Message ID: 267     Entry time: Monday, January 14, 2013, 13:51
Author: Sebastian Raeder 
Target/No.#: RFQ empty 
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: In progress 
Subject: heating 

Started heating the target, now Silica sleevings are installed for wire insulation and the gap target -- repeller is now 0.6mm (was 0.25mm)