Replacement Ta target for the previous one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing.
Friday, June 25, 2021, 11:55: TP1B started.
Friday, June 25, 2021, 12:00: TP1B on. TP1 A started.
Friday, June 25, 2021, 12:08: IG1 on.
Friday, June 25, 2021, 12:23: Vacuum @ 1.06E-05T. Open waterline FS#5.
Friday, June 25, 2021, 12:26: Vacuum @ 9.97E-06T. OK.
Friday, June 25, 2021, 12:30: Power / sources PS on.
Friday, June 25, 2021, 12:34: Full check for remote use. IV4 open (OK)
Vacuum @ 6.70e-06T
TGHT / TBHT @ 10 / 10 A
BIAS / EE / EZL @ 1 / -0.1 / 0.5 kV.
Ready for operation.
Friday, June 25, 2021, 12:39: All back to 0 Kv / 0 A. Wait for vacuum stabilization.
Sunday, June 27, 2021, 03:55: Auto-ramping TGHT / TBHT to 500 / 150 A @ 2 A per min.
Sunday, June 27, 2021, 04:04: BIAS / EE / EZL @ 20 / -1.0 / 10 kV.
Sunday, June 27, 2021, 09:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Sunday, June 27, 2021, 10:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Sunday, June 27, 2021, 10:16: TGHT / TBHT @ 580 / 230 A. Vacuum @ 1.25e-06T.
Sunday, June 27, 2021, 11:20: Mass & wire scans complete. Vacuum @ 1.14e-06T. Auto-cooling @ 2 A per min.
Sunday, June 27, 2021, 15:07: BIAS / EE / EZL @ 0 kV. TGHT still cooling.
Monday, June 28, 2021, 06:17: IV4 closed (Needs reset). Sources, IG1, turbo pumps, off
Monday, June 28, 2021, 08:22: Power off. IV4 reset. Venting. |