Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 564     Entry time: Wednesday, January 25, 2017, 09:48
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#: 41882-4 
Heat Shield W.O#: 41751-6 
Status: Done 
Subject: Out gas Heat Shield for Target cleaning test 

No EE. Insulators, gripper arms, and blank EE plate included

-New grounded 9 pins included in brackets

-TGHT included to out gas Heat shield


Wednesday, January 25, 2017, 09:45: Roughing

Wednesday, January 25, 2017, 10:04: Turbo pumps started.

Wednesday, January 25, 2017, 11:26: Ion gauge & RGA on.


Thursday, January 26, 2017, 08:25: RGA restarted. (Fatal communication error)

Thursday, January 26, 2017, 08:32: Water lines opened. No response on RGA. Vacuum stable @ 1.44e-07T.

Thursday, January 26, 2017, 08:35: Power/sources on.

Thursday, January 26, 2017, 08:37: Auto-ramping TGHT to 580A @ 2A per min. Vacuum @ 1.44e-07T.

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 23.5 4.02
 TBHT 23.3 3.13
 COIL + EE 23.3 5.18
 TGHT  23.4 5.78

Thursday, January 26, 2017, 13:11: RGA restarted. (Fatal communication error)

Thursday, January 26, 2017, 15:20: RGA restarted. (Fatal communication error)

Thursday, January 26, 2017, 15:26: RGA being shut down. (Fatal communication error)

Thursday, January 26, 2017, 15:31: RGA Restarted.


Friday, January 27, 2017, 08:06: RGA running ok.

  Device Temp
[C]
 Flow
[lpm]
 HS + MSP 30.2 4.06
 TBHT 21.2 3.14
 COIL + EE 21.4 5.11
 TGHT  23.3 5.78

Friday, January 27, 2017, 15:23: Auto-cooling started @ 2A per min.


Monday, January 30, 2017, 08:02: RGA off. Ion Gauge off. Turbo pumps off.

Monday, January 30, 2017, 08:05: Power/sources off. Water lines purged.

Monday, January 30, 2017, 09:09: Venting.

Attachment 1: OMEGA_OM-DAQPRO-5300_30-Jan-17_09.03.56.dlp  856 kB  Uploaded Monday, January 30, 2017, 10:30
Attachment 2: Target_cleaning_test_HS_out_gassing.docx  741 kB  Uploaded Monday, January 30, 2017, 10:30
Attachment 3: TS-2017-01-25-11-25.rga  94 kB  Uploaded Monday, January 30, 2017, 10:30
Attachment 4: TS-2017-01-26-08-25.rga  156 kB  Uploaded Monday, January 30, 2017, 10:30
Attachment 5: TS-2017-01-26-15-20.rga  19 kB  Uploaded Monday, January 30, 2017, 10:30
Attachment 6: TS-2017-01-26-15-30.rga  24 kB  Uploaded Monday, January 30, 2017, 10:30
Attachment 7: TS-2017-01-26-15-50.rga  2.682 MB  Uploaded Monday, January 30, 2017, 10:30
ELOG V2.9.2-2455