Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 114     Entry time: Thursday, June 28, 2012, 17:00
Author: Pierre Bricault 
Target/No.#:  
Source: LP-FEBIAD 
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: In progress 
Subject: Cathode heater reached its value of 230 A and stoped. good test. 

Now ramp cathode current up to 290 A. The total current out is 1.e-7 A.

 

ELOG V2.9.2-2455