICS lost contact with the PLC
|
Everything shut down, while EPICS showed everyhing to be on.
Controls group (Dave Morris) has reestablished contact. System is operations.
TSG section vented for Source Tray work
Friday, May 08, 2015, 09:13: TMS turbos at speed. Vacuum at 1.2E-5 T |
Monday, May 04, 2015, 09:51, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD Coil power supply replaced
|
Power supply did not work after high voltage conditioning. On Friday May 1st John Chow replaced the power supply with a 12 V 100 A power supply temporary while the other supply is being repaired. EPICS controls have not been adjusted. |
Friday, April 24, 2015, 12:26, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Testing new TM2 Source Tray
|
Photos on DocuShare
Friday, April 24, 2015
The source tray has been installed and inspected.
Friday, April 24, 2015, 12:32: Roughing
Friday, April 24, 2015, 13:33: Starting turbos. Vacuum at 0.24 T
Friday, April 24, 2015, 13:42: Turbos at speed.
Friday, April 24, 2015, 13:43: 3.5E-5 T
Leak check performed with RGA and He pressurized on water line incl GE line to 50 psi. Doors and ANODE line blank off He sprayed. No response.
RGA response to He confirmed with FEBIAD gas leak.
Monday, April 27, 2015, 12:00: Ge water open.
Monday, April 27, 2015, 12:03: Water open
Monday, April 27, 2015, 15:07: Electrical check completed OK. Test results attached. Tested low voltage on EZL, CB1, VCB1, CBC, EE, ANODE and BIAS
Monday, April 27, 2015, 15:15: Turbos stopped. Colimator connected to HS lines (60 kV). Should be on GND potential.
Monday, April 27, 2015, 16:00: Roughing
Monday, April 27, 2015, 16:30: Starting turbos
Monday, April 27, 2015, 16:40: Turbos at speed. Vacuum at 1.8E-5 T
Tuesday, April 28, 2015, 09:46: Starting auto-ramping of heaters to 100 / 100 A at 2 A/min 3E-6 / 4E-6 T good/bad vacuum limits.
Tuesday, April 28, 2015, 10:38: Continue auto-ramping TGHT to 200 A
Tuesday, April 28, 2015, 11:15: Optics and steerers on.
Tuesday, April 28, 2015, 11:34: Continue auto-ramping TGHT to 250 A
Tuesday, April 28, 2015, 12:50: Continue auto-ramping TGHT/TBHT to 300 /150 A
Tuesday, April 28, 2015, 13:30: Continue auto-ramping TGHT/TBHT to 400 /200 A
Tuesday, April 28, 2015, 14:24: Continue auto-ramping TGHT/TBHT to 500 /250 A
Wednesday, April 29, 2015, 06:06: Starting auto-ramp down.
Wednesday, April 29, 2015, 09:09: ANODE to 200 V. No current.
Wednesday, April 29, 2015, 09:16 : ANODE to 300 V. No current.
Wednesday, April 29, 2015, 09:16: EE to 2kV. 691 uA
Wednesday, April 29, 2015, 09:17: ANODE off. EE to 1.5 kV
Wednesday, April 29, 2015, 09:20: BIAS/EZL at 5/5 kV
Wednesday, April 29, 2015, 09:26: BIAS/EZL at 7.5/5 kV
Wednesday, April 29, 2015, 09:32 : BIAS/EZL at 10/5 kV
Wednesday, April 29, 2015, 09:47: BIAS/EZL at 15/7.5 kV
Wednesday, April 29, 2015, 10:04: BIAS/EZL at 20/10 kV
Wednesday, April 29, 2015, 10:20: BIAS/EZL at 25/12.5 kV
Wednesday, April 29, 2015, 10:48: BIAS/EZL at 30/15 kV. 2 sparks in 10 min on BIAS
Wednesday, April 29, 2015, 10:54: No sparks for 10 min
Wednesday, April 29, 2015, 12:01: BIAS/EZL at 40/20 kV
Wednesday, April 29, 2015, 12:48: No spark for the last 15 min. 3 sparks in the last 30 min
Wednesday, April 29, 2015, 13:09: BIAS/EZL at 45/22.5 kV
Wednesday, April 29, 2015, 13:45: BIAS/EZL at 50/25 kV
Wednesday, April 29, 2015, 14:53: Sparking above 50 kV. Loosing EPICS communication.
Wednesday, April 29, 2015, 15:46: BIAS/EZL at 53/27.5 kV
Wednesday, April 29, 2015, 16:11: BIAS/EZL at 53/27.5 kV. No sparks for 15 min
Wednesday, April 29, 2015, 16:19: BIAS/EZL/EE off for today
Thursday, April 30, 2015, 08:37: BIAS/EZL at 40/20 kV. EE at 1.5 kV. IG1 at 7.1E-7 T
Thursday, April 30, 2015, 08:55: BIAS/EZL at 50/25 kV
Thursday, April 30, 2015, 09:10: 1 spark in the last 15 min
Thursday, April 30, 2015, 09:32: BIAS/EZL at 53/25 kV
Thursday, April 30, 2015, 09:42: No sparks for 10 min
Thursday, April 30, 2015, 09:53: BIAS/EZL at 54/25 kV
Thursday, April 30, 2015, 10:00: Sparking caused lost EPICS communication.Manually current limiting PS
Thursday, April 30, 2015, 10:25: BIAS/EZL at 53/25 kV
Thursday, April 30, 2015, 10:31: BIAS/EZL at 54/25 kV
Thursday, April 30, 2015, 10:47: BIAS/EZL at 55/25 kV
Thursday, April 30, 2015, 10:53: BIAS/EZL at 55/27.5 kV. No sparks for 5 min
Thursday, April 30, 2015, 10:57: No sparks for 10 min.
Thursday, April 30, 2015, 11:01: BIAS/EZL at 55/30 kV
Thursday, April 30, 2015, 11:17: No sparks for 30 min.
Thursday, April 30, 2015, 11:19: BIAS at 30 kV
Thursday, April 30, 2015, 11:36: ANODE to 200 V. COIL is limited in EPICS to 0A and 0V
Thursday, April 30, 2015, 11:41: Opened isolation valve
Thursday, April 30, 2015, 11:42: Autoramping heaters to 500 / 250 A at 4/2 A/min. Good vacuum 2E-6 T, bad vacuum 3E-6 T
Thursday, April 30, 2015, 12:01: No EZL sparks for 60 min
Thursday, April 30, 2015, 12:03: EZL to 14 kV
Thursday, April 30, 2015, 13:50: Continue ramping to 580 / 300 A at 1/1 A/min
Troubleshooting FEBIAD coil power supply
Thursday, April 30, 2015, 14:10: Pumping on gas lines.
Thursday, April 30, 2015, 14:18: Tripped heaters when opening gas line to vacuum.
Thursday, April 30, 2015, 14:20: Autoramping heaters 500 / 250 A at 6/3 A/min.
A large (water?) leak opened up with target close to max temperature. Water lines were pressurized in an attempt to identify the leaky line. The test yesterday were not conclusive and was repeated this morning with no He response. The vacuum did not improve over night.
Friday, May 01, 2015, 10:08: Venting
Left coil line removed.
Friday, May 01, 2015, 11:10: Roughing
Friday, May 01, 2015, 11:41: Started turbos
With the leak detector pumping on the left coil line, a large leak could be confirmed at the soldering site. |
Friday, April 24, 2015, 12:25, Anders Mjos, , , , , , , Problems/Solutions, Backing line pressure high
|
TSG:RP1 backing line pressure is >200 mT. An e-fault has been submitted to have the roughing pump replaced.
Friday, April 24, 2015, 13:13: Pump replaced by vacuum group. |
Wednesday, April 22, 2015, 13:17, Anders Mjos, , , , , , , , Source Tray Removed
|
by Mico, Dan and Anders |
Monday, April 13, 2015, 13:07, Anders Mjos, , , , , , , Problems/Solutions, ISAC Test Stand Optical elements power supply drop out
|
See e-fault 8027
Monday, April 13, 2015
Kevin and Graham are working on it
|
Thursday, April 09, 2015, 11:21, Anders Mjos, , , , , , , Problems/Solutions, No RGA communcations
|
RGA stopped working. Likely after a spark yesterday. |
Thursday, April 02, 2015, 15:42, Anders Mjos, TM2 Test Target, LP-FEBIAD, , TM2, , 39230-1, Done, TM2 Test Target Conditioning
|
Thursday, April 02, 2015, 15:42: Roughing
Thursday, April 02, 2015, 16:12: Turbos started
Thursday, April 02, 2015, 16:22: Turbos at speed. Vacuum at 8.7E-6 T
Tuesday, April 07, 2015, 08:24: Opened water for HS. Vacuum stable at 1.1E-7 T
Tuesday, April 07, 2015, 08:25: Pumping on gas lines.
Tuesday, April 07, 2015, 08:37: Finished pumping.
Tuesday, April 07, 2015, 08:41: Opening gas valve to vacuum chamber
Tuesday, April 07, 2015, 08:42: RGA filament on.
Tuesday, April 07, 2015, 08:55: BIAS/EZL/EE to 30/14/1.5 kV
Tuesday, April 07, 2015, 08:55: COIL to 50 A, ANODE to 200 V
Tuesday, April 07, 2015, 09:01: Started auto-heating to 580/250 A at 2 A/min
Tuesday, April 07, 2015, 13:25 : Opened IV4
Tuesday, April 07, 2015, 15:10: Ramping TBHT to 290A
Wednesday, April 08, 2015, 09:27: Opening for Ne gas
Wednesday, April 08, 2015, 12:05: BIAS/EZL to 40/18.5 kV
Wednesday, April 08, 2015, 13:15 :BIAS/EZL/EE to 50/23.5/2.0 kV
Wednesday, April 08, 2015, 15:15: BIAS/EZL/EE to 30/14/1.5 kV
Thursday, April 09, 2015, 11:19: Starting target cool down
Thursday, April 09, 2015, 16:54: BIAS/EZL/EE to 30/30/1.5 kV
Thursday, April 09, 2015, 17:58: BIAS and source off.
Friday, April 10, 2015, 08:21: Closed gas supply
Friday, April 10, 2015, 08:23: Stopped turbos |
Tuesday, March 24, 2015, 09:50, Anders Mjos, , , , , , , In progress, Empty chamber
|
Roughed down on Friday 20th
Tuesday, March 24, 2015, 09:49: Turbos started
Tuesday, March 24, 2015, 09:59: Turbos at speed. Vacuum at 2.8E-6 T
EPICS could not communicate with devices. Contacted controls (Dave M)
Thursday, April 02, 2015, 14:45: Stopped turbos.
Thursday, April 02, 2015, 15:10: Started venting through turbo pump (to 16 T)
Thursday, April 02, 2015, 15:12: Venting through VV1 |
Monday, March 16, 2015, 18:53, Anders Mjos, Ta#45, HP-SIS, ITE, TM4, 38817-5, , In progress, Conditioning Ta#45
|
Monday, March 16, 2015, 18:53: Started turbos
Monday, March 16, 2015, 19:00: Turbos at speed. Vacuum at 1.3E-5 T
Tuesday, March 17, 2015, 09:03: Opened cooling water. Vacuum stable at 1.9E-7 T
Tuesday, March 17, 2015, 09:12: Opened IV4. BIAS/EZL/EE to 30/14/1.5 kV
Tuesday, March 17, 2015, 09:20: Started heating TGHT/TBHT to 400/150 A at 2/1 A/min
Wednesday, March 18, 2015, 08:41: Continued heating TGHT/TBHT to 580/170 A at 2/1 A/min
Wednesday, March 18, 2015, 09:33: MB1 found tripped on water flow. Water pressure is low this morning as cyclotron main magnet was switched on, but not all water pumps. Expected to be resolved soon..
Some emittance scans at 170, 180, 190, 200 A TBHT were done
Thursday, March 19, 2015, 08:47: Heating TBHT to 220 A
Thursday, March 19, 2015, 08:56: Heating TBHT to 230 A
Thursday, March 19, 2015, 10:50: EE at -2000 V for 10 min
Thursday, March 19, 2015, 10:52: EE back at -1.5 kV
Thursday, March 19, 2015, 17:54: Started cool down of target
Friday, March 20, 2015, 08:47: Closed IV4
Friday, March 20, 2015, 08:47: RGA off.
Friday, March 20, 2015, 08:50: Stopped turbos
Friday, March 20, 2015, 10:24: Venting
Friday, March 20, 2015, 11:45: Target removed. |
Thursday, February 26, 2015, 10:11, Anders Mjos, , , , , , , In progress, Installing FEBIAD test target for emittance rig tests
|
Thursday, February 26, 2015, 10:11: Stopped turbos
Thursday, February 26, 2015, 11:23: Venting
Thursday, February 26, 2015, 11:39: Stopped venting at 550 T. To be continued later
Thursday, February 26, 2015, 15:46: Started roughing. Doors needed a push.
Thursday, February 26, 2015, 16:23: Started turbos
Thursday, February 26, 2015, 16:39: Turbos at speed. Vacuum at 5.2E-6 T
Friday, February 27, 2015, 09:22: Water on. Vacuum stable at 1.6E-7 T
Friday, February 27, 2015, 09:30: RGA on
Friday, February 27, 2015, 10:32: HV on. Ramping to TBHT 250 A at 4A/min
Friday, February 27, 2015, 16:38: Source off
Monday, March 02, 2015, 14:00: Gas lines purged. Opening.
Fixed a air leak on one of the Swagelok joints.
Monday, March 02, 2015, 14:47: RGA with Ne Open
Total 3.5E0-7T, IG1 9.7E-8 T
20Ne 6.3E-10 T
22Ne 1.7E-10 T
Mass 18 1.6E-7 T
Tuesday, March 03, 2015, 09:58: Started heating
Tuesday, March 03, 2015, 16:33: Finished ER testing. First ER scans made on mass 4.
Wednesday, March 04, 2015, 14:32: TSG:CB1 found off. Switched back on.
Emittance vs EE voltage studied
Thursday, March 05, 2015, 09:02 : Ramping source back up to 285 A (TBHT)
Thursday, March 05, 2015, 15:12: The following devices were found off
TMS:Q6
TMSQ1
TPS:CBC
Friday, March 06, 2015, 08:51: Found TPS:Q3 off. Switched back on.
Friday, March 06, 2015, 10:51 : Ramping down source
Friday, March 06, 2015, 12:08 : Source and HV off. Closed IV.
Graham will be doing some controls work
Monday, March 09, 2015, 09:16: Ramping up the source. IV opened
Monday, March 09, 2015, 09:23: Source biased and optics tune recovered.
Monday, March 09, 2015, 16:51: Opened Ne leak
Wednesday, March 11, 2015, 09:06: Found TMS:Q6/Q1 and TPS:Q4 off. Switched back on.
Thursday, March 12, 2015, 16:57: Finished more ER data taking. See attached spreadsheet
Friday, March 13, 2015, 08:41 : TMS:CBC1, TMS:CB5, TMS:Q2, TPS:Q3, TPS:CB2 found off. Switched back on.
Monday, March 16, 2015, 09:13: TMS:CBC1, TMS:Q3, Q2, TMS:VCB1,CB1 found off.
Monday, March 16, 2015, 09:14: Bias off. Stopping turbos
Monday, March 16, 2015, 15:26: Venting |
Wednesday, February 18, 2015, 13:32, Anders Mjos, , , , , , , Problems/Solutions, Switched off system in preparation for power outage
|
Thursday, February 19, 2015, 12:14: Starting system again after the power outage
Thursday, February 19, 2015, 13:27: The performance of RP1 has degraded. Edi flushed some air through, which helped a bit. It now takes longer to start up.
Thursday, February 19, 2015, 13:33: Vacuum recovered. |
Tuesday, February 17, 2015, 14:41, Anders Mjos, , , , , , , In progress, Pumping down empty chamber
|
Tuesday, February 17, 2015, 14:35: Roughing. Doors were difficult to get to seal.
Tuesday, February 17, 2015, 15:11: Started turbos
Tuesday, February 17, 2015, 15:34: Turbos at speed. Vacuum at 6.7E-6 T |
Friday, February 13, 2015, 13:59, Anders Mjos, , , , , , , Problems/Solutions, PLC failure
|
The PLC CPU came out of the socket around 11:50am today (Dave Morris). The CPU had not been properly attached. This resulted in full stop of all power supplies and vacuum pumps.
Restarted vacuum pumps at 12:10pm (20 min later). |
Tuesday, February 03, 2015, 16:10, Anders Mjos, , , , , , , Problems/Solutions, Current read back on TBHT has been corrected to 600 A
|
By controls group |
Tuesday, February 03, 2015, 14:33, Anders Mjos, Empty, LP-SIS, , , , , In progress, Target with new center block and new EE insulator
|
Also with newly installed RGA
Tuesday, February 03, 2015, 14:33: Roughing
Tuesday, February 03, 2015, 15:05: Turbos started
Tuesday, February 03, 2015, 15:15: Turbos at speed. Vacuum at 3.3E-5 T
Wednesday, February 04, 2015, 13:56: Cooling water on HS circuit on. No response on IG1 or on the RGA (water)
Thursday, February 05, 2015, 09:00: RGA started. Scan 1-100 every 5 min
Thursday, February 05, 2015, 09:02: Opened IV4
Thursday, February 05, 2015, 09:16: Started target heating to 500 / 150 A at 2 / 1 A/min
Thursday, February 05, 2015, 09:24: Opened electrical cage to switch on TGHT PS
Thursday, February 05, 2015, 09:26 : Started target heating to 500 / 150 A at 2 / 1 A/min
Thursday, February 05, 2015, 09:28: BIAS/EZL/EE on and at HV
Thursday, February 05, 2015, 13:21: TGHT voltage limited. Voltage limit increased to 7 V
Thursday, February 05, 2015, 13:53: Continue to 580 A
Thursday, February 05, 2015, 14:25: RGA stopped around 13:34. Started scanning again
Thursday, February 05, 2015, 15:08: Heating to 200 A on TBHT
Friday, February 06, 2015, 10:34: Heating TBHT to 220 A
Friday, February 06, 2015, 11:07: TBHT at 230 A. TGHT at 580 A
Friday, February 06, 2015, 11:50: Cooling down target
Friday, February 06, 2015, 11:56: RGA off
Friday, February 06, 2015, 11:5: BIAS/EZL/EE off
Tuesday, February 10, 2015, 11:34: BIAS/EZL/EE on. Started heating to 580 / 230 A at 4 / 2 A/min. RGA on
Monday, February 16, 2015, 08:46: BIAS/EZL/EE on
Monday, February 16, 2015, 09:13 : Started heating to 580 / 230 A at 4 / 2 A/min. RGA on
Monday, February 16, 2015, 10:10: Opened isolation valve
Monday, February 16, 2015, 14:23: TGHT was found voltage limiting at 7 V. Increased voltage limit to 7.2 V
Temperature read with digital optical pyrometer. Inside target 1800 - 1900 deg C. Outside 1900 - 2000 deg C
Monday, February 16, 2015, 15:50: Starting cool down
Tuesday, February 17, 2015, 08:30: RGA off
Tuesday, February 17, 2015, 08:32: BIAS/EZL/EE off. Isolation valve closed.
Tuesday, February 17, 2015, 08:34: Turbos off
Tuesday, February 17, 2015, 13:58: Venting |
Tuesday, February 03, 2015, 09:40, Anders Mjos, , , , , , , Problems/Solutions, RGA installation
|
Tuesday, February 03, 2015, 09:40: Venting
RGA installed on the 12" CF port below the Source Tray.
Wednesday, February 04, 2015, 13:45: RGA turned on and mass scan performed. |
Wednesday, January 28, 2015, 10:40, Anders Mjos, , , , , , , Problems/Solutions, Test Stand shut down for site wide power outage today
|
Friday, January 30, 2015, 10:50: Optics section accidentally vented during work on the ER
Monday, February 02, 2015, 13:24: Roughing TMS section
Monday, February 02, 2015, 13:39: Starting turbos
Monday, February 02, 2015, 13:45: Turbos at speed
Monday, February 02, 2015, 13:49: Vacuum at 5.7 E-5 T
Tuesday, February 03, 2015, 09:00: Vacuum low 1E-6 T. Backing pressure high ~ 75 mT. Caused by TP6.
Tuesday, February 03, 2015, 09:01: Turbos stopped to investigate vent screw on TP6.
Tuesday, February 03, 2015, 09:40: Venting through TP6
Gasket on the TP6 venting screw had fallen off. Re-installed.
Tuesday, February 03, 2015, 09:57: Roughing
Tuesday, February 03, 2015, 10:32: Started turbos
Tuesday, February 03, 2015, 10:45: Turbos at speed. Vacuum at 1.3E-5 T |
Wednesday, January 21, 2015, 13:40, Anders Mjos, , , , , , , In progress, HV BIAS Test
|
Wednesday, January 21, 2015, 13:34: Opened water flow.
Wednesday, January 21, 2015, 13:42: 30 / 15 kV (BIAS / EZL)
Wednesday, January 21, 2015, 13:4: 40 / 20 kV
Wednesday, January 21, 2015, 13:54: No sparks.
Wednesday, January 21, 2015, 13:56: 50 / 25 kV
Wednesday, January 21, 2015, 14:0: No sparks
Wednesday, January 21, 2015, 14:11: 55 / 30 kV
Wednesday, January 21, 2015, 14:45: No sparks
Wednesday, January 21, 2015, 14:47: 60 / 30 kV and 37 / 122 uA
Wednesday, January 21, 2015, 16:00: No sparks.
Wednesday, January 21, 2015, 16:02: PS off.
Thursday, January 22, 2015, 10:18 : Started TBHT heating
Thursday, January 22, 2015, 10:26: Opened isolation valve
Friday, January 23, 2015, 09:45: 30 / 15 kV
ANODE 200 V
COIL 0 A
EE -1400
Friday, January 23, 2015, 09:46: TBHT auto heating to 280 A (235)
Friday, January 23, 2015, 10:05
COIL 5.4 A 4.9 V
Friday, January 23, 2015, 10:13: 40 / 17 kV
Coil voltage limited. Reduced to 0 A - minimal impact on FC0 current.
Friday, January 23, 2015, 10:24: 50 / 22 kV
Friday, January 23, 2015, 10:42: 60 / 26 kV
Friday, January 23, 2015, 11:45: Sparking activity. Seen and heard by people in the area.
Friday, January 23, 2015, 12:00: Reduced current limit on BIAS PS to 0.10 (on the pot)
Friday, January 23, 2015, 12:04: A couple more sparks.
Friday, January 23, 2015, 12:05: Anode current limited since shortly after the large spark at 11:45
Friday, January 23, 2015, 12:11: 50 / 23 kV
Friday, January 23, 2015, 12:48 : Restarted turbos after the spark. TP1B and TP6
Friday, January 23, 2015, 13:16: 55 / 25 kV
Friday, January 23, 2015, 14:44: ~ 5 sparks / hour for the last 60 min
Friday, January 23, 2015, 15:49 : No sparks for the last 60 min. Cooling target.
Friday, January 23, 2015, 16:14: Source and HV off.
Monday, January 26, 2015, 11:15: TBHT at 235A set point
Tuesday, January 27, 2015, 10:13: Source on
Tuesday, January 27, 2015, 10:13: 30 / 15 kV
Tuesday, January 27, 2015, 10:59: COIL to 3.5 A
Tuesday, January 27, 2015, 11:15: 40 / 20 kV
Tuesday, January 27, 2015, 13:17: 50 / 23 kV
Tuesday, January 27, 2015, 16:56: No sparks for the last 3 h. 1 spark earlier.
Tuesday, January 27, 2015, 16:59 30 / 14 kV
Tuesday, January 27, 2015, 17:02: Cooling down target. Source and HV off. |
Tuesday, January 20, 2015, 14:31, Anders Mjos, , , , , , , Problems/Solutions, Ne leak disconnected for recallibration
|
SN 11-231 from VIC |
Monday, January 05, 2015, 09:20, Anders Mjos, , , , , , , Problems/Solutions, IV4 did not get close signal before the Hollidays
|
The valve closes physically, but does not receive the closed signal.
Cycled the valve multiple times before finally showing closed state. |
Monday, January 05, 2015, 09:06, Anders Mjos, , , , , , , Problems/Solutions, TSG:TP1A found to be timed out after the Hollidays
|
Vacuum at 1.7E-7 T
Corrected title from off to timed out . It seems the controller lost contact with the pump when I touched the rack. The pump recovered right back to 38 kRPM upon restart.
|
Tuesday, December 23, 2014, 09:08, Anders Mjos, , , , , , , , Water closed for Christmas
|
Shutting of water supply to the source box. Water not needed. |
Monday, December 22, 2014, 11:06, Anders Mjos, , , , , , , Problems/Solutions, Copper rod removed
|
A copper rod - not used was removed from one of the cooling lines. |
Thursday, December 18, 2014, 16:38, Anders Mjos, , , , , , , Problems/Solutions, Leak found on service cap F/T Q 9 pin connector
|
Largest response on the bottom of the insulator.
Thursday, December 18, 2014, 16:39: Closing pumping valves. Will allow system to leak up over night
Friday, December 19, 2014, 08:19: Venting
Friday, December 19, 2014, 11:55: F/T and insulator removed. Lid not yet installed. Spark marks found on the insulator (see attached photo).
Installed blank off on F/T Q. New o-ring (1-1/02235) and screws 10-24x0.50 (1-2/02526). F/T insulator reference ITA0439
Monday, December 22, 2014, 09:54: Roughing
Monday, December 22, 2014, 10:25 : 0.5 T at CG1
Monday, December 22, 2014, 11:00: No leak detected at 0.2 T
Monday, December 22, 2014, 11:01: Starting turbos
Monday, December 22, 2014, 11:02: Opened water flow on GE (and TP1B)
Monday, December 22, 2014, 11:03: Some noise from TP1B around 12 kRPM
Monday, December 22, 2014, 11:07: TP1B at speed
Monday, December 22, 2014, 11:10: TP1A timed out restarted. Bypass BV1A required.
Monday, December 22, 2014, 11:11: Turbos at speed.
Monday, December 22, 2014, 11:11: Vacuum at 2.6 E-5 T
Tuesday, December 23, 2014, 08:27 : Vacuum at 1.8E-6 T
Tuesday, December 23, 2014, 08:51: Opened water. Vacuum stable at 1.7E-6 T
Tuesday, December 23, 2014, 09:05: No leaks found with leak detector. Base leak rate <7.7E-8 mbar-l / s
Monday, January 05, 2015, 09:28: Repeated leak check. Both doors. Sprayed He through service cap cover. No response above 2.4E-8 mbar-l/s base leak rate. |
Thursday, December 18, 2014, 14:34, Anders Mjos, , , , , , , Problems/Solutions, GE cooling water lines disconnected
|
In preparation for leak check
Thursday, December 18, 2014, 16:37: Reconnected after leak check
Monday, December 22, 2014, 11:02: Water opened. |
Tuesday, December 16, 2014, 10:18, Anders Mjos, , , , , , , Problems/Solutions, TP1B and TP6 stopped/fault
|
possibly due to HV spark
Tuesday, December 16, 2014, 10:24: Starting TP1B and TP6
Tuesday, December 16, 2014, 10:26: Both turbos at speed. Power 15 W and 17 W.
Tuesday, December 16, 2014, 11:37: Happened again. Restarted. |
Friday, December 12, 2014, 14:09, Anders Mjos, , LP-FEBIAD, , , Tube only, , In progress, HV BIAS Test
|
BIAS current limit pot changed from 2.40 to 0.25
EZL current limit pot changed from 0.50 to 0.20
Testing max HV bias with Ray
Tested successfully to plc limit of 50kV.
Dave M updated limit to 59kV. the limit will reset to 50 kV if PLC is restarted
Friday, December 12, 2014, 14:43: BIAS at 59kV and 55 uA. EZL at 20kV and 73 uA. No sparking observed.
Tuesday, December 16, 2014, 09:12: BIAS and EZL to 40kV and 20kV
Tuesday, December 16, 2014, 09:53: BIAS at 50 kV. One spark w/vaccum response at 50 kV
Tuesday, December 16, 2014, 10:20: BIAS and EZL to 0 to try and restart TP1B TP6
Tuesday, December 16, 2014, 10:33: Both turbos restated. BIAS and EZL at 50 kV and 20 kV
Tuesday, December 16, 2014, 11:23: BIAS at 60 kV. One audible spark with vacuum response.
Tuesday, December 16, 2014, 11:37: Another spark took out TP1B and TP6 again.
