Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 595     Entry time: Thursday, July 06, 2017, 13:16
Author: Aaron Schmidt 
Target/No.#: Ta#55 
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: 42218-11 
Heat Shield W.O#: 42738-2 
Status: In progress 
Subject: Conditioning Ta spare for Ta#52 

Thursday, July 06, 2017, 13:56: Roughing.

Thursday, July 06, 2017, 14:25: Turbo  pumps started.

Thursday, July 06, 2017, 14:30: Ion gauge on. RGA Started


Friday, July 07, 2017, 07:29: Waterlines opened. No response on RGA. Vacuum ok @ 1.97e-07T

Friday, July 07, 2017, 07:33: Power/sources on.

Friday, July 07, 2017, 07:39: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .

Friday, July 07, 2017, 07:40: IV4 Opened.

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.0 3.78
 TBHT 26.5 3.02
 COIL + EE 25.8 4.86
 TGHT  26.0 5.47

Friday, July 07, 2017, 07:42: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Friday, July 07, 2017, 07:45: Optics reset.

Friday, July 07, 2017, 14:28: Anode brought up to 5, 10 15, and 50 V using FEBIAD controls. No Current detected.

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 36.5 3.75
 TBHT 27.6 3.04
 COIL + EE 26.5 4.87
 TGHT  28.7 5.54

 


Saturday, July 08, 2017, 08:58: Ramping down heaters


Monday, July 10, 2017, 08:15: Power/Sources off. *BIAS 30 to 0 kV due to shut off. EE & EZL Brought to 0.

Monday, July 10, 2017, 08:23: Water lines purged. IV4 Closed

Monday, July 10, 2017, 08:27: IV4 reset.

Monday, July 10, 2017, 09:40: RGA off. Ion Gauge off. Turbos off.

Monday, July 10, 2017, 11:02: Venting.

Attachment 1: ER-580-200-30kV-m23.txt  3 kB  Uploaded Monday, July 10, 2017, 10:42  | Show | Hide all
Attachment 2: ER-580-200-30kV-m38.txt  3 kB  Uploaded Monday, July 10, 2017, 10:42  | Show | Hide all
Attachment 3: ER-580-200-30kV-m39.txt  3 kB  Uploaded Monday, July 10, 2017, 10:42  | Show | Hide all
Attachment 4: ER-580-200-30kV-m133.txt  3 kB  Uploaded Monday, July 10, 2017, 10:42  | Show | Hide all
Attachment 5: TS-2017-07-06-14-30.rga  619 kB  Uploaded Monday, July 10, 2017, 10:43
Attachment 6: TS-2017-07-07-10-10.rga  34 kB  Uploaded Monday, July 10, 2017, 10:43
Attachment 7: TS-2017-07-07-12-50.rga  2.097 MB  Uploaded Monday, July 10, 2017, 10:43
Attachment 8: Spare_Ta_LP_SIS.docx  1.850 MB  Uploaded Monday, July 10, 2017, 11:31
Attachment 9: OMEGA_OM-DAQPRO-5300_10-Jul-17_10.27.49.dlp  3.669 MB  Uploaded Monday, July 10, 2017, 11:31
Attachment 10: ITE-TM4-Ta#(Spare)-LP-SIS_Test_Stand.docx  700 kB  Uploaded Monday, July 10, 2017, 11:49
ELOG V2.9.2-2455