U-Loop installed on FS#5
Tuesday, November 10, 2020, 12:13: Roughing.
Tuesday, November 10, 2020, 12:57: TP1B on
TS Tripped Thursday am. Leak noted Thursday am remotely. Control room noted water in the chamber.
Friday, November 13, 2020, 06:40: Confirmed. Cleanup
Friday, November 13, 2020, 08:30: FS#4 TBHT (A). Visible water dripping out from the water block. Line (A) removed.
Friday, November 13, 2020, 10:25 Set up Fan. Clean.
Removed, cleaned & leak checked (A) & (B).
(A) leaks at seat and solder
(B) OK.
Closed ballast on RP1. Lines stable.
Friday, November 13, 2020, 12:51: TS chamber to continue to air dry over the weekend.
Monday, November 16, 2020, 09:00: TBHT (B) line is installed. (A) blanked off. Roughing BV1A open.
Monday, November 16, 2020, 09:07: BV1B opened.
Monday, November 16, 2020, 11:41: Vacuum @ 1.965T. Open RP1 ballast. W/ Filter cap
Monday, November 16, 2020, 11:49: Vacuum @ 1.170 and dropping.
Wednesday, November 18, 2020, 10:16: Vacuum At 0.201T. Venting.
TBHT line (A) repaired and leak checked. Installed in TS. HS w/ horizontal tube oven installed for out gassing.
HS: 44378-1 (SIS Config)
Oven: 43044-13
Wednesday, November 18, 2020, 14:02: Roughing.
Wednesday, November 18, 2020, 14:45: TP1B on.
Wednesday, November 18, 2020, 15:54: TP1A on.
Wednesday, November 18, 2020, 16:03: IG1 on.
Wednesday, November 18, 2020, 19:05: Power bump shut down TS. Controls in whiteout. Restart attempt
Wednesday, November 18, 2020, 19:29: TP1B on.
Wednesday, November 18, 2020, 20:22: TP1A on.
Wednesday, November 18, 2020, 20:31: IG1 on
Thursday, November 19, 2020, 11:57: Vacuum @ 3.32e-06T.
Thursday, November 19, 2020, 11:58: Opened FS#2, FS#3 & FS#5. Vacuum ok
Thursday, November 19, 2020, 12:01: Opened FS#4..
Thursday, November 19, 2020, 12:03: Vacuum ok @ 3.32e-06T.
Thursday, November 19, 2020, 12:07: Power / sources on.
Thursday, November 19, 2020, 12:08: Restarted IOC/PLC.
Thursday, November 19, 2020, 12:13: Auto-ramping TGHT to 200 A @ 1 A per min.
Thursday, November 19, 2020, 15:58: Auto-ramping TGHT to 350 A @ 1 A per min.
Thursday, November 19, 2020, 17:35: Bypass TMS:PV1 open/close. leave as is. remove Bypasses.
Friday, November 20, 2020, 07:35: Auto-ramping TGHT to 580 A @ 1 A per min.
Saturday, November 21, 2020, 12:32: Check. Vacuum @ 4.13e-06T . TGHT @ 494 A.
Monday, November 23, 2020, 09:53: Check. Vacuum @ 2.97e-06T . TGHT @ 580 A.
On the beamline side:
https://elog.triumf.ca/TIS/Test-Stand/821
Monday, November 23, 2020, 14:03: Check. Vacuum @ 2.73e-06T . TGHT @ 580 A.
Tuesday, November 24, 2020, 12:58: Auto-cooling @ 0.5 A per min.
Wednesday, November 25, 2020, 09:30: Sources/power off. IG1 & Turbo pumps off. |