Tuesday, June 14, 2016, 10:46: Begin roughing.
Tuesday, June 14, 2016, 11:16: Turbo pumps started.
Tuesday, June 14, 2016, 11:23: Ion gauge on.
Wednesday, June 15, 2016, 07:45: Water opened. RGA ok. Vacuum stable @ 1.9E-7T. Power/sources on.
Wednesday, June 15, 2016, 08:24: BIAS / EZL / EE to 30 / 13 / 1.5 kV
Wednesday, June 15, 2016, 08:24: Ramping TBHT to 120 A at 1 A/min
Wednesday, June 15, 2016, 10:23: EZL P/S was not on. Switched on and set to 13 kV
Wednesday, June 15, 2016, 15:05: Ramping down.
Thursday, June 16, 2016, 08:57: IV4 reset. RGA off. Ion gauge off. Turbo pumps off.
Thursday, June 16, 2016, 13:22: Water lines purged. Power/sources off. Venting. |