Tuesday, December 16, 2014, 11:42: Restarted TP1B and TP6
EE power supply switched on
Wednesday, December 17, 2014, 10:19: BIAS at 60kV for 10 min. EZL at 20kV
Wednesday, December 17, 2014, 13:13 : 3h at 60 kV (see attached screen shot)
Wednesday, December 17, 2014, 13:24: BIAS off
Wednesday, December 17, 2014, 13:40: All power supplies ON. TBHT autoramping to 290 A (240 A0. 4A / min
Wednesday, December 17, 2014, 13:46: IV4 opened
Wednesday, December 17, 2014, 16:10: Source on at 30 kV (previously tested to 50 kV)
Thursday, December 18, 2014, 08:21 : Starget autoraming to 290 A (240 A). 4 A / min
Thursday, December 18, 2014, 08:48: 40 kV
Thursday, December 18, 2014, 08:57: 50 kV
Thursday, December 18, 2014, 09:18: 60 kV. Extracting 1E-7 A on FC0
Thursday, December 18, 2014, 09:29: Increased COIL and ANODE to 3.6 A and 60 V
Thursday, December 18, 2014, 10:11: Large spark? Vacuum in source box compromised 6E-4 T.
Thursday, December 18, 2014, 10:24: Closed IV4 (red, but closed - IG6 vacuum good). Stopping turbos. Vacuum is increasing on CG1.
Thursday, December 18, 2014, 10:26: Shutting off water supply.
Thursday, December 18, 2014, 10:29: Venting through turbo vent valves.
Thursday, December 18, 2014, 10:35: Closed turbo vent valves.
Thursday, December 18, 2014, 10:37: Roughing
Thursday, December 18, 2014, 10:42: Pumping curve changing slope abruptly around 30 T and again around 2.5 T
Thursday, December 18, 2014, 10:48: Stopped roughing
Thursday, December 18, 2014, 12:14 : Venting
Thursday, December 18, 2014, 13:43: Roughing
|
Friday, December 12, 2014, 13:11, Anders Mjos, , , , , , , Problems/Solutions, HV inspection and cleaning
|
by Ray D and Anders in preparation for 60kV test. Rack insulators and f/t insulators cleaned with windex |
Friday, December 12, 2014, 13:11, Anders Mjos, , , , , , , Problems/Solutions, HV inspection and cleaning
|
by Ray D and Anders in preparation for 60kV test. Rack insulators and f/t insulators cleaned with windex |
Monday, November 24, 2014, 08:41, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 replaced
|
by Edi on Friday Nov 11th |
Monday, November 03, 2014, 14:50, Anders Mjos, , , , , , , Problems/Solutions, IV4 did not close until 4th attempt
|
Indicated with red valve on the EPICS vacuum page |
Friday, October 31, 2014, 14:57, Anders Mjos, , LP-FEBIAD, , , Tube only, 38307-9, In progress, Test
|
Friday, October 31, 2014, 14:47: Starting turbos
Friday, October 31, 2014, 14:57: Turbos at speed. Vacuum at 2.9E-5 T
Monday, November 03, 2014, 10:08 : Opened HS water circuit. Vacuum stable at 1.7E-7 T
Monday, November 03, 2014, 10:22: Starting auto ramping to 228A on TBHT at 1 A/min
Monday, November 03, 2014, 13:44: Target at temperature. Opening IV4.
Monday, November 03, 2014, 14:45: IV4 closed
Monday, November 03, 2014, 15:00: Starting cool down. 1 A/min |
Monday, October 27, 2014, 09:26, Anders Mjos, , , , , , , Problems/Solutions, TSG:TP1B noisy
|
e-fault 7748
Monday, October 27, 2014, 09:21: Switched off turbos
Friday, October 31, 2014, 10:43 : Venting
Friday, October 31, 2014, 14:3: Turbo replaced by vacuum group |
Monday, October 20, 2014, 09:17, Anders Mjos, , , , , , , Problems/Solutions, Power bump this weekend tripped off all turbo pumps
|
Monday, October 20, 2014, 09:17: Roughing
Monday, October 20, 2014, 09:18 : Turbos started
Monday, October 20, 2014, 09:29 : All turbos at speed
Monday, October 20, 2014, 10:11: Switched on optics |
Tuesday, October 07, 2014, 09:32, Anders Mjos, , , , , , , In progress, Pumping down empty chamber
|
Tuesday, October 07, 2014, 09:30: Roughing
Tuesday, October 07, 2014, 10:24: Starting turbos
Tuesday, October 07, 2014, 10:32 : Turbos at speed. Vacuum at 3.3E-5 T |
Thursday, September 25, 2014, 15:44, Anders Mjos, ThO#1, , ITW, TM1, 40282-5, , Done, ThO#1 Heat Shield Conditioning
|
Thursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06: Starting turbos
Thursday, September 25, 2014, 16:14: Turbos at speed.
Thursday, September 25, 2014, 16:28: Vacuum at 1.9E-5 T
Vacuum was coming down slowly yesterday. Vented this morning to clean o-ring on door.
Friday, September 26, 2014, 08:40: Roughing
Friday, September 26, 2014, 09:02: Starting turbos
Friday, September 26, 2014, 09:10: Turbos at speed
Friday, September 26, 2014, 09:12: Vacuum at 9.7E-6 T
Monday, September 29, 2014, 08:40: Water opened for HS circuit. Vacuum stable at 1.8E-7 T
Monday, September 29, 2014, 13:51: Opened and closed IV4
Wednesday, October 01, 2014, 13:13 : Target cooled down.
Monday, October 06, 2014, 09:10: Turbos stopped. Vacuum at 1.3E-7 T
Monday, October 06, 2014, 10:49: Venting
Tuesday, October 07, 2014, 09:31: Heat Shield removed |
Monday, September 08, 2014, 16:23, Anders Mjos, UC#11, , , TM4, 40282-5, , Done, UC#11 Heat Shield Conditioning
|
T/C installed
CH 1: Attached to TGHT outside middle
CH 2: Through HS outside TGHT right
CH 3: Through HS inside TGHT right
CH 4: Attached to HS on left gripper. Does not read temp
Monday, September 08, 2014, 16:22: Roughing
Monday, September 08, 2014, 16:43: Started turbos
Monday, September 08, 2014, 16:51: Turbos at speed
Monday, September 08, 2014, 16:53: Vacuum at 2.7E-5 T
Tuesday, September 09, 2014, 08:20 : Opened HS water supply. Vacuum stable at 3.7E-7 T
Tuesday, September 09, 2014, 08:21: Starting auto ramping. TGHT to 580 A at 2A/min
Tuesday, September 09, 2014, 08:50 :
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.8 |
26.7 |
TBHT |
6.5 |
26.2 |
COIL + EE |
5.3 |
26.9 |
TGHT |
5.8 |
26.3 |
SUPPLY |
|
27.0 |
Wednesday, September 24, 2014, 11:30: T/C attached to tube does no longer read a correct temperature. Cooling down.
Thursday, September 25, 2014, 08:50: Turbos stopped.
Thursday, September 25, 2014, 11:07: Venting
Thursday, September 25, 2014, 14:00: Heat shield removed |
Friday, August 29, 2014, 14:52, Anders Mjos, Ta#44, HP-SIS, ITE, TM4, 38817-9, 40316-11, Done, Conditioning Ta#44
|
Friday, August 29, 2014, 14:51: Roughing
Friday, August 29, 2014, 15:11: Starting turbos.
Friday, August 29, 2014, 15:19: Turbos at speed
Friday, August 29, 2014, 15:21: Vacuum at 1.6E-5 T
Tuesday, September 02, 2014, 08:36: HS cooling water supply opened. Vacuum stable at 1.4E-7 T
Tuesday, September 02, 2014, 08:50 : BIAS/ EZL / EE to 30 / 14 / -1.5 kV. Started auto ramping to 500 / 150 (180) A
Tuesday, September 02, 2014, 09:23
Supply ~97psi, Return ~7psi
Device
|
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.9 |
28.0 |
TBHT |
6.5 |
27.6 |
COIL + EE |
5.4 |
28.6 |
TGHT |
5.8 |
27.8 |
SUPPLY |
|
28.2 |
Thursday, September 04, 2014, 12:38 : Starting cool-down
Thursday, September 04, 2014, 15:20: Closed IV4
Thursday, September 04, 2014, 15:37 : BIAS / EZL / EE to 0
Friday, September 05, 2014
Target cooled down. Power supplies switched off.
Monday, September 08, 2014, 14:07: Turbos stopped.
Monday, September 08, 2014, 15:15: Venting. HS cooling water lines purged.
Monday, September 08, 2014, 16:00: Target removed. |
Wednesday, August 27, 2014, 12:55, Anders Mjos, , , , , , , Problems/Solutions, Water leak on MB1
|
e-faulted by operations Aug 26th |
Wednesday, August 20, 2014, 16:25, Anders Mjos, , , , , , , Problems/Solutions, Lost power on TGHT, TBHT and EE simultaniously
|
Possible controls problem. Breaker 18 found latched. Can not be re-energized. Burnt smell in PLC / HV area. e-faut 7561
Thursday, August 21, 2014: Dave Morris had a look and was able to isolate the problem to be with one of the low voltage power supplies in the PLC panel.
Friday, August 22, 2014: New 12V and 24V power supplies installed. PLC cabinet vacuumed. A new 24V fan with filter will also be installed.
Tuesday, August 26, 2014: Power restored to PLC cabinet. System is operational again. |
Thursday, August 14, 2014, 08:45, Anders Mjos, , , , , , , Problems/Solutions, FC0 reading full current
|
since yesterday around 19h. See attached screen shot of archived data
Thursday, August 14, 2014, 08:40: Rebooted IOC. Still reading full scale only. FC0 reads full scale with signal cable removed.
e-fault 7545
Thursday, August 14, 2014, 11:28: Graham called to inform me that all of the 8 channels on the module was reading high. TRIUMF does not have a spare. He will arrange to have the module repaired.
Tuesday, August 19, 2014, 16:27: Graham has brought the system back into operation with a new vqsx module from the ICB stand. |
Tuesday, August 12, 2014, 09:52, Anders Mjos, , , , , , , Problems/Solutions, RTD installed on Supply water
|
Travis assisted in installing a temperature reading RTD from Omega (SA1-RTD-MTP) on the water supply. The RTD has been installed with a 503 Ohm resistor => 0V = -175.75 C, 10V = 205.71 C. The RTD has been connected to Ch 9 on the data logger.
Offset calibration data towards the SUPPLY temperature reading is attached. |
Friday, August 08, 2014, 12:45, Anders Mjos, ZrC#6, LP-SIS, ITW, TM1, 40282-3, 39230-5, Done, Condictioning ZrC#6
|
Friday, August 08, 2014, 12:44: Stopped turbos
Friday, August 08, 2014, 14:42: Venting
Target assembly inserted
Friday, August 08, 2014, 15:08: Roughing
Friday, August 08, 2014, 15:29: Turbos started
Friday, August 08, 2014, 15:37: Turbos at speed
Friday, August 08, 2014, 15:39: Vacuum at 1.4E-5 T
Monday, August 11, 2014, 08:58: Opened HS cooling water. Vacuum stable at 1.6E-7 T
Tuesday, August 12, 2014, 10:31: IV4 Opened
Tuesday, August 12, 2014, 10:35: EZL / EE / BIAS to 14 / -1.5 / 30 kV
Tuesday, August 12, 2014, 10:39: Starting target heat to 300 A / 96 (115) A
Wednesday, August 13, 2014, 08:03 : Continue heating to 580 A / 190 (228) A
Wednesday, August 13, 2014, 08:24: Aborting target heating. Cu-LCW pressure and flow is reduced due to a problem with a pump.
Device |
Flow
[lpm] |
Temp
[C]
|
HS + MSP |
1.9 |
27.7 |
TBHT |
4.1 |
23.9 |
COIL + EE |
3.5 |
25.1 |
TGHT |
3.7 |
25.6 |
SUPPLY |
|
24.4 |
Supply pressure ~ 52 psi
Return pressure ~ 11 psi
Wednesday, August 13, 2014, 08:31: Starting cool down as flow rate on HS + MSP is low. A low flow trip of the TGHT should be avoided.
Wednesday, August 13, 2014, 11:54 : Curtis Ballard contacted me and asked if they could valve off the Cu-LCW circuit to the Test Stand. Heaters had been previously brought down. Bias off and power supplies are switched off. IV4 closed.
Wednesday, August 13, 2014, 12:00: Cooling water syupply valved off to Test Stand.
Flow rates are back to normal since yesterday evening
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.1 |
27.8 |
TBHT |
5.9 |
27.4 |
COIL + EE |
5.0 |
28.3 |
TGHT |
5.4 |
27.6 |
SUPPLY |
|
28.1 |
Thursday, August 14, 2014, 08:00: Conditioning on hold due to FC0 problem
Wednesday, August 20, 2014, 07:50: Conditioning continues. Auto-ramping to 400 / 150 ( 180) A @ 4/2 A/min
Wednesday, August 20, 2014, 09:35 : Continue heating to 580 / 165 (200) A @ 2/1 A/min
Wednesday, August 20, 2014, 09:50
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.6 |
32.9 |
TBHT |
6.5 |
28.5 |
COIL + EE |
5.4 |
29.2 |
TGHT |
5.8 |
29.7 |
SUPPLY |
|
28.8 |
Wednesday, August 20, 2014, 15:15: Power lost to TBHT, TGHT and EE during nominal operation (580/ 183 (220) A). Fault report submitted.
PLC cabinet work finished. Resuming conditioning.
Tuesday, August 26, 2014, 16:35:EZL / EE / BIAS to 14 / -1.5 / 30 kV
Tuesday, August 26, 2014, 16:35: Starting target heat to 50 A / 25 A
Wednesday, August 27, 2014:
Continued conditioning. Heating to 580 /190 (228) A
Thursday, August 28, 2014, 08:34
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.5 |
38.0 |
TBHT |
6.4 |
28.0 |
COIL + EE |
5.5 |
29.8 |
TGHT |
5.8 |
30.3 |
SUPPLY |
|
28.2 |
Friday, August 29, 2014, 10:30: EE conditioned for ~20 min @ 2kV.
Friday, August 29, 2014, 10:32 : Starting cool down at 4/2 A/min
Friday, August 29, 2014, 11:55: Closed IV4
Friday, August 29, 2014, 11:56: BIAS, EE and EZL to 0
Friday, August 29, 2014, 13:10: Stopped turbos.
Friday, August 29, 2014, 14:06: Venting
Friday, August 29, 2014, 14:51: Target removed |
Friday, August 01, 2014, 08:39, Anders Mjos, , , , , , , Problems/Solutions, TMS:RP2 noisy
|
Friday, August 01, 2014, 08:39: Backing pressure 0 / 11 mT |
Wednesday, July 23, 2014, 14:34, Anders Mjos, , , , , , , In progress, Empty chamber
|
Wednesday, July 23, 2014, 14:34: Roughing
Wednesday, July 23, 2014, 15:03: Starting turbos.
Wednesday, July 23, 2014, 15:11: Turbos at speed
Wednesday, July 23, 2014, 15:13: Vacuum at 7.4E-6 T |
Friday, July 18, 2014, 11:30, Anders Mjos, UC#10, LP-SIS, ITE, TM4, 40282-5, 40316-1, Done, UC#10 Heat Shield Conditioning
|
Friday, July 18, 2014, 11:30: Roughing
Friday, July 18, 2014, 11:51: Starting turbos
Friday, July 18, 2014, 11:59: Turbos at speed.
Friday, July 18, 2014, 12:01: Vacuum at 1.4E-5 T
Monday, July 21, 2014, 08:51: Opened water for HS circuit. Small vacuum "bump" recovered to 1.5E-7 T
Monday, July 21, 2014, 09:17: Starget TGHT autoramping to 580A @ 2 A/min
Monday, July 21, 2014, 14:05: TGHT @ 580A 7.47V.
Tuesday, July 22, 2014, 10:41: Data logger installed
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
37.6 |
3.7 |
TBHT |
28.5 |
6.1 |
COIL + EE |
28.7 |
4.8 |
TGHT |
31.0 |
5.4 |
Tuesday, July 22, 2014, 13:41: BIAS / EZL / EE to 30 / 14 /2 kV. EE:RDCUR 695 uA
Tuesday, July 22, 2014, 14:23: Starting cool down of TGHT 2A/min. Vacuum at 2.7E-7 T
Wednesday, July 23, 2014, 09:05: BIAS / EZL / EE off. Turbos off. Vacuum at 1.3E-7 T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.5 |
3.7 |
TBHT |
28.3 |
6.1 |
COIL + EE |
29.2 |
5.2 |
TGHT |
28.4 |
5.7 |
Wednesday, July 23, 2014, 14:05: Purged HS water line.
Wednesday, July 23, 2014, 14:07 : Venting
Wednesday, July 23, 2014, 14:33: Heat Shield removed |
Friday, July 18, 2014, 08:19, Anders Mjos, , , , , , , , Venting
|
Friday, July 18, 2014, 08:19: Stopped turbos
Friday, July 18, 2014, 10:58: Venting |
Wednesday, July 09, 2014, 14:08, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD ANODE current readback
|
The read back of the ANODE current was confirmed to be working today with help of Ray D. using a 1kOhm resistor. There is an offset in the read back which can explain why no current was seen on SiC#30. The resistor between CATHODE and GND was changed from 100 kOhm to 50kOhm. |
Tuesday, July 08, 2014, 09:05, Anders Mjos, , , , , , , In progress, Empty chamber
|
Tuesday, July 08, 2014, 09:05: Roughing
Tuesday, July 08, 2014, 13:23: Starting turbos
Tuesday, July 08, 2014, 13:30 : Turbos at speed
Tuesday, July 08, 2014, 13:33 : Vacuum at 2.8E-6 T |
Thursday, June 26, 2014, 16:32, Anders Mjos, Ta#43, LP-SIS, ITW, TM1, 40282-2, 39230-6, In progress, Conditioning Ta#43
|
Thursday, June 26, 2014, 16:31: Roughing.
Thursday, June 26, 2014, 16:51: Starting turbos.
Thursday, June 26, 2014, 16:59: Turbos at speed.
Thursday, June 26, 2014, 17:01: Vacuum at 1.2E-5 T
Friday, June 27, 2014, 08:39: Opened HS cooling line. Vacuum stable at 1.9E-7 T
Wednesday, July 02, 2014, 10:24: Vacuum at 1.3E-7 T
Wednesday, July 02, 2014, 10:31: BIAS / EE / EZL to 30 / 1.5 / 14 kV
Wednesday, July 02, 2014, 10:32: Opened TPS:IV4
Wednesday, July 02, 2014, 10:36: Started heating TGHT / TBHT to 400 A / 155 A
Wednesday, July 02, 2014, 14:00: Heating finished for today.
Thursday, July 03, 2014, 08:09 : Resuming heating TGHT / TBHT to 580 A / 200 A. Vacuum at 2.1E-7 T
Thursday, July 03, 2014, 09:17: TGHT voltage limiting. Stopped and restarted heating.
Thursday, July 03, 2014, 12:51 : Heating TBHT to 230 A
Thursday, July 03, 2014, 13:18: TBHT at 227 A (local readback). Started mass scan.
Thursday, July 03, 2014, 15:39: Lowering TBHT to 218 A (local).
Friday, July 04, 2014, 11:00: Heated to 230 A.
Friday, July 04, 2014, 15:40: Q1/Q6 found off.
Friday, July 04, 2014, 15:42 : Starting cool down.
Monday, July 07, 2014, 09:24 : Closed TPS:IV4
Monday, July 07, 2014, 09:24: EE conditioning to -2kV
Monday, July 07, 2014, 10:02: BIAS off. Turbos off.
Tuesday, July 08, 2014, 08:13: Venting |
Friday, June 20, 2014, 11:44, Anders Mjos, , , , , , , In progress, Pumping down empty chamber
|
Friday, June 20, 2014, 11:44: Roughing
Friday, June 20, 2014, 13:00: Strarting turbos
Friday, June 20, 2014, 13:09: Turbos at speed.
Friday, June 20, 2014, 13:10 : Vacuum at 1.3E-5
Thursday, June 26, 2014, 08:52 : Turbos stopped. Vacuum at 1.3E-7 T
Thursday, June 26, 2014, 15:34: Venting |
Thursday, June 19, 2014, 10:48, Anders Mjos, , , , , , , Problems/Solutions, FC0 did not retract from beam line
|
Upon inspection it was found that the bolt attaching the FC to the actuator had fallen off. The bolt was reattached and FC0 can be actuated in/out again. |
Wednesday, June 18, 2014, 09:23, Anders Mjos, , , , , , , Problems/Solutions, TSH:MB1 Trip & MB1 June 10th water leak
|
A water leak on MB1 was found and reported by operations on June 10th e fault 7429
MB1 can not be switched on due to an TSH:MB1 water flow trip. Paddle wheel is rotating.
Wednesday, June 18, 2014, 14:03: Paddle wheel replaced with a used one from beam lines. Model SST150. Signal recovered. |
Monday, May 26, 2014, 14:15, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , Done, SiC#30 HV and Heaters Conditioning
|
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation. |
Friday, June 13, 2014, 08:43, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, Done, SiC#30 HV and Heaters Conditioning
|
Aurelia Laxdal wrote: |
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.
|
Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T
Monday, June 16, 2014, 08:26: Venting. Water purged.
Monday, June 16, 2014, 09:00: Target removed |
Tuesday, June 17, 2014, 15:22, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, In progress, SiC#30 HV and Heaters Conditioning
|
Anders Mjos wrote: |
Aurelia Laxdal wrote: |
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.
|
Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T
Monday, June 16, 2014, 08:26: Venting. Water purged.
Monday, June 16, 2014, 09:00: Target removed
|
The target assembly did not pass the megger test between anode and heat shield after the previous conditioning. The AlN insulators were found to have failed during the conditioning. The coil insulation was burnt. AlN insulators and anode ware replaced.
Tuesday, June 17, 2014, 15:22: Roughing
By R.M.
Tuesday, June 17, 2014, 15:52: Turbos Started
Tuesday, June 17, 2014, 15:54: TP1B at speed
Tuesday, June 17, 2014, 15:57: IG1 Turned on 1.92e-05T
Tuesday, June 17, 2014, 15:59: TP1A at speed
Tuesday, June 17, 2014, 15:59: IG1 1.31e-05T
By AM
Wednesday, June 18, 2014, 08:24: Opened HS water circuit. Vacuum stable at 2.2E-7 T.
Wednesday, June 18, 2014, 08:40: Pumping on gas lines.
Wednesday, June 18, 2014, 08:49: Closed pump valve on gas lines.
Wednesday, June 18, 2014, 08:51: Opening TSH:SV5
Wednesday, June 18, 2014, 08:53: Opening TSH:SV2
Wednesday, June 18, 2014, 09:00: BIAS/ EZL / EE 30 / 13 / -1.5 kV
Wednesday, June 18, 2014, 09:04: Starting target heating to 500 / 240 A
Wednesday, June 18, 2014, 09:07: COIL to 50 A. ANODE to 200 V
Wednesday, June 18, 2014, 09:33: OPEN TPS:IV4
Wednesday, June 18, 2014, 14:05: TBHT at 240 A 2.6 V. TGHT still ramping (403 A)
Wednesday, June 18, 2014, 15:03: TGHT at 500 A 4.5 V
Thursday, June 19, 2014, 08:51: Ramping to 580 A / 265 A
Thursday, June 19, 2014, 09:37: Continue ramping TBHT to 290A
Thursday, June 19, 2014, 09:44: 8E-8 A on FC0
Thursday, June 19, 2014, 10:52: TBHT at 305A. Running mass scan.
Thursday, June 19, 2014, 11:36: Opening for He.
Thursday, June 19, 2014, 11:46: Opening for Ne.
Thursday, June 19, 2014, 11:54: Lowering TBHT to 300 A
Thursday, June 19, 2014, 13:01: Mass scan. ~1E-10 A Ne current on FC6 with Ne open.
Thursday, June 19, 2014, 15:06: Mass scan up.
Thursday, June 19, 2014, 16:00: Mass scan down.
Thursday, June 19, 2014, 16:49: Started cooling down target.
Friday, June 20, 2014, 08:53: Target de-biased. Turbos off.
Friday, June 20, 2014, 10:23: Venting. Purging water from HS circuit. |
Monday, June 16, 2014, 09:12, Anders Mjos, , , , , , , In progress, Empty chamber
|
Monday, June 16, 2014, 09:12: Roughing
Tuesday, June 17, 2014, 14:38: Venting |
Friday, March 21, 2014, 14:12, Anders Mjos, , , , , , , Problems/Solutions, Elevated backing pressure on ISAC Test Stand TMS:RP2
|
The performance of the roughing pump has gradually gone down. Notably after the system has been vented. See attached screenshot from the archiver.
E-fault 7258.
|
Thursday, June 12, 2014, 09:28, Anders Mjos, , , , , , , Problems/Solutions, Elevated backing pressure on ISAC Test Stand TMS:RP2
|
Anders Mjos wrote: |
The performance of the roughing pump has gradually gone down. Notably after the system has been vented. See attached screenshot from the archiver.
E-fault 7258.
|
Edi replaced the backing pump on June 5th. |
Wednesday, May 21, 2014, 17:05, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , In progress, SiC#30 HV and Heaters conditiong
|
As per Friedhelm the conditioning settings are:
TGHT 580A
TBHT 290A
COIL 80A
ANODE 200V
Ramped up completed:
TGHT 580A/5.683V
TBHT 242A/2.295V (EPICS settings) and 289A/2.29V at the PS
COIL 80A
Current on the Anode = 13.431mA
|
Tuesday, May 20, 2014, 12:39, Anders Mjos, , , , , , , Done, FEBIAD Cathode Negative BIAS configuration
|
As per ISK4562 Rev 3 and ISK4563 Rev 3
By Ray D. and co. |
Tuesday, May 20, 2014, 11:17, Anders Mjos, , , , , , , Problems/Solutions, Burnt off GND connection on Service Cap
|
The ground connection between B and F (ISK4523D Rev 6) was found burnt off. It will be switched out as per CATHODE BIAS configuration (ISK4563D Rev 3) by Ray D. |
Thursday, May 15, 2014, 14:58, Anders Mjos, , , , , , , Problems/Solutions, IOC rebooted to recover from white-out.
|
Restarted archivers. |
Monday, May 12, 2014, 14:20, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, In progress, Conditioning SiC#30
|
Monday, May 12, 2014, 14:14 : Roughing
Monday, May 12, 2014, 14:34: Starting turbos
Monday, May 12, 2014, 14:42 : Turbos at speed
Monday, May 12, 2014, 14:44 : Vacuum at 1.7E-5 T
Tuesday, May 13, 2014, 10:51: Opened water for HS circuit. Vacuum stable at 2.2E-7 T. Minor spike to 2.5E-7 T for 10 s.
Tuesday, May 13, 2014, 10:54: Roughing out gas lines.
Tuesday, May 13, 2014, 11:30: Opening SV5 and SV2 to evacuate gas lines completely.
Tuesday, May 13, 2014, 11:58: BIAS to 30kV, EZL to 13 kV. EE to 1.5 kV.
Tuesday, May 13, 2014, 11:59: Opening isolation valve
Tuesday, May 13, 2014, 12:12: Started heating to 450A / 200A TGHT / TBHT.
Target heating stopped at 167 A - likely caused by network problems. Multiple gaps in strip tool. Indicating lost network connection.
Wednesday, May 14, 2014, 10:07: Resuming heating to 450A / 200A TGHT / TBHT (EPICS 170A)
Wednesday, May 14, 2014, 10:12: De-biasing to investigate ANODE/CATHODE BIAS
Switched ON ANODE/CATHODE BIAS PS.
Wednesday, May 14, 2014, 10:22: BIAS to 30kV, EZL to 13 kV. EE to 1.5 kV.
Wednesday, May 14, 2014, 16:07: Continue heating TGHT to 500A
Wednesday, May 14, 2014, 16:33: TGHT at 500A. TBHT at 203 A.
Thursday, May 15, 2014, 14:57: Switched OFF/ON IOC to recover from white-out.
Thursday, May 15, 2014, 15:51: Started heating to 550A / 240A
COIL to 50A
ANODE to 200V
TGHT to 580A
TBHT to 280A
Friday, May 16, 2014, 11:28 : Opening Ne
Friday, May 16, 2014, 11:56: TBHT to 290 A
Friday, May 16, 2014, 14:12: Started cool down. ANODE/CATHODE Bias requires reconfiguration.
Tuesday, May 20, 2014, 11:10: Ray and co is checking the configuration and troubleshooting the burnt off GND connection. The Test Stand will be configured to CATHODE negative BIAS.
Tuesday, May 20, 2014, 12:35: BIAS, EZL, EE, COIL, ANODE ON.
Tuesday, May 20, 2014, 12:35: Gas lines pumped.
