Sam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51 FS#5 on (HS bypassed with a water loop)
Wednesday, November 23, 2022, 13:55: TSG:IG1 Bypass on
Wednesday, November 23, 2022, 14:03: Signage up. Main breaker on.
Wednesday, November 23, 2022, 14:07: FS#5 off & purged. Not needed.
Wednesday, November 23, 2022, 15:01: measured magnetic field of coil at 8A
end test
Monday, November 28, 2022, 11:45: start test set up the hall probe with the jig to move it on the table and centered the hall probe in the magnet. signage up Main breaker on
Monday, November 28, 2022, 13:17: start collecting data at 8 amps
Monday, November 28, 2022, 16:11: end test
Tuesday, November 29, 2022, 10:50:Signage up Main Breaker on Testing started; with current of 8 amps
Taking measurements of temperature at 8A 9A and 10A
Tuesday, November 29, 2022, 15:25 : system locked out and took out magnet
end test
Wednesday, November 30, 2022, 12:40: Test started. Breaker on. signage up. put in low profile magnet with wire ties to keep coils together.
taking data with 8A of current
Wednesday, November 30, 2022, 16:25: end of test power supply off breaker off
|