HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B on.
Wednesday, May 26, 2021, 15:36: TP1B off.
Wednesday, May 26, 2021, 16:37: Venting.
Wednesday, May 26, 2021, 18:03: VV1 closed.
Thursday, May 27, 2021, 07:05: Gaskets swapped. Connections inspected. Roughing.
Thursday, May 27, 2021, 07:47: TP1B on.
Thursday, May 27, 2021, 08:00: TP1A started.
Thursday, May 27, 2021, 08:16: IG1 on.
Monday, May 31, 2021, 08:08: Vacuum @ 7.29e-07T.
Monday, May 31, 2021, 08:10: Waterlines opened. Vacuum ok @ 7.26e-07T
Monday, May 31, 2021, 08:12: Power/Sources on.
Monday, May 31, 2021, 08:15: No response on TGHT. TBHT ok.
Monday, May 31, 2021, 11:30: Loose control cable found on the PS. Connected. Manually set TGHT / TBHT to 10 A & back ok. Checked FS#5 interlocks - OK.
Monday, May 31, 2021, 11:50: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Monday, May 31, 2021, 18:06: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, June 01, 2021, 15:40: Auto-cooling @ 1 A per min.
Wednesday, June 02, 2021, 07:57: Power / sources off. Ion gauge & turbo pumps off.
Wednesday, June 02, 2021, 07:58: FS#5 purged.
Wednesday, June 02, 2021, 10:12: Venting.
|