Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 51     Entry time: Monday, March 05, 2012, 14:41
Author: Friedhelm Ames 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: vacuum and optics switched off 

vacuum and optics at teststand switched off to allow work on the water cooling system.

ELOG V2.9.2-2455