Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
Test-Stand
Not logged in
List
Message ID:
239
Entry time:
Monday, December 03, 2012, 15:33
Author:
Anders Mjos
Target/No.#:
Source:
Station:
Module:
Target Oven W.O#:
Heat Shield W.O#:
Status:
In progress
Subject:
Leak check of 9-pin feed through
Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin feed through.
ELOG V2.9.2-2455