LP-SIS modified w/ 2 holes on the center block to accept a pair of Ta tubes that are run to the coil PS.
*Note modified HS plates at the ion source to accommodate the LP-SIS (Has a slightly bent ionizer tube from the drilling)
-Plan to shut down the ISAC TS on 12/23/2021 for the holidays.
Thermocouples are installed.
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
Twisted pairs |
TP1 |
TP1 |
- |
TP2 |
TP2 |
TP3 |
TP3 |
TP4 |
TP4 |
Tuesday, December 21, 2021, 13:55: Roughing.
Tuesday, December 21, 2021, 13:57: BV1A open.
Thursday, December 23, 2021, 07:42: TP2 & TP6 off.
Thursday, December 23, 2021, 09:00: PV1 & PV2 off. RP1 & RP2 off.
Clean up?? What happened here? (Water mess?)
Tuesday, January 04, 2022, 11:13: RP1 & RP2 on.
Tuesday, January 04, 2022, 11:14: Roughing.
Tuesday, January 04, 2022, 11:17: TP2 & TP6 on.
Tuesday, January 04, 2022, 11:21: IG6 on.
Tuesday, January 04, 2022, 13:00: TP1B on.
Carla:
Swapped top and bottom connector on target side multipin to match up with wires. Added kapton tape where things were touching. TC#3 (ROI) maybe won't work, was very twisted. Not sure if I got all the twists.
Data logger |
Location |
Source tray position |
HV rack position |
TC#1 |
MMO |
1 pos |
5 pos
|
|
|
6 neg |
9 neg |
TC#2 |
MMI |
4 pos |
2 pos |
|
|
5 neg |
1 neg |
TC#3 |
ROI |
8 pos |
7 pos |
|
|
9 neg |
6 neg |
Monday, January 10, 2022, 09:53: Roughing.
Monday, January 10, 2022, 15:55: TP1B on
Monday, January 10, 2022, 16:04: TP1A on.
Monday, January 10, 2022, 16:14: TP2 Tripped. Back on within 30 seconds.
Monday, January 10, 2022, 16:14: IG1 on.
Wednesday, January 12, 2022, 09:56 : Cage has been closed up and HS water lines are open. |