Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 625     Entry time: Tuesday, January 30, 2018, 06:51
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: (Blank) 
Heat Shield W.O#: 42752-3 
Status: Done 
Subject: HV test 3 

Tuesday, January 30, 2018, 06:50: BIAS / EZL / EE @ 30 / 13 / 1.5

Tuesday, January 30, 2018, 06:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Tuesday, January 30, 2018, 06:58: Optics on / set

Tuesday, January 30, 2018, 06:59: IV4 opened.

RGA switched completely off and unplugged.

Tuesday, January 30, 2018, 13:15: BIAS / EZL / EE @ 40 / 17 / 2

Tuesday, January 30, 2018, 13:20: BIAS / EZL / EE @ 50 / 21.8 / 2.5

Tuesday, January 30, 2018, 13:50: Half hour wait. Ok. No sparks.

Tuesday, January 30, 2018, 13:55: BIAS / EZL / EE @ 55 / 24 / 2.8

15 minute wait. No sparks.

Tuesday, January 30, 2018, 14:10: BIAS / EZL / EE @ 57.5 / 27 / 3.1

Tuesday, January 30, 2018, 14:23: BIAS / EZL / EE @ 60 / 28 / 3.1

Tuesday, January 30, 2018, 14:35: No sparks.

Tuesday, January 30, 2018, 15:05: BIAS / EZL / EE @ 0

Tuesday, January 30, 2018, 15:06: Auto-cooling started.


Wednesday, January 31, 2018, 06:59: Power/sources off.

 

Attachment 1: 2018_HV_test_3.docx  737 kB  Uploaded Wednesday, January 31, 2018, 09:50
ELOG V2.9.2-2455