Message ID: 817     Entry time: Tuesday, October 27, 2020, 08:54
Author: Aaron Schmidt 
Target/No.#: Nb#9  
Source: LP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#: 44508-2 
Heat Shield W.O#: 43515-4 
Status: In progress 
Subject: Nb#9 Conditioning 

Tuesday, October 27, 2020, 08:40: Roughing.

Tuesday, October 27, 2020, 09:13: TP1B on.

Tuesday, October 27, 2020, 10:13: TP1A on.

Tuesday, October 27, 2020, 12:59: Vacuum @ 4.55e-06T

Tuesday, October 27, 2020, 13:01: Waterlines opened. Vacuum @ 4.26e-06T.

Tuesday, October 27, 2020, 13:03: Power / sources on.

Tuesday, October 27, 2020, 13:05: Optics on. IV4 open. TGHT / TBHT check ok.


Wednesday, October 28, 2020, 04:30: Auto-ramping TGHT / TBHT  to 350 / 150 A @ 2 A per min. 

Wednesday, October 28, 2020, 06:30:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.66 5.67
 TBHT 26.51

8.40

 COIL + EE 26.43 2.59
 TGHT 26.52 6.44

Wednesday, October 28, 2020, 06:42: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Wednesday, October 28, 2020, 07:33: Auto-ramping TGHT / TBHT  to 580 / 230 A @ 2 A per min.

Wednesday, October 28, 2020, 13:03:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.25 6.62
 TBHT 26.90 9.27
 COIL + EE 26.68 3.08
 TGHT 26.88 6.85

 


Thursday, October 29, 2020, 15:19: HV to 0 kV. Begin auto-cooling @ 1 A per min.


Large Vacuum spike noted 5:30 approx. Tripped TS.

Monday, November 02, 2020, 08:32: Vacuum @ 2.65e-06T. PS/optics off (Sources already tripped)

Monday, November 02, 2020, 08:33: IV4 closed.

https://elog.triumf.ca/TIS/Test-Stand/818 - Leak Checks (FS#4 confirmed)

Monday, November 02, 2020, 09:27: IG1 off. Turbo pumps off.

Monday, November 02, 2020, 10:38: Venting.

Attachment 1: Nb#9_Conditioning.docx  1.136 MB  Uploaded Monday, November 09, 2020, 11:42
Attachment 2: ER-580-230-30kV-M133.txt  3 kB  Uploaded Monday, November 09, 2020, 11:42  | Show | Hide all