Tuesday, May 20, 2014, 12:35: Auto heating to 240A/500A at 1A/2A /min.
Tuesday, May 20, 2014, 12:44: IV4 opened |
Friday, May 09, 2014, 10:48, Anders Mjos, , , , , , , Problems/Solutions, EPICS white-out e-fault 7380
|
Monday, May 12, 2014, 10:02: Jane R. power cycled the hardware. EPICS is back up. Sources archiver required a restart. |
Thursday, May 08, 2014, 15:09, Anders Mjos, , , , , , , Problems/Solutions, SOURCES archiver reported stopped
|
Archiver restarted. |
Monday, April 28, 2014, 10:23, Anders Mjos, , , , , , , In progress, Cu-strip cleaning test - sample #2, cleaned
|
Monday, April 28, 2014, 10:23: Started roughing
Monday, April 28, 2014, 10:48: Started turbos. CG1 at ~0.3 T
Monday, April 28, 2014, 10:56 : Turbos at speed
Monday, April 28, 2014, 10:58 : Vacuum at 7.2E-6 T
Tuesday, April 29, 2014, 09:15: Vacuum over night was somewhat erratic with a couple of excursions. Venting to redo door seal and inspect chamber.
Tuesday, April 29, 2014, 13:18: Venting
Aborted venting.
Wednesday, April 30, 2014, 10:15: Vented. Cleaned front door o-ring and groove. Inspected VCR joint on HS water loop. No visible issues.
Wednesday, April 30, 2014, 10:15: Roughing
Wednesday, April 30, 2014, 10:35 : Starting turbos
Wednesday, April 30, 2014, 10:44 : Turbos at speed
Wednesday, April 30, 2014, 10:45 : Vacuum at 6.5E-6 T
Thursday, May 01, 2014, 08:44: Vacuum erratic over night. Small burst of pressure increase in vacuum with ~2 hours intervals. Leak found on HS cooling circuit by purging the water line.
Thursday, May 01, 2014, 08:46: Stopping turbos. Vacuum at 2.7E-7 T
HS water line should be purged again before breaking VCR seal.
Thursday, May 01, 2014, 09:59: Venting
Thursday, May 01, 2014, 10:45: Removed HS loop.
Thursday, May 01, 2014, 10:45: Roughing
Thursday, May 01, 2014, 11:11: Starting turbos. CG1 ~ 0.1 T
Thursday, May 01, 2014, 11:19: Turbos at speed
Thursday, May 01, 2014, 11:21 : Vacuum at 5.2E-6 T
Monday, May 12, 2014, 10:03 : Turbos stopped. Vacuum at 1.22 E-7 T
Monday, May 12, 2014, 13:34: Venting
|
Wednesday, April 23, 2014, 14:16, Anders Mjos, , , , , , , Done, Cu-strip cleaning test - sample #1, not cleaned
|
Wednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34 : Starting turbos
Wednesday, April 23, 2014, 14:42 : Turbos at speed
Wednesday, April 23, 2014, 14:44 : Vacuum at 8.3E-6 T
Thursday, April 24, 2014, 09:12: Opened water for HS loop. Vacuum stable at1.6E-7 T
Thursday, April 24, 2014, 09:25: Started heating TGHT to 580A at 2A/min
Thursday, April 24, 2014, 14:07: Aborted autoramping. Cu-strip glowing. Started Target Cooldown.
Monday, April 28, 2014, 08:36: Stopped turobs. Vacuum at 1.2E-7 T |
Wednesday, April 23, 2014, 09:37, Anders Mjos, , , , , , , Problems/Solutions, Started Sources archiver
|
The archiver was not running |
Friday, April 04, 2014, 17:01, Rick Maharaj, UC#9, LP-SIS, ITW, TM1, , 39230-3, Done, Conditioning Heatshield for UCx#9
|
Friday, April 04, 2014, 16:26: Heatshield/Ionsource assembly for UC LP SIS installed in test stand with Ta tube as heat load.
Friday, April 04, 2014, 16:29: Chamber roughing started
Friday, April 04, 2014, 16:51: Turbos started
Friday, April 04, 2014, 16:59: TP1B at speed
Friday, April 04, 2014, 17:00: TP1A at speed
Friday, April 04, 2014, 17:00: IG1 Turned on vacuum at 2.8e-05T
Tuesday, April 08, 2014, 10:37: Vacuum 1.8e-07 T - Heatshield water turned on
Tuesday, April 08, 2014, 10:40: No change in vacuum pressure.
Wednesday, April 09, 2014, 11:46: Started heating tght to 200 amps
Wednesday, April 09, 2014, 14:58: Heating increased to 400 amps
Thursday, April 10, 2014, 14:58: Heating increased to 580 amps
By AM
Friday, April 11, 2014, 14:57: Started cool down. Vacuum at 4.2E-7 T
By AM
Wednesday, April 23, 2014, 09:18: Turbos stopped. Vacuum at 1.2E-7 T
Wednesday, April 23, 2014, 13:50: Venting
Wednesday, April 23, 2014, 14:14: Heat Shield removed |
Thursday, April 03, 2014, 16:46, Aurelia Laxdal, TiC#4, HP-SIS, ITE, TM3, , , Done, HV and Heaters Conditioning
|
HV and Heaters Conditioning had finished. The target was cooled down and it's ready for the on-line installation. |
Friday, April 04, 2014, 08:24, Anders Mjos, TiC#4, HP-SIS, ITE, TM3, , , In progress, Venting
|
Aurelia Laxdal wrote: |
HV and Heaters Conditioning had finished. The target was cooled down and it's ready for the on-line installation.
|
Friday, April 04, 2014, 08:23: Target bias, EE and EZL to zero. Turbos off.
Friday, April 04, 2014, 10:14: Venting
Friday, April 04, 2014, 10:48: Target removed - By R.M. |
Tuesday, April 01, 2014, 11:09, Aurelia Laxdal, TiC#4, HP-SIS, ITE, TM3, , , In progress, HV and Heaters Conditioning
|
Started March 31, 2014:
- did the HV conditioning up to 30kV.
April 1, 2014:
- started the Heaters Conditioning.
Heaters Conditioning finished.
The Power Supplies front panel:
TGHT: 5.56V and 580A
TBHT: 2.23V and 227A
April 2, 2014:
- did a mass scan. NOTE: data is shifted by 10-15%.
plotdump-local-clean.txt_Apr2_14_16-33-19.txt
After the scan finished I found the Test Stand EPICS screens whited-out. Decided with Friedhelm to leave it as it was for the night and to contact Controls next day to reboot it without tripping the heaters and the HV.
April 3, 2014:
Found everything recovered. Except: “SOURCES ARCH IS RUNNING” was red. So, I restarted it. Jane Richards and Friedhelm didn’t do any IOC reboot. Also found that the data from yesterday’s scan was saved (see the previous scan).
Did another mass scan: plotdump-local-clean.txt_Apr3_14_10-18-13.txt
NOTE: data is shifted by 10-15%.
Cooling down .
|
Friday, March 28, 2014, 10:39, Anders Mjos, TiC#4, HP-SIS, ITE, TM3, , , In progress, Conditioning TiC#4
|
NOTE:
TBHT Power Supply is 600A. EPICS thinks it is 500. Multiply current setting with 1.2 for actual current to the tube.
Friday, March 28, 2014, 10:38: Stopped turbos. Vacuum at 1.3E-7 T
Friday, March 28, 2014, 15:05: Venting
By RM
Friday, March 28, 2014, 15:22: Target assembly installed
Friday, March 28, 2014, 15:43: Chamber Roughing started
Friday, March 28, 2014, 15:58: Turbos started
Friday, March 28, 2014, 16:03: TP1B at speed
Friday, March 28, 2014, 16:06: TP1A at speed
Friday, March 28, 2014, 16:07: IG1 Turned on - reading 1.29e-05T
By R.M.
Monday, March 31, 2014, 09:55: Water to heatshield line turned on, no change in vacuum: 1.31e-07 T
|
Friday, March 21, 2014, 13:55, Anders Mjos, , , , , , , In progress, Pumping down empty chamber
|
Roughing
Friday, March 21, 2014, 13:59: Starting turbos
Friday, March 21, 2014, 14:08: Turbos at speed
Friday, March 21, 2014, 14:09: Vacuum at 7.5 E-6T |
Monday, March 17, 2014, 19:10, Anders Mjos, Ta#42, LP-SIS, ITW, TM4, 40282-1, 39956-1 / 39956-9 (base / lid), In progress, Conditioning
|
NOTE:
TBHT Power Supply is 600A. EPICS thinks it is 500. Multiply current setting with 1.2 for actual current to the tube.
Time stamp on OM-DAQPRO-5300 is on hour behind (daylight savings).
All bolts torqued to 130 in lbs. TGHT and TBHT bolts tightened and loosened 3x.
Monday, March 17, 2014, 19:10: Roughing
Monday, March 17, 2014, 19:30: Turbos started
Monday, March 17, 2014, 19:38: Turbos at speed.
Monday, March 17, 2014, 19:40: Vacuum at 1.3E-5 T
BY R.M.
Tuesday, March 18, 2014, 10:10: Vacuum 2.87e-07 T
Tuesday, March 18, 2014, 10:12: Heatshield Water Circuit turned on
Tuesday, March 18, 2014, 10:25: Vacuum 2.85e-07 T
By AM
Tuesday, March 18, 2014, 16:06:
Conditioned high voltage BIAS to 30kV. BIAS:RDCUR 37 uA.
Started heater auto-ramping. TBHT to 50A at 1A/min. TGHT to 100A at 2 A/min.
Vacuum at 2.7E-7 T
Tuesday, March 18, 2014, 17:06: TBHT and TGHT reached 50A and 100A respectively. Local readback on TBHT is 58A (as expected - see note above). Vacuum is gradually coming down.
Operation stable over night. TSG:CBC needed to be restarted. Switched off over night.
Wednesday, March 19, 2014, 08:21: Continue heating to 85A / 250 A TBHT/TGHT.
Wednesday, March 19, 2014, 09:12
Water temperatures 27 - 28 deg C, and flow Rates
4.0 l/m HS+MSP
6.4 l/m TBHT
5.1 l/m COIL+EE
5.6 l/m TGHT
Wednesday, March 19, 2014, 09:57: Continue heating to 170 A / 500 A, TBHT/TGHT
Wednesday, March 19, 2014, 09:58: Opened IV4
Wednesday, March 19, 2014, 09:58: Restarted Q1.
Wednesday, March 19, 2014, 10:11: Switched FC0 bias to negative
Wednesday, March 19, 2014, 10:30: Q1 restarted. Possible spark. Small vacuum response on IG1
Wednesday, March 19, 2014, 10:49: Some sparking
Wednesday, March 19, 2014, 12:43: Continue heating to 190A / 580 A TBHT/TGHT.
Wednesday, March 19, 2014, 13:00: TBHT voltage limited. Increased limit to 2.3V
Water temperatures and flow rates
35 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
28 C 5.1 l/m COIL+EE
30 C 5.6 l/m TGHT
Wednesday, March 19, 2014, 13:32: Local read back on PS: 223A / 580A TBHT/TGHT
Water temperatures and flow rates
37 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
29 C 5.1 l/m COIL+EE
31 C 5.6 l/m TGHT
Wednesday, March 19, 2014, 14:30: Measured ~2E-7 A 23Na on FC6 and 2E-7 A on FC0. Vacuum on IG1 4.2E-8 T
Wednesday, March 19, 2014, 14:58: TBHT was voltage limiting. Increased voltage limit to 2.4 V
Target will condition over night.
Thursday, March 20, 2014, 10:07: Measured ~1.4E-8 A 23Na on FC6 and 2E-7 A on FC0. Vacuum on IG1 8.3E-7 T
Water temperatures and flow rates
35 C 4.0 l/m HS+MSP
27 C 6.4 l/m TBHT
27 C 5.1 l/m COIL+EE
29C 5.6 l/m TGHT
Thursday, March 20, 2014, 10:13: Starting mass scan 200 - 0
Local current on PS (TBHT/TGHT): 227 A / 580 A
At about 10:15 to 10:20 the TGHT:RDVOL dropped from 7.2 - 7.1 V.
Thursday, March 20, 2014, 11:05: Mass scan finished.
Water temperatures and flow rates
36 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
29 C 5.1 l/m COIL+EE
30 C 5.6 l/m TGHT
Thursday, March 20, 2014, 13:20
Water temperatures and flow rates
34.8 C 4.0 l/m HS+MSP
26.1 C 6.4 l/m TBHT
26.8 C 5.1 l/m COIL+EE
28.4 C 5.6 l/m TGHT
Thursday, March 20, 2014, 13:24: Conditioning EE to -2kV
Thursday, March 20, 2014, 13:26: EE at -2kV and 694 uA
Thursday, March 20, 2014, 13:36: Lowering EE back to -1.4kV
Thursday, March 20, 2014, 13:38: Starting the cool down of the target at 2 A/min
Thursday, March 20, 2014, 15:08: Closed IV4
Friday, March 21, 2014, 08:32: Lowered BIAS, EE and EZL to 0. TGHT and TBHT off.
Friday, March 21, 2014, 08:33: Stopped turbos. Vacuum at 1.3E-7 T
Friday, March 21, 2014, 13:10: Venting |
Wednesday, March 12, 2014, 10:20, Rick Maharaj, , , , , , , Done, replace heatshield waterline loop
|
A new Heatshield waterline loop was manufactured and installed to replace the old one which had a leak.
Chamber vacuum currently being roughed down.
Wednesday, March 12, 2014, 10:41: Started turbos.
Wednesday, March 12, 2014, 10:5:0 Turbos at speed. TP1A timed out once.
Wednesday, March 12, 2014, 10:51: Vacuum at 2.6E-5 T.
By AM
Thursday, March 13, 2014, 10:20: Opened water. Vacuum stable at 9.3E-7 T.
Venting chamber to investigate slow pump down.
Thursday, March 13, 2014, 10:21: Stopped turbos.
Thursday, March 13, 2014, 11:15: Venting
By RM
HS loop wiped with methanol, door seals wiped.
Thursday, March 13, 2014, 11:47: Pump down Started
Thursday, March 13, 2014, 12:05: Turbos started
Thursday, March 13, 2014, 12:09: TP1B at speed
Thursday, March 13, 2014, 12:12: TP1A at speed
Thursday, March 13, 2014, 12:13: IG1 turned on Vacuum at 7.2E-06
By AM
Monday, March 17, 2014, 12:55 : Stopped turbos. Vacuum at 2.4E-7 T.
Monday, March 17, 2014, 17:39: Venting
|
Tuesday, March 11, 2014, 09:03, Anders Mjos, , , , , , , Problems/Solutions, Leak on water line for Heat Shield
|
Tuesday, March 11, 2014, 09:03: Venting to investigate |
Friday, March 07, 2014, 11:38, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP2 stopped over night
|
See fault report 7240
Tuesday, March 11, 2014, 09:04: Stopping TMS:TP6. Vacuum at 9.7E-6 T.
Wednesday, March 12, 2014, 10:22: Venting TMS section for TP2 replacement.
Edi replaced TP2
Wednesday, March 12, 2014, 15:36: Roughing TMS section.
Wednesday, March 12, 2014, 15:45: Starting turbos.
Wednesday, March 12, 2014, 15:49: Turbos at speed. Vacuum at 3.6E-5 T.
Wednesday, March 12, 2014, 15:55: Vacuum at 1.5E-5 T. |
Wednesday, February 12, 2014, 09:01, Anders Mjos, , , , , , , In progress, Testing Cleaning sample
|
Wednesday, February 12, 2014, 08:55: Stopped turbos
Wednesday, February 12, 2014, 11:28: Venting
Installed one sample. No cleaning. Connection tabs wiped with alcohol to prevent making the source tray dirty.
Wednesday, February 12, 2014, 13:17: Started roughing
Wednesday, February 12, 2014, 13:38: Started turbos
Wednesday, February 12, 2014, 13:42: TP1B at speed. Vacuum at 5.4E-5 T
Wednesday, February 12, 2014, 13:46: TP1A at speed. Vacuum at 1.9E-5 T
Wednesday, February 12, 2014, 13:48: Vacuum at 1.7E-5 T
EPICS white-out due to ER0 activity. Graham assisted in getting the system back up.
Wednesday, February 12, 2014, 15:16 : Vacuum at 4.8E-6 T
Friday, February 27, 2014
Leak checked doors. No leak found.
Friday, February 28, 2014, 08:42: Opened up water supply. Major vacuum response.
Friday, February 28, 2014, 08:42: Stopped turbos
Friday, February 28, 2014, 10:19: Venting
Removed cleaning sample.
Friday, February 28, 2014, 11:38: Pumping down empty chamber
Friday, February 28, 2014, 11:56 : Starting Turbos
Friday, February 28, 2014, 12:05 : Turbos at speed
Friday, February 28, 2014, 12:06: Vacuum at 1.7E-5 T
Monday, March 03, 2014, 09:28 : Vacuum leak on waterline (HS) still present. Stopping turbos for investigation.
Tuesday, March 04, 2014, 09:58: Venting
Replaced Cu-gaskets with Parker SST gaskets.
Tuesday, March 04, 2014, 11:03: Roughing
Tuesday, March 04, 2014, 11:26: Starting Turbos
Tuesday, March 04, 2014, 11:35: Turbos at speed. (TP1A timed out once)
Tuesday, March 04, 2014, 11:36: Vacuum at 1.6E-5 T
Thursday, March 06, 2014, 08:21: Vacuum leak no waterline (HS) still present. Stopping turbos. |
Wednesday, February 05, 2014, 11:27, Anders Mjos, , , , , , , Problems/Solutions, Emittance Rig installation
|
Wednesday, February 05, 2014, 11:27 : Stopped turbos
- 2x spacers ITD0468 1/8" THK installed to shift the wire scanner screen closer to the wire scanner. (ITD0469 1/16" THK spacers not used).
- Emittance Rig installed. Manually actuated from out -> in -> out position. No interference observed.
- Replaced two insulators on wire scanner screens that broke in the installation process. New insulators kindly donated from ISIS.
By Anders and Ayan.
Wednesday, February 05, 2014, 16: Roughing
Thursday, February 06, 2014, 08:42: Turbos started
Thursday, February 06, 2014, 08:50: Turbos at speed. IG6 6.2E-6 T, IG1 1.3 E-6 T |
Wednesday, January 29, 2014, 14:42, Anders Mjos, , , , , , , Problems/Solutions, Valved off water to TSG and TMS:MB1
|
CuLCW will be shut off tomorrow. Valved off water supply to MB1 and TSG to minimize air into the system. Turbos are off. |
Thursday, January 30, 2014, 15:38, Anders Mjos, , , , , , , Problems/Solutions, Starting turbos after CuLCW shut off
|
Anders Mjos wrote: |
CuLCW will be shut off tomorrow. Valved off water supply to MB1 and TSG to minimize air into the system. Turbos are off.
|
Opened up for water flow.
Thursday, January 30, 2014, 15:30: Started turbos
Thursday, January 30, 2014, 15:34: TP2 and TP6 at speed. Vacuum at 2.5E-5 T
Thursday, January 30, 2014, 15:34: TP1B at speed. Vacuum at 1.3E-5 T
Thursday, January 30, 2014, 15:38: TP1A at speed. Vacuum at 1.6E-6 T |
Friday, January 24, 2014, 10:49, Anders Mjos, , , , , , , Problems/Solutions, Venting the optics section to investigate Emittance Rig installation
|
Friday, January 24, 2014, 10:49 : Stopped turbos. Vacuum at 2.5E-7 T
Friday, January 24, 2014, 12:52: Venting
Finished evaluating emittance rig installation.
Friday, January 24, 2014, 14:25: Roughing.
The Cu-tubing for cooling the Turbo pumps broke off during disassembly. New ferrules could not be located on site and may have to be ordered.
The system will be left under roughing vacuum over the weekend.
Wednesday, January 29, 2014
Cooling for Turbo pumps reconnected. |
Thursday, January 16, 2014, 15:00, Anders Mjos, , , , , , , Problems/Solutions, Flow and temperature meter
|
Flow and temperature meter previously installed on cooling circuits. See attachment for details.
Typical values at 95 psi in and 10 psi out. Cyclotron off.
Device
|
Temp
[°C] |
Flow
[lpm]
|
Heat Shield and Mounting Support Plate |
25 |
3.9 |
Tube Heater |
25 |
6.2 |
Coils and Extraction Electrode |
25 |
5.0 |
Target Heater |
25 |
5.5 |
|
Tuesday, January 14, 2014, 08:58, Anders Mjos, , , , , 40282-5, 39230-1, Done, Heating Test
|
Tuesday, January 14, 2014, 08:57: Stopping turbos. Vacuum at 1.2E-7 T
Tuesday, January 14, 2014, 13:32: Venting
Ta-tube installed. All bolts torqued to 130 in lbs
Thermocouples installed. CH2/3 left/right swapped with respect to previous test.
CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe right side - type C
CH3 6/7: inside probe left side - type C
CH4 8/9: welded on leg - type K
Tuesday, January 14, 2014, 15:10: Roughing
Tuesday, January 14, 2014, 15:33: Starting turbos.
Tuesday, January 14, 2014, 15:42: Turbos at speed
Tuesday, January 14, 2014, 15:43: Vacuum at 2.3E-5 T
Wednesday, January 15, 2014, 10:32: Opened water. Vacuum stable at 2.9E-7 T.
Monday, January 20, 2014
Started heating the Target-tube.
Pressure increase observed on water supply around 10. Supply ~100psi, return ~7 psi
Tuesday, January 21, 2014
Continue heating from 250 A
Tuesday, January 21, 2014, 15:47: TGHT at 580 A, 7.23 V
Wednesday, January 22, 2014
Target-tube cooled down over night. Will went to investigate TC connections.
Wednesday, January 22, 2014, 08:38 : Turbos stopped. Vacuum at 1.3E-7 T |
Thursday, January 02, 2014, 11:53, Anders Mjos, , , , , , , Problems/Solutions, The computer will not boot Windows
|
The computer has been brought over to PC support for diagnostics.
Hard Drive was found to be corrupted. A new HD will be installed and Windows upgraded to a newer version.
Thursday, January 16, 2014
The PC has gotten a new HD with Windows 8.
Xming and PuTTY installed and configured for access to EPICS controls |
Friday, December 20, 2013, 15:46, Anders Mjos, , , , , , , Problems/Solutions, Water switched off for the holidays
|
|
Wednesday, December 18, 2013, 12:04, Anders Mjos, , , , , 40282-5, 39230-1, Done, Heating Test
|
Wednesday, December 18, 2013, 12:04: Turbos stopped
Wednesday, December 18, 2013, 13:19: Venting
Ta-tube installed. All bolts torqued to 130 in lbs
Thermocouples installed.
CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe left side - type C
CH3 6/7: inside probe right side - type C
CH4 8/9: welded on leg - type K
Wednesday, December 18, 2013, 14:41: Roughing
Initial temperatures
CH1 28.1
CH2 30.7
CH3 31.3
CH4 31.0
Wednesday, December 18, 2013, 15:50: Starting turbos.
Wednesday, December 18, 2013, 15:58: Turbos at speed.
Wednesday, December 18, 2013, 16:00: Vacuum at 9.3E-6 Torr
Thursday, December 19, 2013, 09:35 : Opened water for HS. Vacuum stable at 2.5E-7 Torr. Flow ~ 3.9 l/min
temperatures
CH1 26.3
CH2 Un
CH3 28.7
CH4 30.5
Thursday, December 19, 2013, 16:50: Ta-tube at 500A ~ 1380 deg C.
temperatures
CH1 33.6
CH2 1319.3
CH3 1443.4
CH4 20.1
Heated to 580A
Friday, December 20, 2013, 10:48: Started cool down at 2A/min.
Friday, December 20, 2013, 15:46: Switched off TGHT. |
Thursday, December 12, 2013, 09:01, Anders Mjos, , , , , , , Problems/Solutions, Vacuum excursion over night
|
Monday, December 16, 2013, 08:53
Some additional smaller magnitude excursions have been observed since the fist on on Dec. 12th. See attached plot. |
Wednesday, December 04, 2013, 09:22, Anders Mjos, , , , , , , In progress, Testing impedance with the new TBHT P/S
|
Wednesday, December 04, 2013, 09:21 : Turbos stopped. Vacuum at 1.2E-7 Torr
Wednesday, December 04, 2013, 12:35: Venting
Copper bars installed w/ 130 in lbs torque
Wednesday, December 04, 2013, 13:06: Roughing
Wednesday, December 04, 2013, 15:16: Turbos started. Vacuum at 0.03 Torr
Wednesday, December 04, 2013, 15:23: Turbos at speed.
Wednesday, December 04, 2013, 15:26: Vacuum at 5E-6 Torr
Thursday, December 05, 2013
Impedance measured on TGHT and TBHT (~2.5 mOhm and ~2.0 mOhm). Readback on TBHT gives an impedance of ~2.5 mOhm. This is higher than the previous test. Local current on TBHT shows 60A more than the readback at 300A. The vacuum did not come down as low as usual, which likely means there is a leak.
Thursday, December 05, 2013, 13:15: Turbos stopped.
Friday, December 06, 2013, 13:11: Venting
Gaskets on doors cleaned.
Friday, December 06, 2013, 13:40: Roughing
Friday, December 06, 2013, 13:59: Starting turbos
Friday, December 06, 2013, 14:07: Turbos at speed.
Friday, December 06, 2013, 14:09: Vacuum at 1.4 E-5 Torr
Monday, December 09, 2013, 08:46: Vacuum at 2.0 E-5 Torr |
Monday, December 02, 2013, 15:21, Anders Mjos, , , , , , , Problems/Solutions, Xantrex 10V 600A installed and in Cathode Negative mode
|
By Ray Dube. |
Monday, December 02, 2013, 08:36, Anders Mjos, , , , , , , Problems/Solutions, Sources archiver started
|
|
Wednesday, November 27, 2013, 08:27, Anders Mjos, , , , , , , Problems/Solutions, EPICS whiteout
|
Since yesterday around 4pm. Due to attempt to use the TMS:ER0 device.
IOC rebooted this morning. Archivers restarted. |
Tuesday, November 05, 2013, 15:50, Anders Mjos, , , , , , , Problems/Solutions, Backing pressure TSG:CG1A and CG1B elevated
|
Pressure around 140 mTorr. The pressure started increasing early November 2nd. Will continue to monitor.
Tuesday, November 12, 2013, 09:51 UPDATE
Backing pressure further increased to ~ 350 mTorr over the weekend. Vacuum group has been informed and will replace the pump this week. |
Wednesday, November 20, 2013, 08:57, Anders Mjos, , , , , , , Problems/Solutions, Backing pressure TSG:CG1A and CG1B elevated
|
Anders Mjos wrote: |
Pressure around 140 mTorr. The pressure started increasing early November 2nd. Will continue to monitor.
Tuesday, November 12, 2013, 09:51 UPDATE
Backing pressure further increased to ~ 350 mTorr over the weekend. Vacuum group has been informed and will replace the pump this week.
|
The backing pump (TSG:RP1) was replaced yesterday by Anthony Ip. Backing pressure is down to 1 mTorr on TSG:CG1A |
Tuesday, November 12, 2013, 12:38, Anders Mjos, , , , , , , Problems/Solutions, Vacuumed desk, on and around the beam line
|
|
Tuesday, October 22, 2013, 15:20, Rick Maharaj, , , , , , , Problems/Solutions, Target Heater Conductor Block Insulators Replaced
|
The Conductor insulating blocks - ITD053C and ITD054C - that secure the target heater and coil conductor blocks were replaced. The existing ones were cracked and fell apart upon removal. |
Tuesday, October 15, 2013, 16:17, Anders Mjos, , , , , , , Done, TGHT and TB HT test bar test
|
HS line is looped. Cu-test bars installed on TGHT and TBHT. Torqued all bolts to 120 in lbs.
Tuesday, October 15, 2013, 16:17: Roughing
Tuesday, October 15, 2013, 16:39: Turbos started.
Tuesday, October 15, 2013, 16:48: Turbos at speed
Tuesday, October 15, 2013, 16:49: Vacuum at 3.0 E-5 T
Wednesday, October 16, 2013, 08:38: Opened water on HS. Vacuum stable at 5.5E-7 T.
Wednesday, October 16, 2013, 10:12: TBHT to 300A (0.623V) TGHT to 580A (1.443 V)
Wednesday, October 16, 2013, 10:13: Ramping down at 6A/min
Thursday, October 17, 2013, 08:33: Turbos stopped. Vacuum at 2.6E-7 T.
Thursday, October 17, 2013, 10:24: Venting
Turned TGHT Cu-bar 180 deg. Loosened and re-fastened all bolts to 120 in lbs.
Thursday, October 17, 2013, 10:48: Roughing.
