Message ID: 850     Entry time: Friday, February 12, 2021, 16:38
Author: Fernando Maldonado 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Failed 
Subject: FEBIAD parameter scan - efficiency measurements - energy spread. 

Friday, February 12, 2021, 16:37: FEBIAD installed with mechanical calibrated leak

Friday, February 12, 2021, 16:38: Roughing.

Gas lines opened all the way to the sour. SV4 and SV5.

Friday, February 12, 2021, 18:47: Turbos on.

Friday, February 12, 2021, 18:55: IG1 on.

Friday, February 12, 2021, 23:22: IG1 @ 1.5E-4 T.  I think the line inside the vacuum chamber is leaking

Friday, February 12, 2021, 23:23: SV5 closed.

Friday, February 12, 2021, 23:24: Vacuum dropping slightly.

Friday, February 12, 2021, 23:24: SV5 opened. IG1 responds to the opening of SV5. The lines from the feedthrough to the calibrated leak need to be re-done.

Tuesday, February 16, 2021, 10:21: IG1 off. Turbos off.

Tuesday, February 16, 2021, 11:21: Venting.


Aaron closed SV4 and the vacuum drop normally. Leak through SV5 as well.