  Test-Stand  Not logged in ELOG logo
Message ID: 447     Entry time: Wednesday, May 27, 2015, 14:19
Author: Anders Mjos 
Target/No.#:  
Source: LP-FEBIAD 
Station:  
Module: TM2 
Target Oven W.O#:  
Heat Shield W.O#:  
Status: In progress 
Subject: Re-testing new TM2 Source Tray 

Wednesday, May 27, 2015, 14:19: Roughing

Wednesday, May 27, 2015, 14:50: Turbos started

Wednesday, May 27, 2015, 15:00: Turbos at speed. Vacuum at 1.6e-5 T


Thursday, May 28, 2015, 08:13: Water opened on HS line. Vacuum stable at 4.3E-7 T. No response on RGA

Thursday, May 28, 2015, 08:17: Pumping on gas line.

Thursday, May 28, 2015, 08:37: Open gas lines.

Thursday, May 28, 2015, 08:50: Started auto-ramping to 500 / 250 A at 4/2 A/min.

Thursday, May 28, 2015, 08:55: ANODE 200 V, COIL 50 A

Thursday, May 28, 2015, 08:52: Opened IV4

Thursday, May 28, 2015, 09:01: BIAS/EZL/EE to 30 / 15 / 1.5 kV

Thursday, May 28, 2015, 10:56: Continue auto-ramping to 580/290 A at 2/2 A/min

Thursday, May 28, 2015, 13:01: Ramping TBHT to 300 A


Friday, May 29, 2015, 08:23: ANODE current limited. Increased limit to 125 uA

Friday, May 29, 2015, 08:25: TPS:Q1 and Q4 found to be off. Switched back on

Friday, May 29, 2015, 14:38: Starting cool down of source.

Friday, May 29, 2015, 15:34: Close IV4

Friday, May 29, 2015, 15:36: BIAS/EZL/EE, COIL and ANODE off


Monday, June 01, 2015, 08:23: Vacuum at 2.8E-7 T. BIAS/EZL to 30  / 15 kV

Monday, June 01, 2015, 08:37: BIAS/EZL to 40  / 20 kV

Monday, June 01, 2015, 09:05: BIAS/EZL to 50  / 25 kV

Monday, June 01, 2015, 09:17: BIAS/EZL to 40  / 20 kV (target hand over to RH)

Monday, June 01, 2015, 09:50: BIAS/EZL to 50  / 25 kV

Monday, June 01, 2015, 10:08: BIAS/EZL to 55  / 25 kV. No sparks so far.

Monday, June 01, 2015, 10:28: EZL to 30 kV

Monday, June 01, 2015, 11:03: 2 sparks last 30 min

Monday, June 01, 2015, 11:48: 5 BIAS sparks last 80 min 

Monday, June 01, 2015, 11:49: BIAS /EZL/ EE off

Monday, June 01, 2015, 15:38: Stopped TP1B for out-gassing measurement tomorrow.


Tuesday, June 02, 2015, 10:28: Stopped TP1A.

Tuesday, June 02, 2015, 13:57: Water lines purged. GE line closed (not purged).


Wednesday, June 03, 2015, 08:25: Venting

Attachment 1: TM2_Source_Tray_Test_FEBIAD_Target_Test_4.docx  4.003 MB  Uploaded Monday, June 01, 2015, 16:41
Attachment 2: TM2_Source_Tray_in_Test_Stand_-_Test_Results.pdf  370 kB  Uploaded Monday, June 04, 2018, 14:38  | Show | Hide all