Thursday, October 17, 2013, 11:07: Turbos started.
Thursday, October 17, 2013, 11:16: Turbos at speed.
Thursday, October 17, 2013, 11:17: Vacuum at 1.2E-5 T
TGHT and TBHT were brought up to 580A and 300A.
Flow meters connected.
TGHT
T 27.8
Q 5.5
Monday, October 21, 2013, 13:34: Heating TGHT to 580A (1.411 V)
Monday, October 21, 2013, 13:37
TGHT
T 28.9
Q 5.4
Monday, October 21, 2013, 13:40
TGHT
T 29.1
Q 5.5
Monday, October 21, 2013, 13:45
TGHT
T 29.4
Q 5.4
TGHT RDCUR/VOL 581.5A / 1.421 V
Monday, October 21, 2013, 13:47
TGHT RDCUR/VOL 270.6 A / 0.674V
T 28.4
Q 5.4
Monday, October 21, 2013, 13:52
TGHT RDCUR/VOL 270.6 A / 0.674V
T 28.3
Q 5.5
Monday, October 21, 2013, 13:52: TGHT off.
TGHT
T 27.9
Q 5.5
Tuesday, October 22, 2013, 08:09: Stopped turbos. Vacuum at 1.4E-7 T
Tuesday, October 22, 2013, 12:29: Venting
Results in DocuShare collection |
Thursday, October 03, 2013, 14:15, Anders Mjos, , , , , , , Problems/Solutions, TMS:Q1 and Q6 tripped
|
|
Thursday, October 03, 2013, 08:43, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP2 tripped off - controller replaced.
|
This morning the turbo was found tripped off.
The controller was replaced by Edi on Friday.
Monday, October 07, 2013, 08:28: Starting Turbo
Monday, October 07, 2013, 08:29: Turbo at speed. Vacuum at 4.4E-7 T |
Monday, September 30, 2013, 15:19, Anders Mjos, , , , , , , Problems/Solutions, New purging valves installed on Heat Shield water circuit
|
The Heat Shield circuit can now be separately purged for water. Use valves on heat shield circuit to purge the lines for target exchanges from now on.
All paddle wheels have been rotated to allow trapped air to escape the system more easily. |
Friday, September 27, 2013, 11:41, Anders Mjos, Ta#41, HP-SIS, ITW, TM4, 39069-5, 38817-10, Done, Ta#41 Conditioning
|
Friday, September 27, 2013, 11:41: Roughing
Friday, September 27, 2013, 12:08: Turbos started
Friday, September 27, 2013, 12:16: Turbos at speed.
Friday, September 27, 2013, 12:18: Vacuum at 1.5E-5 T
Monday, September 30, 2013, 08:41: Opened water supply. Vacuum stable at 1.5E-7 T
TGHT Q=5.5 T=28.0
TBHT Q=5.8 T=28.0
Monday, September 30, 2013, 15:19: Flow sensor moved from TBHT to HS
TGHT Q=5.5 T=27.9
HS Q=3.6 T=27.8
Tuesday, October 01, 2013, 12:08: Taget Biased to 30kV.
Wednesday, October 02, 2013, 08:50: Started autoramping to 580A/230A
Wednesday, October 02, 2013, 08:50: Opened IV4
Wednesday, October 02, 2013, 10:51 TGHT/TBHT 250A / 239A
TGHT Q=5.5 T=28.5
HS Q=3.6 T=29.2
SUPPLY (ext) 27.3
RETURN (ext) 27.8
Wednesday, October 02, 2013, 13:28 TGHT/TBHT 250A / 570A
TGHT Q=5.5 T=30.4
HS Q=3.6 T=33.4
SUPPLY (ext) 27.4
RETURN (ext) 29.3
Wednesday, October 02, 2013, 13:30: TBHT was starting to limit on voltage. Increased voltage limit to 2.4V.
Thursday, October 03, 2013, 08:21: TMS:TP2 timed out over night.
Magnet PS breaker tripped during a mass scan yesterday. Reset breaker and cleared interlocks.
TGHT Q=5.5 T=30.4
HS Q=3.6 T=34.0
SUPPLY (ext) 27.3
RETURN (ext) 29.3
Thursday, October 03, 2013, 08:28: Started mass scan 200 -> 0 m/q. FC0 7.5E-8 A
Thursday, October 03, 2013, 14:29
TGHT Q=5.5 T=30.6
HS Q=3.6 T=33.9
SUPPLY (ext) 27.4
RETURN (ext) 29.6
Thursday, October 03, 2013, 15:14: Lowered TBHT:RDCUR to 230A.
Thursday, October 03, 2013, 15:37: Increased EE to -2000 V
Thursday, October 03, 2013, 16:22
TGHT Q=5.5 T=30.6
HS Q=3.6 T=33.9
SUPPLY (ext) 27.5
RETURN (ext) 29.6
Friday, October 04, 2013, 08:08
TGHT Q=5.5 T=30.6
HS Q=3.5 T=33.9
SUPPLY (ext) 27.5
RETURN (ext) 29.3
Mass scan started.
Friday, October 04, 2013, 08:46: Cool down started.
Friday, October 04, 2013, 13:35: TPS:IV4 closed
Friday, October 04, 2013, 13:41: Source debiased.
Tuesday, October 15, 2013, 09:56: Turbos stopped. Vacuum at 1.15 E-7 T
Tuesday, October 15, 2013, 12:44: Venting
After the conditioning, some oxidation (?) from the standards (?) were found on the Plasma Electrode and around the Target Tube. See attachment |
Wednesday, September 18, 2013, 16:18, Anders Mjos, , HP-FEBIAD, , , Tube only, 38307-9, Done, Test Target - FEBIAD COIL
|
Wednesday, September 18, 2013, 16:18: Starting turbos
Wednesday, September 18, 2013, 16:26 : Turbos at speed
Wednesday, September 18, 2013, 16:28 : Vacuum at 2.8 E-5 T
Wednesday, September 25, 2013, 15:11
TGHT flow 5.52, temp 28.6
TBHT flow 5.92, temp 28.5
Thursday, September 26, 2013, 09:25: Stopped turbos. Vacuum at 1.4 E-7 T
Friday, September 27, 2013, 08:35
TGHT flow 5.49, temp 28.2
TBHT flow 5.90, temp 28.0
Friday, September 27, 2013, 10:47: Venting |
Wednesday, September 18, 2013, 14:54, Anders Mjos, , , , , , , Problems/Solutions, Hall probe calibration
|
New calibration of the m/q based on the hall probe after exchanging the controller(MASSOVERQ2). Based on NiO#2-HP-FEBIAD with Ne supplied and ANODE biased to 200V, 30kV Bias.
CONST11 = -16.3929
CONST22 = 0.12481
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2013-09-18-09%20NiO%232
Data and results from Gnuplot
"2013-09-18 NiOcalibration.txt"
6.02 -1192 6Li
7.02 -1288 7Li
19.99 -2177 20Ne
21.99 -2284 22Ne
38.96 -3043 40K
40.96 -3118 41K
180.9 -6577 Ta
196.9 -6864 TaO
f(x)=((x+a)**2)*b/30000;
a=35.221;
b=0.129991;
fit f(x) "2013-09-18 NiOcalibration.txt" using 2:1 via a,b;
Final set of parameters Asymptotic Standard Error
======================= ==========================
a = -16.3929 +/- 2.015 (12.29%)
b = 0.12481 +/- 8.448e-005 (0.06769%)
correlation matrix of the fit parameters:
a b
a 1.000
b 0.952 1.000 |
Tuesday, September 17, 2013, 10:06, Anders Mjos, , , , , , , Problems/Solutions, TGHT insulator cracked
|
The coil insulator has been observed to have cracked earlier. |
Monday, September 16, 2013, 17:07, Anders Mjos, NiO#2, HP-FEBIAD, ITE, TM3, 39530-6, 39069-4, Done, Conditioning NiO#2 take 2
|
The GE on the Source tray and EE on the target was cleaned. The target will be conditioned again to verify if sparking has been reduced. Torque 120 in lbs
Monday, September 16, 2013, 17:05: Roughing. The roughing pump is somewhat noisy.
Monday, September 16, 2013, 17:26: Starting turbos.
Monday, September 16, 2013, 17:34: Turbos at speed
Monday, September 16, 2013, 17:36: Vacuum at 3.8E-5 T.
Tuesday, September 17, 2013, 08:10: Opened cooling water. Vacuum stable at 6.5E-7. EE flow 4.8 l/min 27.9 C
Tuesday, September 17, 2013, 08:20: Target biased: 30kV, 15kV, -1kV.
Tuesday, September 17, 2013, 08:25: Opening gas line SV5 and Ne SV3 evacuated
Tuesday, September 17, 2013, 08:32: Started auto-ramping to 580A/230A
Tuesday, September 17, 2013, 08:34: Coil to 50A, Anode to 200V (0mA)
Tuesday, September 17, 2013, 08:36: Opened IV4
Tuesday, September 17, 2013, 10:39: EE flow 4.9 l/min 28.5 C
Tuesday, September 17, 2013, 13:05: EE flow 4.9 l/min 28.8 C
Tuesday, September 17, 2013, 15:03: EE flow 4.9 l/min 28.8 C
Tuesday, September 17, 2013, 15:04 :TGHT at 580A, TBHT at 280A.
Tuesday, September 17, 2013, 15:30: TBHT:RDCUR to 290A
Wednesday, September 18, 2013, 08:07: Stared mass scan.
Wednesday, September 18, 2013, 08:08:EE flow 4.9 l/min 28.8 C
Wednesday, September 18, 2013, 09:14: EE to 2kV. Current at 676 uA
Wednesday, September 18, 2013, 09:23: Opened He gas to 6.0. It was later found the SV2 was closed. I.e. no He was supplied to the target.
Wednesday, September 18, 2013, 09:26: Tuning source. EE 0.8kV, EZL 1.3kV
Wednesday, September 18, 2013, 09:32: Started mass scan.
Wednesday, September 18, 2013, 09:55: A jump in BIAS current from 42 to 61 uA. Came down towards 42 after 30 min
Wednesday, September 18, 2013, 10:22: Ramping down heaters at 2A and 2.5A /min
Wednesday, September 18, 2013, 10:23: He and Ne off.
Wednesday, September 18, 2013, 10:48: Gas lines closed.
Wednesday, September 18, 2013, 10:53: EE flow 4.9 l/min 28.5 C
Wednesday, September 18, 2013, 10:55: IV4 closed.
Wednesday, September 18, 2013, 10:59: Target de-biased.
Wednesday, September 18, 2013, 12:18: Heaters off.
Wednesday, September 18, 2013, 12:18: Stopped turbos.
Wednesday, September 18, 2013, 12:56: Started wenting.
Wednesday, September 18, 2013, 13:02: EE flow 4.9 l/min 28.2 C
Wednesday, September 18, 2013, 13:20 : Chamber vented. |
Monday, September 09, 2013, 09:14, Anders Mjos, , , , , , , Problems/Solutions, Ground Electrode cleaned
|
Monday, September 16, 2013, 17:04: Cleaned GE. Copper shavings were removed from below the guide pins for the Heat Shield. The shavings were sitting on top of the aluminum support. |
Monday, September 09, 2013, 09:12, Anders Mjos, , , , , , , Problems/Solutions, Coil power supply back
|
Ray D. installed the "standard" 6V 200A FEBIAD COIL P/S on Friday morning.It has not yet been tested as water supply was on. |
Friday, August 30, 2013, 15:09, Anders Mjos, NiO#2, HP-FEBIAD, ITE, TM3, 39530-6, 39069-4, Done, Conditioning of NiO#2
|
Friday, August 30, 2013, 15:09 : Turbos stopped in preparation for installation.
Friday, August 30, 2013, 16:22: Venting
Friday, August 30, 2013, 17:08: Roughing with NiO#2
Friday, August 30, 2013, 17:27: Starting turbos
Friday, August 30, 2013, 17:35: Turbos at speed
Friday, August 30, 2013, 17:37: Vacuum at 1.9 E-7 T
Monday, September 09, 2013, 14:04: Opened up water. Vacuum stable at 1.5E-7 T
Tuesday, September 10, 2013, 08:59: Pumping out the gas lines.
Tuesday, September 10, 2013, 09:10: Gas lines evacuated.
Tuesday, September 10, 2013, 09:23: TPS:IV4 opened
Tuesday, September 10, 2013, 10:06: TGHT PS was off. Debiased to access el cage.
Tuesday, September 10, 2013, 10:07: EZL/EE/BIAS: 15/2/30 kV 61/674/55 uA
Tuesday, September 10, 2013, 10:08: COIL/ANODE: 50A/200V
Tuesday, September 10, 2013, 10:09: Started target heat to TGHT/TBHT 250/230A
Tuesday, September 10, 2013, 15:12: Started target heat to TGHT 350A (TBHT remains at 230A)
Wednesday, September 11, 2013, 13:06: Heating TGHT to 500A
Thursday, September 12, 2013, 08:44: Heating TGHT to 580A
Thursday, September 12, 2013, 09:39: Heating TBHT to 260A
Thursday, September 12, 2013, 10:06: BIAS sparking occurred at 9:48 TBHT:RDCUR at 256A. Gradually reduced TBHT:RDCUR to 254A. Sparking stopped after ~20 min. ANODE:RDCUR, EE:RDCUR and IG1:RDVAC showed correlated sparking responses. ANODE:RDCUR went to 0 mA and back up after sparking had stopped.
Thursday, September 12, 2013, 10:30: Manually increased TBHT:RDCUR to 260A.
Thursday, September 12, 2013, 11:06: A jump in TBHT:RDVOLT and TBHT:RDCUR at 10:44. Reduced TBHT:RDCUR to 255A
Thursday, September 12, 2013, 12:10: TPS:Q4 was taken out by a spark. Restarted.
Thursday, September 12, 2013, 12:19: EZL to 13 kV
Thursday, September 12, 2013, 13:14: TBHT:RDCUR to 260A
Thursday, September 12, 2013, 13:31: TBHT:RDCUR to 265A. Sparking returns. Lower to 260A
Friday, September 13, 2013, 10:51: Increased TBHT:RDCUR to 265A
Friday, September 13, 2013, 10:58 : Increased TBHT:RDCUR to 270A
Friday, September 13, 2013, 11:05: Some sparking. Lowered EE to 1kV
Friday, September 13, 2013, 11:07 : Increased TBHT:RDCUR to 275A
Friday, September 13, 2013, 11:15 : Increased TBHT:RDCUR to 280A
Friday, September 13, 2013, 11:24 : Increased TBHT:RDCUR to 290A. ANODE:RDCUR 8.5mA. FC0 1.3E-6 A
Friday, September 13, 2013, 11:53: SV5 and SV2 gas lines opened.
Friday, September 13, 2013, 12:05: A spark took out Q4. Restarted.
Friday, September 13, 2013, 12:07: Lowered TBHT:RDCUR to 285A
Friday, September 13, 2013, 13:03: Started mass scan.
Friday, September 13, 2013, 14:27: Lowered TBHT:RDCUR to 280A
Friday, September 13, 2013, 15:01 : Lowered TBHT:RDCUR to 270A
Monday, September 16, 2013, 08:00: Mass scan started.
Monday, September 16, 2013, 09:00: Starting heater ramp down. 2A/min. Gas lines closed.
Monday, September 16, 2013, 13:30: Source off. Target debiased.
Monday, September 16, 2013, 13:56: Turbos stopped
Monday, September 16, 2013, 14:50: Venting. |
Wednesday, August 28, 2013, 11:28, Anders Mjos, , , , , , , Problems/Solutions, Hall probe controller for MB1 removed
|
Jens Lassen provided a new controller for the Hall prove. With the help from Graham from controls it was reconfigured and is operational again. The magnet must likely be calibrated again. |
Monday, August 26, 2013, 13:49, Anders Mjos, , , , , , , Problems/Solutions, TP1A time out/fault sometime this weekend
|
Monday, August 26, 2013, 14:07: The turbo could be restarted, but it does not sound happy (Dimo was consulted earlier today). The pump is drawing around 4 A. The current draw is fluctuating between 3.5 and 4.2 A at the same time as backing pressure is spiking from 0.015 to 0.045 T
Monday, August 26, 2013, 15:32:: The turbo failed again. Dimo had a quick look. It will have to be replaced. See e-fault: 6953
Wednesday, August 28, 2013, 08:48: Stopping TP1B. Vacuum at 4.8 E-7 T
Wednesday, August 28, 2013, 10:59: Venting
Anthony has replaced the pump. There was no screen on the existing pump. A screen has been installed in front of the turbo.
Wednesday, August 28, 2013, 14:03: started roughing
Wednesday, August 28, 2013, 14:31: Starting turbos
Wednesday, August 28, 2013, 14:41Turbos at speed
Wednesday, August 28, 2013, 14:43: Vacuum at 2.0 E-5 T |
Friday, August 23, 2013, 11:16, Anders Mjos, , , , , , , Problems/Solutions, Possible leak between BV1A, BV1B and PV1
|
CG1A is climbing from 0.016 to 0.130 in 30 seconds when isolated.
The leak was confirmed to be between BV1A and PV1 in the bellows. The bellows has been replaced and backing pressure is back to normal values. |
Tuesday, August 20, 2013, 08:27, Anders Mjos, , , , , , , Problems/Solutions, TP1B noise - TP1B replacement
|
TP1B high frequency noise is coming and going. Power is 22W , current 1.1A (other pumps are 11W and 14W, 0.7A)
Edi from vacuum group notified. He will replace the pump today.
Tuesday, August 20, 2013, 08:40: Turbos off. Vacuum 1.4E-7 T
Tuesday, August 20, 2013, 10:01: Started venting.
Turbo has been replaced by Edi.
Tuesday, August 20, 2013, 16:28: Roughing
Tuesday, August 20, 2013, 16:51: Turbos started.
TP1A timed out. Could not open BV1A and restart due to too high backing pressure at CG1A
Wednesday, August 21, 2013, 08:17: Turbos started. Vacuum 0.043 T
Wednesday, August 21, 2013, 08:25: Turbos at speed. TP1B: 1.2A 28W 30 deg C.
Wednesday, August 21, 2013, 08:27: Vacuum at 5.6 E-6 T
|
Tuesday, August 20, 2013, 08:24, Anders Mjos, , , , , Tube only, 38307-9, In progress, FEBIAD Coil Test
|
Tuesday, August 20, 2013, 08:13: Roughing gas lines
Tuesday, August 20, 2013, 08:22: Gas lines roughed. Valve closed |
Monday, July 22, 2013, 14:08, Anders Mjos, , , , , , , Problems/Solutions, 20V 60A COIL PS installed for FEBIAD Coil Test
|
By Ray. Note that controls have not been updated yet. |
Friday, July 19, 2013, 14:14, Anders Mjos, , , , , Tube only, 38307-9, In progress, FEBIAD Coil Test
|
Friday, July 19, 2013, 14:14 : Stopping Turbos. Vacuum at 1.3E-7 T
Friday, July 19, 2013, 15:14: Venting
Friday, July 19, 2013, 16:22: Target installed. Roughing.
Friday, July 19, 2013, 16:41: Starting turbos
Friday, July 19, 2013, 16:49: Turbos at speed
Friday, July 19, 2013, 16:51 : Vacuum at 1.4E-5 T
Monday, July 22, 2013, 08:19: Opened up water flow. Vacuum stable at 1.3E-7 T after some minor bumps to 1.6E-7 T
Monday, July 22, 2013, 13:34: T/C logger installed on 9-pins 4 & 5. Ray is working in the HV cage to install a different PS for the magnet coil.
Monday, July 22, 2013, 14: Increasing Coil current manually. Vacuum starts to creep up at 3A (T/C around 85 deg C).
Monday, July 22, 2013, 16:37: Current at 4A. Voltage at 6.5V. T/C around 400 deg C.
Tuesday, July 23, 2013, 08:50: Coil conditioned to ~500 deg C at about 4.7A
Tuesday, July 23, 2013, 08:54: Evacuating gas line through the chamber.
Tuesday, July 23, 2013, 09:01: Gas lines evacuated.
Tuesday, July 23, 2013, 09:10: Coil current to zero.
Tuesday, July 23, 2013, 09:22: Target. biased
Tuesday, July 23, 2013, 09:22: Opened IV4
Tuesday, July 23, 2013, 09:32: ANODE to 200V. Helium leak to 6.0
Tuesday, July 23, 2013, 09:35: Coil temp at 220 deg C.
Tuesday, July 23, 2013, 10:58: Heating aborted at 200A. Will resume later.
Tuesday, July 23, 2013, 12:01: Restarted heating to 250A.
Tuesday, July 23, 2013, 13:11: Spark too out some optics. Restarted.
Tuesday, July 23, 2013, 14:39: COIL 130 deg C. TBHT at 280A read back.
Tuesday, July 23, 2013, 14:44: Sparking occurs across the spark gap on top of the test stand.
Tuesday, July 23, 2013, 16:14: Lowered TBHT to 270 read back. Will leave it like this over night.
Friday, July 26, 2013, 10:09: Cooling down TBHT.
Friday, July 26, 2013, 11:13: ANODE and COIL OFF. Closed IV4. Closed gas supply.
Friday, July 26, 2013, 12:41: BIAS, EE and EL to zero.
Data on Docushare:
https://documents.triumf.ca/docushare/dsweb/View/Collection-11041 |
Wednesday, July 17, 2013, 12:55, Anders Mjos, , , , , , , Problems/Solutions, Controls are removing dust/cleaning their devices
|
Thursday, July 18, 2013, 08:41: Restarting archivers |
Tuesday, July 16, 2013, 16:01, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD coil connector insulator fracture
|
The right side of the insulator cracked/fractured either as the bolt was tightened or loosened. |
Tuesday, July 16, 2013, 15:39, Anders Mjos, , , , , , , , Empty
|
Tuesday, July 16, 2013, 15:39: Roughing
Tuesday, July 16, 2013, 16:01: Starting turbos.
Tuesday, July 16, 2013, 16:10: Turbos at speed.
Tuesday, July 16, 2013, 16:11: Vacuum at 6.9E-6 T |
Friday, July 12, 2013, 15:52, Anders Mjos, , , , , , , Problems/Solutions, TMS:MB1 fuse latched after mass scan
|
A flash and "thumb" was observed at the end of the mass scan.
Friday, July 12, 2013, 15:51: Ray Dube had a look inside. After the fuse was reset, the Power Supply could operate again.
A power bump was experienced at about the same time as the MB1 fuse latched.
https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=172266&style=entry#172266
|
Thursday, July 11, 2013, 08:38, Anders Mjos, , , , , , , Problems/Solutions, Bias & EL P/S cleaned
|
The power supplies were "de-dusted" yesterday by Ray Dube and team. |
Wednesday, July 10, 2013, 10:21, Anders Mjos, SiC#29, HP-FEBIAD-CTL, ITE, TM4, 38481-6, 39956-4, Done, Testing SiC#29 CTL Target
|
Wednesday, July 10, 2013, 10:20 : Turbos off. Vacuum at 1.3 E-7 T
Wednesday, July 10, 2013, 11:23: Venting chamber
Wednesday, July 10, 2013, 12:00: Vented
Wednesday, July 10, 2013, 12:38: Roughing
Wednesday, July 10, 2013, 12:54: Pumping on gas lines for 10 min.
Wednesday, July 10, 2013, 12:58: Starting Turbos
Wednesday, July 10, 2013, 13:07 : Both turbos at speed. TP1A timed out one.
Wednesday, July 10, 2013, 13:08 : Vacuum at 1.5E-5 T
T/C connectors removed from HV rack. All connections put to ground.
Thursday, July 11, 2013, 08:43: Opened up cooling water supply. Vacuum stable at 2.2E-7 T
Thursday, July 11, 2013, 08:58: Starting ramp up of TGHT and TBHT to 100A and 50A respectively to verify proper function of the new power supply set-up.
Thursday, July 11, 2013, 09:20: TBHT reached 50A. EPICS read back 51.2A / 0.186V. P/S local read back 51A / 0.20V
Thursday, July 11, 2013, 09:44: BIAS 30kV, EE -800V, EZL 13kV
Thursday, July 11, 2013, 09:44: TGHT reached 100A. EPICS read back 100.2A / 0.488V. P/S local read back 99A / 0.46V
Thursday, July 11, 2013, 09:46: IV4 opened
Thursday, July 11, 2013, 09:53: Starting ramp up of TGHT and TBHT to 500A and 200A respectively
Thursday, July 11, 2013, 10:00: Coil and Anode to 50A and 200V respectively
Thursday, July 11, 2013, 14:59: TGHT and TBHT to 500A and 207A EPICS read back. Local read back 500A and 205A.
Thursday, July 11, 2013, 15:03: Opening gas lines into chamber.
Thursday, July 11, 2013, 15:12: Starting ramp up of TGHT and TBHT to 550A and 220A respectively
Thursday, July 11, 2013, 15:21: Some current on FC0 at TBHT 210A
Thursday, July 11, 2013, 15:25: He leak valve at 5.5
Thursday, July 11, 2013, 16:07: Will leave target in current condition over night and continue the test tomorrow.
Friday, July 12, 2013, 08:25: Target ran without interruptions overnight. Started magnet scan. Masscorr constants had to be reentered after the reboot of EPICS.
Friday, July 12, 2013, 10:30: TMS:Q1 and TMS:Q6 found off. Restarted.
Friday, July 12, 2013, 10:32: Starting TGHT ramp to 580A. Increased EE to -1200V
Friday, July 12, 2013, 10:47: Reached 580A. EPICS 581.7A / 5.724V. PS local 580A / 5.69V.
Friday, July 12, 2013, 10:51: Starting manual ramp of TBHT.
Friday, July 12, 2013, 11:14: Autoramping TBHT to 250A
Friday, July 12, 2013, 11:23: Reached 250A. EPICS 259.6A / 1.934V. PS local 256A / 1.93V
Friday, July 12, 2013, 11:35: Manual ramp. ANODE current @ 2mA seen at TBHT @ 262A.
Friday, July 12, 2013, 11:41: BIAS spark seen on current and vacuum.
Friday, July 12, 2013, 12:09: TBHT:RDCUR at 269A
Friday, July 12, 2013, 13:18:TBHT:RDCUR at 280A.. PS local 277A.
Friday, July 12, 2013, 13:21: EE to -1500V / 510uA
Friday, July 12, 2013, 13:30: Ne leak opened.
Friday, July 12, 2013, 14:12: Mass scan started.
Friday, July 12, 2013, 15:04: A thumb sound and flash was seen. Confirmed with AAPS operator. TMS:SX3 went off. TMS:MB1 does not respond to current adjustments.
Friday, July 12, 2013, 15:53: The source will be left in it's present state over the weekend.
Saturday, July 13, 2013, 07:10: FC0 Bias found off. Restarted. Could be related to sparking.
No further issues over the weekend.
Monday, July 15, 2013, 09:10: Starting mass scan.
Monday, July 15, 2013, 10:39: Magnet at Ne (20 amu). FC6 1.3E-10. Ne gas off: FC6 < 1E-11
Monday, July 15, 2013, 10:45: Ne gas on.
Monday, July 15, 2013, 10:50: EE to 2kV. EE:RDCUR at 684 uA.
Monday, July 15, 2013, 13:27: Manually increasing TBHT to 290A. Local 287A.
Monday, July 15, 2013, 15:07: Cooling down target.
Monday, July 15, 2013, 15:26: COIL off. Gases off (earlier). ANODE off.
Monday, July 15, 2013, 15:31: IV4 closed.
Tuesday, July 16, 2013, 08:21: BIAS, EZL and EE to zero.
Tuesday, July 16, 2013, 08:24: Turbos off. Vacuum at 1.3E-7 T.
Tuesday, July 16, 2013, 15:12: Venting
Tuesday, July 16, 2013, 15:38: Target removed. |
Thursday, June 13, 2013, 11:04, Anders Mjos, , , , , , , Problems/Solutions, Viton seals on vacuum chamber doors replaced
|
See PO# TR193650 |
Thursday, June 13, 2013, 10:19, Anders Mjos, , , , , , , Done, Pumping down empty chamber
|
Thursday, June 13, 2013, 10:17: Roughing.
Thursday, June 13, 2013, 10:52: Turbos started
Thursday, June 13, 2013, 11:00 : Both turbos at speed.
