Thursday, July 14, 2016, 14:41: Roughing started.
Thursday, July 14, 2016, 15:41: Turbo pumps started.
Thursday, July 14, 2016, 15:58: Ion gauge & RGA on.
Friday, July 15, 2016, 08:15: Water, power/sources on. Vacuum stable at 3.9E-7 T. No response on RGA.
Friday, July 15, 2016, 08:25: Optics on. BIAS/EZL/EE to 30/13/1.5kV
Friday, July 15, 2016, 08:30: Auto-ramp TBHT to 110A @ 2A/min
Friday, July 15, 2016, 11:19; Auto-ramp TBHT to 130A @ 2A/min
Friday, July 15, 2016, 11:21: IV4 opened
Monday, July 18, 2016, 09:03: TBHT cooling started @ 2A/min
Monday, July 18, 2016, 09:04: RGA disconnected/Filament off.
Monday, July 18, 2016, 10:16: Sources off. IV4 closed. Turbo pumps off.
Monday, July 18, 2016, 11:17: Venting. Note* Global reset used each time VV1 was opened and closed. VV1 becomes non-responsive otherwise.
Monday, July 18, 2016, 11:25: Water purged. Power off/lockout. |