Message ID: 898     Entry time: Tuesday, September 07, 2021, 16:04
Author: Alexander Shkuratoff 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Done 
Subject: Replaced flange on F/T R with blank flange 

Feedthrough R had a flange installed with a HV feedthrough on it for TM3 service tray prototype HV tests. It was replaced today with the original blank flange.