Thursday, June 13, 2013, 11:02 : Vacuum at 7.5E-6 Torr
|
Wednesday, June 12, 2013, 20:38, Friedhelm Ames, , , , , , , Problems/Solutions, target heater power supply removed
|
The target heater power supply at the teststand has been removed to replace one in ITE. |
Friday, June 07, 2013, 08:47, Anders Mjos, , , , , , , Problems/Solutions, TPS:Q2, TPSQ4 and TMS:MB1 found off
|
Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1 |
Monday, June 10, 2013, 08:16, Anders Mjos, , , , , , , Problems/Solutions, TPS:Q2, TPSQ4 and TMS:MB1 found off
|
Anders Mjos wrote: |
Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1
|
Monday, June 10, 2013, 08:16: Restarted Q2 and Q4 |
Monday, June 10, 2013, 16:46, Anders Mjos, , , , , , , Problems/Solutions, TPS:Q2, TPSQ4 and TMS:MB1 found off
|
Anders Mjos wrote: |
Anders Mjos wrote: |
Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1
|
Monday, June 10, 2013, 08:16: Restarted Q2 and Q4
|
Monday, June 10, 2013, 16:44: Restarted Q2 and Q4. A dip in coil current and voltage was seen at the same time. |
Tuesday, June 11, 2013, 08:41, Anders Mjos, , , , , , , Problems/Solutions, TPS:Q2, TPSQ4 and TMS:MB1 found off
|
Anders Mjos wrote: |
Anders Mjos wrote: |
Anders Mjos wrote: |
Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1
|
Monday, June 10, 2013, 08:16: Restarted Q2 and Q4
|
Monday, June 10, 2013, 16:44: Restarted Q2 and Q4. A dip in coil current and voltage was seen at the same time.
|
Tuesday, June 11, 2013, 08:41: Restarted Q1, Q2 and Q4
Tuesday, June 11, 2013, 10:36: Restarted Q2 and Q4. No sign of sparks
Tuesday, June 11, 2013, 11:06: Restarted Q1, Q2, Q4 and CBC. No sign of sparks
Tuesday, June 11, 2013, 11:52: Restarted Q1, Q2 and Q4
Tuesday, June 11, 2013, 14:40: Restarted Q1, Q2, Q4 and CBC. |
Monday, June 03, 2013, 15:00, Anders Mjos, , , , , , , Problems/Solutions, SOURCES ARCH Restarted
|
SOURCES ARCH was found not running |
Wednesday, May 29, 2013, 12:10, Anders Mjos, CTL FEBIAD, HP-FEBIAD, , , 38481-5, , Done, CTL Test
|
Wednesday, May 29, 2013, 12:09: Debiased to insert temp logger
Wednesday, May 29, 2013, 14:40: Temp logger installed
CH1 COIL
CH2 CTL Block
Wednesday, May 29, 2013, 14:51: Opening gas lines
Temperatures [deg C]
COIL: 190
CTL: 44
Wednesday, May 29, 2013, 15:31: Coil at 50A
Temperatures [deg C]
COIL: 212
CTL: 45
Thursday, May 30, 2013, 09:18: TGHT was voltage limited at about 570A. Increased voltage limit to 5.5V and raised current to 580A
Thursday, May 30, 2013, 09:20: Ramping TBHT to 280A
Thursday, May 30, 2013, 10:03
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, May 30, 2013, 10:07: Heard a noise from the vacuum chamber coinciding with a spike in vacuum on both gauges.
Monday, June 03, 2013, 08:54: Target debiased and gases off. Target cooling started in preparation for power outage tomorrow at 9am.
Wednesday, June 05, 2013, 09:57: Purging gas lines to vacuum chamber
Wednesday, June 05, 2013, 10:13: Target biased again. Started target heating.
Thursday, June 06, 2013, 13:23:
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, June 06, 2013, 16:45: TBHT increased ti 290A
Temperatures [deg C]
COIL: 230
CTL: 50
Friday, June 07, 2013, 08:40: Magnet found off. TPS:Q4 and TPS:Q2 found off.
Temperatures [deg C]
COIL: 227
CTL: 48
Friday, June 07, 2013, 14:21: Anode current limit increased to 500 mA. Adjusted magnet current. Increasing TBHT.
Friday, June 07, 2013, 16:24: TBHT at 296A
Temperatures [deg C]
COIL: 237
CTL: 50
Monday, June 10, 2013, 08:19
Temperatures [deg C]
COIL: 232
CTL: 49
Monday, June 10, 2013, 16:55: COIL at 60A
Temperatures [deg C]
COIL: 244
CTL: 49
Tuesday, June 11, 2013, 08:42: TBHT voltage limited this morning at 291A
Temperatures [deg C]
COIL: 242
CTL: 49
Tuesday, June 11, 2013, 11:02: COIL at 70A
Temperatures [deg C]
COIL: 256
CTL: 49
Tuesday, June 11, 2013, 15:49: COIL at 80A
Temperatures [deg C]
COIL: 272
CTL: 49
Wednesday, June 12, 2013, 08:19:
Short on TBHT - see attached photo.
T/C logger is is off.
Gas lines closed.
Cooling down target.
Target debiased.
Thursday, June 13, 2013, 08:37: Turbos stopped.
Thursday, June 13, 2013, 09:20: Water lines purged.
Thursday, June 13, 2013, 09:41: Venting
Thursday, June 13, 2013, 10:19: Target removed |
Tuesday, May 28, 2013, 09:53, Anders Mjos, , , , , , , Problems/Solutions, TPS:Q4 and TPS:Q2 restarted
|
|
Tuesday, May 28, 2013, 09:51, Anders Mjos, , , , , , , Problems/Solutions, Archivers restarted
|
COIL and ANODE data added to ISACT Data Archiver |
Friday, May 24, 2013, 15:13, Aurelia Laxdal, CLT FEBIAD, , , , , , , CLT FEBIAD conditioning started
|
Purged the gas lines, turned on the HV and started the heaters for CLT FEBIAD: TGHT up to 580A and TBHT up to 230A. |
Tuesday, May 21, 2013, 19:38, Friedhelm Ames, , , , , , , Problems/Solutions, magnet power supply water leak
|
The cyclotron operators discovered a water leak in the magnet power supply. The water is valved off and the power is off. A fault report has been issued to the power supplies group. |
Tuesday, May 21, 2013, 15:50, Rick Maharaj, CTL Febiad, , , , , , , Cooling Water Turned On
|
Cooling water turned on when vacuum reading 5.54e-06 T. Vacuum steadily increasing. Ion gauge reading steadily decreasing now reading 4.48e-06 T. |
Tuesday, May 21, 2013, 15:14, Rick Maharaj, CTL Febiad, , , , , , , Turbos Started
|
Turbos started |
Tuesday, May 21, 2013, 14:58, Rick Maharaj, CTL Febiad, , , , , , , CTL Febiad Installed
|
Ceramic coated coil development target removed. CTL Febiad target installed.
Roughing chamber. |
Tuesday, May 21, 2013, 10:09, Rick Maharaj, , , , , , , , Test stand Vented
|
Turbos stopped, waterlines flushed, chamber vented |
Thursday, May 09, 2013, 15:28, Anders Mjos, , , , , , , Problems/Solutions, TSGRP1 showing signs of reduced performance
|
TSG:CG1A and TSG:CG1B shows an increase in vacuum.
See attached archived data for details. |
Wednesday, May 08, 2013, 08:52, Anders Mjos, , , , , , , Problems/Solutions, TMS and TPS P/S problems
|
Wednesday, May 08, 2013, 08:52: TMS:CB5 found off this morning. Switched back on.
Wednesday, May 08, 2013, 12:14: Lost the following devices during a mass scan
TMS:VCB5
TMS:OCT3
TPS:Q4
TPS:Q2
TPS:Q1
TSG:CBC
All devices but TPS:Q1 could be completely restored.
Wednesday, May 08, 2013, 12:49: TPS:Q1 restored by lowering and increasing the voltage
|
Monday, March 25, 2013, 16:50, Sebastian Raeder, , , , , , , Problems/Solutions, RFQ powersupplies removed - Anode PS still connected to ground
|
The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.
NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off |
Friday, May 03, 2013, 14:32, Anders Mjos, , , , , , , Problems/Solutions, Cathode PS cable reconnected
|
Sebastian Raeder wrote: |
The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.
NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off
|
Friday, May 03, 2013
The anode cable has been reconnected to F/T J and the 100k resistor placed between L and J. Q is now grounded to L. See dwg ISK4523
Tuesday, May 07, 2013
The cathode cable has been reconnected to F/T B and the 100k resistor removed between L and J. See dwg ISK4563 Rev 3
|
Thursday, April 25, 2013, 13:32, Anders Mjos, Empty, LP-FEBIAD, , , Tube Only, 38307-9 , In progress, FEBIAD Coil test
|
Same target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54: Roughing
Thursday, April 25, 2013, 14:25: Started turbos
Thursday, April 25, 2013, 14:33: Turbos at speed
Thursday, April 25, 2013, 14:33: Vacuum at 8.8E-6 T
Friday, April 26, 2013, 08:25: Cooling water supply opened. Vacuum stable at 2.2E-7 T
Friday, April 26, 2013, 13:35: Gas lines evacuated.
Testing Coil current vs Temperature before heating
COIL:RDCUR at 1.95A
COIL:RDVOL at 1.47V
COIL T/C at 86 deg C and still slowly increasing
Tuesday, April 30, 2013
Testing Coil current vs Temperature before heating
COIL:RDCUR at 3.96A
COIL:RDVOL 3.2 V Vacuum starts to increase (base 1.4E-7
COIL:RDVOL 3.8 V T/C at 150 C vacuum at 5E-7
COIL:RDCUR at 3.47A to reduce out-gassing T/C at 175 C
Tuesday, April 30, 2013, 12:39
COIL:RDCUR at 3.96A T/C 225 C
COIL:RDVOL 5.0 V T/C at 250 C vacuum at 6.2E-7
Tuesday, April 30, 2013, 13:00
COIL:RDCUR at 4.25A COIL:RDVOL at 5.7V T/C 290 C
Tuesday, April 30, 2013, 13:10
COIL:RDCUR at 4.15A COIL:RDVOL at 5.75V T/C 310 C
Tuesday, April 30, 2013, 14:53
COIL:RDCUR at 4.15A COIL:RDVOL at 5.85V T/C 320 C
Tuesday, April 30, 2013, 16:30
COIL:RDCUR at 4.15A COIL:RDVOL at 5.89V T/C 328 C
Wednesday, May 01, 2013, 08:16
COIL:RDCUR at 4.15A COIL:RDVOL at 5.95V T/C 350 C - P/S is voltage limited at 5.95V
Ramping down current to 0. T/C logger is required elsewhere.
Friday, May 03, 2013, 12:07: Pumping out gas line through vacuum chamber.
The anode cable has been reconnected (see e-log entry 297)
Friday, May 03, 2013, 14:17: BIAS and EE to 30kV and -800V
Friday, May 03, 2013, 14:24: Started heating TBHT to 280A at 1A/min
Monday, May 06, 2013, 08:46: TBHT @ 276A, Voltage limiting at 2.5V. Increased limit to 2.7V. TGHT to 280A and 2.52V. COIL temp ~100C
Monday, May 06, 2013, 09:48: COIL:RDCUR at 2.93A
Monday, May 06, 2013, 10:34: Coil temp ~240C. Increasing COIL:RDCUR to 3.52A COIL:RDVOL at 4.1V
Monday, May 06, 2013, 11:48: Coil temp 330C COIL:RDCUR at 3.52A RDVOL at 4.9V
Monday, May 06, 2013, 11:54: COIL:RDCUR at 3.9A
Monday, May 06, 2013, 12:56: RDVOL at 5.9V. Coil temp ~380C
Monday, May 06, 2013, 13:47: Cooling down target to correct anode connection.
Tuesday, May 07, 2013, 08:47: De-biased
Tuesday, May 07, 2013, 10:06: Corrected el. connections to cathode floating. Started tube heating to 280A
Wednesday, May 08, 2013, 12:12: De-biased
Wednesday, May 08, 2013, 12:12: Cooling down cathode 1A/min
Thursday, May 09, 2013, 15:22: TPS:IV4 closed |
Wednesday, April 10, 2013, 12:14, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Conditioning Ta#40
|
Wednesday, April 10, 2013, 12:13: Stopped turbos in preparation for venting the chamber.
Wednesday, April 10, 2013, 13:05: Venting
Wednesday, April 10, 2013, 13:37: Ta#40 installed with 130 in lbs torque on all bolts.
Wednesday, April 10, 2013, 13:37: Roughing
Wednesday, April 10, 2013, 13:58: Started turbos
Wednesday, April 10, 2013, 14:07: Turbos at speed
Wednesday, April 10, 2013, 14:08: Vacuum at 9.2E-6 Torr
Thursday, April 11, 2013, 08:26: Opened cooling water. Vacuum stable at 2.2E-7 Torr
Monday, April 15, 2013, 08:40: HV conditioned to 30kV TSG:BIAS:RDCUR at 37 uA
Monday, April 15, 2013, 08:46: Started Target Heat Ramp 580A / 230A
Monday, April 15, 2013, 13:30: Target at temperature TGHT:RDCUR=574A, TBHT:RDCUR=230A
Monday, April 15, 2013, 15:10: Mass scan
Monday, April 15, 2013, 16:21: Target will be left at temperature overnight.
Tuesday, April 16, 2013, 08:40: Mass scan
Tuesday, April 16, 2013, 13:08: Started Target Cooling Sequence
Wednesday, April 17, 2013, 08:43: High voltage BIAS to zero
Wednesday, April 17, 2013, 08:47: Turbos off
Wednesday, April 17, 2013, 16:20: Target will likely be removed tomorrow Thursday.
Thursday, April 18, 2013, 11:13 : Venting
Thursday, April 18, 2013, 11:17: Water lines purged
Thursday, April 18, 2013, 11:29: Chamber vented. Target Removed |
Thursday, April 18, 2013, 13:50, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Ta#40 stored under vacuum
|
Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs
Thursday, April 18, 2013, 13:48: Rouging
Thursday, April 18, 2013, 14:11: Starting turbos
Thursday, April 18, 2013, 14:20 : Turbos at speed
Thursday, April 18, 2013, 14:21 : Vacuum at 2.3E-5 T
Friday, April 19, 2013, 08:23: Opened cooling water. Vacuum stable at 9.6E-6 T
Vacuum is somewhat higher than expected (5.2E-7 T) . Will went and clean the o-rings on the doors.
Monday, April 22, 2013, 09:32: Turbos off.
Monday, April 22, 2013, 10:57: Venting
Monday, April 22, 2013, 12:25: Vented
Monday, April 22, 2013, 14:09: Roughing
Monday, April 22, 2013, 14:31: Started Turbos
Monday, April 22, 2013, 14:40: Turbos at speed
Monday, April 22, 2013, 14:41: Vacuum at 1.8E-5 T
Tuesday, April 23, 2013, 09:52 : Vacuum at 2.6E-7 T - already an improvement from yesterday
Thursday, April 25, 2013, 08:47: Stopped turbos. A test target with at new FEBIAD coil will be tested.
Thursday, April 25, 2013, 13:27: Venting |
Tuesday, April 16, 2013, 08:59, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP2 found in timeout / fault state
|
Tuesday, April 16, 2013, 08:59
The turbo was found in fault state this morning. Based on data from IG6 the pump stopped around midnight.
An attempt to restart the pump will be made after the conditioning of Ta#40 is complete later today.
The TP has recently been replaced:
https://elog.triumf.ca/TIS/Test-Stand/280
Tuesday, April 16, 2013, 16:23: TMS:TP2 restarted I=1.0A P=21W T=29C @ 42kRPM
Wednesday, April 17, 2013, 16:19: TMS:TP2 I=0.8A P=14W T=29C @ 42kRPM |
Tuesday, April 02, 2013, 15:19, Anders Mjos, , , , , , , Problems/Solutions, Water leak at MB1 Power Supply
|
See Cyclotron e-fault 6637
|
Tuesday, April 09, 2013, 16:21, Anders Mjos, , , , , , , Problems/Solutions, Water leak at MB1 Power Supply
|
Tuesday, April 09, 2013:
Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.
Wednesday, April 10, 2013:
Removed the remaining water in the P/S rack. |
Thursday, April 11, 2013, 08:49, Anders Mjos, , , , , , , Problems/Solutions, MB1 Power Supply operational
|
Anders Mjos wrote: |
Tuesday, April 09, 2013:
Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.
Wednesday, April 10, 2013:
Removed the remaining water in the P/S rack.
|
Thursday, April 10, 2013:
The power supply is again operational. See e-fault entry above for details. |
Thursday, March 28, 2013, 13:55, Anders Mjos, Empty, , , , , , In progress, Pumping down empty chamber
|
Thursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36: Starting turbos (vacuum at ~0.100 T)
Thursday, March 28, 2013, 14:44: Both turbos at speed
Thursday, March 28, 2013, 14:46: Vacuum at 5.2E-6 Torr |
Monday, March 25, 2013, 11:39, Anders Mjos, Ta#39, LP-SIS, ITW, TM1, , , Done, Ta#39 commissioning
|
Target installed with 130 in lbs torque on all bolts.
Monday, March 25, 2013, 11:36: Roughing
Monday, March 25, 2013, 11:54: Starting turbos
Monday, March 25, 2013, 12:02: Both turbos at speed
Monday, March 25, 2013, 12:04: Vacuum at 2E-5 Torr
Tuesday, March 26, 2013, 08:03: Opened water supply. Vacuum stable at 3E-7 Torr
Tuesday, March 26, 2013, 09:11
All P/S switched on.
ISAC Ops will condition this target as a training exercise.
ISAC ops e-log
ISAC ops e-log 2
Wednesday, March 27, 2013, 13:41: ISAC ops called to inform that the target has been cooled down and bias is off.
Thursday, March 28, 2013, 08:22: Closed TPS:IV4 and switched off turbos.
Thursday, March 28, 2013, 13:27: Venting
Thursday, March 28, 2013, 13:33: Water purged |
Tuesday, March 19, 2013, 12:34, Anders Mjos, SiC#28, , ITE, TM4, , , Done, Installation of SiC#28 LP-RFQ
|
Tuesday, March 19, 2013, 12:32 : Turbos off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting
Target SiC#28 LP-RFQ inserted
New bolts used. Old bolts removed.
All bolts torqued to 120 in lbs
By Sebastian (SR) & Henning
modification of 9 Pin connector needed to match wiring in TM4 (see separate e-log entry)
Tuesday, March 19, 2013, 18:32 : started roughing - SR
Tuesday, March 19, 2013, 18:52: started turbos - SR
Tuesday, March 19, 2013, 18:57: TSGIP1 on - SR
Tuesday, March 19, 2013, 19:00: turbos at speed - SR
Tuesday, March 19, 2013, 19:02: vacuum at 1.68E-5T
By Anders
Wednesday, March 20, 2013, 08:18: Opened cooling water. Vacuum stable at 6.8E-7 Torr
By Sebastian (SR) & Henning
Wednesday, March 20, 2013, 11:39: 9PIN connector in HV cage connected
4,5,6,9 on GND 1,2 to RF, 7,8,RFoffest,Source for now also on GND
RF: 800kHz, 20Vampl, 0.128mA
HV cage locked up for heating
Wednesday, March 20, 2013, 16:42: heating is taken care of by ISAC operations, now at 300A / 3V TGHT and 250A / 1.47V TBHT reading on the panel is really close
Friedhelm restarted some of the CANBUS ports, since not all optics were working properly
Thursday, March 21, 2013, 10:53 start cooling down
Vacuum not perfect was around 2E-6T, over nigth not full current
Suppression tested yesterday: full beam (SRC +3V, others GND) was 40nA, while no signal on FB0B with SRC +3V, IGOffset&Exit +25V
!!!!! but short on #7 --> 2nd Repeller, was OK when tested, after some minutes on 25V short was there, reading now (Thursday, March 21, 2013, 10:58 ) <1OHM, will be checked while heating down
Magnet had wrong polarity - so no mass scans yesterday evening, Friedhelm looked into this this morning
Mass scan only for good transmission mode (SRC +3V) this morning - see attached scan (seen Na, Al, K, Ca, Cr, Rb, Sr, Cs and Ba)
Thursday, March 21, 2013, 12:26: stopped turbos
#7 still short
By Anders
Thursday, March 21, 2013, 13:25: Venting |
Thursday, March 21, 2013, 15:05, Sebastian Raeder, SiC#28, , ITE, TM4, , , Done, 2nd heating of SiC#28 LP-RFQ - short resolved
|
Anders Mjos wrote:
|
Tuesday, March 19, 2013, 12:32 : Turbos off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting
Target SiC#28 LP-RFQ inserted
By Sebastian (SR) & Henning
modification of 9 Pin connector needed to match wiring in TM4 (see separate e-log entry)
Tuesday, March 19, 2013, 18:32 : started roughing - SR
Tuesday, March 19, 2013, 18:52: started turbos - SR
Tuesday, March 19, 2013, 18:57: TSGIP1 on - SR
Tuesday, March 19, 2013, 19:00: turbos at speed - SR
Tuesday, March 19, 2013, 19:02: vacuum at 1.68E-5T
By Anders
Wednesday, March 20, 2013, 08:18: Opened cooling water. Vacuum stable at 6.8E-7 Torr
By Sebastian (SR) & Henning
Wednesday, March 20, 2013, 11:39: 9PIN connector in HV cage connected
4,5,6,9 on GND 1,2 to RF, 7,8,RFoffest,Source for now also on GND
RF: 800kHz, 20Vampl, 0.128mA
HV cage locked up for heating
Wednesday, March 20, 2013, 16:42: heating is taken care of by ISAC operations, now at 300A / 3V TGHT and 250A / 1.47V TBHT reading on the panel is really close
Friedhelm restarted some of the CANBUS ports, since not all optics were working properly
Thursday, March 21, 2013, 10:53 start cooling down
Vacuum not perfect was around 2E-6T, over nigth not full current
Suppression tested yesterday: full beam (SRC +3V, others GND) was 40nA, while no signal on FB0B with SRC +3V, IGOffset&Exit +25V
!!!!! but short on #7 --> 2nd Repeller, was OK when tested, after some minutes on 25V short was there, reading now (Thursday, March 21, 2013, 10:58 ) <1OHM, will be checked while heating down
Magnet had wrong polarity - so no mass scans yesterday evening, Friedhelm looked into this this morning
Mass scan only for good transmission mode (SRC +3V) this morning - see attached scan (seen Na, Al, K, Ca, Cr, Rb, Sr, Cs and Ba)
Thursday, March 21, 2013, 12:26: stopped turbos
#7 still short
By Anders
Thursday, March 21, 2013, 13:25: Venting
|
Thursday, March 21, 2013, 14:46: started roughing
Target was out, visibly inspected, nothing to be seen, no short on the target - wiring of the 9Pin connector shows short circuit inside vacuum chamber
Wires removed - short could be reproduced with the strandings of the shielding from the kapton twisted pairs going into the peek connector
wire shieldings now fixed to position further away with Cu wire
all wires against ground and each other tested for holding 250V - all fine
everything reconnected and target put in, torcked w 120 inch pounds
Thursday, March 21, 2013, 15:05 : turbos started
Thursday, March 21, 2013, 15:14: turbos at speed
Thursday, March 21, 2013, 15:17: vacuum at 1.4E-5T
Thursday, March 21, 2013, 18:01: vacuum at 1.45E-6T opening water lines - vacuum is stable
Thursday, March 21, 2013, 19:19 : vacuum at 8.6E-7T - start ramping heater to 580A / 250 A
Friday, March 22, 2013, 00:08: target is heated full way up
setpoint 570A and 7.250V voltage limit
readback 564.1A and 7.201V --> needs more voltage than the normal target !
vacuum at 1.2E-6T
Friday, March 22, 2013, 15:15: vacuum at 5.4E-7T
preparing for HV test and mass scan
transmission mode: Source +3V, everything else on GND: 12nA - mass scan see attachment
suppression mode 1: Source -15V, everything else on GND: 20pA - mass scan see attachment
suppression mode 2: Source +3V, everything else on +25V: <1pA - FC0 current while biasing see attachment
NOTE: the legs of the target are glowing differently, the left leg (view from the lid side onto the target unit) glows brighter, this side was open during the sintering process of the SiC and needed more alignment at the jig --> see attached picture
NOTE2: there is a slight increase in TGHT voltage over time: in ~ 22h from 7.201V to 7.216V
Friday, March 22, 2013, 21:33 : vacuum at 4.8E-7, start ramping down
Friday, March 22, 2013, 22:47: heaters down and turned off, vacuum at 2.7E-7T
Monday, March 25, 2013, 00:15: vacuum at 1.4E-7T, IG off, turbos off
By Anders
Monday, March 25, 2013, 08:18: Venting
Monday, March 25, 2013, 08:33: Purging water lines
Monday, March 25, 2013, 08:42: Target removed |
Tuesday, March 19, 2013, 19:13, Sebastian Raeder, , , , , , , Problems/Solutions, 9 Pin connector rewired to match wiring in TM4
|
The 9 Pin connector was rewired in the ISAC teststand to match the wiring in TM4
The wiring from the connection board in the HV cage to the connector (view from the target unit onto module) is now the following
---------------------------
\ 4 8 9 7 6 /
\ 5 1 2 x /
-----------------
with the pairs of wires
1,2 (kapton wire twisted pair all way)
4,5 (kapton wire twisted pair all way)
6,7 (kapton wire twisted pair inside the vacuum chamber, other twisted pair from top of vacuum chamber to HV cage)
8,9 (kapton wire twisted pair inside the vacuum chamber, other twisted pair from top of vacuum chamber to HV cage)
___ for completeness the wiring on top of the vacuum chamber (view from top onto the feedthrough)
---------------------------
\ 1 2 x 4 5 /
\ 6 7 8 9 /
-----------------
NOTE: with this rewiring the metal screws on the PEEK 9Pin connector have been grounded using Ta foil
Thursday, March 21, 2013: there was a short in one of the lines - most probably due to a shielding strand into the connector, has been resolved by fixation of the shielding in a position further away with Cu wire
|
Tuesday, March 19, 2013, 17:25, Sebastian Raeder, , , , , , , Problems/Solutions, new turbo installed
|
Edi replaced the faulty turbo pump in the mass separator section.
Roughing and turbo started
vacuum @ 9E-7T after 2.5h |
Tuesday, February 26, 2013, 08:32, Anders Mjos, , , , , , , Problems/Solutions, TMSTP2 timeout / fault
|
Tuesday, February 26, 2013, 08:24: Started turbo
Tuesday, February 26, 2013, 08:24: Turbo timed out
e-fault 6585 submitted |
Tuesday, March 19, 2013, 09:04, Anders Mjos, , , , , , , Problems/Solutions, Venting TMS section for replacement of TP2 by vacuum group
|
Anders Mjos wrote: |
Tuesday, February 26, 2013, 08:24: Started turbo
Tuesday, February 26, 2013, 08:24: Turbo timed out
e-fault 6585 submitted
|
Edi called to inform that he can replace the turbo today.
