Tuesday, October 13, 2015, 17:22: Roughing
Tuesday, October 13, 2015, 18:07: Started turbos.
Tuesday, October 13, 2015, 18:15: Turbos at speed. Vacuum at 1.9E-5 T
Wednesday, October 14, 2015, 07:55: Vacuum at 4.0E-7 T. Pumping on gas lines.
Wednesday, October 14, 2015, 08:00: Opened HS water. No response on vacuum or RGA.
Wednesday, October 14, 2015, 08:03: Ramping heaters to 580 / 300 A
Wednesday, October 14, 2015, 08:10: Opening gas lines.
Wednesday, October 14, 2015, 08:14: IV4 opened.
Wednesday, October 14, 2015, 16:00: RP2 replaced. See separate e-log entry.
Wednesday, October 14, 2015, 16:32: TBHT 305 A
Wednesday, October 14, 2015, 17:02: Opened He. - 5.6
Wednesday, October 14, 2015, 19:15: Started cool down of target.
Wednesday, October 14, 2015, 19:16 : Closed gas valves.
Thursday, October 15, 2015, 06:22: Source off. Stopped turbos. RGA off.
Thursday, October 15, 2015, 07:46: Venting
The bolt on the right side TGHT leg was difficult to remove. Se separate e-log entry |