Test for Aurelia L. Empty LP-SIS w/ end caps in. Right side expanded.
Thermocouples installed (R - L):
X & Y For the (V) checks.
Y - Y
X - O
X - R
L - R
L - O
Datalogger: R= T1 & L=T2
X = TGHT
Y = TBHT
O = Not in use.
Thursday, January 12, 2023, 09:06: Beamline side roughed down & TP on sometime last night. Vacuum @ 2.77e-06T.
Connect volt meters to 4,5 (TBHT) & 6,7 (TGHT)
Thursday, January 12, 2023, 09:43: IG1 Bypass made. TGHT / TBHT at 10 A. Volt meter check. Both display in negatives.
Thursday, January 12, 2023, 09:54: Swapped wires around for both TGHT / TBHT volt meters. OK. Breaker / PS off. Bypass removed.
Thursday, January 12, 2023, 10:14: Roughing.
Thursday, January 12, 2023, 10:16: BV1A open.
Monday, January 16, 2023, 10:25: Sources off. IV4 closed. Turbo pumps off. |