Message ID: 610     Entry time: Friday, October 13, 2017, 15:53
Author: Aaron Schmidt 
Target/No.#: SiC#37 
Source: HP-FEBIAD 
Station: ITE 
Module: TM4 
Target Oven W.O#: 39530-10 
Heat Shield W.O#: 41751-4 
Status: In progress 
Subject: Conditioning SiC#37 (ii) 

Previous short fixed. Grid clamp removed. Grid tack welded.

Friday, October 13, 2017, 15:49: Roughing.


By Anders

Friday, October 13, 2017, 16:10: TPs started

Friday, October 13, 2017, 16:20: Vacuum at 2.7E-7 T


Saturday, October 14, 2017, 06:37: Opened water supply to HS. 95/10 psi. Vacuum stable at 5.7E-7 T

Saturday, October 14, 2017, 06:42: Opened gas lines.

Saturday, October 14, 2017, 06:43: Started heater ramping to 580 / 290 A

Saturday, October 14, 2017, 06:45: BIAS/EZL/EE to 30 / 13.5 / 1.5 kV. EE current somewhat unstable around 500 uA - seems related to elevated BIAS current. Improving as BIAS current is gradually coming down.

Saturday, October 14, 2017, 15:19: TBHT to 310 A. Local readback 316 A


Sunday, October 15, 2017, 17:36 : Ramping down heaters.


Monday, October 16, 2017, 09:10: Sources off.

Monday, October 16, 2017, 09:13; IV4 Closed & Reset. FEBIAD Gas lines closed.

Monday, October 16, 2017, 09:15: RGA, Ion gauge, turbos off.

Monday, October 16, 2017, 10:40: Power off. Waterlines purged.

Monday, October 16, 2017, 10:43: Venting.

Attachment 1: SiC#37_(iii).docx  225 kB  Uploaded Tuesday, October 17, 2017, 12:26
Attachment 2: TS-2017-10-13-17-44.rga  415 kB  Uploaded Thursday, October 19, 2017, 12:04
Attachment 3: TS-2017-10-14-06-35.rga  1.548 MB  Uploaded Thursday, October 19, 2017, 12:04
Attachment 4: ER-580-310-30kV-m20.txt  3 kB  Uploaded Thursday, October 19, 2017, 12:04  | Show | Hide all
Attachment 5: ER-580-310-30kV-m23.txt  3 kB  Uploaded Thursday, October 19, 2017, 12:04  | Show | Hide all
Attachment 6: ER-580-310-30kV-m28.txt  3 kB  Uploaded Thursday, October 19, 2017, 12:04  | Show | Hide all
Attachment 7: ER-580-310-30kV-m40.txt  3 kB  Uploaded Thursday, October 19, 2017, 12:04  | Show | Hide all
Attachment 8: SiC#37_(ii).docx  1.898 MB  Uploaded Thursday, October 19, 2017, 12:17
Attachment 9: OMEGA_OM-DAQPRO-5300_19-Oct-17_11.17.50.dlp  3.676 MB  Uploaded Thursday, October 19, 2017, 12:18
Attachment 10: ITE-TM4-SiC#37-HP-FEBIAD_Test_Stand.docx  692 kB  Uploaded Thursday, October 19, 2017, 13:03