Friday: Test to validate Ferran's assembly. The plan is to ramp up to operating current, apply high voltage, and possibly extract beam.
Turbos on. IG1. Power on.
Monday, December 02, 2019, 15:59: Auto-ramp to 230/600 A for TBHT/TGHT @ 2A/min and 4A/min (0.5A/15 s 1 A/15s.)
Tuesday, December 03, 2019, 15:30: Sources on.
Tuesday, December 03, 2019, 15:41: Bias/EZL/EE @ 30/13/1.5 kV
Bias/EE/EZL to 40/2.0/17 kV.
Bias/EE/EZL to 50/2.5/22 kV.
Bias/EE/EZL to 50/2.6/22.5 kV.
Spark. Inaudible
Tuesday, December 03, 2019, 17:26: Bias/EZL/EE to 0kV.
Tuesday, December 03, 2019, 17:26: Auto-cooling @ 2A/min
Wednesday, December 04, 2019, 09:37: Power/sources off |