Message ID: 789     Entry time: Wednesday, March 11, 2020, 13:31
Author: Aaron Schmidt 
Target/No.#: Ta#60 
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: 44139-13 
Heat Shield W.O#: 43515-5 
Status: In progress 
Subject: Ta#60 w/ EE testing - 2 

Thermocouples installed on EE. Double checked continuity & used a heat gun.

Wednesday, March 11, 2020, 13:30: Roughing.

Wednesday, March 11, 2020, 15:03: Turbo pumps on, interlocks by-passed (No water at the moment) 

Wednesday, March 11, 2020, 15:10: IG1 on.


Thursday, March 12, 2020, 06:08: Vacuum @ 2.33e-06T. Opening waterlines.

 Thursday, March 12, 2020, 06:11: Waterlines all open. Vacuum Stable @ 2.31e-06T

Thursday, March 12, 2020, 06:13: Bypass on TP1A & B removed.

Thursday, March 12, 2020, 06:18: Power / Sources on TGHT / TBHT @ 0 / 0 A.

Thursday, March 12, 2020, 06:20: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.

Thursday, March 12, 2020, 07:34: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.

Thursday, March 12, 2020, 08:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 08:30: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 08:55: Ramping aborted. TGHT / TBHT @ 488 / 230 A. Vacuum limit reached at 3.30e-06T.

Thursday, March 12, 2020, 08:56: Vacuum limit increased to 5.0e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 09:27: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.

W/ Water cooling on EE

 TGHT / TBHT Current (A) EE Temp (A - T1 - Red/Black wire - 1,2)
[C]
EE Temp (B - T2 - White/Black wire 8,9)
[C]
0 / 0 17.7 17.8
250 / 150 26.4 28.1
350 / 200 34.1

39.0

450 / 230 41.4 48.0
580 / 230 43.1 49.0

Thursday, March 12, 2020, 09:31: Auto-cooling @ 6A per min.

Thursday, March 12, 2020, 11:09: PS off. Lock up. Remove HV cage for FS#3 EE route & water purge.

Thursday, March 12, 2020, 11:27: PS on. Locks off. FS#3 re-routed (K line - EE isolated). Water on. Vacuum ok @ 2.07e-06T

W/O Water cooling on EE

 TGHT / TBHT Current (A) EE Temp (A - T1 - Red/Black wire - 1,2)
[C]
EE Temp (B - T2 - White/Black wire 8,9)
[C]
0 / 0 15.5 15.6
250 / 150 26.6 27.6
350 / 200 35.0

38.9

450 / 230 42.6 48.1
580 / 230 46.3 51.9
580 / 230 @ 2:41 pm 43.3 49.3

Thursday, March 12, 2020, 11:28: Power / Sources on TGHT / TBHT @ 0 / 0 A.

Thursday, March 12, 2020, 11:29: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.

Thursday, March 12, 2020, 12:33: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.

Thursday, March 12, 2020, 13:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 13:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 14:11: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.

Thursday, March 12, 2020, 14:41: Auto-cooling @ 4A per min.


Tuesday, March 17, 2020, 05:26: IG1 & turbo pumps off. Water lines closed for FS#3 & HS.

Tuesday, March 17, 2020, 05:31: Waterlines FS#5 & FS#3 purged.

Tuesday, March 17, 2020, 07:08: Venting.

Attachment 1: Ta#60_-_TS_Pre-condition_-_EE_Test_-_2.docx  1.316 MB  Uploaded Tuesday, March 17, 2020, 08:09