Friday, October 16, 2020, 11:11: Roughing.
Friday, October 16, 2020, 11:39: TP1B on.
Friday, October 16, 2020, 12:29: TP1A on.
Monday, October 19, 2020, 07:59: Waterlines opened. Vacuum ok @ 6.20e-07T
Monday, October 19, 2020, 08:01: Power / Sources on.
Monday, October 19, 2020, 08:02: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Monday, October 19, 2020, 08:03: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.43 |
5.86 |
TBHT |
23.34 |
8.52
|
COIL + EE |
23.36 |
2.65 |
TGHT |
23.27 |
6.45 |
Monday, October 19, 2020, 08:09: Optics on / set.
Monday, October 19, 2020, 08:16: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, October 19, 2020, 12:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, October 19, 2020, 15:50: Initial wire scans were good. MB1 requires a polarity reversal
Monday, October 19, 2020, 16:00: Auto-cooling TGHT / TBHT to 300 / 10 A @ 1 A per min. Stop manually.
Monday, October 19, 2020, 18:11: TBHT @ 100 A halt. Auto-cooling TGHT to 300 @ 1 A per min. Stop manually.
Monday, October 19, 2020, 19:16: TGHT @ 300 A halt.
Tuesday, October 20, 2020, 06:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, October 20, 2020, 09:30: HV off. IV4 closed. Switching MB1 polarity.
Tuesday, October 20, 2020, 13:30: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. MB1 on
Tuesday, October 20, 2020, 14:10: Mass scans working
Tuesday, October 20, 2020, 14:17:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.64 |
5.87 |
TBHT |
24.29 |
8.76
|
COIL + EE |
24.07 |
2.71 |
TGHT |
24.25 |
6.54 |
Tuesday, October 20, 2020, 15:15: IV4 opened.
Thursday, October 22, 2020, 11:35: HV to 0 kV.
Thursday, October 22, 2020, 11:36: Auto-cooling @ 1 A per min.
Monday, October 26, 2020, 11:40: IV4 closed / reset
Monday, October 26, 2020, 11:41: PS off.
Monday, October 26, 2020, 11:42: IG1 / Turbo pumps off. Purging waterlines.
Monday, October 26, 2020, 13:00: Venting. |