TSG:BIAS unplugged and controls pigtail (made by Ray) added in order to connect controls cable to TCS:BIAS, which is now installed in the same rack.
Basic controls testing done without turning on the power supply, controls max values scaled to 75kV, 5mA.
In process of grounding all features inside the faraday cage. New grounding will be marked with a label for easy identification later.
NOTE: we should get together in January to discuss test stand wiring, since I discovered another burned up connection (see next elog entry, #823).
Tuesday, December 01, 2020, 16:47 :
Grounding of all feedthroughs on the service cap complete and continuity checked.
Removed gas line with Fernando's approval, to make more space for our feedthrough.
Awaiting nylon insulator to proceed. |