Installed a new window on MB1 as per Aurelia. Connect modified 9 pin connector & voltage meters for Ta#62 testing.
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
Wednesday, June 09, 2021, 14:41: Pins connected source tray side: 1, 4, 5, 6
https://elog.triumf.ca/TIS/Test-Stand/721
ST 9-pin HV rack
Pin to L TGHT - 1 - Black / COM / 5
Pin to R TGHT - 6 - Red / 9
Pin to L TBHT - 4 - Black / COM / 2
Pin to R TBHT - 5 - Red / 1
Wednesday, June 09, 2021, 14:29: Window installed. Roughing - Beam line side.
Wednesday, June 09, 2021, 14:41: TP6 on.
Wednesday, June 09, 2021, 14:45: TP2 on.
Wednesday, June 09, 2021, 14:55: Roughing.
Wednesday, June 09, 2021, 16:09: TP1 on.
Thursday, June 10, 2021, 13:25: Power / sources on. FS#5 open.\
TGHT reading ok , TBHT odd? Internal connection.
Thursday, June 10, 2021, 14:45: Turbo pumps off.
Thursday, June 10, 2021, 15:25: Venting.
Thursday, June 10, 2021, 16:16: Fixed TBHT connection. Roughing.
Thursday, June 10, 2021, 16:20: Bypass used. TGHT / TBHT to 40 A each. Multimeter check ok.
Thursday, June 10, 2021, 16:24: TGHT / TBHT to 0 A. Bypass removed.
Thursday, June 10, 2021, 16:43: TP1B on.
Thursday, June 10, 2021, 16:48: TP1A on.
Thursday, June 10, 2021, 16:55: IG1 on
Tests Complete as per Aurelia.
Monday, June 21, 2021, 07:51: Power / sources off. IG1 & IG6 off. All TP off. FS#5 purged.
Monday, June 21, 2021, 09:40: Venting both ends. |