Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 805     Entry time: Wednesday, August 05, 2020, 10:01
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: Roughing pump swap out. 

Wednesday, August 05, 2020, 10:00: TP6 & TP2 off. IG6 off.

Wednesday, August 05, 2020, 12:20: RP2 swapped with a smaller roughing pump from the hot lab.

Wednesday, August 05, 2020, 12:25:  Roughing.

Wednesday, August 05, 2020, 13:53: Open BV2 to beam line chamber.

Wednesday, August 05, 2020, 14:21: Turbo pumps on.

Wednesday, August 05, 2020, 14:25: Ion gauge on. Turbo pumps at speed.

ELOG V2.9.2-2455