Wednesday, October 07, 2015, 11:15: roughing
Wednesday, October 07, 2015, 12:09 Turbos started
Wednesday, October 07, 2015, 12:18: Turbos at speed. Vacuum at 1.7E-5 T
Thursday, October 08, 2015, 08:55: Pumping down gas lines.
Thursday, October 08, 2015, 09:09: Opened gas line
Thursday, October 08, 2015, 09:24: Opened HS water line. Vacuum stable at 3.3E-7 T. No response on RGA
Thursday, October 08, 2015, 09:32: PS on. Starting autoramping to 580/300 A at 2/1 A/min good/bad vacuum at 1E-6 and $E-6
Thursday, October 08, 2015, 09:41: BIAS/EZL/EE to 30/15/1.5 kV
Thursday, October 08, 2015, 09:42: COIL to 50 A ANODE to 200 V
ANODE developed a short Thursday evening. Target was cooled down and will be inspected.
Friday, October 09, 2015, 12:36: Stopped turbos.
Friday, October 09, 2015, 13:26: Venting |