Message ID: 879     Entry time: Wednesday, June 09, 2021, 14:31
Author: Aaron Schmidt 
Target/No.#: Ta#62 
Source: LP-SIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 44139-10 
Heat Shield W.O#: 44378-4 
Status: In progress 
Subject: Install MB1 window & 9 pin for V test. 

Installed a new window on MB1 as per Aurelia. Connect modified 9 pin connector & voltage meters for Ta#62 testing.

Ref:

https://elog.triumf.ca/TIS/Test-Stand/679

Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders

Grounded     X            
Source Tray Side (looking head on) 1 2 3 4 5 6 7 8 9
High Voltage Cage Side 5 4 3 2 1 9 8 7 6

Wednesday, June 09, 2021, 14:41: Pins connected source tray side: 1, 4, 5, 6

https://elog.triumf.ca/TIS/Test-Stand/721

ST 9-pin                       HV rack

Pin to L TGHT - 1 - Black / COM / 5

Pin to R TGHT - 6 - Red / 9

Pin to L TBHT - 4 - Black / COM / 2

Pin to R TBHT - 5 - Red / 1


Wednesday, June 09, 2021, 14:29: Window installed. Roughing -  Beam line side.

Wednesday, June 09, 2021, 14:41: TP6 on.

Wednesday, June 09, 2021, 14:45: TP2 on.

Wednesday, June 09, 2021, 14:55: Roughing.

Wednesday, June 09, 2021, 16:09: TP1 on.


Thursday, June 10, 2021, 13:25: Power / sources on. FS#5 open.\

TGHT reading ok , TBHT odd? Internal connection.

Thursday, June 10, 2021, 14:45: Turbo pumps off.

Thursday, June 10, 2021, 15:25: Venting.

Thursday, June 10, 2021, 16:16: Fixed TBHT connection. Roughing.

Thursday, June 10, 2021, 16:20: Bypass used. TGHT / TBHT to 40 A each. Multimeter check ok.

Thursday, June 10, 2021, 16:24: TGHT / TBHT to 0 A. Bypass removed.

Thursday, June 10, 2021, 16:43: TP1B on.

Thursday, June 10, 2021, 16:48: TP1A on.

Thursday, June 10, 2021, 16:55: IG1 on


Tests Complete as per Aurelia.

Monday, June 21, 2021, 07:51: Power / sources off. IG1 & IG6 off. All TP off. FS#5 purged.

Monday, June 21, 2021, 09:40: Venting both ends.

Attachment 1: Ta#62_voltage_tests.docx  39 kB  Uploaded Friday, June 25, 2021, 12:21