Message ID: 158     Entry time: Friday, August 10, 2012, 13:48
Author: Anders Mjos 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: He line leak checked - leak fixed 

A major leak was found on the connection to the regulation valve on the He bottle. Ferrule replaced. System leak checked.

After He bottle: base 5E-6, no response to He spray

AfterSV1: base 5E-7, no response

After SV2: base 4E-7, no response

The system should now be operational. Gas lines were evacuated with the leak checker.