Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 901     Entry time: Monday, October 04, 2021, 15:38
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-IG-LIS 
Station: ITE 
Module: TM4 
Target Oven W.O#:  
Heat Shield W.O#: 42132-7 
Status: In progress 
Subject: Conditioning UC#35 IG-LIS HS 

Monday, October 04, 2021, 15:38: Roughing.

Monday, October 04, 2021, 16:08: TP1B on. 

Monday, October 04, 2021, 16:15: TP1 A on. 

Monday, October 04, 2021, 16:41: IG1 on.


Tuesday, October 05, 2021, 06:47: Vacuum @ 4.09e-06T.

Tuesday, October 05, 2021, 06:49: Waterlines opened. Vacuum stable.

Tuesday, October 05, 2021, 06:50: Power / sources on.

Tuesday, October 05, 2021, 06:52: Auto-ramping TGHT to 580 A @ 2 A per min.


Wednesday, October 06, 2021, 05:44: Auto-cooling @ 3 A per min. Vacuum @ 2.37e-06T.\

Wednesday, October 06, 2021, 09:37: Power / sources off.

Wednesday, October 06, 2021, 09:38: IG1 off. TSG:TP1 A & B off.

Wednesday, October 06, 2021, 11:11: Venting. Waterlines off.


Edit* Switched from ITW to ITE. on station icon - AS.

 

Attachment 1: UC#35.docx  182 kB  Uploaded Thursday, October 14, 2021, 11:23
ELOG V2.9.2-2455