Friday, November 12, 2021, 13:01: BV1B open. Roughing.
Friday, November 12, 2021, 13:05: BV1A open.
Friday, November 12, 2021, 13:34: TP1B on.
Friday, November 12, 2021, 13:42: TP1A on.
Friday, November 12, 2021, 13:50 : IG1 on. TMS:TP2 trip. Fast reset. OK. Vacuum @ 3.54e-05T. Waterline FS#5 open.
Friday, November 12, 2021, 13:53: Vacuum @ 2.12e-05T. Ok
Friday, November 12, 2021, 13:54: Power / sources on.
Monday, November 15, 2021, 09:00: Auto-ramping TGHT / TBHT to 350 / 150 @ 3 A per min. IV4 open. TMS:VCB1 not functioning. Controls group notified.
Monday, November 15, 2021, 09:40: Optics set minus TMS:VCB1
Monday, November 15, 2021, 11:16: Auto-ramping TGHT / TBHT to 580 / 230 @ 2 A per min.
Monday, November 15, 2021, 11:34: TMS:VCB1 fixed. Optics set ok.
Monday, November 15, 2021, 11:43: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, November 15, 2021, 15:44: Mass & wire scans complete. OK. HV to 0 kV. IV4 closed.
Tuesday, November 16, 2021, 06:16: Auto-cooling TGHT / TBHT @ 2A per min.
Tuesday, November 16, 2021, 11:13: Power / sources off.
Tuesday, November 16, 2021, 11:14: IG1. Turbo pumps off.
Tuesday, November 16, 2021, 12:12: Venting. |