Message ID: 430     Entry time: Thursday, February 26, 2015, 10:11
Author: Anders Mjos 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: In progress 
Subject: Installing FEBIAD test target for emittance rig tests 

Thursday, February 26, 2015, 10:11: Stopped turbos

Thursday, February 26, 2015, 11:23: Venting

Thursday, February 26, 2015, 11:39: Stopped venting at 550 T. To be continued later

Thursday, February 26, 2015, 15:46: Started roughing. Doors needed a push.

Thursday, February 26, 2015, 16:23: Started turbos

Thursday, February 26, 2015, 16:39: Turbos at speed. Vacuum at 5.2E-6 T


Friday, February 27, 2015, 09:22: Water on. Vacuum stable at 1.6E-7 T

Friday, February 27, 2015, 09:30: RGA on

Friday, February 27, 2015, 10:32: HV on. Ramping to TBHT 250 A at 4A/min

Friday, February 27, 2015, 16:38: Source off


Monday, March 02, 2015, 14:00: Gas lines purged. Opening.

Fixed a air leak on one of the Swagelok joints.

Monday, March 02, 2015, 14:47: RGA with Ne Open

Total 3.5E0-7T, IG1 9.7E-8 T
20Ne 6.3E-10 T
22Ne 1.7E-10 T

Mass 18 1.6E-7 T


Tuesday, March 03, 2015, 09:58: Started heating

Tuesday, March 03, 2015, 16:33: Finished ER testing. First ER scans made on mass 4.


Wednesday, March 04, 2015, 14:32: TSG:CB1 found off. Switched back on.

Emittance vs EE voltage studied


Thursday, March 05, 2015, 09:02 : Ramping source back up to 285 A (TBHT)

Thursday, March 05, 2015, 15:12: The following devices were found off

TMS:Q6
TMSQ1
TPS:CBC


Friday, March 06, 2015, 08:51: Found TPS:Q3 off. Switched back on.

Friday, March 06, 2015, 10:51 : Ramping down source

Friday, March 06, 2015, 12:08 : Source and HV off. Closed IV.

Graham will be doing some controls work


Monday, March 09, 2015, 09:16: Ramping up the source. IV opened

Monday, March 09, 2015, 09:23: Source biased and optics tune recovered.

Monday, March 09, 2015, 16:51: Opened Ne leak


Wednesday, March 11, 2015, 09:06: Found TMS:Q6/Q1 and TPS:Q4 off. Switched back on.


Thursday, March 12, 2015, 16:57: Finished more ER data taking. See attached spreadsheet


Friday, March 13, 2015, 08:41 : TMS:CBC1, TMS:CB5, TMS:Q2, TPS:Q3, TPS:CB2 found off. Switched back on.


Monday, March 16, 2015, 09:13: TMS:CBC1, TMS:Q3, Q2, TMS:VCB1,CB1 found off.

Monday, March 16, 2015, 09:14: Bias off. Stopping turbos

Monday, March 16, 2015, 15:26: Venting

Attachment 1: ER_Test_w_FEBIAD.docx  1.224 MB  Uploaded Tuesday, March 03, 2015, 16:33
Attachment 2: FebiadTS.xls  24 kB  Uploaded Thursday, March 12, 2015, 17:57
ELOG V2.9.2-2455