  Test-Stand  Not logged in ELOG logo
Message ID: 676     Entry time: Friday, July 27, 2018, 14:44
Author: Aaron Schmidt 
Target/No.#: UC#24 
Source: LP-SIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 41177-3 
Heat Shield W.O#: 42752-6 
Status: In progress 
Subject: Conditioning Heat Shield for UC#24 & voltage test prep 

4 Kapton wire routed into the 9-pin connector. Unused pins are grounded on the bracket.

Friday, July 27, 2018, 14:25: Roughing

Friday, July 27, 2018, 14:41: Turbo pumps on.

Friday, July 27, 2018, 15:53: RGA on.


Saturday, July 28, 2018, 07:03: Waterlines opened. No response on RGA. Vacuum steady @ 1.34e-06T


Friday, August 03, 2018, 10:30: Exposed 9-pin wires inside the cage insulated with electrical tape.

Friday, August 03, 2018, 10:35: Auto-ramping TGHT / TBHT to 580 / 225 A @ 2A per min.


Tuesday, August 07, 2018, 07:40: Small spikes but frequent noted in the RGA on Water, Nitrogen, and Oxygen. More than usual although the vacuum in reasonable at 7.0e-07T.

Tuesday, August 07, 2018, 07:49: Auto-cooling started @ 2A per min.