Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 794     Entry time: Wednesday, June 10, 2020, 08:23
Author: Aaron Schmidt 
Target/No.#: C#1 
Source: LP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#: 43044-8 
Heat Shield W.O#: 43515-3 
Status: In progress 
Subject: Conditioning C#1 

Salts: 

Li - 10 uL

Na - 10 uL

K - 5 uL

Rb - 10 uL

Cs - 15 uL

Wednesday, June 10, 2020, 08:55: Roughing.

Wednesday, June 10, 2020, 09:30: Turbo pumps on.

Wednesday, June 10, 2020, 09:35: Ion gauge on.

Wednesday, June 10, 2020, 13:52: HS waterline opened. Vacuum ok @ 4.11e-06T.

Wednesday, June 10, 2020, 13:59: All main PS on. E-rig PS on. Optics on.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.21 5.81
 TBHT 27.04

8.83

 COIL + EE 26.93 2.76
 TGHT  27.04 6.58

Wednesday, June 10, 2020, 14:02: Sources on.


Thursday, June 11, 2020, 07:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Thursday, June 11, 2020, 07:29: IV4 opened. BIAS / EZL / EE @ 30 / 13 / -1.5 kV. 

Thursday, June 11, 2020, 09:56: BIAS reduced to 20 kV due to sparking / out gassing. MB1 having issues? 

Thursday, June 11, 2020, 14:24: Halted auto ramp due to the vacuum. TGHT @ 500 A. Vacuum @ 7.08e-06T.

Thursday, June 11, 2020, 14:26: TBHT reduced to 200 A. 

Thursday, June 11, 2020, 19:09: Auto-cooling @ 1 A per min. 


Friday, June 12, 2020, 10:43: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.  


Monday, June 15, 2020, 03:00: Vacuum @ 2.66e-06T. TGHT / TBHT @ 300 / 150 A. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Monday, June 15, 2020, 05:30: Tap up BIAS. BIAS / EZL / EE @ 30 / 13 / -1.5 kV.  TGHT @ 512 A. Vacuum @ 6.11e-06T.

Monday, June 15, 2020, 06:46:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.40 7.51
 TBHT 26.08

10.15

 COIL + EE 25.88 3.53
 TGHT  26.06 7.31

Mass scans complete w/ TGHT / TBHT @ 512 / 230 A. 30 kV.

Mass, wire, & emittance scans taken on: M7, M23, M38, M86, M125.

Monday, June 15, 2020, 09:52: Auto-cooling @ 1 A per min.

Monday, June 15, 2020, 21:23: BIAS / EE / EZL @ 0 kV. 


Tuesday, June 16, 2020, 06:57: IV4 closed & reset.

Tuesday, June 16, 2020, 07:00: Sources / Power off. IG1 off. Turbo pumps off.

Tuesday, June 16, 2020, 08:06: Waterlines purged. N bottle @ 1450 PSI. Venting.

Attachment 1: C#1_Conditioning.docx  1.458 MB  Uploaded Monday, June 15, 2020, 10:54
Attachment 2: ER-512-230-30kV-m7.txt  3 kB  Uploaded Monday, June 15, 2020, 10:54  | Show | Hide all
Attachment 3: ER-512-230-30kV-m23.txt  3 kB  Uploaded Monday, June 15, 2020, 10:55  | Show | Hide all
Attachment 4: ER-512-230-30kV-m86.txt  3 kB  Uploaded Monday, June 15, 2020, 10:55  | Show | Hide all
Attachment 5: ER-512-230-30kV-m125.txt  3 kB  Uploaded Monday, June 15, 2020, 10:55  | Show | Hide all
Attachment 6: ER-512-230-30kV-m38.txt  3 kB  Uploaded Monday, June 15, 2020, 10:55  | Show | Hide all
Attachment 7: C#1_Conditioning_-_R.docx  329 kB  Uploaded Monday, June 15, 2020, 22:23
ELOG V2.9.2-2455