Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
Test-Stand |
Not logged in |
|
|
Tuesday, April 02, 2013, 15:19, Anders Mjos, , , , , , , Problems/Solutions, Water leak at MB1 Power Supply
|
Tuesday, April 09, 2013, 16:21, Anders Mjos, , , , , , , Problems/Solutions, Water leak at MB1 Power Supply
|
Thursday, April 11, 2013, 08:49, Anders Mjos, , , , , , , Problems/Solutions, MB1 Power Supply operational
|
|
Message ID: 293
Entry time: Thursday, April 11, 2013, 08:49
In reply to: 291
|
Author: |
Anders Mjos |
Target/No.#: |
|
Source: |
|
Station: |
|
Module: |
|
Target Oven W.O#: |
|
Heat Shield W.O#: |
|
Status: |
Problems/Solutions |
Subject: |
MB1 Power Supply operational |
|
|
Anders Mjos wrote: |
Tuesday, April 09, 2013:
Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.
Wednesday, April 10, 2013:
Removed the remaining water in the P/S rack.
|
Thursday, April 10, 2013:
The power supply is again operational. See e-fault entry above for details. |