Message ID: 226     Entry time: Thursday, November 01, 2012, 14:57
Author: Aurelia Laxdal 
Target/No.#: TiC#3 
Source: LP-SIS 
Station: ITW 
Module: TM1 
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: TSH:TGHT readback stopped at 264.5A (for a higher setpoint) 

The TSH:TGHT stopped at 263.7A, but the setpoint is still ramping (now at 421A). The voltage is set correctly: have 6.238V setpoint and 4.386V readback. The reading on the Power Supply shows 418A. Through the window the target assembly looks at high temperature. The readback on Epics seems stuck. E-Fault for Controls 6389