Wednesday, April 13, 2016, 13:03: Begin roughing. (Plasma electrode in. Salts in)
Wednesday, April 13, 2016, 13:34: Turbo pumps started.
Wednesday, April 13, 2016, 13:39: Ion Gauge on.
Thursday, April 14, 2016, 08:13: Open water to heat shield. Vacuum stable at 3.3E-7T.
Thursday, April 14, 2016, 08:19: Isolation valve opened. Auto ramping TGHT/TBHT to 300A/200A @ 2A/min.
Thursday, April 14, 2016, 08:33: Turned on optics. BIAS/EZL/EE to 30/13/1.5kV.
Thursday, April 14, 2016, 15:20: Ramping down TGHT from 300A to 250A @ 2A/min.
Friday, April 15, 2016, 8:23: Slow ramping TGHT to 300A/ @ 1/2A/min.
Friday, April 15, 2016, 10:30: Begin ramping down TGHT/TBHT. @3A/2A per min.
Friday, April 15, 2016, 12:54: Sources off.
Friday, April 15, 2016, 13:09 :Water lines purged & power down.
Monday, April 18, 2016, 08:23: Opened water. Auto ramping TGHT/TBHT to 300A/200A @ 3A/2A per min. BIAS/EZL/EE to 30/13/1.5kV
Monday, April 18, 2016, 09:58: Ramping TBHT to 230A @ 2A/min
Monday, April 18, 2016, 12:54: Sources off. Ramping down @ 2A/min.
Tuesday, April 19, 2016, 09:37 : BIAS and EE off - AM
Tuesday, April 19, 2016, 15:30: Water, Ion gauge and Turbos off.
Thursday, April 21, 2016, 13:41: Venting - AM |