Monday, October 04, 2021, 15:38: Roughing.
Monday, October 04, 2021, 16:08: TP1B on.
Monday, October 04, 2021, 16:15: TP1 A on.
Monday, October 04, 2021, 16:41: IG1 on.
Tuesday, October 05, 2021, 06:47: Vacuum @ 4.09e-06T.
Tuesday, October 05, 2021, 06:49: Waterlines opened. Vacuum stable.
Tuesday, October 05, 2021, 06:50: Power / sources on.
Tuesday, October 05, 2021, 06:52: Auto-ramping TGHT to 580 A @ 2 A per min.
Wednesday, October 06, 2021, 05:44: Auto-cooling @ 3 A per min. Vacuum @ 2.37e-06T.\
Wednesday, October 06, 2021, 09:37: Power / sources off.
Wednesday, October 06, 2021, 09:38: IG1 off. TSG:TP1 A & B off.
Wednesday, October 06, 2021, 11:11: Venting. Waterlines off.
Edit* Switched from ITW to ITE. on station icon - AS.
|