Tuesday, March 19, 2013, 09:03: Stopped TP6
Tuesday, March 19, 2013, 09:35: Venting
Tuesday, March 19, 2013, 09:48 : TMS section and backing line vented
The turbo pump has been replaced see
https://elog.triumf.ca/TIS/Test-Stand/284
Some heat marks were observed on the turbo pump that was replaced. Vacuum group took pictures.
|
Monday, March 04, 2013, 09:11, Anders Mjos, , , , , , , Problems/Solutions, Restarted turobos after planned power outage
|
Started archivers
Started turbos
Switched on ion gauges
TMSTP2 out as per precious e-log entry (and e-fault 6585) |
Tuesday, February 19, 2013, 08:28, Anders Mjos, , , , , , , Problems/Solutions, Opened all backing valves after scheduled site wide air outage
|
|
Monday, January 28, 2013, 14:41, Anders Mjos, Empty, , , , , , , Pumping down
|
Monday, January 28, 2013, 14:41: Roughing
Monday, January 28, 2013, 15:35: Starting turbos
Monday, January 28, 2013, 15:43: Turbos at speed
Monday, January 28, 2013, 15:45: Vacuum at 3.9 E-6 T |
Monday, January 28, 2013, 12:56, Anders Mjos, Empty, , , , , , , Venting
|
For conductor bolt work
Monday, January 28, 2013, 12:56: Turbos off
Monday, January 28, 2013, 14:18: Venting |
Thursday, January 17, 2013, 08:16, Sebastian Raeder, RFQ empty, , , , , , In progress, heating
|
Thursday, January 17, 2013, 08:16: started heating of the target, vacuum at 2.6E-7T
Thursday, January 17, 2013, 14:55: current at 572A/6.95V (panel reading), vacuum at 6.7E-7T
Thursday, January 17, 2013, 18:40: measurements done, vacuum at 5.3E-7T, current 572V/6.94V, start cooling down |
Friday, January 18, 2013, 16:17, Anders Mjos, RFQ empty, , , , , , In progress, heating
|
Sebastian Raeder wrote: |
Thursday, January 17, 2013, 08:16: started heating of the target, vacuum at 2.6E-7T
Thursday, January 17, 2013, 14:55: current at 572A/6.95V (panel reading), vacuum at 6.7E-7T
Thursday, January 17, 2013, 18:40: measurements done, vacuum at 5.3E-7T, current 572V/6.94V, start cooling down
|
The temperature of the cooling water was logged during this test. See attachments for details. Note that current and voltage read back is not available due to trouble with the power supply. One thermocouple (Heat Shield circuit) came loose before the end of the test (not shown in plot). |
Friday, January 18, 2013, 15:57, Anders Mjos, , , , , , , Problems/Solutions, Conductor bolts to be replaced
|
After the last test at the test stand, one of the conductor bolts (ITD0058) is damaged. To prevent damage to the thread inserts, all conductor bolts will be replaced with new ones. |
Friday, January 18, 2013, 15:34, Anders Mjos, empty, , , , , , , Pumping down empty chamber
|
Started roughing
Friday, January 18, 2013, 15:25: Started turbos
Friday, January 18, 2013, 15:33: Turbos at speed
Friday, January 18, 2013, 15:35: Vacuum at 1.5E-5 T |
Friday, January 18, 2013, 11:28, Sebastian Raeder, RFQ empty, , , , , , , stop turbos
|
Friday, January 18, 2013, 11:28: turbos stopped |
Wednesday, January 16, 2013, 01:06, Sebastian Raeder, RFQ empty, , , , , , , Target installed - pumping down
|
RFQ empty target installed
Wednesday, January 16, 2013, 01:05: roughing started
Wednesday, January 16, 2013, 01:34: turbos started
Wednesday, January 16, 2013, 01:43: turbos at speed
Wednesday, January 16, 2013, 01:44: vacuum at 1.7E-5T |
Tuesday, January 15, 2013, 15:12, Sebastian Raeder, RFQ empty, , , , , , , Start cooling
|
Start cooling of Target RFQ empty |
Tuesday, January 15, 2013, 16:10, Anders Mjos, RFQ empty, , , , , , , Turbos off
|
Sebastian Raeder wrote: |
Start cooling of Target RFQ empty
|
Tuesday, January 15, 2013, 16:09: Turbos off
Tuesday, January 15, 2013, 21:15: Start venting with nitrogen- SR |
Monday, January 14, 2013, 18:18, Friedhelm Ames, , , , , , , , TMS:CBC1 not working
|
The optics at the teststand has been switched on, but TMS:CBC1 is not working. A fault report has been send to controls. |
Monday, January 14, 2013, 13:51, Sebastian Raeder, RFQ empty, , , , , , In progress, heating
|
Started heating the target, now Silica sleevings are installed for wire insulation and the gap target -- repeller is now 0.6mm (was 0.25mm) |
Friday, January 11, 2013, 11:02, Anders Mjos, RFQ empty, , , , , , , Target installed, pumping down
|
Target installed with 120 in lbs torque on target legs and on central support.
Friday, January 11, 2013, 11:01: Roughing
Friday, January 11, 2013, 11:25: Start turbos - SR
Friday, January 11, 2013, 11:34: turbos at speed - SR
Friday, January 11, 2013, 11:35: vacuum at 1.2E-5T - SR
|
Friday, January 11, 2013, 08:37, Anders Mjos, Empty, , , , , , In progress, Venting
|
Friday, January 11, 2013, 08:36: Venting for installation of RFQ test target later today |
Wednesday, January 09, 2013, 14:13, Anders Mjos, Empty, , , , , , , Rouging
|
Wednesday, January 09, 2013, 14:12: Roughing empty chamber |
Wednesday, January 09, 2013, 10:39, Anders Mjos, RFQ empty, , , , , , In progress, Venting
|
Wednesday, January 09, 2013, 10:38: Turbos off. Vacuum at 1.7 E-7 T
Wednesday, January 09, 2013, 13:24 : Venting with nitgogen
Wednesday, January 09, 2013, 14:12: Target removed |
Monday, January 07, 2013, 14:52, Sebastian Raeder, RFQ empty, , , , , , , heating target
|
heating target for RFQ tests. Now the wiring is insulated with alumina beats and tubing and the target has the standard Ta alkali element mixture
Unfortunately I deleted some entries, so here a short summary in combination with a screenshot of the striptool
heated to 580A, vacuum increased over time from 4.8 to 5.6E-7T
HV up to 30kV - current of 37 uA - seems fine
Mass scan not possible, ops found a water leak in the magnet PS, optics around the magnet are thereofre also not available and red in EPICS
NOTE: all FC values are in reversed bias!!
source +4.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 2E-9A at FC0
one spark observed
source -5.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 4E-11A at FC0
source -12V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 5E-11A at FC0
two sparks observed
source +4.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 3E-10A at FC0
source -5.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up - done again since not sure if the restore of the tune was done properly for this
about 4E-11A at FC0
done, source +4.5V, 2nd Rep +12V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 3E-10A at FC0
1 spark during HV ramping
done, source +4.5V, 2nd Rep&exit +12V: RFQ offs =+12V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
there is something visible <~ 2E-12A at FC0
reduced current to 550A and leave it over night.
Short summary:
suppression possible but RFQ has to be shifted, the "only source shift" mode yielded a worse suppression than expected - unfortunately no mass scans have been possible, which would help to get some information on possible effects
|
Friday, January 04, 2013, 15:07, Anders Mjos, RFQ empty, , , , , , In progress, Pumping down
|
Friday, January 04, 2013, 15:04: Roughing
Friday, January 04, 2013, 15:24: Starting turbos
Friday, January 04, 2013, 15:33 : Turbos at speed
Friday, January 04, 2013, 15:34 : Vacuum at 1.7E-5 T |
Friday, January 04, 2013, 10:52, Anders Mjos, , , , , , , In progress, Preparing for venting
|
Friday, January 04, 2013, 10:51: Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52: Turbos stopped
Friday, January 04, 2013, 13:50: Venting |
Thursday, January 03, 2013, 11:39, Anders Mjos, , , , , , , Problems/Solutions, Starting pumps after holiday shut down - TMSRP2 replaced
|
Thursday, January 03, 2013, 11:28: TMSRP2 is noisy. Stopped.
Roughing pump inspected by Vacuum group. Will be replaced later today. See e-fault 6516
Thursday, January 03, 2013, 11:29: TSGRP1 Started
Thursday, January 03, 2013, 11:29: TSGTP1A and 1B started
Thursday, January 03, 2013, 11:38 : TSGTP1A and B at speed
Thursday, January 03, 2013, 11:38 : Vacuum at 1.3E-5 T
TMSRP2 replaced
Thursday, January 03, 2013, 15:03: TMSTP2 and 6 started
Thursday, January 03, 2013, 15:07: TMSTP2 and 6 at speed
Thursday, January 03, 2013, 15:08: Vacuum at 5 E-5 T |
Thursday, January 03, 2013, 08:33, Anders Mjos, , , , , , , Problems/Solutions, Started archivers after holiday shut down
|
Started archivers. Controls whited out. |
Thursday, December 20, 2012, 14:19, Anders Mjos, , , , , , , , Power down for holidays
|
|
Wednesday, December 19, 2012, 16:22, Sebastian Raeder, , , , , , , Problems/Solutions, status after power outage
|
Wednesday, December 19, 2012, 16:24:
After long power outage, everything is off except the roughing pumps. Two turbo pumps (TMSTP2 and TSGTP1B) have shown fault due to timeout, only TSGTP1B could be reset, while TMSTP2 is still showing this fault
Vacuum in Magnet section is 0.004T according to TMSCG2. Since the target chamber was vented to remove the RFQ tests target, this section is actually pumped down using the roughing pumps (water lines are blanked off)
archivers started
Wednesday, December 19, 2012, 21:43
I was now able to reset TMSTP2.
closed the roughing pumps to the target chamber, vacuum at 0.027T |
Wednesday, December 19, 2012, 11:24, Anders Mjos, , , , , , , Problems/Solutions, Restarted turbos in TMS section after power bump
|
Sources arch restared |
Wednesday, December 19, 2012, 09:44, Sebastian Raeder, , , , , , , In progress, venting
|
venting and inspect the target
Wednesday, December 19, 2012, 09:43: vqacuum at 1.9E-7T, stop turbos |
Tuesday, December 18, 2012, 16:00, Sebastian Raeder, RFQ empty, , , , , , Done, target heating
|
Tuesday, December 18, 2012, ~ 13:00 start ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56: @ 250A, target is glowing, center block is cooler (can be inspected with a new hole in the heatshield lid), thermocouple is reading 224C, which is definitely colder than the temp from visual insepection, reading may be corrupted from contact to Heatschield
Tuesday, December 18, 2012, 23:11: target at 600A(593A/7.35V Panel reading), vacuum was up to 1.7E-6T, now 1.34E-6T. temperature reading was 405C which is quite away from glowing. Nevertheless, the center block of the target is visibly colder than the legs, while the center support is still way colder then the block. Thermocouple readback removed from HV cage. since the is a short cut the target (thermocouple?) the RFQ can be biased to 18V for suppression. everything locked up and stat HV test.
Wednesday, December 19, 2012, 00:14: target at 600A(593A/7.35V Panel reading), vacuum at 8.5E-7T, first HV test done, up to 30kV some occasional sparks. RFQ (1MHz , 40Vpp) without bias--> no signal, RFQ -9V biased --> 1.5E-11 on TMS:FC0
Wednesday, December 19, 2012, 01:17 : vacuum at7.7E-7T, start cooling down, was ~ 2.5h at max current. |
Tuesday, December 18, 2012, 12:51, Sebastian Raeder, , , , , , , , Anode powersupply connected to HV-common
|
The anode PS is turned off and connected to HV common.
the Target is connected to a -18V PS at the center support (Feed through A) for a on/off test of ion suppression
NOTE: there is a shortcut target <--> HV gnd, most propably due to the thermocouple touching something after pumping.
workaround to obtain suppression for today is to put in a differnt driver for the RFQ which can be biased to positive potential. |
Monday, December 17, 2012, 22:35, Sebastian Raeder, RFQ empty, , , , , , , wire connection for RFQ test
|
Overview over the connections of the new 9Pin connector inside the vacuum and in the HV cage
1&2 : RFQ rods in the vacuum, RFQ Driver in HV cage
4: Repeller electrode, grounded in HV cage
5: Exit electrode , grounded in HV cage
6&7: thermocouple at the center block, w/o HV to OMEGA thermocouple display, with HV should be connected to GND with 1k-10kOhm (to allow a shift of the target)
8&9: not connected, grounded in HV cage
View on top of the feedthrough and the connector on the source tray (male connectors)
__________________
\ 1 2 3 4 5 /
\ 6 7 8 9 /
----------------------
1to1 connection for pins 1,2,4-9
Pin 3 is NOT CONNECTED
The pin pairs 1&2, 4&5, 6&7, 8&9 each use a line of twisted pairs |
Friday, December 14, 2012, 20:34, Sebastian Raeder, RFQ empty, , , , , , Done, pumping down
|
Friday, December 14, 2012, ~ 17:00: start roughing pumps
Friday, December 14, 2012, 20:33: start turbo pumps
Friday, December 14, 2012, 20:42 : turbos at speed
Friday, December 14, 2012, 20:43 : vacuum at 7.32E-6T
Monday, December 17, 2012, 12:53 vacuum at 1.77E-7T |
Friday, December 14, 2012, 14:24, Sebastian Raeder, RFQ empty, , , , , , , Venting
|
Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target |
Friday, December 14, 2012, 15:28, Anders Mjos, RFQ empty, , , , , , In progress, Venting
|
Sebastian Raeder wrote: |
Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target
|
Friday, December 14, 2012, 15:27 : Venting |
Thursday, December 13, 2012, 14:38, Anders Mjos, , , , , , , , Pumping down empty chamber
|
Thursday, December 13, 2012, 14:36: Roughing
Thursday, December 13, 2012, 14:56 : Starting turbos
Thursday, December 13, 2012, 15:05 : turbos at speed
Thursday, December 13, 2012, 15:06 : vacuum at 2.3E-5 T
|
Thursday, December 13, 2012, 08:40, Anders Mjos, RFQ empty, , , , , , In progress, Venting
|
Thursday, December 13, 2012, 08:38: TBHT and TGHT off
Thursday, December 13, 2012, 08:38 : Vacuum at 1.8E-7 T
Thursday, December 13, 2012, 08:38 : Turbos off
Thursday, December 13, 2012, 11:19: Venting
Thursday, December 13, 2012, 11:30: Water lines purged
Thursday, December 13, 2012, 11:41: Target removed for inspection. |
Tuesday, December 11, 2012, 13:40, Sebastian Raeder, RFQ empty, , , , , , Done, Heating test for Ion guide Laser ion source
|
new ion guide laser ion source installed. Pure target container without targetmaterial and without surface ion source.
Heat up to 580A for heat test of all components. Distance between target and repeller < 1mm
13:15 start heating TGHT, 1A per 30sec vacuum below 2E-7T
14:50 reached 200A at TGHT (1.5V readback same as frontpanel), vacuum now 2.9E-7T, proceed on to 400A
16:10 TGHT 350 A (setpoint, readback stopped at 269A) and 3.4V readback, sudden increase in vacuum from 4E-7T to 5.5E-7T and larger fluctuations, give it 10min
16:22 vacuum back to 4.4E-7T but some occasional vacuum spikes , proceed to 400A
17:00 at 400A / 4.13V, vacuum hit 2E-6T in between which delayed the heating, now decreasing, will goto 410A for half an hour and then 385A over night
Dec 12th
8:30 3.3E-7T Vac at 385A, goto 420A
8:50 7.5E-7T Vac at 420A, goto 450A
9:20 1.7E-6T Vac at 450A, goto 470A
10:00 1.5E-6T Vac at 470A / 4.5V
11:30 1.1E-6T at 520A/4.56V
Wednesday, December 12, 2012, 11:46 1.7E-6T at 550A/4.58V
Wednesday, December 12, 2012, 14:31
580A reached, Vacuum dropped from 1.8E-6T to 5.8E-7T in 2h
voltage read back is wrong as well Panel readings are 572A/6.99V (read back values in EPICS are 248A/ 4.6V)
Wednesday, December 12, 2012, 14:47 6.5E-7T at 592A/ 7.31V (Panel readings)
Wednesday, December 12, 2012, 15:01 there is no contact of the target to HV GND (especially the repeller), the target can still be biased to 5V
Wednesday, December 12, 2012, 19:48 5.9E-7Tvacuum is slowly going down now
Thursday, December 13, 2012, 00:23 5.5E-7T, start cooling down
Short summary on results of first heating teest with the Ion Guide Ion source:
The Ion source is still in good shape, nothing was effected by the heat. Just some deposition in the repellers and the exit electrode
The capton wires used for wiring the electrodes had some problem with heat and went black and got brittle - for the next test we will ad a Ta schield at the side of the source to prevent radiation inside the source. |
Tuesday, December 11, 2012, 13:27, Sebastian Raeder, , , , , , , , 9 PIN connector
|
A Sub D 9 Pin connector on a HV insulator was installed on Port Q of the target box at the teststand. The insulator is leak tested and OK, vacuum is below 2E-7 T
The feed through is connected (1to1) to the upper 9 Pin connector of the target tray. Since the existing upper 9 Pin connector was damaged from a previous FEBIAD test, this connector was replaced. For wiring 4 twisted pair Capton insulated and shielded wires (identical to ITE and TM4) of about 50cm length are used.
View on top of the feedthrough and the connector on the source tray (male connectors)
__________________
\ 1 2 3 4 5 /
\ 6 7 8 9 /
----------------------
1to1 connection for pins 1,2,4-9
Pin 3 is NOT CONNCTED
The pin pairs 1&2, 4&5, 6&7, 8&9 each use a line of twisted pairs
Monday, December 17, 2012, 22:21
Connection to the HV added. The wires end in the HV cage on a screw terminal with labels 1--12. The numbers 1,2,4-9 are used in corresponding notation to the sketch above. Since 3 is not connected at all this terminal is used for grounding the wire shielding.
As cable 2 Capton isolated pairs of wire (1&2, 4&5) and two "normal" pairs for thermocouple (6&7, 8&9) reading are used. So all connections have shielded twisted pair cable, while (6&7, 8&9)change the cable type at the 9Pin connector |
Thursday, December 06, 2012, 08:41, Anders Mjos, , , , , , , , Opened cooling water
|
Vacuum stable at 2.8E-7 T |
Wednesday, December 05, 2012, 11:18, Anders Mjos, , , , , , , In progress, Leak checking 9-pin feed through
|
Vacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background. |
Tuesday, December 04, 2012, 17:27, Anders Mjos, RFQ empty, , , , , , In progress, Pumping down
|
The RFQ heating test target was installed by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26: roughing
Tuesday, December 04, 2012, 17:45: starting turbos
Tuesday, December 04, 2012, 17:55 : turbos at speed
Tuesday, December 04, 2012, 17:55 : vacuum at 3.3E-5 T |
Tuesday, December 04, 2012, 11:05, Anders Mjos, , , , , , , , Vented
|
In preparation for RFQ target and leak troubleshooting.
Tuesday, December 04, 2012, 11:04: Turbos off (vacuum at 3.8E-7 T)
Water lines purged.
Tuesday, December 04, 2012, 15:03: Venting
Tuesday, December 04, 2012, 15:32 : Vented |
Monday, December 03, 2012, 15:33, Anders Mjos, , , , , , , In progress, Leak check of 9-pin feed through
|
Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin feed through. |
Friday, November 30, 2012, 12:04, Anders Mjos, , , , , , , In progress, 9-pin connector installation work in progress
|
in preparation for RFQ testing. By Sebastian and Anders
An insulated 9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target assembly was placed in the upper slot on the source tray.
Friday, November 30, 2012, 14:57: Rouging in preparation for leak check (next week).
Friday, November 30, 2012, 15:16: Turbos on
Friday, November 30, 2012, 15:25 : Turbos at speed
Friday, November 30, 2012, 15:26 : Vacuum at 3.4E-5 T |
Friday, November 30, 2012, 10:42, Anders Mjos, , , , , , , , Venting
|
|
Thursday, November 29, 2012, 16:21, Anders Mjos, , , , , , , , Pumping down
|
Thursday, November 29, 2012, 16:21: Roughing |
Thursday, November 29, 2012, 14:15, Anders Mjos, , , , , , , In progress, Venting in preparation for RFQ work
|
Thursday, November 29, 2012, 14:15: Stopping turbos
Thursday, November 29, 2012, 15:57: Venting |
Thursday, November 22, 2012, 12:52, Aurelia Laxdal, Test-SiC, HP-FEBIAD, , , , , , E-Fault#6389 re-directed to PS
|
Evgeniy and Kazuya investigated the problem with TSH:TGHT readbacks and they came to the conclusion that the PS is faulty, and the PLC reads correctly the signal sent by the PS. Kazuya is redirecting the E-Fault from Controls to PS.
Ray Dube estimated few weeks (4-6) to send the PS offsite for repairs. This needs to be scheduled. For the time being, one can use the Test Stand with the PS setpoints, displayed on its front panel, as a reference. |
Monday, November 19, 2012, 10:20, Aurelia Laxdal, Test-SiC, HP-FEBIAD, , , , , , Preparations for E-Fault#6389 investigations
|
Prepared the Test Stand for Controls to investigate E-Fault#6389.
Evgeniy increased the current limit on the power supply TSH:TGHT from 2 rotations to 7 rotations, after talking to Ray Dube.
I turned on the HV at 30kV and started the Auto-ramping. |
Monday, November 05, 2012, 14:42, Anders Mjos, Test SiC, HP-FEBIAD, , , , , Done, Pumping down
|
Monday, November 05, 2012, 14:41: Roughing
Monday, November 05, 2012, 14:58: Started turbos
Monday, November 05, 2012, 15:06 : Turbos at speed
Monday, November 05, 2012, 15:068: Vacuum at 2.2E-5 T
Wednesday, November 07, 2012, 08:26: Cooling water open. Vacuum stable at 1.8E-7 T |
Monday, November 05, 2012, 14:41, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , Done, Target Removed
|
Target looks OK. The right leg was a bit much out of center and will be adjusted in the lab.
The torque required to loosen the bolts were measured (from left to right):
Target legs: 48 and 30 in lbs
Tube htr: 25, 30 and 25 in lbs |
Monday, November 05, 2012, 13:26, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, Venting the Test Stand
|
Venting the Test Stand.
TiC#3 will be ready to be removed in few minutes.
Please note: water is still ON. |
Monday, November 05, 2012, 09:47, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, TPS optics cannot be turned off.
|
All TPS optics, with the exception of TPS:Q4 cannot be turned off. E-Fault#6395 for Controls.
Same for the TSG optics: CB1, VCB1 and CBC.
Talked to Evgeniy and Kazuya. Optics are OFF now. |
Friday, November 02, 2012, 15:40, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, SiC#3 cooldown started
|
Started the cooldown for SiC#3. |
Friday, November 02, 2012, 14:20, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , , Mass scan done
|
Mass scan file: plotdump-local-clean.txt Nov2 12 13-15-59.txt
The scan was taken at TGHT=573A (read from the PS panel) .
The TBHT = 230A
|
Thursday, November 01, 2012, 14:57, Aurelia Laxdal, TiC#3, LP-SIS, ITW, TM1, , , , TSH:TGHT readback stopped at 264.5A (for a higher setpoint)
|
The TSH:TGHT stopped at 263.7A, but the setpoint is still ramping (now at 421A). The voltage is set correctly: have 6.238V setpoint and 4.386V readback. The reading on the Power Supply shows 418A. Through the window the target assembly looks at high temperature. The readback on Epics seems stuck. E-Fault for Controls 6389 |
Thursday, November 01, 2012, 11:16, Aurelia Laxdal, TiC#3, LP-SIS, ITW, TM1, , , , TiC#3-LP-SIS Startup
|
Did the HV conditioning for the TiC#3 up to 30kV.
Heaters ramp up in progress. |
Thursday, October 25, 2012, 13:02, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , In progress, Pumping down
|
Thursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19 : Turbos on
Thursday, October 25, 2012, 13:28 : Turbos at speed
Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T |
Friday, October 26, 2012, 08:29, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , Done, Target ready for conditioning
|
Anders Mjos wrote: |
Thursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19 : Turbos on
Thursday, October 25, 2012, 13:28 : Turbos at speed
Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T
|
Friday, October 26, 2012, 08:29: Opened water. Vacuum stable at 1.8E-7 T |
Thursday, October 25, 2012, 11:13, Anders Mjos, Test, HP-FEBIAD, , , , , In progress, Venting chamber for installation of TiC#3
|
Thursday, October 25, 2012, 11:11: Vacuum at 1.3E-7 T
Thursday, October 25, 2012, 11:12: Turbos off
Thursday, October 25, 2012, 11:50: Venting |
Wednesday, October 10, 2012, 10:47, Friedhelm Ames, , , , , , , Failed, found teststand tripped off
|
turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown. |
Wednesday, October 10, 2012, 17:35, Aurelia Laxdal, , , , , , , Failed, found teststand tripped off
|
Friedhelm Ames wrote: |
turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.
|
Checked the Archiver and the striptool: TSG:TP1A & TP1B tripped on Oct. 10, at 7:53am. Both pumps showed timeout, but the AC breakers were not tripped. Also, checked with MCR: they were no power bumps or cooling water problems around that time.
Discussed it with Kazuya Negishi from Controls: there were no PLC problems. Kazuya and I would monitor the trips. |
Wednesday, October 03, 2012, 13:50, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, Training updates
|
On Monday October 1, the HP-FEBIAD source was turned ON again, to complete the operator training. The last session was yesterday and for the time being the ISAC operators can play with the source when time allows, and from the ISAC Control room. For this purpose the source will be kept on this week and also over the week-end. |
Monday, October 01, 2012, 10:41, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, SiC-HP-FEBIAD for operator training - Source ON
|
Turned the source back ON. Heaters are ramping up. |
Friday, September 28, 2012, 09:59, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training - Source Off
|
Checked with ISAC Ops this morning and they are not available for FEBIAD training. Turned off the source until next week. |
Thursday, September 27, 2012, 12:27, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training
|
The source was used yesterday for operator training.
Today, I found the source off: the ISAC PLC Status was stopped. Kazuya re-started the PLC. I will re-start the source. |
Tuesday, September 25, 2012, 16:10, Aurelia Laxdal, , , , , , , , Conditioning - SiC-HP-FEBIAD for operator training
|
Did the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A
for TSH:TBHT up to 230A |
Tuesday, September 25, 2012, 13:25, Anders Mjos, , , , , , , Done, Started turbos after replaced roughing pump
|
|
Monday, September 24, 2012, 13:52, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 will not start without blowing the fuse
|
See e-fault 6329
Tried to start the pump from another power outlet with Edi. No luck. Pump will be replaced tomorrow. |
Tuesday, September 25, 2012, 13:05, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 will not start without blowing the fuse
|
Anders Mjos wrote: |
See e-fault 6329
Tried to start the pump from another power outlet with Edi. No luck. Pump will be replaced tomorrow.
|
Pump replaced by vacuum group |
Monday, September 24, 2012, 15:25, Anders Mjos, , , , , , , Done, TMS RP and TP started
|
|
Monday, September 24, 2012, 10:31, Anders Mjos, , , , , , , Problems/Solutions, EPICS whiteout
|
Test stand was off this morning and EPICS controls in "white-out". Controls is looking into it.
Update 13:51:
Controls have reestablished contact with the PLC. |
Friday, September 21, 2012, 08:27, Anders Mjos, , , , , , , Problems/Solutions, Backing pressure TSG:CG1A/B fluctuating
|
Backing pressures TSG:CG1A/B are fluctuating between 0.02 and 0.05 since Sept 17th at ~17h. Expected values <0.01. |
Thursday, September 20, 2012, 15:52, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training
|
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
Thursday, September 20, 2012, 16:29: Starting turbos
Thursday, September 20, 2012, 16:38 : Turbos at speed
Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr
|
Friday, September 21, 2012, 08:20, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training
|
Anders Mjos wrote: |
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
Thursday, September 20, 2012, 16:29: Starting turbos
Thursday, September 20, 2012, 16:38 : Turbos at speed
Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr
|
Friday, September 21, 2012, 08:19: Cooling water on. Vacuum stable at 2.3E-7 torr. |
Thursday, September 20, 2012, 14:24, Anders Mjos, , , , , , , In progress, Venting - installation of FEBIAD test target for operator training
|
Thursday, September 20, 2012, 14:24: Turbos off
Thursday, September 20, 2012, 15:20: Venting |
Friday, September 14, 2012, 16:33, Anders Mjos, , , , , , , In progress, Pumping down empty chamber
|
Friday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57: Starting turbos
Friday, September 14, 2012, 17:05 : Turbos at speed
Friday, September 14, 2012, 17:07: Vacuum at 8.7E-6
|
Friday, September 14, 2012, 15:27, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , Done, Venting
|
Target cooled down. Power supplies off.
Friday, September 14, 2012, 15:27: Turbos off.
Friday, September 14, 2012, 15:32: Water purged.
Friday, September 14, 2012, 16:00: Venting
Friday, September 14, 2012, 16:26: Vented |
Thursday, September 13, 2012, 13:05, Friedhelm Ames, Nb#7, LP-SIS, , , , , , heater ramping up started
|
|
Thursday, September 13, 2012, 08:24, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Water on
|
Thursday, September 13, 2012, 08:16: Opened up cooling water. Vacuum (IG1) increased from 5.9E-7 to 6.2E-7 before returning to 5.9E-7. Similar response on IG6 (valve closed). Response is however similar to previous (short time ~5 min) vacuum fluctuations. |
Wednesday, September 12, 2012, 17:04, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Pumping down - w/replaced insulators
|
Replaced swollen insulator and added Ta heat shield on insulator.
Wednesday, September 12, 2012, 17:03: Roughing
Wednesday, September 12, 2012, 17:23 : Starting turbos
Wednesday, September 12, 2012, 17:32 : Turbos at speed
Wednesday, September 12, 2012, 17:33 : Vacuum at 3.2E-5 |
Wednesday, September 12, 2012, 08:02, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Venting
|
Wednesday, September 12, 2012, 08:01: Turbos off
Wednesday, September 12, 2012, 13:35: Venting, water off and purged.
