Wednesday, July 22, 2024, 11:41 - target installed
Wednesday, July 22, 2024, 13:31 - pumping down
Wednesday, July 22, 2024, 14:21 - turbo pumps on
Wednesday, July 22, 2024, 16:35 - water cooling on - no pressure increase
Tuesday, July 23, 2024, 09:42 - TGHT/TBHT ramping up to 580/230A at 1A/15s.
Tuesday, July 23, 2024, 09:55 increasing ramp rate to 1.4A/10s
Tuesday, July 23, 2024, 11:17 increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV.
Tuesday, July 23, 2024, 11:44 sparks more frequent than expected. FC0 current at 1.17e-8A
Tuesday, July 23, 2024, 11:48 decreasing bias to 29.5k until spark frequency reduces
Tuesday, July 23, 2024, 13:23 once back up to 30kV, mass scan was run
Tuesday, July 23, 2024, 13:23 bias ee ezl were dropped to zero. reservoir heater was switched to 5A. the vacuum jumped up and shut down TGHT TBHT. heater turned off. TGHT TBHT restarted and reheated.
Tuesday, July 23, 2024, 13:24 reservoir heater turned to 2A while monitoring the vacuum. then to 3A as it appeared to be stable. at 4A the vacuum began slowly increasing.
Tuesday, July 23, 2024, 13:30 4A vacuum plateaus and recovering
Tuesday, July 23, 2024, 14:30 once reservoir heater is at 5A with a stable vacuum, increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV
Tuesday, July 23, 2024, 14:50 running mass scan
Tuesday, July 23, 2024, 15:20 dropping BIAS / EE / EZL to zero
Tuesday, July 23, 2024, 15:40 turning off reservoir heater
Tuesday, July 23, 2024, 15:51 increasing BIAS EE EZL to 30 -1.5 13 kV.
Tuesday, July 23, 2024, 16:05 running mass scan
Tuesday, July 23, 2024, 17:00 cooling target. TGHT TBHT to 0 at -1A/30s
Wednesday, July 24, 2024, 09:24 purged water lines and turned off TP1A and TP1B, TP6 and TP2 --- waiting for TP to slow down. (will be venting beam line to change window)
|