Message ID: 908     Entry time: Tuesday, December 21, 2021, 13:34
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: 44691-8 
Heat Shield W.O#: 44378-6 
Status: In progress 
Subject: Salts test HS & Holiday Shutdown 

LP-SIS modified w/ 2 holes on the center block to accept a pair of Ta tubes that are run to the coil PS.

*Note modified HS plates at the ion source to accommodate the LP-SIS (Has a slightly bent ionizer tube from the drilling)

-Plan to shut down the ISAC TS on 12/23/2021 for the holidays.

Thermocouples are installed.

Ref:

https://elog.triumf.ca/TIS/Test-Stand/679

Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders

Grounded     X            
Source Tray Side (looking head on) 1 2 3 4 5 6 7 8 9
High Voltage Cage Side 5 4 3 2 1 9 8 7 6
Twisted pairs TP1 TP1 - TP2 TP2 TP3 TP3 TP4 TP4

 


Tuesday, December 21, 2021, 13:55: Roughing.

Tuesday, December 21, 2021, 13:57: BV1A open.


Thursday, December 23, 2021, 07:42: TP2 & TP6 off.

Thursday, December 23, 2021, 09:00: PV1 & PV2 off. RP1 & RP2 off.


Clean up?? What happened here? (Water mess?)

Tuesday, January 04, 2022, 11:13: RP1 & RP2 on.

Tuesday, January 04, 2022, 11:14: Roughing.

Tuesday, January 04, 2022, 11:17: TP2 & TP6 on.

Tuesday, January 04, 2022, 11:21: IG6 on.

Tuesday, January 04, 2022, 13:00: TP1B on.


Carla:

Swapped top and bottom connector on target side multipin to match up with wires. Added kapton tape where things were touching. TC#3 (ROI) maybe won't work, was very twisted. Not sure if I got all the twists.

Data logger Location Source tray position HV rack position
TC#1 MMO 1 pos

5 pos

     6 neg 9 neg
TC#2 MMI 4 pos 2 pos
    5 neg 1 neg
TC#3 ROI 8 pos 7 pos
    9 neg 6 neg

 


Monday, January 10, 2022, 09:53: Roughing.

Monday, January 10, 2022, 15:55: TP1B on

Monday, January 10, 2022, 16:04: TP1A on.

Monday, January 10, 2022, 16:14: TP2 Tripped. Back on within 30 seconds.

Monday, January 10, 2022, 16:14: IG1 on.


Wednesday, January 12, 2022, 09:56 : Cage has been closed up and HS water lines are open.