Message ID: 874     Entry time: Wednesday, May 26, 2021, 14:29
Author: Aaron Schmidt 
Target/No.#: UC#33 (HS) 
Source: LP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#:  
Heat Shield W.O#: 44378-3 
Status: In progress 
Subject: UC#33 HS conditioning 

HS waterlines were very tight to line up.

Wednesday, May 26, 2021, 14:29: Roughing.

Wednesday, May 26, 2021, 15:09: TP1B on. 

Wednesday, May 26, 2021, 15:36: TP1B off. 

Wednesday, May 26, 2021, 16:37: Venting. 

Wednesday, May 26, 2021, 18:03: VV1 closed. 


Thursday, May 27, 2021, 07:05: Gaskets swapped. Connections inspected. Roughing.

Thursday, May 27, 2021, 07:47: TP1B on. 

Thursday, May 27, 2021, 08:00: TP1A started.

Thursday, May 27, 2021, 08:16: IG1 on. 


Monday, May 31, 2021, 08:08: Vacuum @ 7.29e-07T.

Monday, May 31, 2021, 08:10: Waterlines opened. Vacuum ok @ 7.26e-07T

Monday, May 31, 2021, 08:12: Power/Sources on.

Monday, May 31, 2021, 08:15: No response on TGHT. TBHT ok.

Monday, May 31, 2021, 11:30: Loose control cable found on the PS. Connected. Manually set TGHT / TBHT to 10 A & back ok. Checked FS#5 interlocks - OK.

Monday, May 31, 2021, 11:50: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.

Monday, May 31, 2021, 18:06: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.


Tuesday, June 01, 2021, 15:40: Auto-cooling @ 1 A per min.


Wednesday, June 02, 2021, 07:57: Power / sources off. Ion gauge & turbo pumps off. 

Wednesday, June 02, 2021, 07:58: FS#5 purged.

Wednesday, June 02, 2021, 10:12: Venting.

 

Attachment 1: Conditioning_UC#33_HS.docx  417 kB  Uploaded Wednesday, June 02, 2021, 08:59