Wednesday, September 12, 2012, 13:55: Vented |
Tuesday, September 11, 2012, 19:48, Friedhelm Ames, NB#7, HP-SIS, , , , , Done, cool down finished, all source power supplies off.
|
|
Tuesday, September 11, 2012, 13:13, Friedhelm Ames, Nb#7, LP-SIS, , , , , In progress, start cool down
|
start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL. |
Friday, September 07, 2012, 14:34, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , Problems/Solutions, Insulator ITD0342 overheated - swelling
|
See attached photo |
Friday, September 07, 2012, 13:10, Friedhelm Ames, Nb#7, , , , , , Done, mass scan finished
|
mass scan is finished saved as
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/plotdump-local-clean.txt_Sep7_12_13-01-51.txt
|
Friday, September 07, 2012, 12:11, Friedhelm Ames, NB#7, LP-SIS, , , , , In progress, mass scan started
|
mass scan has been started after optimization on 23Na |
Thursday, September 06, 2012, 09:23, Friedhelm Ames, NB#7, , , , , , ,
|
start high voltage and heaters |
Friday, August 31, 2012, 13:59, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Nb#7 installed
|
Friday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 : starting turbos
Friday, August 31, 2012, 15:44 : TP1B at speed
Friday, August 31, 2012, 15:48 : TP1A timed out
Friday, August 31, 2012, 15:48 : TP1A restarted. at speed.
Friday, August 31, 2012, 15:49 : both turbos at speed. Vacuum @2.7E-5 |
Tuesday, September 04, 2012, 08:11, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , Done, Nb#7 installed
|
Anders Mjos wrote: |
Friday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 : starting turbos
Friday, August 31, 2012, 15:44 : TP1B at speed
Friday, August 31, 2012, 15:48 : TP1A timed out
Friday, August 31, 2012, 15:48 : TP1A restarted. at speed.
Friday, August 31, 2012, 15:49 : both turbos at speed. Vacuum @2.7E-5
|
Tuesday, September 04, 2012, 08:10: Opened cooling water. Vacuum stable @ 2.2E-7 |
Friday, August 31, 2012, 11:39, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, Venting vacuum chamber - source change
|
Friday, August 31, 2012, 11:39: Stopped turbos.
Friday, August 31, 2012, 13:06: Venting.
Friday, August 31, 2012, 13:23: Water lines purged.
Friday, August 31, 2012, 13:25 : Vented |
Friday, August 31, 2012, 11:12, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , Done, Finished testing NiO#1
|
Turned off the HV and the optics in the first section. Couldn't turn off the optics in the second section: left a message for Evgeniy.
Also TMS:RP2 is very noisy. Talked to Edi D. from vacuum group. He would work on it this afternoon. E-Fault#6282 |
Thursday, August 23, 2012, 10:40, Anders Mjos, , , , , , , Problems/Solutions, Replaced TMSRP2
|
Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49: TMSRP2 replaced and started. |
Friday, August 31, 2012, 10:19, Anders Mjos, , , , , , , Problems/Solutions, Replaced TMSRP2 (again)
|
Anders Mjos wrote: |
Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49: TMSRP2 replaced and started.
|
Edi will replace TMSRP2 again as it became noisy since yesterday morning. Vacuum should not be affected by the work. |
Thursday, August 30, 2012, 16:51, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 cooldown started
|
Started the cooldown. |
Thursday, August 30, 2012, 14:34, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 updates
|
Did another mass scan at 280A for the ionizer:
Plotdump-local-clean.txt Aug30 12 14-28-14.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html
Ramping up the TBHT from 280A -> 290A
And from 290A -> 300A:
Plotdump-local-clean.txt Aug30 12 16-40-29.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html |
Wednesday, August 29, 2012, 11:34, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 heating startup & few checks
|
Friedhelm checked the voltage across R4 from ISK4563D-rev2.pdf. It shows 50 kOhms with the power supplies off and everything connected according to the drawing. With the Anode PS On and set at 20V, we could see the same readback on EPICS and on the meter.
Then started the heater ramping: auto ramp 2A/min.
We'd be watching the vacuum carefully during this process. Also the setup is such that:
- the target and tube heaters are only incremented if the vacuum is less than 5e-6Torr
- and if the vacuum exceeds 2e-5Torr the last increment of the target and tube heater is backed off.
Pierre asked for the 2e-5Torr limit to be changed to 8e-6Torr.
Anders asked to stop the heating at 500A to take a temperature measurement.
Raising the target heater from 500A to 580A.
Did a mass scan at TGHT=580A & TBHT=280A: Plotdump-local-clean.txt Aug29 12 19-53-16.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html |
Tuesday, August 28, 2012, 16:57, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, Updates for NiO#1 at Test Stand
|
Tested the power supplies and locked up the HV cage.
Turned on the HV: 30kV.
Tomorrow we'll start up the heaters: 580A for the target and 280-300A for the tube. |
Monday, August 27, 2012, 15:21, Aurelia Laxdal, , , , , , , In progress, Xantrex PS 10-600 for TSH:TGHT is not working
|
When turned ON it was not going higher than 3.6A (EPICS/front panel). Kazuya checked the connections at the back and also the EPICS/PLC/PS input/output signals. He compared these values with the similar once of the TSH:TBHT PS (which is also a Xantrex PS 10-600). E-Fault 6275
It turned out to be the connections on the top of the ion source box: the target heater was not connected and the power supply was not seeing the load. Tomorrow we'll check all the top connections, with the corresponding power supplies. |
Monday, August 27, 2012, 13:21, Aurelia Laxdal, NiO#1, HP-FEBIAD, ITE, TM4, , , In progress, HV conditioning at Test Stand
|
Did HV conditioning up to TSG:BIAS=30kV, TSH=EE=-600V
Turned off the HV for Kazuya to check the connection/output of the TSG:TGHT Xantrex power supply. |
Thursday, August 23, 2012, 11:39, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 installed
|
Thursday, August 23, 2012, 11:38: NiO#1 installed.
Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.
Thursday, August 23, 2012, 11:54: Roughing.
Thursday, August 23, 2012, 12:12 : Starting turbos.
Thursday, August 23, 2012, 12:16 : TP1B at speed.
Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.
Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5
Thursday, August 23, 2012, 12:22: Vacuum at 2E-5
Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7 |
Friday, August 24, 2012, 08:28, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, NiO#1 installed
|
Anders Mjos wrote: |
Thursday, August 23, 2012, 11:38: NiO#1 installed.
Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.
Thursday, August 23, 2012, 11:54: Roughing.
Thursday, August 23, 2012, 12:12 : Starting turbos.
Thursday, August 23, 2012, 12:16 : TP1B at speed.
Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.
Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5
Thursday, August 23, 2012, 12:22: Vacuum at 2E-5
Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7
|
Friday, August 24, 2012, 08:28: Opened water lines. No response in vacuum. Stable at 3.1E-7 |
Thursday, August 23, 2012, 11:59, Anders Mjos, , , , , , , Problems/Solutions, Roughing blows the fuse for both roughing pumps.
|
The fuse for both roughing pumps blows when roughing the chamber. With the help from Edi: disconnect the exhaust port on the roughing pump for the first few hundred torrs of roughing. Reconnect and continue.
Seems the roughing pump RP1 pushes air towards the exhaust of RP2 which blows the fuse |
Thursday, August 23, 2012, 10:11, Anders Mjos, , , , , , , In progress, Venting - installation of NiO#1
|
Thursday, August 23, 2012, 10:10: Vacuum 2.1E-7
Thursday, August 23, 2012, 10:10: Stopped both turbos.
Thursday, August 23, 2012, 10:20: Water purged.
Thursday, August 23, 2012, 10:53: Venting |
Friday, August 17, 2012, 12:53, Pierre Bricault, , , , , , , Done,
|
Test completed.
exel file on My Documents in folder FEBIAD Test Aout2012/TestFEBIAD
Edited by Anders 2012-09-19, file attached. |
Friday, August 17, 2012, 10:09, Pierre Bricault, , , , , , , In progress, FEBIAD test cathode bias
|
Backing pressure on the bender section is quite large. TMSIG6 reads 5.09E-7 T and TMS:CG2B reads 0.249 T! |
Friday, August 17, 2012, 08:30, Pierre Bricault, , , , , , , In progress, FEBIAD test with cathode biased
|
Yesterday Ray Dube has changed the configuration in order to run the FEBIAD with the cathode on negative bias.
There were a short between the gas line and the common. The box has been opened and the short removed.
This morning I am turning on the cathode heater to 290 A. |
Thursday, August 16, 2012, 16:56, Anders Mjos, , , , , , , In progress, Pumping down after troubleshooting
|
Thursday, August 16, 2012, 17:04 : Starting turbos
Thursday, August 16, 2012, 17:09 : TP1B at speed
Thursday, August 16, 2012, 17:13 : TP1A at speed (after 1 time out)
Thursday, August 16, 2012, 17:14 : Vacuum at 1.8E-5 |
Thursday, August 16, 2012, 16:56, Anders Mjos, , , , , , , Problems/Solutions, Target heater PS disconnected from controls.
|
As per Ray Dube for the FEBIAD anode bias test. The PS will need to be reconnected before a target is run. |
Thursday, August 16, 2012, 16:54, Anders Mjos, , , , , , , Problems/Solutions, Short between gas line and heat shield
|
There was a short between the gas line and the heat shield - as the gas line insulator was not tied to the heat shield. A Ta-wire was used to tie the gas line and keep it from touching the heat shield. |
Thursday, August 16, 2012, 15:30, Anders Mjos, , , , , , , Problems/Solutions, Venting to investigate short between anode - cathode
|
Thursday, August 16, 2012, 15:29: Turbos off
Thursday, August 16, 2012, 15:50 : Venting |
Thursday, August 16, 2012, 10:41, Pierre Bricault, , , , , , , In progress, Test FEBIAD
|
Ray is finishing the electrical modifications for the FEBIAD with the biased cathode.
We found the source of the sparks. The disconnected target heater cables were resting on the Einzel lens cap.
|
Monday, August 13, 2012, 14:56, Pierre Bricault, , , , , , , In progress, FEBIAD test
|
One thing that seems to be strange regarding this FEBIAD is the best results are without any current in the coil.
Normally for the neon ionization the on-line source wanted to be at around 50 to 80 Amp. Not this one.
Is there anything special about this coil?
|
Monday, August 13, 2012, 14:26, Pierre Bricault, , , , , , , In progress, FEBIAD test
|
I am done with the FEBIAD test (anode biased)
We will swap the bias now to the cathode and change the polarity to negative. |
Monday, August 13, 2012, 10:59, Pierre Bricault, , , , , , , Problems/Solutions, Test FEBIAD
|
This morning I try to contact PS group no one answer. Dan Louie is in vacation.
I went into the can diagnostics panel and reconfigure MB1 power supply.
This worked.
|
Monday, August 13, 2012, 08:39, Anders Mjos, , , , , , , Problems/Solutions, Started Archivers
|
Archivers not running this morning. Started both ISACT and SOURCES |
Sunday, August 12, 2012, 22:07, Pierre Bricault, , , , , , , In progress, FBIAD test
|
The reset restored the control.
But magnet supply does not put any amperage out.
Try turning it off and on. No chance.
I gave up. See tomorrow. |
Sunday, August 12, 2012, 21:50, Pierre Bricault, , , , , , , In progress, Test FEBIAD
|
Lost communication with EPICS. Came in reset the ...
So far no luck.
|
Saturday, August 11, 2012, 16:18, Pierre Bricault, , , , , , , , Test FEBIAD anode biased at 120 V
|
The ramp up finished.
I have 3.35E-6 Amp out of the source on FC0.
Vacuum 4.3 E-7 T increase Coil current to 40 A. No effect on vac.
Increase coil to 50 A. Vacuum still good.
I will continue from home.. |
Saturday, August 11, 2012, 13:34, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, In progress, Test FEBIAD anode bias 120 V
|
|
Friday, August 10, 2012, 15:57, Pierre Bricault, , , , , , , ,
|
Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok
Will run test from home.
|
Friday, August 10, 2012, 15:29, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, , finishing the gas installation and its pump
|
1524H Start small pump.
1529H stop the pump.
|
Friday, August 10, 2012, 14:08, Rick Maharaj, , , , , , , , Gas line pump
|
Gas line vacuum pump reinstalled after fitting was modified to receive a standard swagelok connector. The vacuum line was plumbed using 1/4" copper tube (not Stainless) for the the ability to flex and manipulate the line for pump removal and and insertion. |
Friday, August 10, 2012, 13:48, Anders Mjos, , , , , , , Problems/Solutions, He line leak checked - leak fixed
|
A major leak was found on the connection to the regulation valve on the He bottle. Ferrule replaced. System leak checked.
After He bottle: base 5E-6, no response to He spray
AfterSV1: base 5E-7, no response
After SV2: base 4E-7, no response
The system should now be operational. Gas lines were evacuated with the leak checker. |
Friday, August 10, 2012, 12:44, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, In progress, FEBIAD test
|
Rick put the helium bottle back in the rack.
Waiting for status of the gas lines.
|
Friday, August 10, 2012, 11:29, Pierre Bricault, NA, , , , N A, NA, In progress, Test FEBIAD
|
The helium bottle was found empty.
Rick will refill it and hook the leak detector on the system to find out
if we have a leak on the line.
|
Thursday, August 09, 2012, 13:08, Pierre Bricault, , , , , , , , Test FEBIAD
|
Waiting Rick for the fitting on the vacuum pump. |
Thursday, July 19, 2012, 12:59, Anders Mjos, , , , , , , Problems/Solutions, Leak checking doors - no response
|
Thursday, July 19, 2012, 12:57: Doors leak checked. No response. Base rate 1.6E-8 atm-cc/sec. TP pressuer 0.0E-4 Torr . TSGIG1 4.2E-6 Torr. TSG:CG1A 0.014 Torr. |
Thursday, July 19, 2012, 11:32, Anders Mjos, , , , , , , Done, Pumping down
|
Thursday, July 19, 2012, 11:29: roughing
Thursday, July 19, 2012, 11:49: starting turbos
Thursday, July 19, 2012, 11:54: TP1B at speed
Thursday, July 19, 2012, 11:58: TP1A timed out
Thursday, July 19, 2012, 11:58 TP1A restarted. at speed.
Thursday, July 19, 2012, 11:59: both turbos at speed. Vacuum. 2E-5
|
Thursday, July 19, 2012, 08:42, Anders Mjos, , , , , , , Problems/Solutions, Leak checking source chamber - leak found on front door
|
Due to high vacuum a leak check will be done on the system.
Thursday, July 19, 2012, 09:00 : Base leak rate 4E-9 atm-cc/sec
Thursday, July 19, 2012, 09:07: Leak detected on side door. Mid 1E-8 range.
Thursday, July 19, 2012, 09:08: Leak detected on front door. Mid 1E-6 range. Main leak left or bottom side.
Thursday, July 19, 2012, 09:20: Leak on side door could not be reproduced. Previous response possibly due to "cross-talk" with front door. |
Thursday, July 19, 2012, 11:31, Anders Mjos, , , , , , , Problems/Solutions, Wiped o-rings and sealing faces
|
Anders Mjos wrote: |
Due to high vacuum a leak check will be done on the system.
Thursday, July 19, 2012, 09:00 : Base leak rate 4E-9 atm-cc/sec
Thursday, July 19, 2012, 09:07: Leak detected on side door. Mid 1E-8 range.
Thursday, July 19, 2012, 09:08: Leak detected on front door. Mid 1E-6 range. Main leak left or bottom side.
Thursday, July 19, 2012, 09:20: Leak on side door could not be reproduced. Previous response possibly due to "cross-talk" with front door.
|
Thursday, July 19, 2012, 11:29: Wiped both o-rings, grooves and sealing faces with kimwipes. Removed black and brown residues. |
Thursday, July 19, 2012, 09:35, Anders Mjos, , , , , , , Done, Venting to investigate leak on front door
|
Thursday, July 19, 2012, 09:35: Switched off both turbos.
Thursday, July 19, 2012, 10:23: Venting
|
Tuesday, July 17, 2012, 10:10, Anders Mjos, , , , , , , Problems/Solutions, Gas lines leak checked - air supply leak on manifold
|
Leak found on the Ne supply line. 1E-4 - 1E-5 range. Replaced fittings. Had to use one brass piece. Leak rate 6E-9 (probably due to Ne response). No response to He.
Leak rate around low E-8 with regulation valve open.
When closing the HV rack, an air supply leak developed on the manifold for the valves. Shut off air supply. Valves still operational, but requires opening up air supply to actuate.
|
Wednesday, July 18, 2012, 14:08, Anders Mjos, , , , , , , Problems/Solutions, Air supply leak on manifold fixed
|
Anders Mjos wrote: |
Leak found on the Ne supply line. 1E-4 - 1E-5 range. Replaced fittings. Had to use one brass piece. Leak rate 6E-9 (probably due to Ne response). No response to He.
Leak rate around low E-8 with regulation valve open.
When closing the HV rack, an air supply leak developed on the manifold for the valves. Shut off air supply. Valves still operational, but requires opening up air supply to actuate.
|
With the help of Rick, the leak was fixed.
The vacuum pump for the gas lines was removed for repairing the leaking hose. |
Monday, July 16, 2012, 15:46, Anders Mjos, , , , , , , In progress, Pumping down
|
Monday, July 16, 2012, 15:11: Roughing.
Monday, July 16, 2012, 15:38: Turbos started.
Monday, July 16, 2012, 15:46: TSGTP1B at speed TSGTP1A timeout.
Monday, July 16, 2012, 15:54: Both turbos at speed. Vacuum 3.6E-5.
|
Thursday, July 12, 2012, 15:49, Anders Mjos, , , , , , , , test stand vented for TP1A replacement
|
see e-fault 6142 |
Thursday, July 12, 2012, 13:49, Anders Mjos, , , , , , , Problems/Solutions, Aluminum oxide found inside TSHSV1
|
Aluminum oxide found inside TSHSV1 and the copper line to TSHUHV1.
SV1 replaced and copper line cleaned. |
Thursday, July 12, 2012, 13:41, Anders Mjos, , , , , , , Done, purging gas lines with air
|
- gas lines purged with air for 60 min (through TSHUHV1 and TSHSV4).
- gas line allowed to fill with nitrogen to 300 torr and evacuated. repeated 3 times.
|
Thursday, July 12, 2012, 12:23, Anders Mjos, , , , , , , Done, TSH:SV5 bypass on
|
Thursday, July 12, 2012, 15:48: bypass removed |
Thursday, July 12, 2012, 09:44, Anders Mjos, , , , , , , In progress, Venting
|
System will be vented and gas lines purged with air, then nitrogen.
Thursday, July 12, 2012, 09:43: Shut down TSGTP1B. |
Thursday, July 12, 2012, 09:05, Anders Mjos, , , , , , , Problems/Solutions, Shut down TSGTP1A - bearing noise
|
Shut down TSGTP1A due to noise (possibly from bearings) after consulting Edi. |
Wednesday, July 11, 2012, 15:30, Anders Mjos, , , , , , , Problems/Solutions, Restarting turbos after power bump
|
Wednesday, July 11, 2012, 15:27: Started TSGTP1A and 1B
Wednesday, July 11, 2012, 15:31: Started TSMTP2 and 6
Wednesday, July 11, 2012, 15:33: TMS tubos at speed. Vacuum 4.8E-7
Wednesday, July 11, 2012, 15:34: TSG turbos at speed. Vacuum 9.5E-6 |
Wednesday, July 11, 2012, 11:16, Anders Mjos, , , , , , , In progress, Pumping down - with new turbo pump
|
|
Tuesday, July 10, 2012, 16:01, Anders Mjos, , , , , , , Problems/Solutions, Turbo replaced - cleaning chamber recommended
|
A new turbo has been installed. Eddie said the other one had crashed but not catastrophically. He recommends the test stand be wiped clean before pumping because there is a fine layer of Aluminum dust on the chamber base.
|
Monday, July 09, 2012, 12:57, Anders Mjos, , , , , , , Done, Vented
|
|
Monday, July 09, 2012, 11:14, Aurelia Laxdal, , , , , , , , Test Stand status
|
Restarted the PC at the Test Stand.
Restarted the Archivers; currently pumping down the separator area. |
Friday, July 06, 2012, 15:36, Friedhelm Ames, , , , , , , Done, switched everything off
|
switched everything off to prepare for scheduled power outage on Monday |
Friday, July 06, 2012, 11:18, Friedhelm Ames, , , , , , , , TSG:TP1B off source off again.
|
turbo pump TSG:TP1B has tripped off. Cannot be restarted. Fault report to vacuum. Everything switched off again
|
Friday, July 06, 2012, 11:05, Friedhelm Ames, , , , , , , , start source again
|
heater ramping up again with Ne leak closed. |
Friday, July 06, 2012, 11:04, Friedhelm Ames, , , , , , , , source tripped off over night
|
A big vacuum excursion tripped the source off at about 1am. The vacuum did not fully recover afterwards only down to about 1.3e-6T. Ne leak has been closed and vacuum went down to 6e-7T within a few minutes. After the trip the current of the magnet stayed constant. Fluctuations may have been caused by high voltage sparks. |
Thursday, July 05, 2012, 18:02, Friedhelm Ames, , , , , , , Problems/Solutions, fluctuations in magnet current
|
The current at the magnet power supply TMS:MB1 shows fluctuations every 1-2 minutes. The same can be seen in the Hall probe read back and in the beam current at Fc6. |
Thursday, July 05, 2012, 18:10, Friedhelm Ames, , , , , , , Problems/Solutions, fluctuations in magnet current
|
Friedhelm Ames wrote: |
The current at the magnet power supply TMS:MB1 shows fluctuations every 1-2 minutes. The same can be seen in the Hall probe read back and in the beam current at Fc6.
|
a fault report has been issued to power supplies group. Dan Louie will look into it. |
Thursday, July 05, 2012, 11:00, Friedhelm Ames, , , , , , , In progress, source started up again
|
tube heater ramping started |
Thursday, July 05, 2012, 10:59, Friedhelm Ames, , , , , , , Problems/Solutions, water tripping in front of HV power supplies
|
Found some water tripping in front of the high voltage power supplies rack from the water lines at the ceiling. Plastic sheets have been put on top of the racks and MCR has been informed. |
Wednesday, July 04, 2012, 15:37, Anders Mjos, FEBIAD anode end cap test, , , , , , In progress, Pumping down
|
Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.
NOTE: While closing up the VCR fittings the tube rotated causing the tube to flatten in a bend. This may reduce water flow on the heat shield circuit. (see attachment)
Wednesday, July 04, 2012, 15:33: Started roughing.
Wednesday, July 04, 2012, 15:57 : Started turbos
Wednesday, July 04, 2012, 16:03: Turbos at speed. Vacuum at 3E-5 |
Thursday, July 05, 2012, 08:41, Anders Mjos, FEBIAD anode end cap test, , , , , , In progress, Water opened - reduced flow heat shield
|
Anders Mjos wrote: |
Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.
NOTE: While closing up the VCR fittings the tube rotated causing the tube to flatten in a bend. This may reduce water flow on the heat shield circuit. (see attachment)
Wednesday, July 04, 2012, 15:33: Started roughing.
Wednesday, July 04, 2012, 15:57 : Started turbos
Wednesday, July 04, 2012, 16:03: Turbos at speed. Vacuum at 3E-5
|
Thursday, July 05, 2012, 08:39: Water supply open. Vacuum stable at 5.9E-7. Due to the kink in the heat shield cooling line, flow in the heat shield line is lower than other lines (visually inspecting speed of paddle wheels). |
Tuesday, July 03, 2012, 19:05, Friedhelm Ames, , , , , , , Problems/Solutions, short in anode
|
A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate. |
Wednesday, July 04, 2012, 15:33, Anders Mjos, , , , , , , Problems/Solutions, short in anode
|
Friedhelm Ames wrote: |
A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.
|
Wednesday, July 04, 2012: short found between anode and target. probably caused by the target tube coming in contact with the anode due to bending of the tube caused by heating and deformation of the grid retaining ring. see attachements |
Wednesday, July 04, 2012, 09:22, Friedhelm Ames, , , , , , , Problems/Solutions, turbo pumps stopped
|
turbo pumps stopped to prepare for venting for anode short investigation. |
Wednesday, July 04, 2012, 13:07, Anders Mjos, , , , , , , Problems/Solutions, water lines purged
|
Friedhelm Ames wrote: |
turbo pumps stopped to prepare for venting for anode short investigation.
|
Wednesday, July 04, 2012, 13:07: Water lines purged |
Tuesday, July 03, 2012, 09:23, Friedhelm Ames, , , , , , , In progress, start up again
|
purged Ne line and started cathode heater ramp up to 295 A |
Friday, June 29, 2012, 15:02, Friedhelm Ames, , , , , , , , mass scan finished
|
mass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt
|
Friday, June 29, 2012, 16:39, Friedhelm Ames, , , , , , , , mass scan finished
|
new parameters for mass scan program after fit of mass scan
CONST11 = -4.13
CONST22 = 0.09595 |
Friday, June 29, 2012, 15:03, Friedhelm Ames, , , , , , , , start ramping down heater
|
|
Friday, June 29, 2012, 13:39, Friedhelm Ames, , , , , , , , start mass scan
|
start mass scan to do new mass calibration |
Friday, June 29, 2012, 08:57, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Continue cathode heating
|
This morning the pressure was 3.5E-7 T. Current at 275 A is 30nA.
Continue cathode heating to 290 A during meeting.
Start seeing some electron current from the cathode around 275 A. |
Thursday, June 28, 2012, 17:18, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Leave the cathode heater at 275 A overninght.
|
|
Thursday, June 28, 2012, 17:00, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode heater reached its value of 230 A and stoped. good test.
|
Now ramp cathode current up to 290 A. The total current out is 1.e-7 A.
|
Thursday, June 28, 2012, 15:14, Aurelia Laxdal, , LP-FEBIAD, , , , , , Quick check
|
Just a quick check at the Test Stand:
1. The system operational ( white out not present ) with TSH:TBHT heating in progress.
2. Started the Archivers: for Source and Optics.
3. Removed bypass on TSH:SV5 since it's not necessary anymore.
4. Currently: TSH:TBHT=107A |
Thursday, June 28, 2012, 11:29, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Lost all cnntrol interface, complete whiteout of the epics system.
|
|
Thursday, June 28, 2012, 11:27, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode heating in progress, pressure 8.3e-7 T
|
|
Thursday, June 28, 2012, 11:19, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode ramping to 230 A in progress
|
|
Thursday, June 28, 2012, 11:13, Pierre Bricault, , LP-FEBIAD, , , , , , ISAC test stand ready for cathode heating
|
The ISAC test stand is ready for cathode heating.
Bias voltage: 30000 V
Bias current: 37 microAmp
Anode bias: 200 V
Anode current: 6.105 mA
Cathode current: 0 Amp
Cathode voltage: 0 V
Coil current: 30 A
Coil Voltage 0.2 V
EE Voltage: 1800 V
EE current: 30 microAmp
Einzel Lens voltage: 14000 V
Einzel lens current: 49 microAmp. |
Thursday, June 28, 2012, 11:04, Pierre Bricault, Test FEBIAD, LP-FEBIAD, , , , , In progress, Ready to bias the high voltage.
|
|
Tuesday, June 26, 2012, 18:30, Anders Mjos, , , , , , , Problems/Solutions, Crack in source tray insulator
|
A crack in the insulator ITD0054 was observed while mounting the target assembly. See attachment. |
Tuesday, June 26, 2012, 18:04, Anders Mjos, FEBIAD anode end cap test, , , , Tube only, 38307-9, In progress, FEBIAD anode end cap test - ready
|
Testing FEBIAD anode end cap as per dwg ITD0304 REV C
Target with TUBE ONLY. Do not use target heater.
Tuesday, June 26, 2012, 18:03: Roughing
Tuesday, June 26, 2012, 18:24: Turbos started
Tuesday, June 26, 2012, 18:31 : Turbos at speed. Vacuum at 1.8E-5
Wednesday, June 27, 2012, 08:48: Cooling opened. Vacuum stable at 4.2E-7. Ready for testing.
|
Monday, June 04, 2012, 11:40, Anders Mjos, , , , , , , In progress, Empty chamber
|
HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting turbos.
Monday, June 04, 2012, 12:06 : Turbos at speed. Vacuum 1.5 E-5 |
Tuesday, June 26, 2012, 16:06, Anders Mjos, , , , , , , Done, Vented
|
Anders Mjos wrote: |
HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting turbos.
Monday, June 04, 2012, 12:06 : Turbos at speed. Vacuum 1.5 E-5
|
Tuesday, June 26, 2012, 16:06: Turbos off.
Tuesday, June 26, 2012, 17:20: Vented. |
Friday, June 01, 2012, 12:23, Aurelia Laxdal, Ta#38, LP-SIS, ITW, TM1, , , In progress, HV & Heaters conditioning.
|
Did the HV conditioning.
Heaters conditioning in progress.
The Hall probe is not working: couldn't pass 35.5 units (readback) or 50.16 units (setpoint) at field -3710G.
Tried to turn ON/OFF magnet PS and to reboot Canbus, but nothing worked. Still waiting for E-Fault 6031 to be resolved.
