Friday, October 19, 2018, 10:00 (Approx): Site wide power outage. TS completely shut down.
Power brought back Saturday
Monday, October 22, 2018, 07:15: Full white out on screens. To restart PLC.
Monday, October 22, 2018, 07:42: Multiple attempts made to restart the PLC. Controls white out continues
Also attempted restart of the Vacuum. All 4 turbo pumps switch back to red on any restart attempt.
The turbo pumps had been manually switched off from the controllers to protect them once the power was switched back on.
Monday, October 22, 2018, 09:28: Turbo pumps restarted.
Monday, October 22, 2018, 11:01: All back except the magnet.
|