Message ID: 702     Entry time: Thursday, December 20, 2018, 13:55
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-FEBIAD 
Station:  
Module:  
Target Oven W.O#: 395530-3 
Heat Shield W.O#: 42752-5 
Status:  
Subject: Holiday shut down. 

High winds caused a brief power outage that completely shutoff the ISAC test stand.

Locked out the power.

RGA checked & shutoff complete

Epics failure, computer restarted.

Thursday, December 20, 2018, 13:52: Shutting ISAC test stand down for the holidays. Checking Epics & operation first.

Thursday, December 20, 2018, 13:55: Roughing pump operating. Turbos left off. Backing valves opened. Epics whiteout on TS sources & optics.

TBHT, TGHT, Anode all brought to zero on epics, although still mostly white out.

Thursday, December 20, 2018, 14:14: Waterlines shut off at the main source & the TS is purged.

Note* Small leak directly on the fittings noticed on FS#5 right after the flow meter paddle wheel on the supply end.  All water flow was briefly halted during the power bump.

Epics still whited out.


Monday, January 07, 2019, 11:13: Fault report 11981 submitted.