Started cool-down. |
Monday, June 04, 2012, 10:51, Anders Mjos, Ta#38, LP-SIS, ITW, TM1, , , Done, Venting chamber
|
Aurelia Laxdal wrote: |
Did the HV conditioning.
Heaters conditioning in progress.
The Hall probe is not working: couldn't pass 35.5 units (readback) or 50.16 units (setpoint) at field -3710G.
Tried to turn ON/OFF magnet PS and to reboot Canbus, but nothing worked. Still waiting for E-Fault 6031 to be resolved.
Started cool-down.
|
Monday, June 04, 2012, 10:51: Turbos switched off
Monday, June 04, 2012, 11:06: Purging water. Venting.
Monday, June 04, 2012, 11:36: Target removed |
Thursday, May 31, 2012, 15:43, Anders Mjos, Ta#38, LP-SIS, ITW, TM1, , , In progress, Target ready to be heated
|
Thursday, May 31, 2012, 15:42: Roughing
Thursday, May 31, 2012, 16:01 : Starting turbos
Thursday, May 31, 2012, 16:08 : Turbos at speed. Vacuum 1.7 E-5
Friday, June 01, 2012, 08:08: Cooling water opened. Vacuum stable at 5.7E-7. Target ready to be heated and biased. |
Thursday, May 31, 2012, 14:46, Anders Mjos, , , , , , , , Venting in preparation for Ta#38
|
Thursday, May 31, 2012, 14:46: Switching off turbos
Thursday, May 31, 2012, 15:05: Venting |
Thursday, May 17, 2012, 15:14, Anders Mjos, , , , , , , , Pumping down empty chamber
|
Thursday, May 17, 2012, 15:14: Started roughing. Cooling lines blanked off.
Thursday, May 17, 2012, 16:52: Starting turbos.
Thursday, May 17, 2012, 17:00: Turbos at speed. Vacuum at 1.5E-5. |
Thursday, May 17, 2012, 13:24, John Wong, SiC#27, HP-SIS, ITE, TM4, 38817-3, , Problems/Solutions, Solid residues found on EE
|
Thursday, May 17, 2012, 13:15
After the test-stand, the EE was removed for inspection. It was discovered that there were some solid residues coated on the extraction electrode and the common plate, but the ionizer tube was clean (see attachment#1). Some samples were collected and will try to do some analysis. This problem has been seen before but it's still not clear why the solid residues form after the test-stand.
The EE & the common plate were cleaned with acetone and re-assembled back to the target.
|
Wednesday, May 16, 2012, 16:01, Anders Mjos, , , , , , , Problems/Solutions, Loose chip of insulator material detected
|
A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed. |
Thursday, May 17, 2012, 12:19, Anders Mjos, SiC#27, HP-SIS, ITE, TM4, , , Problems/Solutions, Loose chip of insulator material detected
|
Anders Mjos wrote: |
A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed.
|
The chip came from the lower insulator stand-off on the target assembly (see attachment). After investigating the chipped insulator, it was decided (Pierre, Friedhelm, Anders) not to replace it - as the risk involved may be less than the risk involved in replacing. |
Tuesday, May 15, 2012, 09:46, Rick Maharaj, , , , , , , , target reinstalled pumping started
|
|
Tuesday, May 15, 2012, 10:14, Anders Mjos, SiC#27, HP-SIS, ITE, TM4, , , In progress, target ready to be heated and biased
|
Tuesday, May 15, 2012, 10:13: Turbo pumps at speed. Vacuum at 1.4E-5.
Tuesday, May 15, 2012, 12:03: Cooling lines opened. Vacuum stable at 1.6E-6
Tuesday, May 15, 2012, 12:17: Target ready to be heated and biased. |
Thursday, May 17, 2012, 08:36, Anders Mjos, SiC#27, HP-SIS, ITE, TM4, , , Done, Target removed
|
Thursday, May 17, 2012, 08:36: Turbo pumps switched off in preparation of target removal.
Thursday, May 17, 2012, 08:51: Purging cooling lines.
Thursday, May 17, 2012, 08:55: Venting.
Thursday, May 17, 2012, 09:21: Target removed |
Wednesday, May 16, 2012, 19:55, Friedhelm Ames, , , , , , , Problems/Solutions, Hall probe reading wrong
|
During the mass scan today it was discovered, that the mass calibration was off. Further investigation showed, that the Hall probe readings are a factor of 1.31 lower than during previous measurements. A fault report has been issued to controls. |
Wednesday, May 16, 2012, 18:10, Aurelia Laxdal, , , ITE, TM4, , , , SiC#27 cooling down
|
Today: did a mass scan at 580A on TGHT and 230A on TBHT at 30kV. Found some A/q units discrepancies on the mass scan page. It may be a hall probe problem: under investigations.
Uploaded the testing file on Docushare: http://documents.triumf.ca/docushare/dsweb/View/Collection-8539/Document-56575
Started the cool down. |
Tuesday, May 15, 2012, 16:18, Aurelia Laxdal, SiC#27, HP-SIS, ITE, TM4, , , In progress, Target/Ion source conditioning
|
Did the HV conditioning up to 30kV and started to ramp up the heaters to 580A and 230A. |
Tuesday, May 15, 2012, 08:42, Rick Maharaj, , , , , , , , target removed
|
|
Tuesday, May 15, 2012, 08:16, Rick Maharaj, , , , , , , , Water circuits flushed
|
|
Tuesday, May 15, 2012, 08:15, Rick Maharaj, , , , , , , , Test Stand chamber venting
|
|
Tuesday, May 15, 2012, 08:08, Rick Maharaj, sic#27, , , , , , , Turbos off
|
Target needs to be removed form teststand to remove heatshielding around target oven. The chamber will be vented, water circuits flushed and target removed. |
Tuesday, May 15, 2012, 07:39, Rick Maharaj, Sic #27, HP-SIS, ITE, TM4, , , In progress, Water on at test stand
|
The vacuum on TSGIG1 reads 2.85e-07. Turing on water on teststand and observing any changes in vacuum pressure. |
Monday, May 14, 2012, 16:57, Aurelia Laxdal, , , ITE, TM4, , , , SiC#27-HP-SIS installed in the Test Stand
|
Rick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012 in the Test Stand. Pumping down. |
Monday, May 14, 2012, 15:36, Aurelia Laxdal, , , , , , , , Test Stand - IOC reboot
|
Did a local IOC reboot to cure to white-out. The test stand is now operational. |
Wednesday, May 09, 2012, 08:56, Anders Mjos, , , , , , , Problems/Solutions, TSGIG1 not working
|
TSGIG1 has timed out. As seen on the attached screen shot, the IG has been out since 17h May 1st. |
Wednesday, May 09, 2012, 09:16, Anders Mjos, , , , , , , Problems/Solutions, TSGIG1 not working
|
Anders Mjos wrote: |
TSGIG1 has timed out. As seen on the attached screen shot, the IG has been out since 17h May 1st.
|
Wednesday, May 09, 2012, 09:15: ISAC Fault Report submitted |
Thursday, May 10, 2012, 08:13, Anders Mjos, , , , , , , Problems/Solutions, Venting for TSGIG1 repair
|
Anders Mjos wrote: |
Anders Mjos wrote: |
TSGIG1 has timed out. As seen on the attached screen shot, the IG has been out since 17h May 1st.
|
Wednesday, May 09, 2012, 09:15: ISAC Fault Report submitted
|
Thursday, May 10, 2012, 08:12: Venting vacuum chamber for Edi - to repair the Ion Gauge.
Thursday, May 10, 2012, 08:45: Vented. |
Thursday, May 10, 2012, 09:48, Anders Mjos, , , , , , , Problems/Solutions, Ion Gauge filament replaced
|
Anders Mjos wrote: |
Anders Mjos wrote: |
Anders Mjos wrote: |
TSGIG1 has timed out. As seen on the attached screen shot, the IG has been out since 17h May 1st.
|
Wednesday, May 09, 2012, 09:15: ISAC Fault Report submitted
|
Thursday, May 10, 2012, 08:12: Venting vacuum chamber for Edi - to repair the Ion Gauge.
Thursday, May 10, 2012, 08:45: Vented.
|
Thursday, May 10, 2012, 09:38: Ion Gauge filament replaced by Edi.
Thursday, May 10, 2012, 09:48 : Pumping down.
Thursday, May 10, 2012, 10:17: Ion Gauge reading vacuum at 1.3 E-5 torr. |
Wednesday, February 29, 2012, 15:08, Friedhelm Ames, , , , , , , , connected Al(CH3)3
|
connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating valve first response at mass 27 with valve set point at 7.0. |
Thursday, April 26, 2012, 09:14, Anders Mjos, , , , , , , , removed Al(CH3)3
|
Friedhelm Ames wrote: |
connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating valve first response at mass 27 with valve set point at 7.0.
|
The bottle with Al(CH3)3 was removed from the test stand yesterday April 25.
comments in e-mail from Marik:
Anders & I took the Al(CH3)3 bottle out of the test stand & put it in the middle fume hood of lab 07. There was some puffs of white "smoke" when Anders unscrewed the VCR coupling. Likely some trapped liquid that oxidized on air exposure. If at all possible, I would suggest a vertical orientation in the Faraday cage.
-Marik |
Friday, April 20, 2012, 08:56, Anders Mjos, Nb#6, LP-SIS, ITW, TM1, , , Problems/Solutions, Insulator stand-off failure
|
When the target was removed from the test stand it was discovered that the custom designed insulator stand-off (ITD0400 made from Mycroy 1100) had swollen and become discoloured in the area exposed to "heat shine" from the target oven. See attached pdf for photos of the insulators.
The heat shield lid was opened up and the target temporarily removed to replace the two insulators that had failed. These were replaced with the commercially available glazed steatite stand-offs. The target had some marks from the insulators which was cleaned with acetone and methanol.
After replacing the insulators, the target assembly was assembled, leak checked and a new electrical check was performed.
Additional photos are available on DocuShare |
Wednesday, April 18, 2012, 13:10, Anders Mjos, No target, , , , , , In progress, Pumping down empty vacuum chamber
|
Wednesday, April 18, 2012, 13:10: Roughing the vacuum chamber.
Wednesday, April 18, 2012, 13:34 : Turbo pumps started and at speed. Pressure 3.5 E-5 torr |
Wednesday, April 18, 2012, 12:19, Anders Mjos, , , , , , , Problems/Solutions, Noise from roughing pump TSGRP1
|
Wednesday, April 18, 2012, 12:15: Blanked off cooling lines. Chamber ready to be pumped down.
Wednesday, April 18, 2012, 12:16: TSGRP1 makes unusual noise when attempting to pump down vacuum chamber. Roughing aborted for now. Edi Dalla Valle is informed. He will have a look at it after lunch. |
Wednesday, April 18, 2012, 13:09, Anders Mjos, , , , , , , Problems/Solutions, Noise from roughing pump TSGRP1
|
Wednesday, April 18, 2012, 13:08 Anders Mjos wrote: |
Wednesday, April 18, 2012, 12:15: Blanked off cooling lines. Chamber ready to be pumped down.
Wednesday, April 18, 2012, 12:16: TSGRP1 makes unusual noise when attempting to pump down vacuum chamber. Roughing aborted for now. Edi Dalla Valle is informed. He will have a look at it after lunch.
|
Wednesday, April 18, 2012, 13:08: Started pumping down again with Edi present. No noise was observed. |
Monday, April 16, 2012, 11:16, Anders Mjos, Nb#6, LP-SIS, ITW, TM1, , , In progress, Venting, purging cooling lines
|
Venting chamber and purging cooling lines in preparation for target removal |
Monday, April 16, 2012, 11:56, Anders Mjos, Nb#6, LP-SIS, ITW, TM1, , , In progress, Venting, purging cooling lines
|
Anders Mjos wrote: |
Venting chamber and purging cooling lines in preparation for target removal
|
Monday, April 16, 2012, 11:55: Target removed. Cooling lines must be blanked off before pumping down. |
Wednesday, April 11, 2012, 09:34, Friedhelm Ames, , , , , , , , turbopumps in mass separator section started
|
turbopumps in mass separator section started after power outages |
Wednesday, April 11, 2012, 09:30, Friedhelm Ames, , , , , , , Failed, TSGRP1 poor vacuum
|
The backing pressure at TSGRP1 does not go below 578 mT. Fault report to vacuum. |
Friday, March 09, 2012, 17:25, Friedhelm Ames, , , , , , , , heaters and HV power supplies off
|
heaters and HV power supplies have been switched off
IG1 5.1e-9 T. |
Friday, March 09, 2012, 13:30, Friedhelm Ames, NB#6, , , , , , , heater ramping down
|
Fc0 23 nA
IG1 9.9e-7 T
start automatic heater ramping down |
Friday, March 09, 2012, 10:56, Friedhelm Ames, Nb#6, , , , , , , scan finished
|
mass scan is finished and saved see attached. |
Friday, March 09, 2012, 08:53, Friedhelm Ames, Nb#6, , , , , , In progress, mass scan started
|
mass scan started again. Total current 3.2e-8 A |
Thursday, March 08, 2012, 18:32, Friedhelm Ames, , , , , , , , mass scan crashed due to a network error
|
mass scan crashed due to a network error will be restarted tomorrow |
Thursday, March 08, 2012, 17:39, Friedhelm Ames, , , , , , , Problems/Solutions, TPS:Q2 amd TMS:MB1 failed
|
TPS:Q2 and TMS:MB1 failed during the scan. -> restarted. |
Thursday, March 08, 2012, 17:16, Friedhelm Ames, Nb#6, , , , , , , mass scan started
|
|
Thursday, March 08, 2012, 14:08, Friedhelm Ames, Nb#6, , , , , , , heater ramped up
|
heaters have reached final values TGHT 580 A, TBHT 230 A, some sparking during ramp up. see strip tool image attached |
Thursday, March 08, 2012, 09:14, Friedhelm Ames, Nb#6, , , , , , , continue target heating
|
continue target heating up to 580 A. Strip tool for the heating up to 300A from yesyerday see below |
Wednesday, March 07, 2012, 17:44, Friedhelm Ames, Nb#6, , , , , , , ramping up heaters
|
ramping up heaters has been started by ISAC ops. |
Wednesday, March 07, 2012, 13:48, Friedhelm Ames, Nb#6, , , , , , , high voltage conditioning
|
High voltage conditioning has been started by ISAC ops. Einzel lens is unstable below 5 kV., o.k. above this. |
Wednesday, March 07, 2012, 10:36, Paul Mocock, , , , , , , , HV conditioning begins.
|
HV conditioning has begins. Vacuum chamber pressure is currently 3.2e-07 Torr on TSG:IG1. |
Wednesday, March 07, 2012, 09:27, Friedhelm Ames, Nb#6, , , , , , Done, water cooling started
|
water cooling line valves opened. No response on vacuum TSG:IG1 3.5e-7 T |
Tuesday, March 06, 2012, 15:51, Friedhelm Ames, , , , , , , , turbopumps in mass separator section started
|
|
Tuesday, March 06, 2012, 15:25, Pierre Bricault, , , , , , , , ISAC test stand
|
Turbos at full speed. P = 1.5E-05 T |
Tuesday, March 06, 2012, 15:17, Pierre Bricault, , , , , , , , ISAC test stand
|
Start turbo pumps at 1514H |
Tuesday, March 06, 2012, 15:15, Pierre Bricault, , HP-SIS, , , , , , ISAC test stand two turbos replaced
|
Vac group has replaced the two turbo pumps. |
Monday, March 05, 2012, 19:31, Friedhelm Ames, , , , , , , Failed, turbo pumps failed
|
Both turbo pumps at the source box cannot be started. A fault report has been issued. |
Monday, March 05, 2012, 14:41, Friedhelm Ames, , , , , , , , vacuum and optics switched off
|
vacuum and optics at teststand switched off to allow work on the water cooling system. |
Friday, March 02, 2012, 13:28, Anders Mjos, FEBIAD test, , , , , , , Venting test stand
|
Venting for target exchange |
Friday, March 02, 2012, 08:53, Anders Mjos, FEBIAD test, , , , , , Problems/Solutions, Tube heater insulator glowing
|
The insulator for the tube heater was observed to be glowing with a blue shine when the target was on high voltage. The insulator was glowing on the side closest to the 9-pin connector. See attached photo. |
Thursday, March 01, 2012, 17:10, Friedhelm Ames, , , , , , , , start ramping down of heaters
|
|
Thursday, March 01, 2012, 17:04, Friedhelm Ames, , , , , , , , new mass scan
|
bigger mass scan after separator optimization and with finer step size
|
Thursday, March 01, 2012, 17:09, Friedhelm Ames, , , , , , , , new mass scan
|
Friedhelm Ames wrote: |
bigger mass scan after separator optimization and with finer step size
|
total curren on Fc0 183 nA gas valves SV2/5 open leak valve at 7.2 SV1 closed |
Thursday, March 01, 2012, 17:05, Friedhelm Ames, , , , , , , , start heater ramping down
|
|
Wednesday, February 29, 2012, 17:26, Friedhelm Ames, , , , , , , , gas inlet valves closed
|
|
Wednesday, February 29, 2012, 17:22, Friedhelm Ames, , , , , , , , mass scan
|
mass scan with valve at 7.2 to let in Al(CH3)3 saved as
plotdump-local-clean.txt_Feb29_12_17-19-20.txt
|
Wednesday, February 29, 2012, 09:43, Friedhelm Ames, , , , , , , , checking gas inlet valve for FEBIAD
|
|
Tuesday, February 28, 2012, 16:32, Brandon Humphries, , , , , , , , Initial settings for FEBIAD on Test Stand
|
ISAC Test Stand FEBIAD Ion Source and ISACT optics screen grabs before practicing tuning. Tune saved as: data/febiaddata/tune/120228-1620_0.snap and data/isactdata/tune/120228-1620_0.snap respectively.<br>
Seeing 1.93e-06 on TMS:FC0 and 3.30e-09 on TMS:FC6. |
Tuesday, February 28, 2012, 11:04, Pierre Bricault, , , , , , , ,
|
Calibrating the gas valve |
Tuesday, February 28, 2012, 10:29, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Test FEBIAD at ISAC test statnd
|
|
Monday, February 27, 2012, 17:39, Friedhelm Ames, , , , , , , In progress, target and tube heaters ramped up
|
ramping up target to 300 A and tube to 270 A |
Friday, February 17, 2012, 10:27, Aurelia Laxdal, , , , , , , Done, Started the Archivers
|
Started both ISACT and SOURCES Archivers. |
Thursday, February 16, 2012, 15:59, Anders Mjos, , , , , , , Problems/Solutions, He and Ne installed and gas lines leak checked
|
New supply of He and Ne was installed yesterday and gas lines leak checked. The He bottle is currently closed.
UPDATE Monday, June 17, 2013, 15:17
Specifications for the currently installed Ne leak (SN: 11-231) can be found on DocuShare
https://documents.triumf.ca/docushare/dsweb/Get/Document-46969 |
Wednesday, February 08, 2012, 17:39, Friedhelm Ames, , , , , , , Failed, TSG:TP1B failure
|
Both turbo pumps at the source box were found off. TSG:TP1A has been started normally. TSG:TP1B does not spin up above 3KRPM even after several attemps. A fault report has been send to vacuum group.
|
Wednesday, February 08, 2012, 18:16, Friedhelm Ames, , , , , , , Failed, TSG:TP1B and TSG:TP1A failure
|
Friedhelm Ames wrote: |
Both turbo pumps at the source box were found off. TSG:TP1A has been started normally. TSG:TP1B does not spin up above 3KRPM even after several attemps. A fault report has been send to vacuum group.
|
after about 30 minutes running at normal speed TP1A failed as well. Both pumps will be kept off over night. |
Tuesday, January 24, 2012, 09:44, Friedhelm Ames, , , , , , , , turbo pumps restarted
|
All turbo pumps have been restarted after cooling water is back and running.
|
Friday, January 20, 2012, 10:37, Friedhelm Ames, , , , , , , , vacuum pumps shut off
|
turbo pumps shut off due to work on cooling water system |
Monday, October 17, 2011, 10:22, Anders Mjos, FEBIAD, , , , , , Problems/Solutions, Variable leak valve replaced
|
Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames. |
Monday, November 14, 2011, 15:40, Anders Mjos, , , , , , , Problems/Solutions, Variable leak valve repaired
|
Anders Mjos wrote: |
Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames.
|
The variable leak valve
F3-592
has been repaired. Contaminated diaphragm was replaced. See attachment for details. |
Tuesday, December 20, 2011, 16:09, Anders Mjos, , , , , , , Problems/Solutions, Variable leak valve repaired
|
Anders Mjos wrote: |
Anders Mjos wrote: |
Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames.
|
The variable leak valve F3-592 has been repaired. Contaminated diaphragm was replaced. See attachment for details.
|
The leak valve has been tested with He and a leak detector. The leak valve could regulate in the complete range of the leak detector. 10^-11 to 10^-4 atm cc/s |
Monday, December 19, 2011, 13:09, Aurelia Laxdal, , , , , , , , Test Stand updates
|
In January Controls will install a new firewall for ISAC Test Stand. Until then ISAC Test Stand can be used, but it may require an IOC reboot once in while. |
Tuesday, December 13, 2011, 14:10, Aurelia Laxdal, , , , , , , , Test Stand IOC reboot
|
Evgeniy rebooted the ISAC Test Stand IOC. Re-started EPICS at the Test Stand.
Found all 4 turbo pumps off and their backing valves closed. Re-started the pumps. |
Thursday, October 13, 2011, 12:33, Rick Maharaj, Training , , , , , , , Test stand vented
|
test stand vented |
Thursday, October 13, 2011, 15:42, Anders Mjos, Training , HP-FEBIAD, , , , , Problems/Solutions, Target ready to be heated
|
Rick Maharaj wrote: |
test stand vented
|
Thursday, October 13, 2011, 15:40: Pumping down
Friday, October 14, 2011, 10:00: Cooling water is on. Pressure increase from 8e-7 to 3e-6 torr. Venting.
Friday, October 14, 2011, 11:10: Replaced seals on cooling lines with new silver plated SS seals. Pumping down.
Friday, October 14, 2011, 13:25: Cooling water is on. Vacuum at 1.35e-6 torr.
Monday, October 17, 2011, 09:00: Vacuum at 5.4e-7 torr. target ready to be heated. |
Monday, October 03, 2011, 10:53, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target is ready to be removed.
|
Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on. |
Monday, October 03, 2011, 13:56, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Venting
|
Aurelia Laxdal wrote: |
Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.
|
Monday, October 03, 2011, 13:45: Venting. |
Monday, October 03, 2011, 14:46, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target stored under vacuum
|
Anders Mjos wrote: |
Aurelia Laxdal wrote: |
Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.
|
Monday, October 03, 2011, 13:45: Venting.
|
Monday, October 03, 2011, 14:45
- Target was visually inspected and found to be ready to go online.
- No burn marks found on the 9-pin connectors.
- Pumping down. Target will be stored under vacuum for now. Target is scheduled to go to Hot Cell on Oct. 20th. Electrical connections (target/tube heater + coil) are not connected
|
Wednesday, October 12, 2011, 13:14, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target removed
|
Anders Mjos wrote: |
Anders Mjos wrote: |
Aurelia Laxdal wrote: |
Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.
|
Monday, October 03, 2011, 13:45: Venting.
|
Monday, October 03, 2011, 14:45
- Target was visually inspected and found to be ready to go online.
- No burn marks found on the 9-pin connectors.
- Pumping down. Target will be stored under vacuum for now. Target is scheduled to go to Hot Cell on Oct. 20th. Electrical connections (target/tube heater + coil) are not connected
|
Wednesday, October 12, 2011, 13:15: Venting
Wednesday, October 12, 2011, 14:15: Target brought back to lab for inspection and final check. |
Friday, September 30, 2011, 18:03, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Finished testing SiC#26 at the Test Stand
|
Today, did a did a mass scan: plotdump-local-clean.txt Sep30 11 12-20-08.txt
Optimized a bit the tune with Friedhelm, then started the Target Cooldown. |
Thursday, September 29, 2011, 09:27, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, In progress, Heaters conditioning
|
Started the heaters conditioning: TGHT up to 580A and TBHT up to 230A. |
Wednesday, September 28, 2011, 16:33, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, In progress, HV conditioning
|
Started the HV conditioning: TSG:BIAS=30kV |
Wednesday, September 28, 2011, 14:11, Friedhelm Ames, SiC#26, , ITE, TM4, , , , gas system checked and pumped
|
The gas system has been checked. The variable valve opens at about 7.55 very fast. Please be careful when using it. Stepsize for opening around this value should be 0.01. Gas lines have been pumped with pump in the high voltage rack. Ne leak was opened to release pressure. |
Monday, September 26, 2011, 16:14, Anders Mjos, , , , , , , Problems/Solutions, Fixed leak on water line for HS, added Kapton insulation
|
- While testing SiC#26 a leak was discovered on the water line to the heat shield. The leak was in the right joint (see attachment). The heat shield water lines were removed from the test stand and repaired in the Machine Shop.
- Kapton was added to the FEBIAD coil line to prevent it from shorting to the target heater line (see attachment).
|
Friday, September 23, 2011, 16:40, Anders Mjos, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray
|
Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn marks from the previous FEBIAD tests. Corresponding mark was found on the connector on the target side. Because of this the upper and lower 9-pin connectors were swapped to have a clean connector for the next FEBIAD target. |
Monday, September 26, 2011, 14:56, John Wong, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray
|
Anders Mjos wrote: |
Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn marks from the previous FEBIAD tests. Corresponding mark was found on the connector on the target side. Because of this the upper and lower 9-pin connectors were swapped to have a clean connector for the next FEBIAD target.
|
See attachment#1: 9-pin-connector.jpg |
Friday, September 23, 2011, 16:42, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, In progress, Target ready to be heated
|
Friday, September 23, 2011, 16:4: Target installed and roughing started.
Friday, September 23, 2011, 17:12: Started turbo pumps.
Monday, September 26, 2011, 09:00: Opened up water flow. Vacuum rose from 3e-6 to 3e-5 torr in 30 s. Closed water flow.
Monday, September 26, 2011, 09:00: Venting for leak check.
Monday, September 26, 2011, 10:20: Pressurized water lines with 120 PSI He. Leak detected on right water line connection to heat shield.
Monday, September 26, 2011, 12:00: Leak repaired. Pumping down. Kapton added on target heater cooling line to prevent short with cooling line for FEBIAD coil.
Monday, September 26, 2011, 12:47: Started turbo pumps.
Monday, September 26, 2011, 15:45: Opened up water flow. Vacuum stable at 3.5e-6 torr.Target ready to be heated. |
Friday, September 23, 2011, 15:38, Rick Maharaj, , , , , , , , test stand vented
|
Test stand vented |
Tuesday, September 20, 2011, 19:00, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, Done, Finished testing TaC#1
|
Tuesday, September 20, 2011:
Did another mass scan today at 5:40. Saved as: plotdump-local-clean.txt Sept 20 11 11-51-20.txt
Started target cool-down. Tomorrow the target would be ready to be removed from the Test Stand.
Wednesday, September 21, 2011:
Turned off the HV & optics.
Target is ready to be removed. Currently, it's under vacuum and the water is still on.
|
Monday, September 19, 2011, 09:11, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, Started target and tube heaters.
|
Heaters conditioning went fine: 580A and 230A.
Did a mass scan:
Plotdump-local-clean.txt Sept19 11 12-45-22.txt
Set for Li-7 for over the night on TMS:FC6. |
Friday, September 16, 2011, 12:39, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, HV conditioning
|
Started the HV conditioning: TSG:BIAS=30kV and TSH:EE=-700V. |
Thursday, September 15, 2011, 13:46, Anders Mjos, FEBIAD Test, HP-FEBIAD, , , , , Failed, FEBIAD Broken Tube
|
See attached file for photos of the broken tube |
Thursday, September 15, 2011, 09:20, Anders Mjos, , , , , , , , ISAC TestStand old e-log
|
link to old e-log |
Wednesday, September 14, 2011, 15:40, Anders Mjos, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, TaC#1 installed and pumping down.
|
Wednesday, September 14, 2011, 15:39: Vacuum at 1.3e-5 torr
Thursday, September 15, 2011, 08:59: Vacuum at 2.9e-7 torr. Water flowing and vacuum stable. |
Wednesday, September 14, 2011, 15:33, John Wong, Test#1, HP-SIS, ITW, TM1, test, test, In progress, testing elog for test stand
|
Wednesday, September 14, 2011, 15:33
blah blah blah... |
Wednesday, June 29, 2011, 15:30, John Wong, , , , , , , , Testing Yield station elog
|
ABC 123 blah blah blah... |
|