Wednesday, February 12, 2014, 08:55: Stopped turbos
Wednesday, February 12, 2014, 11:28: Venting
Installed one sample. No cleaning. Connection tabs wiped with alcohol to prevent making the source tray dirty.
Wednesday, February 12, 2014, 13:17: Started roughing
Wednesday, February 12, 2014, 13:38: Started turbos
Wednesday, February 12, 2014, 13:42: TP1B at speed. Vacuum at 5.4E-5 T
Wednesday, February 12, 2014, 13:46: TP1A at speed. Vacuum at 1.9E-5 T
Wednesday, February 12, 2014, 13:48: Vacuum at 1.7E-5 T
EPICS white-out due to ER0 activity. Graham assisted in getting the system back up.
Wednesday, February 12, 2014, 15:16 : Vacuum at 4.8E-6 T
Friday, February 27, 2014
Leak checked doors. No leak found.
Friday, February 28, 2014, 08:42: Opened up water supply. Major vacuum response.
Friday, February 28, 2014, 08:42: Stopped turbos
Friday, February 28, 2014, 10:19: Venting
Removed cleaning sample.
Friday, February 28, 2014, 11:38: Pumping down empty chamber
Friday, February 28, 2014, 11:56 : Starting Turbos
Friday, February 28, 2014, 12:05 : Turbos at speed
Friday, February 28, 2014, 12:06: Vacuum at 1.7E-5 T
Monday, March 03, 2014, 09:28 : Vacuum leak on waterline (HS) still present. Stopping turbos for investigation.
Tuesday, March 04, 2014, 09:58: Venting
Replaced Cu-gaskets with Parker SST gaskets.
Tuesday, March 04, 2014, 11:03: Roughing
Tuesday, March 04, 2014, 11:26: Starting Turbos
Tuesday, March 04, 2014, 11:35: Turbos at speed. (TP1A timed out once)
Tuesday, March 04, 2014, 11:36: Vacuum at 1.6E-5 T
Thursday, March 06, 2014, 08:21: Vacuum leak no waterline (HS) still present. Stopping turbos. |