Message ID: 719     Entry time: Friday, April 26, 2019, 13:45
Author: Aaron Schmidt 
Target/No.#: Ta#58 
Source: LP-SIS 
Station: ITE 
Module: TM2 
Target Oven W.O#: 43044-4 
Heat Shield W.O#: 42972-7 
Status: In progress 
Subject: Conditioning Ta#58 HS 

Friday, April 26, 2019, 13:43: Roughing.

Friday, April 26, 2019, 14:12: Turbo pumps on.

Friday, April 26, 2019, 14:58: RGA on.


Monday, May 06, 2019, 07:05: RGA restarted.

Monday, May 06, 2019, 07:10: Waterlines opened. Vacuum ok @ 5.13e-07T. No response on the RGA.

Monday, May 06, 2019, 07:16: Power / sources on.

Monday, May 06, 2019, 07:20: Optics set.

Monday, May 06, 2019, 07:23: Auto-ramping TGHT / TBHT to 575 / 200 A @ 2A per min.

Monday, May 06, 2019, 07:28: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.

Monday, May 06, 2019, 07:39: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Monday, May 06, 2019, 07:57: Reset DaqPro. Ref data sheet.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.8 5.52
 TBHT 25.7

7.93

 COIL + EE 25.6 1.92
 TGHT  25.70 6.29

 Monday, May 06, 2019, 09:07: TBHT at 200A ok. Halt auto ramp. Set TBHT. Cont'd auto-ramping TGHT / TBHT to 575 / 230 A @ 2A per min.

Monday, May 06, 2019, 09:47: RGA restarted. Updates?

RGA timed out around 10:30.

Monday, May 06, 2019, 11:00: RGA error. Initial communications errors, would not connect. Restarted the computer and allowed updates to take effect. EM7 error displayed.

Monday, May 06, 2019, 11:27: RGA restarted.

Monday, May 06, 2019, 13:10: EZL to 14.3 kV

Monday, May 06, 2019, 14:48 :

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.4 7.78
 TBHT 27.0

10.30

 COIL + EE 26.8 3.01
 TGHT  27.1 7.09

 


Tuesday, May 07, 2019, 07:26: Noticed a discrepancy on the mass scan. The mass peaks appear to have moved further along the mass / q. They are identical to what we used to see on previous scans, just further down the line. A calibration / scaling may be appropriate.

Element Mass Mass/q Beam Current
Lithium 6.941 7.508 1.04401e-10
Sodium 22.9897 27.556 9.85687e-10
Mass 27 (Al) 26.9815 32.2943 2.97834e-08
Potassium 39.0983 46.3293 7.49146e-10
  (peak 2) 47.6191 1.568e-10
Rubidium 85.4678 100.355 2.79327e-10
  (peak 2) 102.904 1.04431e-10
Cesium 132.9055 156.6 8.6103e-10
  (peak 2) 162.532 2.4408e-10

The discrepancy appears to get larger the further we move along the masses.

Tuesday, May 07, 2019, 07:39: Auto-cooling @ 2 A per min to TGHT / TBHT @ 350 / 0 A. Check around 9:20am.

Tuesday, May 07, 2019, 09:30: Auto-cooled to TGHT / TBHT @ 350 / 0 A.

Tuesday, May 07, 2019, 11:06: Auto-cooling @ 2A per min.

Tuesday, May 07, 2019, 11:09: Auto-cooling @ 4A per min.

Tuesday, May 07, 2019, 12:51: Power / sources off. IV4 closed / reset. RGA off.

Tuesday, May 07, 2019, 12:54: Turbo pumps off.

Tuesday, May 07, 2019, 14:00: Venting.

Attachment 1: Ta#58.docx  1.864 MB  Uploaded Tuesday, May 14, 2019, 08:14
Attachment 2: TS-2019-04-26-14-56.rga  4.897 MB  Uploaded Tuesday, May 14, 2019, 08:14
Attachment 3: TS-2019-05-03-11-21.rga  2.058 MB  Uploaded Tuesday, May 14, 2019, 08:15
Attachment 4: TS-2019-05-06-07-05.rga  93 kB  Uploaded Tuesday, May 14, 2019, 08:15
Attachment 5: TS-2019-05-06-09-47.rga  38 kB  Uploaded Tuesday, May 14, 2019, 08:15
Attachment 6: TS-2019-05-06-10-57.rga  805 kB  Uploaded Tuesday, May 14, 2019, 08:15
Attachment 7: ITE-TM2-Ta#58-LP-SIS_Test_Stand.docx  646 kB  Uploaded Friday, August 09, 2019, 15:18