Friday, November 25, 2016, 14:28: Roughing
Friday, November 25, 2016, 14:47: Turbos started
Friday, November 25, 2016, 14:56: Turbos at speed. Vacuum at 6.4E-6 T. RGA on
Monday, November 28, 2016, 08:45: Ion gauge & Turbo pumps off.
Monday, November 28, 2016, 15:02: Venting.
Monday, November 28, 2016, 15:32: Camera removed & bagged. |