Message ID: 982     Entry time: Tuesday, October 10, 2023, 15:46
Author: Aaron Schmidt 
Target/No.#: Ta#68 (Spare) 
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: 45220-3 
Heat Shield W.O#: 45235-11 
Status: In progress 
Subject: Conditioning Ta#68 (Spare) 

Tuesday, October 10, 2023, 15:18: Roughing.

Tuesday, October 10, 2023, 15:46: TP1B on.

Tuesday, October 10, 2023, 15:52: TP1B at speed. CG1A @ 0.113T & dropping.

Tuesday, October 10, 2023, 15:53: TP1A on.

Tuesday, October 10, 2023, 16:01: TP1A tripped. Reset.

Tuesday, October 10, 2023, 16:03: TP1A on. IG1 on.


Wednesday, October 11, 2023, 09:14: FS#5 open. Vacuum @ 5.19e-07T.

Wednesday, October 11, 2023, 09:20: PS / Sources on.

Wednesday, October 11, 2023, 09:22: Auto-ramping TGHT / TBHT to 230 / 230 A @ 2 A per min.

Wednesday, October 11, 2023, 14:10: HV off.

Wednesday, October 11, 2023, 14:26: Grounded HV rack. HV on.

Wednesday, October 11, 2023, 14:27: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.

Wednesday, October 11, 2023, 22:59: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 

Wednesday, October 11, 2023, 23:24: 1st round of mass & wire scans complete.


Thursday, October 12, 2023, 09:37: HV off.


Wednesday, October 18, 2023, 08:12: IV4 closed. Sources off.

Wednesday, October 18, 2023, 08:14 : Power off. IG1 off. TP off.


Thursday, August 15, 2024, 08:15: Formerly Ta#67 until the thin foil target, - AS

Attachment 1: Ta#68-Spare_Conditioning.docx  360 kB  Uploaded Friday, August 16, 2024, 11:14