Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
Test-Stand
Not logged in
List
Message ID:
53
Entry time:
Tuesday, March 06, 2012, 15:15
Author:
Pierre Bricault
Target/No.#:
Source:
HP-SIS
Station:
Module:
Target Oven W.O#:
Heat Shield W.O#:
Status:
Subject:
ISAC test stand two turbos replaced
Vac group has replaced the two turbo pumps.
ELOG V2.9.2-2455