Message ID: 683     Entry time: Friday, August 31, 2018, 12:27
Author: Aaron Schmidt 
Target/No.#: nSiC#1 
Source: LP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#: 43044-1 
Heat Shield W.O#: 42752-4 
Status: In progress 
Subject: Conditioning nSiC#1 

Friday, August 31, 2018, 12:27: Roughing.

Friday, August 31, 2018, 13:19: Turbo pumps started.


Wednesday, September 05, 2018, 11:03: RGA on.

***NOTE***

P (kW) = A*V

TGHT at 475/7.84V, temp at 1550 C (3.72 kW - Max operating target heating power)

Note:  To condition the nanoSiC, it is better to keep TBHT at 0A and ramp up TGHT to 475A while monitoring the vacuum.  Then step up TBHT; any increase in vacuum would indicate a local evaporation of nanoSiC close to the ionizer. 

Settings as per John Wongs instructions and found in https://elog.triumf.ca/TIS/Evaporator_2/414

DO NOT EXCEED 400A


Thursday, September 06, 2018, 07:23: Waterlines opened. No response on RGA. Vacuum ok @ 5.5e-07T

Thursday, September 06, 2018, 07:25: Power/sources on.

Thursday, September 06, 2018, 07:30: Auto-ramping TGHT to 250 A @ 2A per min

Thursday, September 06, 2018, 07:38: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.

Thursday, September 06, 2018, 07:39: IV4 opened.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.6 3.85
 TBHT 26.8 3.12
 COIL + EE 25.4 4.99
 TGHT  25.5 5.64

Thursday, September 06, 2018, 07:43: Optics set.

Thursday, September 06, 2018, 08:25: Vacuum @ 1.05e-06T. TGHT @ 105 A. Rate increments based on Vacuum. Minor out gassing.

Thursday, September 06, 2018, 08:51: Vacuum @ 9.13e-07T. TGHT @ 150 A. Rate increments back to 2A.

Thursday, September 06, 2018, 10:13: Vacuum @ 6.62e-07T. TGHT @ 250 A / 2.171 V.

Thursday, September 06, 2018, 11:11: Auto-ramping TGHT to 400 A @ 2A per min.

Thursday, September 06, 2018, 11:51: Vacuum @ 1.05e-06T. TGHT @ 315 A. Rate increments based on Vacuum. Minor out gassing.

Thursday, September 06, 2018, 13:44: Auto-ramping TGHT to 450 A @ 2A per min. Vacuum @ 1.05e-06T. TGHT @ 358 A. Rate increments based on Vacuum. Out gassing.

Thursday, September 06, 2018, 14:34: Auto-ramping TGHT to 400 A @ 2A per min. Vacuum @ 1.05e-06T. TGHT @ 383 A. Rate increments based on Vacuum. Out gassing.


Friday, September 07, 2018, 06:24: Auto-ramping TGHT to 450 A @ 2A per min. TGHT VOL @ 4.200 V

Friday, September 07, 2018, 06:50: TGHT @ 450 A. Vacuum @ 9.13e-07T. TGHT VOL @ 4.933 V

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.6 3.85
 TBHT 26.8 3.12
 COIL + EE 25.5 4.99
 TGHT 27.0 5.64

Friday, September 07, 2018, 06:55: Auto-ramping TBHT to 150 A @ 2A per min.

Friday, September 07, 2018, 08:12: TBHT @ 150 A. Vacuum @ 9.57e-07T. TGHT VOL @ 1.470 V

Friday, September 07, 2018, 08:15: Auto-ramping TBHT to 230 A @ 2A per min.

Friday, September 07, 2018, 09:55: TBHT @ 230 A. Vacuum @ 9.97e-07T. TGHT VOL @ 1.520 V

Friday, September 07, 2018, 11:00: EZL to 13.5 kV

Friday, September 07, 2018, 15:12: Auto-cooling @ 2 A per min.


Monday, September 10, 2018, 08:15: RGA off.

Monday, September 10, 2018, 08:20:BIAS / EZL / EE @ 0. Sources off.

Monday, September 10, 2018, 08:23: IV4 closed / reset. Ion gauge off. Turbo pumps off.

Attachment 1: TGHT_to_450_A.docx  1.173 MB  Uploaded Friday, September 07, 2018, 07:58
Attachment 2: TBHT_to_230_A.docx  306 kB  Uploaded Friday, September 07, 2018, 14:13
Attachment 3: TS-2018-09-05-10-25.rga  1.456 MB  Uploaded Monday, September 10, 2018, 11:20
Attachment 4: TS-2018-09-07-10-41_-_Analog.rga  22 kB  Uploaded Monday, September 10, 2018, 11:20
Attachment 5: TS-2018-09-07-10-42.rga  50 kB  Uploaded Monday, September 10, 2018, 11:20
Attachment 6: TS-2018-09-07-11-45_-_Analog.rga  22 kB  Uploaded Monday, September 10, 2018, 11:20
Attachment 7: TS-2018-09-07-11-45.rga  59 kB  Uploaded Monday, September 10, 2018, 11:21
Attachment 8: TS-2018-09-07-13-05_-_Analog.rga  22 kB  Uploaded Monday, September 10, 2018, 11:21
Attachment 9: TS-2018-09-07-13-05.rga  2.047 MB  Uploaded Monday, September 10, 2018, 11:21
Attachment 10: TS-2018-09-10-08-16_-_Analog.rga  22 kB  Uploaded Monday, September 10, 2018, 11:21
Attachment 11: ER_450-230-30kV-m7-1.txt  3 kB  Uploaded Monday, September 10, 2018, 11:21  | Show | Hide all
Attachment 12: ER_450-230-30kV-m23-1.txt  3 kB  Uploaded Monday, September 10, 2018, 11:21  | Show | Hide all
Attachment 13: ER_450-230-30kV-m27-1.txt  3 kB  Uploaded Monday, September 10, 2018, 11:21  | Show | Hide all
Attachment 14: nSiC#1.docx  3.112 MB  Uploaded Wednesday, September 12, 2018, 14:43
Attachment 15: ITW-TM2-nSiC#1-LP-SIS_Test_Stand.docx  683 kB  Uploaded Thursday, September 13, 2018, 09:31