Message ID: 880     Entry time: Monday, June 21, 2021, 11:53
Author: Aaron Schmidt 
Target/No.#: Ta#62 
Source: LP-SIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 44139-10 
Heat Shield W.O#: 44378-4 
Status: Failed 
Subject: Ta#62 Conditioning - 2 

Replace 9-pin back to normal grounded setup. Re-salt Ta#62. (Cu Gaskets in-use on FS#5)

Monday, June 21, 2021, 11:30: Roughing chamber.

Monday, June 21, 2021, 11:50: Removed backing window. Roughing beam line side.

Monday, June 21, 2021, 12:01: Multimeters removed. Back HV rack re-grounded. TP6 & TP2 on.

Monday, June 21, 2021, 12:02: TP1B on.

Monday, June 21, 2021, 12:13: TP1A on.

Monday, June 21, 2021, 12:21: IG1 on.

Monday, June 21, 2021, 14:37: Vacuum @ 3.96e-06T. Open FS#5

Monday, June 21, 2021, 14:39: Vacuum @ 3.76e-06T.

Monday, June 21, 2021, 14:42: Power / Sources on.

Monday, June 21, 2021, 14:43; IV4 opened & Optics on


Tuesday, June 22, 2021, 07:40: Quick system check ok.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 23.7 4.02
 TBHT 24.2

3.18

 COIL + EE 23.6 5.11
 TGHT 23.8 5.64

Tuesday, June 22, 2021, 07:42: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.

Tuesday, June 22, 2021, 09:36: TGHT / TBHT @ 300 / 150 A. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, June 22, 2021, 09:38: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Tuesday, June 22, 2021, 09:46: External / cage sparks* Multiple.

Tuesday, June 22, 2021, 09:58: Turn down BIAS to 25 kV.

Tuesday, June 22, 2021, 12:45: BIAS to 30 kV.

Tuesday, June 22, 2021, 13:05: Odd. There was activity on FC0 right when the HV was turned on before the 580 ramp up. Now, no activity on FC0, or wire scans. Turning HV down / off.

Tuesday, June 22, 2021, 13:10: BIAS / EE / EZL @ 0 kV.

Tuesday, June 22, 2021, 13:41: Rear cage opened. Digital multi-meter was removed.

Tuesday, June 22, 2021, 13:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, June 22, 2021, 13:57: No beam. Auto-cooling @ 3 A per min.

Tuesday, June 22, 2021, 16:23: HV power off. Optics off. IV4 off. TGHT still cooling.


Wednesday, June 23, 2021, 04:31: IG1 & turbo pumps off. 

Wednesday, June 23, 2021, 06:00: Venting. Power off. FS#5 purged.

Attachment 1: Ta#62_Conditioning_-_2.docx  643 kB  Uploaded Friday, June 25, 2021, 12:20