Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 576     Entry time: Thursday, April 06, 2017, 12:06
Author: Aaron Schmidt 
Target/No.#:  
Source: HP-FEBIAD-CTL 
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: In progress 
Subject: Tri-Coil CTL-FEBIAD test 

Thursday, April 06, 2017, 12:06: Roughing.

Thursday, April 06, 2017, 13:07: Turbo pumps on.

Thursday, April 06, 2017, 13:18: Ion gauge on.

Thursday, April 06, 2017, 13:25: RGA filament error FL5. RESET RGA.

Thursday, April 06, 2017, 13:34: RGA on.


Friday, April 07, 2017, 08:35: Waterlines opened. No response on RGA. Vacuum @ 3.24e-07T


Monday, April 10, 2017, 11:51: Vacuum unstable. Venting to investigate.

Monday, April 10, 2017, 11:52: Turbos stopped.

Monday, April 10, 2017, 14:57: Roughing.

Monday, April 10, 2017, 15:18: Turbos started.

Monday, April 10, 2017, 15:23: TP1 at speed. Opened gases.

Monday, April 10, 2017, 15:26: Turbos at speed. Vacuum at 2.0E-5 T


Tuesday, April 11, 2017, 16:55  : Stopped turbos.

Tuesday, April 11, 2017, 17:01: Venting through turbos to replace seals on HS

Tuesday, April 11, 2017, 17:48: Turbos started


Thursday, April 20, 2017, 09:10: Assembly removed from test stand.

ELOG V2.9.2-2455