Friday, February 12, 2021, 16:37: FEBIAD installed with mechanical calibrated leak
Friday, February 12, 2021, 16:38: Roughing.
Gas lines opened all the way to the sour. SV4 and SV5.
Friday, February 12, 2021, 18:47: Turbos on.
Friday, February 12, 2021, 18:55: IG1 on.
Friday, February 12, 2021, 23:22: IG1 @ 1.5E-4 T. I think the line inside the vacuum chamber is leaking
Friday, February 12, 2021, 23:23: SV5 closed.
Friday, February 12, 2021, 23:24: Vacuum dropping slightly.
Friday, February 12, 2021, 23:24: SV5 opened. IG1 responds to the opening of SV5. The lines from the feedthrough to the calibrated leak need to be re-done.
Tuesday, February 16, 2021, 10:21: IG1 off. Turbos off.
Tuesday, February 16, 2021, 11:21: Venting.
Aaron closed SV4 and the vacuum drop normally. Leak through SV5 as well. |