Message ID: 903     Entry time: Thursday, October 14, 2021, 10:13
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#:  
Heat Shield W.O#: 44378-22 
Status: In progress 
Subject: Conditioning UC#36 HS 

Tube / TGHT only.

Thursday, October 14, 2021, 10:11: Roughing.

Thursday, October 14, 2021, 12:05: TP1B on. 

Thursday, October 14, 2021, 12:10: TP1A on. 

Thursday, October 14, 2021, 13:27: IG1 on.

Thursday, October 14, 2021, 16:08: Vacuum @ 3.73e-06T

Thursday, October 14, 2021, 16:10: FS#5 open. Vacuum Stable.

Thursday, October 14, 2021, 16:13: PS on. Sources on. TGHT manually tapped up to 10 A. OK. Allow vacuum to stabilize further.


Friday, October 15, 2021, 06:38: Auto-ramping TGHT to 580 A @ 2 A per min. 

Friday, October 15, 2021, 21:32: Auto-Cooling @ 1 A per min. 


Monday, October 18, 2021, 07:50: Sources, IG1, & turbo pumps off.  

Attachment 1: UC#36.docx  102 kB  Uploaded Thursday, October 14, 2021, 17:15