Wednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos started
Wednesday, May 27, 2015, 15:00: Turbos at speed. Vacuum at 1.6e-5 T
Thursday, May 28, 2015, 08:13: Water opened on HS line. Vacuum stable at 4.3E-7 T. No response on RGA
Thursday, May 28, 2015, 08:17: Pumping on gas line.
Thursday, May 28, 2015, 08:37: Open gas lines.
Thursday, May 28, 2015, 08:50: Started auto-ramping to 500 / 250 A at 4/2 A/min.
Thursday, May 28, 2015, 08:55: ANODE 200 V, COIL 50 A
Thursday, May 28, 2015, 08:52: Opened IV4
Thursday, May 28, 2015, 09:01: BIAS/EZL/EE to 30 / 15 / 1.5 kV
Thursday, May 28, 2015, 10:56: Continue auto-ramping to 580/290 A at 2/2 A/min
Thursday, May 28, 2015, 13:01: Ramping TBHT to 300 A
Friday, May 29, 2015, 08:23: ANODE current limited. Increased limit to 125 uA
Friday, May 29, 2015, 08:25: TPS:Q1 and Q4 found to be off. Switched back on
Friday, May 29, 2015, 14:38: Starting cool down of source.
Friday, May 29, 2015, 15:34: Close IV4
Friday, May 29, 2015, 15:36: BIAS/EZL/EE, COIL and ANODE off
Monday, June 01, 2015, 08:23: Vacuum at 2.8E-7 T. BIAS/EZL to 30 / 15 kV
Monday, June 01, 2015, 08:37: BIAS/EZL to 40 / 20 kV
Monday, June 01, 2015, 09:05: BIAS/EZL to 50 / 25 kV
Monday, June 01, 2015, 09:17: BIAS/EZL to 40 / 20 kV (target hand over to RH)
Monday, June 01, 2015, 09:50: BIAS/EZL to 50 / 25 kV
Monday, June 01, 2015, 10:08: BIAS/EZL to 55 / 25 kV. No sparks so far.
Monday, June 01, 2015, 10:28: EZL to 30 kV
Monday, June 01, 2015, 11:03: 2 sparks last 30 min
Monday, June 01, 2015, 11:48: 5 BIAS sparks last 80 min
Monday, June 01, 2015, 11:49: BIAS /EZL/ EE off
Monday, June 01, 2015, 15:38: Stopped TP1B for out-gassing measurement tomorrow.
Tuesday, June 02, 2015, 10:28: Stopped TP1A.
Tuesday, June 02, 2015, 13:57: Water lines purged. GE line closed (not purged).
Wednesday, June 03, 2015, 08:25: Venting |